Scarborough Subway Extension EA
Councillor Information SessionDecember 18, 2014
Transportation Planning Section City Planning Division
Toronto’s Official Plan outlines the long-term
vision for the city
2
The Official Plan envisions a safe city that evokes pride, passion and a sense of belonging – a city where people of all ages and abilities can enjoy a good quality of life.
A city with…
OFFICIALPLANVISION
A comprehensive and high quality affordable transit
system that lets people move around the city
quickly and conveniently
OFFICIALPLANVISION
Transportation Planning
Scarborough Subway Background• City Council confirmed support for extension of the
Bloor-Danforth subway line in October, 2013– Route and station locations are subject to an
Environmental Assessment (EA)
• The proposed extension is required soon to replace the aging Scarborough RT
• The Municipal, Provincial and Federal Governments have each contributed funding to make the extension a reality
6
Study ProcessStudy Process•Planning and preliminary engineering work will examine options and recommend an alignment for the subway•A formal Transit Project Assessment Process (TPAP) will then satisfy the Environmental Assessment Act
Work will advance in four phases
7
Planning & preliminary engineering
• Phase 1 – Setting the Stage
• Phase 2 – Choosing the Corridor
• Phase 3 – Recommending the Alignment
• Phase 4 – Final Review (TPAP)
Objectives• Support the city-building principles outlined in the
city’s Official Plan and Provincial Policy Statement
• Make transit as attractive a travel option as practically possible in this area of Scarborough
• Minimize adverse environmental impacts
• Achieve cost-effectiveness
8
Communications & OutreachThe City and TTC are committed to engaging the public in a way that’s transparent, collaborative, inclusive and authentic. The City Planning Division will lead consultations.•Communications activities:
– A dedicated website– Social media campaign– Outreach in public spaces
•Consultation and feedback:– Stakeholder Advisory Group of community leaders– Online consultation– Traditional public meetings in the study area– Interactive workshops
9
Study Area
10
Phase 1: Setting the StageKey Decisions•Confirm study purpose•Confirm objectives•Confirm the process and phasing, including a plan for public consultation•Develop evaluation criteria•Identify all reasonable station locations and corridorsEngagement Opportunities•Online consultation•Public meetings in winter 2015
11
Evaluation Criteria
12
Criteria will be consistent with the Official Plan Update, “Feeling Congested?”
Phase 2: Choosing the CorridorKey Decisions•Apply the evaluation criteria developed in Phase 1 to assess corridor options and choose the preferred corridorEngagement Opportunities•Online consultation•Workshop in spring 2015•Public meetings in spring 2015
13
Update presented to PGM and TTC Board
Phase 3: Recommending the AlignmentKey Decisions•Apply evaluation criteria developed in Phase 1 to identify the recommended alignment within the corridor chosen in Phase 2
– Identify station locations on the preferred alignment
•Identify mitigation strategies for any potential impacts of recommended alignmentEngagement Opportunities•Online consultation•Workshop in summer 2015•Public meetings in fall 2015
14Report to appropriate bodies
Making Decisions
15
Phase 4: Final Review (TPAP)The final review will be undertaken through the TPAP, a streamlined six month process that satisfies the Environmental Assessment Act.Key Decisions•Review of all decisions made in phases 1-3•Finalization of mitigation strategies for any potential impactsEngagement Opportunities•Online consultation•Public meetings in winter 2016
16
TimelinesPhase Timing
Website Launch December 2014
Setting the Stage Fall 2014 – Winter 2015
Choosing the Corridor Spring 2015
Update to PGM & TTC Board
Recommending the Alignment Summer – Fall 2015
Report to appropriate bodies
Final Review (TPAP) Late 2015 – Spring 2016
Submission to Province
17
Next StepsDecember 2014• Input from Councillors about stakeholders and
consultation detailsJanuary 2015• Convene Stakeholder Advisory Group• Launch consultation online• Host public events in the study areaFebruary 2015• Report on feedback
18