The Bluebell Centre at Perivale Woods
The Job Begins
Too Much Rain
Car Tyres Arrive
Laying Out the Foundations
Now For the Gravel
Filling the Tyres
Getting the Level Right
Sheeps Wool Insulation
Insulating the Base Plate
Floor Goes In
Lord Selbourne Lays the First Bale
Roof Trusses
Bales on The Corner
A Great View
A Building of Straw
Spraying on the Lime Plaster Outside
External Lime Plaster
Looking Good
Before Shingling
Cedar Shingles
Shingling Finished
Roof From Above
Putting in the Electrics
Mixing the Clay Plaster for Inside
Walls
Glass Going In
Really Taking Shape Now
Truth Window
The finished building!