Metro Route 2020 Dubai – Construction $2.9bn
IncludedRoute, Programme GraphicTunnelling, Stations & ViaductDetailsLengths
Viaduct 10.5 kmTunnel 4 km
StationsUnderground 2 Nr.Elevated 5 Nr.
Capacity 46,000 passengers per hour.Maximum wait time will be 100 seconds and there will be 15 trains
Tunnels & Underground Stations
Viaduct
3D image to show Sequence, Method & Plant.
David H Moloney
21st July 2016
ⓒ David H Moloney
Project Execution Plan. Details how the Metro will be
constructed, and how the progress, safety and quality will be
monitored and controlled. Also the measures to ensure that
the site is environmentally friendly
ContentsWork Categories as per CESMM
Introduction
Metro Route 2020
Red Line Green Line
Route
ⓒ David H Moloney
Route Animation
GreenCommunity
DubaiInvestmentPark
Jebel Ali Port
Palm Jebel Ali u/c
Ibn Battuta Mall
Harbour &Tower Station
Tunnel
ⓒ David H Moloney
Programme Time ChainageThe chart has two axis: one for time and the other for location
A legend explains meaning of the colours, symbols and line types
Programme Visualisation
Tunnel
Viaduct
Viaduct
ⓒ David H Moloney
Schematic longitudinal Profile
Principal Quantities
Schematic Longitudinal Section ⓒ David H Moloney
Cost Comparisons of various Metro Projects
Dubai Route 2020UAE (To Start)
Red Line North DohaQatar (In Progress)
Red Line South DohaQatar( In Progress)
Metro NorthDublin
(Proposed)
Dart UndergroundDublin (Proposed)
Overall Cost €2,450 million €1,803 million €1,500 million €2,400 million
Cost per km €158 million /k m €140 million / km €108 million / km €134 million / km
Overall Length 15.5 km 13 km 14m 18 km 5 km
Tunnel 4 kmSingle Tunnel
11.6 km Twin Tunnels
14 kmTwin Tunnels
7.5 km Twin Tunnels
5 km Twin Tunnel
Cut & Cover 0 2.7 km 0
Elevated 10.5 km 2.2 km 0
Road Level 0 5.5 0
Stations 7 Nr. 7 Nr. 5 Nr. 14 Nr. 3 Nr.
Capacity 13,000 Passengers per hour
19,800 Passengers per hour
?
ⓒ David H Moloney
Advantages of Light Rail Systems Benefits of Metro to commuters
1. Time saving for commuters 4. Reduction in accident
2. Reliable and safe journey 5. Reduced fuel consumption
3. Reduction in atmospheric pollution 6. Reduced traffic congestion
Contractor’s General Items
Contractor’s Temporary Site Facilities
ⓒ David H Moloney
Quarry & Aggregate Production
ⓒ David H Moloney
Brief Description
Rock is blasted free from the quarry
face and fragmented so it will fit into
the primary crusher. Any oversized
rock is broken with a excavator and
hydraulic Rockbreaker.
At the Crushing and screening yard
the fragmented rock is crushed and
screened into various size ranges.
Concrete Batching Plant David H Moloney
Concrete batching plant comprises -concrete mixer, control cabin, silos for cement and fly ash, aggregate bins and conveyor belt system to feed the mixer. Also aggregate storage bays and water storage tanks. The mixing is computer controlled and has a dynamic screen display, showing the process. Material storage capacity to match two days concrete production
Reinforcement Cutting & Bending Yard David H Moloney
ⓒ David H Moloney
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
Site Hoarding examples
ⓒ David H Moloney
Ge
ne
ral It
em
s
Weighbridge & Sheeting Access
ⓒ David H Moloney
Ge
ne
ral It
em
s
Wheel Wash Drive-through
ⓒ David H Moloney
Ge
ne
ral It
em
s
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Construction dewatering is the removal or drainage of
groundwater and or surface / rain water usually by
pumping to keep the works dry.
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
Dewatering by Wellpoints
ⓒ David H Moloney
Ge
ne
ral It
em
s
Dust Suppression
ⓒ David H Moloney
Ge
ne
ral It
em
s
Traffic Management
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Traffic management plans are necessary when working on or beside roads
Traffic Management – Work on Median
ⓒ David H Moloney
Ge
ne
ral It
em
s
Temporary Electricity Supply & Tower Lights
ⓒ David H Moloney
Ge
ne
ral It
em
s
Welfare Facilities
ⓒ David H Moloney
Ge
ne
ral It
em
s
Toilets – Washing
Canteen, Drying Room, Toilet & Generator
HSE
Existing Underground Utilities
ⓒ David H Moloney
Ea
rth
wo
rks
Brief Description
Before digging
establish the location
and route of
underground utilities.
