PREPARATION AND SUBMISSION OF PREPARATION AND SUBMISSION OF DETAILED PROJECT REPORT FOR BAVLA DETAILED PROJECT REPORT FOR BAVLA

TOWN UNDER UIDSSMT SCHEMETOWN UNDER UIDSSMT SCHEME

Prepared ByPrepared By

Green Eminent, VadodaraGreen Eminent, Vadodara

The Detailed Project Reports (DPRs) should be prepared based on the guidelines laid down in the Manual on Water Supply and Treatment, published by CPHEEO, Ministry of Urban Development and as amended from time-to-time (latest publication in May, 1999) and should include the following with supporting data and based on the guidelines of JNNURM/UIDSSMT

ObjectivesObjectives

DETAILED PROJECT REPORT

SUB-MISSION FOR URBAN INFRASTRUCTURE AND GOVERNANCE

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPR► 1. Sector Background Context & Broad Project Rationale.....• Physical and socioeconomic Features

• Existing structure of Physical Infrastructure

• Baseline Information in terms of user coverage and access

• Details about storage, Transmission main and Distribution Main

• Details about existing Water supply Network

• Area and Population Covered by Existing System

• Population Projection

• Zone wise Population and Water Demand

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPR► 2. Project definition, concept and Scope.....• Physical Infrastructure Components

• Features of Components for Augmentation of Existing Water Supply

• Design criteria of CPHEEO manual standards

• Proposed water supply system

• Proposed Rising Main

• Proposed Clear water sump

• Proposed Service Reservoir

• Proposed Distribution Network with Re-zoning

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPR

a. As per 2001 census 30851 Souls

b. As per present stage (Year-2008) 34605 Souls

c. As per first stage (Year-2023) 42408 Souls

d. As per ultimate stage (Year-2038) 52746 Souls

Population

Rate of Water Supply

Rate of water supply: 135 lpcd

Add 15% UFW 20 lpcd

Total 155 lpcd

Statement for Bavla Town Augmentation of Water Supply Zones

Existing Capacity Proposed Capacity Total Capacity

Zone Zone Zone Population (Ultimate 2038)

Demand (MLD)@155 lpcd

SUMP (MLD)

ELSR (MLD)

SUMP (MLD)

ELSR (MLD)

SUMP (MLD)

ELSR (MLD)

Remarks

Zone 1 Old Town (main) area (Meldi Mata)

32800 5.08 0.13* 0.13** 0.00 0.0 0.00 0.0

Zone 2 Yogeshwar and TP Scheme 1

8690 1.35 0.50 0.20 2.0 0.15 2.50 0.35 Main Head Works

Zone 3 Srinagar Bore and TP Scheme 2

3976 0.62 0.50* 0.25** 0.00 1.4 0.00 1.4 Supply to City Area from this bore to be new areas includes the TP Scheme areas

Zone 4 Rupal Bore and TP Scheme 3

1560 0.24 0.15* 0.20 0.00 0.00 0.00 0.20 Addition storage for TPS 3 is proposed.

Zone 5 Madhuban Bore and Industrial area

1670 0.26 0.50* 0.20 0.00 0.00 0.00 0.20 For industrial supply to South and central zone a separate ESR is proposed.

Zone 6 Maidan and Ramnagar Area

2890 0.45 0.50* 0.20 0.00 0.00 0.00 0.20 Existing new ESR is would to supply to South Eastern Zone

Zone 7 Trimurti Bore Eastern Zone

1150 0.18 0.59 0.25 0.00 0.00 0.59 0.25 Proposed to utilize this source for industrial areas only is not covered in proposal

TOTAL 52736 8.01 1.09 1.05 2.0 1.55 3.09 2.60

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPR

* Not to be utilized in proposed project. Rising Mains are designed from the Main Head Works to reach to supply water to all ESR in the supply zones. This would reduce the recurring O&M Cost to the Nagarpalika.**ESR not in working condition not serviceable till the ultimate year

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPR

ZONE WISE WATER DEMAND

Zone Zone Name

OHT Capacity

Present popn. Inter. Popn.

