Presentation for the Suez World Technical Congress held in Paris 4/3/2014, showing how ASTOSAM managed to implement a sectorisation project in less time and with less cost by using dynamic microsectorisation, water pressure powered valves to close sectores and modulate pressure, as well as wireless flow meters designed by Aqualogy
Citation preview
Deployment of Dynamic Microsectoring -DMS- in TorremolinosSimón Pulido
- 2 -DMS IN TORREMOLINOS
Context
- 3 -DMS IN TORREMOLINOSOverview and context
69.389 inhabitants (up to 250,000 during summer)
30.043 customers and 8.995 connections
201 km long water network
Maximum pressure 8 bar, average 4 bar
System input volume: 9,3 · 106 m3/year, 100%
groundwater
Non-Revenue Water: 2,9 · 106 m3/year
Network Efficiency: 69 %
- 4 -DMS IN TORREMOLINOS
Torremolinos BU requirements
- 5 -DMS IN TORREMOLINOSTorremolinos BU requirements
Making sure that:
• No water quality or pressure problems occur
• Normal distribution conditions are respected
• The existing infrastructure is taken advantage
of to install actuators
• CAPEX are minimized
• The implementation is quickly achieved, without
modeling the complexity of the loops and
meshes in the network
• Absolutely robust and reliable, with minimum
maintenance costs
Improve the efficiency by means of providing minimum night flows for each sector on a daily basis
- 6 -DMS IN TORREMOLINOSTorremolinos BU requirements
Making sure that:
• No water quality or pressure problems occur
• Normal distribution conditions are respected
• The existing infrastructure is taken advantage
of to install actuators
• CAPEX are minimized
• The implementation is quickly achieved, without
modeling the complexity of the loops and
meshes in the network
• Absolutely robust and reliable, with minimum
maintenance costs
Improve the efficiency by means of providing minimum night flows for each sector on a daily basis
Valves closingWaterInput
- 7 -DMS IN TORREMOLINOSTorremolinos BU requirements
Making sure that:
• No water quality or pressure problems occur
• Normal distribution conditions are respected
• The existing infrastructure is taken advantage
of to install actuators
• CAPEX are minimized
• The implementation is quickly achieved, without
modeling the complexity of the loops and
meshes in the network
• Absolutely robust and reliable, with minimum
maintenance costs
Improve the efficiency by means of providing minimum night flows for each sector on a daily basis
Valve
Valve
Valve
Flow Meter
Valves closingWaterInput
05:00 a.m.
- 8 -DMS IN TORREMOLINOSTorremolinos BU requirements
Making sure that:
• No water quality or pressure problems occur
• Normal distribution conditions are respected
• The existing infrastructure is taken advantage
of to install actuators
• CAPEX are minimized
• The implementation is quickly achieved, without
modeling the complexity of the loops and
meshes in the network
• Absolutely robust and reliable, with minimum
maintenance costs
Improve the efficiency by means of providing minimum night flows for each sector on a daily basis
Valve
Valve
Valve
Flow Meter
Valves closing01:00 a.m.Water
InputMNF data sent to NESS
Valves opening05:00 a.m.
- 9 -DMS IN TORREMOLINOSTorremolinos BU requirements
Making sure that:
• No water quality or pressure problems occur
• Normal distribution conditions are respected
• The existing infrastructure is taken advantage
of to install actuators
• CAPEX are minimized
• The implementation is quickly achieved, without
modeling the complexity of the loops and
meshes in the network
• Absolutely robust and reliable, with minimum
maintenance costs
Improve the efficiency by means of providing minimum night flows for each sector on a daily basis
Valve
Valve
Valve
Flow Meter
Valves closing01:00 a.m.Water
InputMNF data sent to NESS
Valves opening05:00 a.m.
