MEETING MINUTES AND IMPORTANCE OF MEETINGS ON CONSTRUCTION SITE

SUBMITTED TO:- SUBMITTED BY:-

PROF. JEETU SONEJI ANIKET MOHITE - AP16248 PAURAV CHORDIYA AP16203 RITUJA BANDE AP16244 JITESH THAKARE AP16207 RAJAT SONAR AP16198 RAHUL YADAV AP16191SIDHANTH WAGHMARE AP16251

MEETING MINUTES AND IMPORTANCE OF MEETINGS ON CONSTRUCTION SITE

MEETING MINUTESMinutes, also known as protocols or, informally,notes, are the instant written record of ameetingor hearing. They typically describe the events of themeetingand may include a list of attendees, a statement of the issues considered by the participants, and related responses or decisions for the issues.Minutes are the official written record of the meetings of an organization or group. They are nottranscriptsof those proceedings.

WHAT IS INCLUDED IN MEETING MINUTESBasic information about the meeting: date, time, location.Who attended, along with a special note in the cases where attendees came late or left early.Agenda items with a brief description of each item.Voting actions with a detailed account of how each individual voted, along with any abstensions.Time when meeting was adjourned.

MEETING MINUTES EXAMPLES

ADVANTAGES OF MEETING MINUTESConfirm any decisions madeRecord any agreed actions to be takenRecord who has been allocated any tasks or responsibilitiesPrompt action from any relevant attendeesProvide details of the meeting to anyone unable to attendServe as a record of the meeting's procedure and outcomeOffer legal protection.Acts as measuring stick.

AN EXAMINATION OF SAFETY MEETINGS ON CONSTRUCTION SITES - Tarja Mki1 and Anssi Koskenvesa2

CONSTRUCTION MEETING MINUTES The Cornice Company Construction Managers

CONSTRUCTION PROGRESS MEETINGSLITERATURE REVIEW

MEETINGS ON CONSTRUCTION SITESA meeting is a coming together of (generally) three or more people to exchange information in a planned manner and discuss issues set out before them to arrive at decisions, solve problems, etc.A meeting can be formal or informal. As regards a formal meeting there is set rules for convening it and conducting it, with a written record of its proceedings. It requires a notice which is a call, an invitation to attend it.It has an agenda or list of things to deal with, and the outcome is systematically written in the form of minutes

TYPES OF MEETINGSInformative where the purpose is to give information to the participants about a new scheme, product, etc.Consultative in which the members are consulted to solve a problemExecutive in which decisions are taken by those empowered to do soIn practice, most of the meetings serve more purposes than one. Some additional classifications of meetings are meeting for negotiation purpose, meeting for giving instructions, etc.

IMPORTANCE OF MEETINGS AT CONSTRUCTION SITESReceive progress reports from thecontractor(thecontractormay hold a progress meeting, sometimes called a production meeting, withsub-contractorsprior to theconstruction progress meeting).Receive progress reports from theconsultant team.Receive cost reports from thecost consultant.Receive records ofsub-contractorsand labour on site.Receive progress photos (which may be required from thecontractorif included in the preliminaries, or may sometimes be commissioned separately by theclient).

IMPORTANCE OF MEETINGS AT CONSTRUCTION SITESProgress vs programme and the causes of any delaysTesting regimesMock-upsQualityissuesWeather reportsIssues that may impact on costsHealth and safetyissuesIssues with neighboursOff-site fabrication and off-site paymentsEarned value analysisDesign issuesWarrantiesLook ahead to the next period