Locator to find Utilities
Spray Paint to mark pavement
Existing Underground Utilities & Overhead Cables - Safety Measures
ⓒ David H Moloney
Ea
rth
wo
rks
Trench - Safety Measures H
ealth,
Safe
ty &
Envir
onm
ent
Trench - Safety Measures
ⓒ David H Moloney
Health,
Safe
ty &
Envir
onm
ent
Safety Precautions
Environmentally Friendly Site Air, Noise, Water & Soil Pollution
Segregation of Waste H
ealth,
Safe
ty &
Envir
onm
ent
Segregation of waste for proper disposal and recycling. Less waste goes to landfill and hazardous waste is treated to make it safe.
Colour Code for Skips & Bins
Water Pollution PreventionG
en
era
l It
em
s
HSE Monitoring & Reporting - Dashboard Dashboard is a single page, graphical representation of
current HSE Issues and historical trends
Emergency Phone Numbers & Response
Geotechnical
Diaphragm Wall Construction - Sequence, Plant & Methods
Diaphragm Wall Grab
ⓒ David H Moloney
Brief Description
Shown is the Sequence,
methods and plant to construct a
diaphragm slurry underground
wall.
Diaphragm Wall Construction - Sequence, Plant & Methods
ⓒ David H Moloney
Earthworks
Tunnels & Underground Stations
3D image to show Sequence, Method & Plant.
David H Moloney
ⓒ David H Moloney
Underground Station Excavation
Underground Station Construction
Rock - Excavability
The excavability of rock depends mainly on the rock strength and the layer thickness. This diagram shows excavation methods for rock of various strengths and thicknesses, with a free face.
ⓒ David H Moloney
Concrete
Concrete Full Scale Trial Castings of Pier
ⓒ David H Moloney
Brief Description
The full-scale trial casting(s) shall
demonstrate/document that all
requirements to the concrete and the
execution of the work are fulfilled
simultaneously using the actual
methods and performed by personnel as
for the future production.
Co
ncre
te
BIM 3D Model Shutter Fibreglass
Concrete Full Scale Trial Castings of Bridge Deck
Brief Description
The full-scale trial casting(s) shall
demonstrate/document that all
requirements to the concrete and the
execution of the work are fulfilled
simultaneously using the actual
methods and performed by personnel as
for the future production.
Co
ncre
te
Fresh Concrete Properties Tests
Air Content, Consistence, Density, Initial and Final Setting Time, Temperature
and Bleeding
Chloride Ion Content
Hardening and Hardened Concrete Properties Tests:
Density and Compressive Strength for 1, 3, 7, 14 and 28 Days
Concrete Core Compressive Strength
Tensile Splitting Strength
Modulus of Elasticity
Heat Development
Chloride Migration Coefficient (28 Days)
Reinforcement Cover Measurement Survey
Trial for Waterproofing to Bridge Deck
ⓒ David H Moloney
Brief Description
. The trial for the deck waterproofing
shall demonstrate/document that all
requirements to the waterproofing and
the execution of the work are fulfilled
simultaneously using the actual
methods and performed by personnel as
for the future production.
Co
ncre
te
Trial for Waterproofing to Bridge Deck - TestsC
on
cre
te
Vibrating Concrete
ⓒ David H Moloney
Co
ncre
te
Tunnel Wall Segments Casting
Clean Mould
Lift Precast Segment out of mould
after 18 hours.
Reinforcement
fabricate
Reinforcement
into Mould
Concreting
Segment Storage
Cycle Time 24 hrs
ⓒ David H Moloney
Tunnel Precast Segments
Precast Yard for Tunnel Segments
Viaduct Construction David H Moloney
ⓒ David H Moloney
Viaduct Construction David H Moloney
ⓒ David H Moloney
Viaduct Construction David H Moloney
ⓒ David H Moloney
Viaduct Segments Casting David H Moloney
Casting Method
The concrete segments are manufactured
using the short-line, match-casting method.
Match-casting is when sequential segments are poured against the previous cast segment, this ensures that the segments will fit perfectly on site.
ⓒ David H Moloney
Viaduct Segments – Short-line, Match Casting Method David H Moloney
Precast Yard for Viaduct Segments
Viaduct Segments Launching
ⓒ David H Moloney
Bridge Construction Sequence David H Moloney
Bridge Construction Sequence David H Moloney
Piling Surcharge Abutments
Remove Surcharge AbutmentsDeck centre
Post-tensioning Fascia & Waterproof deckComplete Bridge
PiersOverview
Deck Ends
Images with Schematic 3D view, Photos & Timeline
ⓒ David H Moloney
Post-tensioning Bridge Deck David H Moloney
Falsework & Shuttering for Insitu Ramp David H Moloney
Large Floor Concrete Pour
Reinforced Wall Construction SequenceDavid H Moloney
ⓒ David H Moloney
Reinforced Structure Construction Sequence David H Moloney
ⓒ David H Moloney
Going Underground
ⓒ David H Moloney
Cut & Cover Tunnel Construction
Sequence -Traffic and utilities are diverted, excavate trench, construct & backfill to bury.