- 10 -DMS IN TORREMOLINOS
Deployment stages
- 11 -DMS IN TORREMOLINOSStages
Actions performed on the Torremolinos Water Network:
• Network Assessment
- 12 -DMS IN TORREMOLINOSStages
Actions performed on the Torremolinos Water Network:
• Pressure Regulation
• Network Assessment
- 13 -DMS IN TORREMOLINOSStages
Actions performed on the Torremolinos Water Network:
• Pressure Regulation
• Microsectoring
• Network Assessment
- 14 -DMS IN TORREMOLINOSStages
Actions performed on the Torremolinos Water Network:
• Pressure Regulation
• Microsectoring
• NESS (Network Efficiency Sectoring Software)
• Network Assessment
- 15 -DMS IN TORREMOLINOS
Pressure regulation
- 16 -DMS IN TORREMOLINOSPressure Regulation
• Previous pressure analysis
• Definition of new pressure areas
• Locate regulation actuators
• Design and build the actuators
• Civil works
3 existing manholes used (5 new)
2 existing butterfly valves used (6 new)
• Installation of actuators in 4 days
8 regulation actuators installed
Previous situation
- 17 -DMS IN TORREMOLINOSPressure Regulation
• Previous pressure analysis
• Definition of new pressure areas
• Locate regulation actuators
• Design and build the actuators
• Civil works
3 existing manholes used (5 new)
2 existing butterfly valves used (6 new)
• Installation of actuators in 4 days
8 regulation actuators installed
Previous situation
2ud Ø150 4ud Ø200 2ud Ø500
- 18 -DMS IN TORREMOLINOSPressure Regulation
• Previous pressure analysis
• Definition of new pressure areas
• Locate regulation actuators
• Design and build the actuators
• Civil works
3 existing manholes used (5 new)
2 existing butterfly valves used (6 new)
• Installation of actuators in 4 days
8 regulation actuators installed
Previous situationAfter Pressure Regulation
2ud Ø150 4ud Ø200 2ud Ø500
- 19 -DMS IN TORREMOLINOS
Dynamic Microsectoring
- 20 -DMS IN TORREMOLINOSDynamic Microsectoring
8 km/microsector
in average
• Definition of 18 microsectors
11 dynamic
7 static
• Analysis of the frontier valves
• Define location of microsectors entrance
• Design of flowmeters
• Design and build open/close actuators
• Civil works
32 butterfly valves installed
6 existing manholes used (26 new)
• Installation flowmeters, iMETER and
actuators
32 open/close actuators installed
18 flowmeters and iMETER installed
- 21 -DMS IN TORREMOLINOSDynamic Microsectoring
8 km/microsector
in average
• Definition of 18 microsectors
11 dynamic
7 static
• Analysis of the frontier valves
• Define location of microsectors entrance
• Design of flowmeters
• Design and build open/close actuators
• Civil works
32 butterfly valves installed
6 existing manholes used (26 new)
• Installation flowmeters, iMETER and
actuators
32 open/close actuators installed
18 flowmeters and iMETER installed
13 ud
Ø80 to
Ø125
15 ud
Ø150 to Ø300
4 ud
Ø400 to Ø600
flowmeter
Ø100
- 22 -DMS IN TORREMOLINOSDynamic Microsectoring
8 km/microsector
in average
• Definition of 18 microsectors
11 dynamic
7 static
• Analysis of the frontier valves
• Define location of microsectors entrance
• Design of flowmeters
• Design and build open/close actuators
• Civil works
32 butterfly valves installed
6 existing manholes used (26 new)
• Installation flowmeters, iMETER and
actuators
32 open/close actuators installed
18 flowmeters and iMETER installed
13 ud
Ø80 to
Ø125
DAY TIME
NIGHT TIME
15 ud
Ø150 to Ø300
4 ud
Ø400 to Ø600
flowmeter
Ø100
- 23 -DMS IN TORREMOLINOS
Network Efficiency Sectoring Software
NESS
- 24 - NESS Network Efficiency Sectoring Software
- 25 - NESS Network Efficiency Sectoring Software
- 26 - NESS Network Efficiency Sectoring Software
Static Sector
Dynamic sector
- 27 -DMS IN TORREMOLINOS
The benefits
- 28 -DMS IN TORREMOLINOSNESS outputs
Minimum Night Flows variation
Quick detection of fresh leaks
- 29 -DMS IN TORREMOLINOSNESS outputs
Minimum Night Flows Evolution
- 30 -DMS IN TORREMOLINOSSummary
• Turn-key projects developed by operators to be used by operators
• In one year expecting 10% of network efficiency improvement
• Implementation did not affect service conditions
• No reports of water quality or pressure problems
• Maximum leverage of the existing infrastructure
• Minimum civil work involved
Microsectoring in Torremolinos
Thank you for your attention
Simón Pulido