Ultimate Popn. Water Demand

(in Lac Liter)

2008 2023 2038 2008 2023 2038

1 Old Town (Meldi Mata Chowk Area) 0 21579 26667 32800 3.34 4.13 5.08

2 Yogeshwar & TP Scheme 1 0.15 5717 7065 8690 0.89 1.10 1.35

3 Srinagar bore & TP Scheme 2 14.0 2616 3233 3976 0.41 0.50 0.62

4 Rupal bore & TP Scheme 3 0.2 1026 1268 1560 0.16 0.20 0.24

5 Madhuban bore & Industrial Area 0.2 1099 1358 1670 0.17 0.21 0.26

6 Maidan & Ramnagar Area 0.2 1901 2350 2890 0.29 0.36 0.45

7 Trimurti bore Eastern Zone 0.25 757 935 1150 0.12 0.14 0.18

  Total 15.25 34695 42875 52736 5.3776 6.6455 8.174

             MLD MLD  MLD 

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPRProposed Water Supply ComponentsSource Surface Water from Narmada Canal

Bavla Taluka Head works is being supplied clear and treated water from the Narmada Canal Authorities. Proposed project would be sourcing its supply for the town from canal and 4.5 MLD supply is assured by the canal authorities for the present population and 8.0 MLD water till the ultimate year. No investment on the treatment and chlorination is required for the town.

Rising Main from Proposed Clear Water Rising Main from Yogeshwar HW (Narmada Head Work) Sump (proposed) to All ESR The rising main from the clear water sump is proposed under the project to supply water to existing and proposed ESR. The pumping mains are designed to supply directly to ESR there by reducing the scope of the sump at each of these water works site.

Pumping machinery Proposed to install at Main Head Works - Two numbers of pump sets including one as stand by unit of capacity 117.60 KW are proposed with 100% standby.

Clear Water Sump The project proposed to construct 2.0 MLD clear water sump at the Bavla Town Head Works at the present Yogeshwar bore area in the TP scheme no. 1. The existing sump of 0.5 MLD would be utilized specifically for the additional demand likely to arise from the rice mill industrial supply (120 nos) within the Bavla town.

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPRProposed Water Supply Components

Service Reservoirs The town has at present 9 ESR serving from outside the old city area and is poorly interconnected. Since the service reservoirs were dependent on the bore water which was pumped from the sump located at each of the sites the O&M cost used to be high as more than 20-30 % of the total revenue

expenditure.

The project proposed to connect all the existing ESR except Trimutri Bore (Beyond NH) and Havada Bore to the Main Head Works. Three new ESR are proposed to meet the zonal demand till the ultimate year, especially in the TP scheme areas.

Elevated service reservoir ( 1.5 Lakh Liter capacity) in Yogeshwar Water Works

Elevated service reservoir ( 14.0 Lakh Liter capacity) at Srinagar Bore Water Works

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPRProposed Water Supply ComponentsDistribution System – Proposed Rezoning

The entire water distribution system has been segmented into seven (7) zones. Each zone will be served by an independent service reservoir. To facilitate this zoning, the total water distribution to each proposed zone has been determined based on per capita demand and benefiting population. Details of the proposed distribution system (Existing and Proposed Service Reservoir) indicating the population served at the ultimate stage, storage capacity, storage/demand ratio etc. is furnished.

For the convenience of utilization of the existing storage and planning for the new infrastructure it was necessary to justify the equitable and area specific distribution zones. For the proposed project the town is rezoned into following water supply zones and infrastructure is presented in table. Proposed Distribution NetworkProposed Distribution Network

Providing Distribution System to Madhuban Bore ESR area

Providing Distribution System to Yogeshwar Bore (TP1) ELSR Area

Providing Distribution System to Srinagar Bore (TP2) ELSR Area and Old Gamtal Area

Providing Distribution System to Rupal Bore (TP3) ELSR Area

CONTENTS OF BAVLA DPRCONTENTS OF BAVLA DPRRECAPATULATION SHEET

Component Description Amount (Rs.)