To prevent the faces of the excavation from collapsing, different measures are used –
batter the faces, diaphragm walls, secant piles or a combination of soil nailing and
shotcreting.
Ramp Construction
Sequence -Traffic and utilities are diverted, excavate, construct and backfill to sides.
To prevent the faces of the excavation from collapsing, different measures are used – batter
faces, diaphragm walls, secant piles or a combination of soil nailing and shotcreting.
ⓒ David H Moloney
Structural Steel
Elevated Stations
Elevated Stations
Elevated Stations
ⓒ David H Moloney
Elevated Stations
ⓒ David H Moloney
Inside Stations
ⓒ David H Moloney
Passenger Bridge
Roof Covering
Roof Covering
Roof Covering
View of Metro from Burg Khalifa
ⓒ David H Moloney
Piling
Piling Construction - Plant & Methods
Brief Description
Piling Plant, Equipment and Material;
Crawler Crane, Piling Hammer, Temporary Casing,
Piling Rig, Concrete Pump, Concrete Mixer Trucks,
Tremie Pipe and Reinforcement Cage
Pili
ng
Piling Construction - Plant, Methods & SequenceP
ilin
g
Piling Construction - Plant & MethodsP
ilin
g
Piling Construction - Vertical PilesP
ilin
g
Pile Load Test
ⓒ David H Moloney
Pili
ng
Brief Description
A jack is used to load the pile in steps and
gauges measure any settlement.
Secant Pile Construction - Sequence, Plant & Methods
3D image to show Sequence, Method & Plant.
For construction details see my YouTube Channel
ⓒ David H Moloney
Brief Description
Shown is the Sequence,
methods and plant to construct a
secant pile underground wall.
Secant Pile Construction - Sequence, Plant & Methods
Sheet Pile Shaft Temporary to Support Excavation
Drive Sheet Piles Excavate & install bracing
Construct Concrete Structure Backfill, remove bracing & sheet piles
ⓒ David H Moloney
Sheet Pile Shaft Temporary to Support Excavation
ⓒ David H Moloney
Roads & Paving
Asphalt Batching YardR
oa
ds &
Pa
vin
gs
Road Construction Sequence Animation
Railway
Tunnel Fit-out Rail, Electricals, Ventilation
Tunnel Fit-out
Install Sleepers & Rails
Concrete Batching Train for Floor Slab
Drilling Machine for Utilities Brackets
Commissioning, Testing, Handover & Opening
Purpose to test and ensure that everything (e.g. trains, escalators, lifts, ticket barriers) works as it should.
ⓒ David H Moloney
Commissioning, Testing, Handover & Opening
Purpose to test and ensure that everything (e.g. trains, escalators, lifts, ticket barriers) works as it should.
ⓒ David H Moloney
Tunnel
Tunnel Boring Machine (TBM)
Tunnel Boring Machine (TBM)
HERRENKNECHY AG
Tunnel Boring Machine (TBM)
Tunnel Boring Machine (TBM)
Tunnel Boring Machine (TBM)
Cutting Head rotates to Dig
Excavated material removed by conveyor belt
Lifting muck to surface with skip
Placing Concrete Segments
Tunnel Boring Machine (TBM)
Cutting Head rotates
7 nr. Precast segments form rings that line the tunnel Excavated material removed
by conveyor belt
ⓒ David H Moloney
Miscellaneous Works
Fencing
ⓒ David H Moloney
Sequence of Construction
Clear Scrub & Grade ground
Fix Corner & Strainer Posts
Fix Intermediate Posts
Fix Line Wire, Chain-link & Razer wire
Concrete ground beam
Administrative
Progress Monthly, Monitoring & Reporting - DashboardDashboard is a single page, graphical representation of current
progress and historical trends
Histogram Charts for Resources & Outputs
Concrete, Manpower, TBM,
Manpower per Discipline Concrete per Location
Numbers for each month of the Project Quantity for each month of the Project
ⓒ David H Moloney
Plant & Equipment List & Worker’s Job Titles
ⓒ David H Moloney
Organogram
Brief Description
Shown are the line and
lateral relationships
between the various team
members and their relative
position in the site
organisation.
Quality Assurance
Quality Assurance Dashboard Dashboard is a single page, graphical representation of
current statistics and historical trends
Setting out & Surveying
Setting out & Surveying
Setting out & Surveying
Pavement Art
Production by David H Moloney
See my YouTube channel for further details
My YouTube Channel link: https://www.youtube.com/channel/UCeJR9J7svhBd-C0ZoAH2fhQ
ⓒ David H Moloney