Upload
nikunj-rana
View
30
Download
0
Embed Size (px)
Citation preview
PRESENTED BY : NIKUNJ RANA
SCM IN SMALL SCALE SHEET METAL INDUSTRY
Introduction
• Type of Industry : Small scale sheet metal• Average Production : 27000 pcs /month• Type of Supply Chain : Responsive • Model : Pull Based model (Make to order)• 3PL : VTRANS LOGISTICS • Location to delivered : JNPT Port Mumbai
Pull Based model
Finished goods
storage
Manufacturing unitJunction Box
Pipe fitting clampsExtension Rings Aluminum Tags
Inventory
GI Sheet ,CRC sheet,Aluminum ,
Screws,Clamps, Packing
material
From the Suppliers
To the Customers
Material Flow
Problems encounter in the present SCM
How this problems can be solved ?
• For on time delivery buffer time have to be keep before the time of delivery.
• During Part Loading ,proper instruction is given to the 3PL ,to cover the material .
• In cities logistics ,Multiple Sourcing is required.• Company has requested to 3PL for proper
tracking service as the company has to call the driver or 3PL for tracking the material.
How this problems can be solved ? Contd…
• Bar-coding is the best technique to identify the material without opening the cartons .
• This will control wrong material to be dispatched and proper labeling can also be done.
• Use of Silica Gel for moisture locking packaging and Full Covered Vehicle should be used during rainy season.
Thank You