Tonight’s Agenda

1/12/2017

• Introductions • Review history and purpose of Windjammer Park Integration Plan• Update on current design phase•Q & A • Feedback opportunities

Page 3: Windjammer Park Phase 1 Design Open House

3

Windjammer Park: Why Now?

• Windjammer Park is a resource and asset to Oak Harbor• Building the Clean Water Facility in

the park presented an opportunity to develop a long-term plan• Working to create citywide asset

for Oak Harbor• Serving as a catalyst for other

improvements in the City

1/12/2017

Page 4: Windjammer Park Phase 1 Design Open House

4

History • Windjammer Park

Integration Plan (WPIP) took shape in 2016• Input from: • Community advisory

group• Public

• City Council adopted plan in mid-2016• WPIP builds off of

previous plans and existing reports

1/12/2017

Page 5: Windjammer Park Phase 1 Design Open House

5

Community Feedback Incorporated in Plan• Waterfront is a resource and asset• Family-friendly elements should be prioritized• Spaces need to be flexible to maximize the number of activities• Remove the existing RV park• Views of the waterfront are important• Remove the ballfields (as long as they are replaced within Oak Harbor)

1/12/2017

Page 6: Windjammer Park Phase 1 Design Open House

6

Current Phase• Initial phase of design and

construction on Windjammer Park • Partial funding is already

secured as mitigation for Clean Water Facility construction• Subsequent phases as

funding is available

1/12/2017

Page 7: Windjammer Park Phase 1 Design Open House

7

• Mitigation for Clean Water Facility construction• Grant funds for splash park• Windjammer Park funds• Park impact fees• Recreation and Conservation Grant (RCO)• Real estate excise tax• Other sources: grants, civic organizations

Implementing the Plan: Funding

3/8/16

Page 8: Windjammer Park Phase 1 Design Open House

8

Schedule

1/12/2017

Page 9: Windjammer Park Phase 1 Design Open House

9

Inspiration for the Future Windjammer Park

1/12/17

Page 10: Windjammer Park Phase 1 Design Open House

10

• Type and quality of materials

• Programming of park areas, for example:• How do you currently and hope to use the kitchens?• What are your parking, power, and lighting needs? • How wide do walkways need to be?

Next Steps: Getting into the Details

3/8/16

Page 11: Windjammer Park Phase 1 Design Open House

11

• This phase of Windjammer Park design includes:• Kitchens• Restrooms• Nature play area• Plaza• Splash Park• Park furnishings (includes benches, lighting, trash receptacles, etc.)• Paths/walkways• Wind shelters

Next Steps: Getting into the Details

3/8/16

Page 12: Windjammer Park Phase 1 Design Open House

12

Questions?

1/12/2017

Page 13: Windjammer Park Phase 1 Design Open House

13

Feedback Opportunities Tonight

1. Prioritize park elements within initial phase

2. Give feedback on character inspiration images for eight park elements

3. Share how you currently and hope to use the park

1/12/2017

The future Clean Water Facility in Windjammer Park