AMOUD UNIVERSITY
FUCALTY ENGINEERING REPORT OF THESES
DEPARTMENT CIVIL ENGINEERING
This is our theses and we decided to design and evaluate or to estimate the huge compound
consisting several buildings like hospitals,
Commercial buildings also we focus on hospital, this enormous building we chose is very
important things, because as we aware the our continent is backward according to the other like
America the sides of health and educational system and also leadership,
And that is why we chose, because we need to inspire our community and youth generation. If
we did this may are we leading some others to flow us. And that is what we need it, we will
please it.
we graduated amoud university in this year also still we endure preparing theories and analyzing
structures of buildings and also we trying to produce the estimations and detailed architectural
designs,
Our advisors guided us also they tried to encouraging as well as supporting us and that is why we
achieved this touchable progress.
FUCALTY ENGINEERING REPORT OF THESES
DEPARTMENT CIVIL ENGINEERING
We are group four of senior student especially civil engineering department, all student were
divided some groups to prepare the final theses of final university books the instructor of Ahmed
A. Gave them some commands, we took area 150 by 110m,
So we decided to design that site a hospital.
First we distributed partitions like emergency ward, x-ray department, management building,
female wards, and male wards. Pediatric wards, training halls E.TC.
After that we fulfill more skills also, we achieved some of our expectations.
We did drawing in auto card designs as well as floor plans, foundations, elevations, detailed bars,
skeletons, sections, footings, columns, slabs, beams, and also gridlines.
Subsequently we transmitted our advisor to check what we made, fortunately he approved
similarly he told us that we are the best group in all groups because we did everything, unless
estimations, analyzing structures, and drawing chief program that will help us decoration.
After mid-exam we are going to start estimation of our huge building hospital ,
Although that is depending on several things like :
1) Providing area of all buildings.
2) Providing perimeters
3) Unit price
4) Type of soil , unit weight of soil and its cohesion.
We are on the proses and we endure the preparing that above mentioned things.
And next we week we hope to finished them.