1 Construction of R C C Under ground sump (20 Lakh capacity) at Yogeshwar Bore Main Head Works

20.00

2 Construction of RCC Elevated service reservoir ( 1.5 Lakh capacity in Town planning Scheme 1 at Yogeshwar Bore site

16.05

3 Construction of RCC Elevated service reservoir ( 14.0 Lakh capacity at Srinagar Bore site

80.93

4 Providing Distribution System to Madhuban Bore ESR area 49.45

5 Providing Distribution System to Yogeshwar Bore (TP1) ELSR Area 48.94

6 Providing Distribution System to Srinagar Bore (TP2) ELSR Area 138.02

7 Providing Distribution System to Rupal Bore (TP3) ELSR Area 132.52

8 Providing Rising main for various ELSRS in Bavla 106.73

9 Estimation of Pumping Machinery 23.58

10 Construction work of pump house (3.60 m x 7.50 m) (1 nos) 3.47

  Total 619.69

  Say Rs. (in Lakhs) 620

  Add 3% for Contingency Charges 18.6

  Total Gross Cost Rs. 638.6

  Add 1% for Third Party Inspection 6.386

  Add 1.5 % for DPR preparation 9.579

  Add 1.5 % for Capacity Building 9.579

  Total Cost for Approval (Rs. Lakhs) 664.144

  Say Rs. (in Lakhs) 664.144

BAVLA AUGMENTATION OF WATER SUPPLY SCHEME

PRESENT SUPPLI ED TW BASED WATER

UNCHANGED FOR THE PROJ ECT PROPOSEDAND CAN BE UTILIZED FOR THE EXI STINGSUPPLY ZONES.

HAVADA BORE

EX. ESR 1.0 LAC LITGL : 37.65 MBOTTOM RL : 46.5FSL RL : 49.65

EX. ESR 2.50 LAC LITGL : 38.50 MBOTTOM RL : 50.5FSL RL : 53.5

SRI NAGAR WATERWORKSPRESENT SUPPLIED TW BASED WATER

PROPOSED TO BE UNSUITABLE FOR USE ANDNOT USED BY THE PROJECT

PROP. DI K-9 150 MM DIA

PROPOSED FOR CONSTRUCTIONMAI N HEAD WORKS

PROPOSED TO CONSTRUCT THE ESR TOSERVICE THE REMAI NING POPULATION ATNORTH ZONE AND TP-1

BAVLA TOWN MAINHEAD WORKS

UG SUMP5.0 LAC LIT.

PUMPROOM

PROP. ESR 1.5 LAC LITGL : 39.15 MBOTTOM RL : 47.5 MFSL RL : 51.0 M

PROPOSED TO UTILIZE THEEXISTING ESR FOR THEYOGESHWAR NAGAR AREASAND TP 1 ONLY TILL THEULTIMATE STAGE 2038 AD.

YOGESHWAR WATERWORKS

EX. ESR 2.00 LAC LITGL : 39.10 MBOTTOM RL : 49.5 MFSL RL : 51.0 M

PROPOSED TO BEUNSUITABLE FOR USEAND NOT USED BY THEPROJECT

CI NEMA WATERWORKS

EX. ESR 1.13 LAC LITGL : 39.50 MBOTTOM RL : 47.5FSL RL : 51.5

DI K-9 500 MM DIA

GL 38.5

DI

K-9

100 M

M D

IA

DI K-9 500 MM DIA100 METERS LENGTH

PUMPROOM

EX. UG SUMP5.0 LAC LIT.

TO BE UTILIZED BY THE PROJ ECT CANALWATER SOURCED FROM THE NEW MAIDANWATER WORKS TO THE SITE. SEEDISTRIBUTION OF MAIDAN WATER WORKS

RAMNAGAR WATERWORKS

EX. ESR 0.70 LAC LITGL : 33.0 MBOTTOM RL : 40.00FSL RL : 43.0

EX. AC 400 MM DIA

PRESENT SUPPLIES TW BASED.

