36
Blackleggs Creek Big Run AMD Treatment Complex Indiana County, PA

Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Embed Size (px)

DESCRIPTION

Approaches to operations and maintenance of AMD treatment systems. Learn how they deal with tough O&M issues.

Citation preview

Page 1: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Blackleggs CreekBig Run AMD

Treatment Complex

Indiana County, PA

Page 2: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel
Page 3: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run AMD Treatment Complex

Page 4: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2

Page 5: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Intake Valve

Page 6: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Limstone Bed Piping

Page 7: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Settling Wetland

Page 8: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Iron Coating of Limestone

Page 9: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 Limestone Washing and Replacing

Page 10: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #2 OM&R

• System is too small for flow requires constant adjustment of boards in drop boxes

• Requires regular flushing• Predicted dissolution and coating of stone• Plugging of holes in pipes – now using chain-sawed

slats rather than drilled holes• Uncooperative Landowner – during high flow, 10-20%

flow goes untreated• Fear that during high flow a siphon is created• Erosion in Overflow channel

Page 11: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7

Page 12: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Mine Water Capture

Page 13: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Pipe Labyrinth

Page 14: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 Drop Boxes

Page 15: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7 OM&R

• Cleaning Debris around mine opening• Cleaning Stone• Flushing• Cleaning and replacing stone• Clogging pipes

Page 16: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Mine Blowout

#7A #8

Page 17: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Mine Blowout

Page 18: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7A Incidental Coal Extraction

Page 19: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7, #7A, and #8 Combined

Page 20: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Discharges of Big Run #7A and #8

#7A #8

Page 21: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Construction Logistics

Page 22: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Drilling to Locate Mine Portal

Page 23: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Partial Construction to Protect Against Possible Mine Blowout

Page 24: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Construction Challenges

Page 25: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 COG and Robot Exploration

Page 26: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Mine Water Capture

Page 27: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Mine Water Inflow Management

Page 28: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 Completed System

Page 29: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #7, #7A, and #8 Combined

Page 30: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #8 OM&R

• Ponds too small to treat the flow and iron levels due to space constraints. We have full iron clogging every 4 months. Now we are facing decision of Lime in silo vs. cleaning stone

• Broken valve down over the bank allowing untreated water to escape to stream.

Page 31: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 Silo Pad

Page 32: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 Lyme Dosing Silo

Page 33: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Downstream of the Big Run AMD Treatment Complex

7/28/99 4/11/00 4/21/02 8/3/03 2/18/04 1/22/05 7/9/05 1/21/06 7/22/06 1/17/07 7/21/07 2/4/08 7/27/08 5/3/09 6/26/10 4/6/11 7/18/12-50

0

50

100

150

200

250

Combined Total and Hot Acidity (mg/L)

Page 34: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run #3 OM&R

• At this time, we do not know how much lime is needed/yr or how much it will cost/yr

• The more lime you use, the more sludge is generated for disposal

• No sludge pond, the designed sludge pond is only big enough for #7 but two additional discharges will be sent through silo, #7A and #8

• #3 is a combo of all discharges so it is important to control flow of all other system discharges.

Page 35: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Big Run AMD Treatment Complex OM&R

• During normal flow, 1hr/wk• During high flow it is easy to spend >20hrs/wk• Not enough sunshine to depend on solar• The more you flush the longer the system is

efficient• Constantly monitoring pH at outflow and

mouth of Big Run

Page 36: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel

Blackleggs Creek Watershed Association and Cooperative Trout Nursery

• Find us on Facebook at Blackleggs Creek

Thanks,Art GrGuricWatershed and Nursery Manager