Welcome St. Clair Avenue West Area Transportation Master Plan St. Clair Avenue West Area Transportation Master Plan Public Information Centre 1 December 2, 2015 1

St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

Embed Size (px)

Citation preview

Page 1: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

1

Welcome

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan

Public Information Centre 1December 2, 2015

Page 2: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

2

Study Process

St. Clair Avenue West Area Transportation Master Plan

This Transportation Master Plan is being carried out according to the Municipal Class Environmental Assessment (EA) process. This is an approved assessment approach for municipal infrastructure projects under the provincial Environmental Assessment Act.

We are here - Opportunity for public input

Opportunity for public input

Identify Problem

or Opportuni

ty

Research natural, cultural,

and socio-economic environme

nt conditions

Identify alternativ

e solution(s)

and develop

evaluation criteria

Evaluate alternativ

e solution(s)

Select preferred solution(s)

and develop design options

Evaluate design(s)

Complete final

report (30 day review

period)

Report to Council

Page 3: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

3

Problem and Opportunity Statement

St. Clair Avenue West Area Transportation Master Plan

The north/south rail corridor in the vicinity of St. Clair Avenue West between Keele Street and Old Weston Road limits east/west movement for cyclists, pedestrians and vehicles. This results in issues of congestion and connectivity.

The Transportation Master Plan will evaluate alternatives to improve movement using existing and potential new road connections for the benefit of all modes of travel.

Page 4: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

4

Study Area

St. Clair Avenue West Area Transportation Master Plan

The alternatives being studied are located within this area. There may be secondary effects beyond the study area, and these will be considered as well.

Page 5: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

5

Challenges

St. Clair Avenue West Area Transportation Master Plan

• Rail bridge – built in 1931; • Traffic impacts that may result from

the bridge replacement construction;• No continuous east-west cycling

connections in the study area;• Accommodating the travel demands

created by potential and ongoing developments in and around the study area;

• Potential rail station;• Property impacts; and• Need to minimize impacts to GO rail

and UP express services.

Benefits• Better east/west connectivity;• Safer more pleasant environment;• Pedestrian lighting;• New sidewalks;• New bike lanes; and• Less overall vehicle delay.

Page 6: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

6

Alternatives

St. Clair Avenue West Area Transportation Master Plan

A number of new roads and road expansions are being considered, primarily:

1) Widening St. Clair Avenue West ;

2) Extending Gunns Road from Weston Road to Union Street;

3) Connecting Davenport Road to Lloyd Avenue;

4) Extending Keele Street south to meet the Gunns Road extension between Weston Road and Union Street; and

5) Extending Davenport Road to Union Street and Implementation of Alternative 4.

Page 7: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

7

Evaluation Process and Criteria

St. Clair Avenue West Area Transportation Master Plan

Each alternative will be assessed based on its impacts on the following factors:

• Socio-Economic Environment• Natural Environment• Cultural Environment• Transportation• Constructability• Cost Your

feedback is needed

Page 8: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

8

Implementation

St. Clair Avenue West Area Transportation Master Plan

• More than one alternative may be recommended

• A staged program of transportation improvements will be defined

• This program will be based on factors which include the impacts of construction staging, to ensure that people can continue to move safely and efficiently across the study area

• Another key factor is the increase in capacity relative to cost

Page 9: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

9

Next Steps

St. Clair Avenue West Area Transportation Master Plan

After this PIC, the Project Team will:  • Review and respond to comments;

• Evaluate the alternative solutions and select the recommended plan;

• Meet with stakeholders, external agencies, and a technical

advisory committee; and

• Prepare for a second public information meeting in 2016 and report back to the community with the recommendation.

Page 10: St. Clair Avenue West Transportation Master Plan - Public Information Centre #1 - December 2, 2015 - Presentation slides

10

Your Input is Vital• We welcome you to provide comments during the

Open House portion of the evening• Project team members are available to answer

questions• Contact information is provided on the display

boards• Provide your feedback using a comment form, or

online at: www.toronto.ca/stclairwesttmp

St. Clair Avenue West Area Transportation Master Plan

Thank you for attending!