Upload
arezzori
View
267
Download
0
Tags:
Embed Size (px)
Citation preview
| Apresentação do Roadshow
1
Arezzo&Co Investor DayArezzo&Co Investor DayArezzo&Co Investor DayArezzo&Co Investor DaySourcing and LogisticsSourcing and LogisticsSourcing and LogisticsSourcing and Logistics
Márcio Jung,Sourcing Director
| Shoes Market
1. Global Industry
Note:DDP: delivered duty paidFOB: free on board
BRAZILLead time: 40 daysProduction (pairs): 894 miCost (w/ taxes ): US$ 19/pairCost (w/ taxes ): US$ 29/pair
ITALYLead time: 70 daysProduction (pairs): 202 miCost (FOB): US$ 26/pairCost (DDP): US$ 38/pair INDIA
Lead time: 160 daysProduction (pairs): 2.000 miCost (FOB): US$ 15/pairCost (DDP): US$ 23/pair
CHINALead time: 120 to 150 daysProduction (pairs): 10.000 miCost (FOB): US$ 16/pairCost (DDP): US$ 40/pair
VIETNALead time: 120 to 150 daysProduction (pairs): 682 miCost (FOB): US$ 15/pairCost (DDP): US$ 23/pair
Brazil is a major shoe producer with a competitive c ost of women leather shoes for the domestic market
1
Source: Abilcalçados, Assintecal, Arezzo&Co3
2. Brazilian Industry
Brazilian Shoes Production (2010)
4
South Region South Region
Vale dos Sinos(RS)
Production - # pairs (million) 302 ~187
Export - # pairs (million) 32 ~20
Export - (million USD) 733 ~455
Jobs (thousand) 130 ~81
Companies 3.400 ~2.000
Southeast RegionSoutheast
Region
Production - # pairs (million) 189
Export - # pairs (million) 9
Export - (million USD) 152
Jobs (thousand) 90
Companies 4.000
Northeast RegionNortheast
Region
Production - # pairs (million) 399
Export - # pairs (million) 102
Export - (million USD) 595
Jobs (thousand) 126
Companies 627
Main producer States
� Expertise in the production of women leather shoes
894million pairs
Other producer regions:
� Expertise in the production of sports shoes� Expertise in the production of men leather shoes
1Arezzo&Co mainly sources its products in the South of Brazil, the world’s largest footwear manufacturer cluster, specialized i n women leather shoes
Source: Abilcalçados, Assintecal, Arezzo&Co
Other667% Sports
8810%
Leather25328%
Rubber48755%
| Sourcing and Outsourcing Model
Constant involvement of Sourcing, R&D e Commercial departments ensure control of the entire chain
1. Sourcing and Logistics Cycle
6
Solid sourcing model
� Knowledge of the cost structure of each SKU
� Flexibility to supply our product at multiple factories
and to maintain tight quality control
� Integration between engineering, R&D and Supply
Chain
Ability to keep up with new trends
� Sourcing of a large variety of SKU’s
� Specialized manufactures
Fast response to the market
� Agility in the development, production and delivery
of new products to the stores
Distribution Center
Transportation
Delivery at the stores
Production
Engineering
2
Source: Arezzo&Co
Outsourcing-based model
22. Sourcing and Supply Chain Cycle
2,000Manufacturers
in Vale dos Sinos
60Active
manufacturers
100Accredited
manufacturers
Focus on engineering, R&D
and process auditing to assure
the quality
Sourcing model based on outsourcing, with constant monitoring of sourcing options
Source: Arezzo&Co
7
Management of the entire supply chain
7 a 9Collections
Over 40 leather suppliers
Strong quality control and terms of the productive
process
Over 90 manufacturers
Other various inputs - jute, rubber,
synthetics, metal, etc
■ Low use of capital
■ Benefit from strong oscillation of the production
demand
■ Grow potential
Continuables Various SKUs
3. Strategic Inventories
■ Greater stock efficiency and better production costs
■ Products that repeat along various collections
■ Arezzo Classic and Schutz Essential
3% to 5% -continuable¹
30% to 35% -repetition of the model
65% to 70% -repetition of the construction (line)
Note:(1) Repetition of the same SKU
2
Formação de estoques antecipados
■ Idle time at the factories
■ Opportunity to obtain discounts
■ Good results in the pilot projects
Suede Velvet Varnish Animal print
Lines
Colors
Materials
Models
Strategic inventories to reduce stock-out and obtai n economies of scale
0
200.000
400.000
600.000
800.000
nov/10 jan/11 mar/11 may/11 jul/11 sep/11 nov/11
Production Idleness
Anticipation for the Winter Collection
Anticipation for the Winter Collection
Source: Arezzo&Co
8
| Logistics and distribution
2. Distribution center
Simultaneous consolidation
and distribution in national scale
Located near the production chain and the South and
Southeast regions
3
� Receiving: 100,000 units / day
� Stocking: 100,000 units / day
� Picking: 150,000 units / day
� Distribution: 200,000 units / day
� Replacement of the milky run strategy