Progress Report on Capacity Development Consultation

16.06.11Consultation for Biro Perekonomian dan SDA Setda Pemprov DIY

Policy Model - IDM

1

Consultation DesignBased on Principles of OwnershipTheme Administration Reform and Good Governance Scope Regional Economic DevelopmentConsultant-Client relationship:Education, Accountability, Transformation and Connections.Area of support include Organizational capacity, Quality policy, and Networking Consultation Phase:Assessment ImplementationEvaluation and Reporting

Asssessment Implementation Evaluation and Reporting

2

AgreementsAgreement on ResultCWG Policy Model Policy Paper SOP CWG Integrated Data Management Intranet Database Master PlanCWG Open Consultation Mon Ev , Survey, Discussion

Agreement on ObjectivesEquipment subsidy Program support IDM hardwares Media info

3

CWG Policy Model

4

Generic Tools

5

BP

BP

BP

BP

6

Sector Specific ? (e.g Environment)

7

KRB IKRB IIKRB III/ terdampak langsungKawasan bebas Hunian, mjd Hutan Lindung/TNGMKawasan Hunian sangat terbatasKRB III

8

PeriodeRehabilitasi &RekonstruksiPemulihan Dini(Early Recovery)

PeriodeDaruratLanjutan/PenuntasanPeriodeDaruratTerkendaliPRA-BENCANASAAT KEJADIAN BENCANAPASCA-BENCANA

PeriodePanik

Masa Tanggap Darurat

Situasi tidak terdapat potensi bencana

Situasi terdapat potensi bencana

BENCANAPenanggulangan bencana pada tahap pasca bencana Saat ini Transisi

9

Insya Allah Juni 2011Tanggap darurat dicabut Inpres rehab rekonSource: Coordination Meeting on Rehab/Recon 07.06.2011

9

10

28.4.2009 Folie 11- Brundtland Commission (1987): SD is development that meets the needs of the present without compromising the ability of future generations to meet their own needs.

Ecology

SocietyEconomyGovernance

Sustainability

11Anthropogenic concept

12NOSEKTOR/ SUBSEKTORTotal Kebutuhan Pemulihan 2011-2013 (Rp. Juta)INDIKASI SUMBER PENDANAAN 2011-2013 (Rp. Juta) APBN APBD PROV APBD KAB 1PERUMAHAN247.077,05 244.873,05 2.204,00 - 2INFRASTRUKTUR417.673,09 323.248,95 47.440,91 46.983,233EKONOMI222.160,25 201.524,82 15.731,96 4.903,47 4SOSIAL149.248,60 144.523,05 3.645,81 1.079,74 5LINTAS SEKTOR314.595,96 312.702,21 1.270,00 623,75 Jumlah1.350.754,95 1.226.872,08 70.292,68 53.590,19

Rekapitulasi Kebutuhan Pendanaan dari Kementerian/Lembaga 2011-2013

12

13

= KRB III

= KRB II

= KRB I

= endapan awan panas erupsi 2010

= area terdampak letusan 201013

Pada daerah terdampak langsung erupsi 2010 = direlokasi dijadikan Hutan lindungPada KRB III = Living in harmony with risk dengan rekayasa sosial dan teknisSumber: Badan Geologi, Kementerian ESDM, 2011Peta Kawasan Rawan Bencana dan Terdampak Erupsi Merapi

13

CWG Policy Model vs Application

14

CWG Database

15

Integrated Data ManagementIT Structure Concept: Intranet database. 8 sub-section. Objective: Digitalization and normalization of paper-based data, partial information, and other pooled info. Dataset: figures, graph, stats, images, tables, texts etc. Develop Master Plan 2012.

16

CWG OCNetworking Opportunities ( PPP) Develop Theme / points of interest Successful investment on sectors: education, tourism, local SMEs, etcExporting services than products, HOW ? Capacity development; tech transfer, knowledge transfer, training, etcCSR programs; economic empowerement, env. Stakeholder Matrix, Disposition to Section, Event Planning (ToR). Objective: to strengthen cooperation of potential and existing stakeholders supporting regional economic development.

17

Ex. Swedish CGG Cooperation Stakeholder Matrix.

Stakeholder CategoriesRelevant StakeholderCharacteristicsInfluenceImportanceInterestGov. Policy MakersSetda ProvDPRD Kom AReg.AdminLegalities HighOpen to investmentImplementing Agency StaffCGGUMYBPBKPMBappeda KADIN DIYLocal NGOLocal UnivLGULGULGUNGOPartnersAnalysisLegal FacilitatorDev. Regulator Sets annual RKPD Business and investment climateMain facilitatorPartnershipStaff Executives (Gov Access PointBudget CommtSupport real dev.In line w/ AoRReputation networkGuide policiesGov. RegulatorBudget PlanningBusiness DevelopmentIntended BeneficieriesBP and SKPDsWork force popLocal authoritiesPolicy supportPolicy AnalysisSynchronization to Dev. Plans 2009-2013Adversely affected personsCompeting industries and business playerLocal-Regional PrivateMarket sharePartnership Profit sharing vs risk sharingOrg. Interest groupsWorker Unionlocal-regionalRepresent workers Drive social cohesion Direct employment benefit and better wagesCivil Society Org.APIKRI (handcrafts)Local communitiesImplementation, operational . Aspiration windowAdvocates fair trade of producst/servicesDonorsSwedish OrgInternationalDelivery of plans (ToR) and activitiesExternal partnershipIn line w/ mission statement

18

Ex. PPP projects BAPPENAS 2011

19

20

Challenges vs OpportunitiesTime processing for equipment subsidy proposal (APA).Translation (Ind-Eng, Eng-Ind); tools, docs, papers, SOP.Positive support and feedback on IDM from supervisors and staffs. Some sections (business, commerce, industry, SMEs, General Section) have plans toward DGS already (i.e system for electronic financial reporting and auditing, database SME, online business portal). Integrating IDM with indicator of individual/org work performance is possible. (i.e record of computer usage)Policy Model have raised already further technical questions on procedures, tools, method, legal framework, and admin.

21

22

Vielen Dank !

23