ROP Construction, Inc. ROP Wall System
(Tilt-up Construction)
Better Wall System copyrighted 2007
ROP Wall System
Interior and Exterior Walls of2-1/4” to 2-3/4”
(ready to paint)
copyrighted 2007Better Wall System
ROP Wall System
. Stronger
. OPTIMIZED structure
. Spacious
. Faster
. 50% - 75% Lighter
. Economical
. Proven
ROP Wall System
. Stronger since ROP wall is SOLID like a vertical slab.
. ROP Wall may be inserted withthe columns and beams before
pouring, thus making the walls, columns, and beams monolithic or acting as a single unit, therefore stronger.
STRONGER
ROP Wall System
. ROP Wall is Load Bearing up to 2,500 psi.
. ROP Wall can prop the beam and directly transfer the load to the columns using embedded truss system. This makes ROP Wall System much better. What used to be a simple partition is now optimized structurally in making the building stronger and more economical.
OPTIMIZED STRUCTURE
ROP Wall System
Optimized Structure
Embedded Truss System
columncolumn
Beam
Load Load Load = (floor loads, beam, wall)
Load may be 1 to 3 floors
Beam
TENSION
COMPRESSION
COMPRESSION
ROP Wall System
Optimized Structure
Embedded Truss System
(High Rise)
A break in the truss system on every 3rd level minimizes the load transfer on the wall during wind and earthquake. Up to 67% of the load Is absorbed by the wall, thus relieving the columns and beams of stresses.
EarthquakeLoad
ROP Wall System
Spacious
. Additional 2.75” to 4.75” more space on all walls.. The columns and beams are smaller due to wall load reduction plus the wall can prop the beam and carry the load instead.
.
ROP Wall System
Faster
. In 3 days the wall is tilted with all the jambs, electrical and plumbing fixtures already installed. . When erected, the wall is ready to paint and serves as shoring for the beams.
ROP Wall System
Lighter
. ROP wall system is very strong
yet much lighter by 50% thus
making the building safer
during earthquake.
ROP Wall System
ECONOMICAL
. ROP Wall system uses only 50% of the concrete used by CHB walls.. The jambs, electrical and plumbing are embedded on the wall during casting unlike in CHB where the wall is chip off to provide electrical and plumbing lines.. No need for heavy equipment like cranes which makes construction convenient and economical.
ROP Wall System
Proven. It’s more than 25 years in usage. Over 1,000 units built. NHA accredited. Aitech accredited. Registered Philippine Patent
. Used by Filinvest