THE ESR I S TO BE UTILIZED FOR THE

EASTERN ZONE AND INDUSTRIAL AREAS

WEST OF THE NATIONAL HI GHWAY. THE

SUPPLY TO EXSITNG CINEMA BORE TO BECURTAILED IN SUBSEQUENT TIME.

EXI STI NG WATER WORKS

EX. ESR 2.50 LAC LITGL : 37.73 MBOTTOM RL: 42.0FSL RL : 47.0

TRI MURTI BORE

BAVLA WATER SUPPLY SCHEMEUIDSSMT SCHEMEGUJ ARAT URBAN DEVELOPMENT MISSION

DWG NO: D3

Green Eminent Consultants304, Time Square, FatehgunjVadodara-390002email: [email protected]

BAVLA WATER SUPPLY AUGMENTATION PLANPROPOSED RISING MAINS LAYOUT

GL 38.5

EX. UG SUMP1.56 LAC LIT.

GL 37.5

GL 39.10

GL 37.65

NEW ESR TO CONSTRUCTED TO AUGMENT THE

WATER DEMAND OF TP SCHEME NO 2.DISTRIBUTION NETWORK IS CONSIDEREDBASED ON THE FUTURE POPULATION PLANNEDFOR TP-2

PROP. ESR 1.5 LAC LITGL : 38.50 MBOTTOM RL : 50.5FSL RL : 65.5

SRINAGAR WW (TP2)EX. PUMP FOR SUMP40 HP CF

EX. PUMP FOR SUMP40 HP CF

EX. UG SUMP5.90 LAC LIT.

EX. UG SUMP1.135 LAC LIT.

EX. PUMP FOR SUMP-30 HP CF & 12.5 HP

EX. PUMP25 HP SUBMERSIBLE

PROP. DI K-9 150 MM DIA

DI K-9 250 MM DIA

DI K-9 250 MM DIA

DI K-9 250 MM DIA

EX. UG SUMP5.0 LAC LIT.

ABONDENED

ABONDENED

ABONDENED

ABONDENED

ABONDENED

ABONDENED

PROP.UG SUMP20.0 LAC LIT.

A

B

C

D

PRESENT SUPPLY FROM THE CINEMA BOREWOULD BE DISCONTINUED. PROJECT

WOULD HAVE RISING MAIN FROM THEBAVLA MAIN WATER WORKS TO THE SUMP.ESR WOULD SERVE THE STATION AREA ANDMAIN ROAD.

MADHUBAN BORE

EX. ESR 2.00 LAC LITGL : 40.0 MBOTTOM RL : 51.0FSL RL : 55.0J

I

G

EX. ESR 2.00 LAC LITGL : 37.50 MBOTTOM RL : 49.0FSL RL : 52.5

PRESENT SUPPLIES TW BASED.

PROPOSED TO BE CONNECTED TO THE MAINHEAD WORKS TO AUGMENT SUPPLY IN THE

MARKET AREA, RABARI VAS, HARIJAN VAS

AND TP 3

RUPAL BORE

EX. ESR 2.00 LAC LITGL : 48.0 MBOTTOM RL : 56.0FSL RL : 60.0 M

MAIDAN BORE

PROPOSED TO BEUTILIZED FOR SOUTHERNZONE

PROPOSED ESR

ABONDENED ESR

EXI STING ESR

ABONDENED

EX. UG SUMP5.0 LAC LIT.

GL 40.00

GL 48.00

GL 33.00

E

H

K

PROP. DI K-9 150 M

M DIA

150

MM

DIA

PROP.

DI K

-9 1

00 M

M DIA

YOGESWAR TO SWAMINARAYAN (A - B)

AREA EXI STING PROPOSED length (m)

634

517

700

480

80

1486

90

3003

250 DI

250 DI

150 DI

150 DI

100 DI

PROPOSED LINE

EXI STING LINE

250 DI

100 DI

498150 DI

150 DI

MADHUBAN BORE TO SRINAGAR BORE (B - D)

SRINAGAR BORE TO MELDI MATA J N. (D - E)

MELDI MATA JN. TO RUPAL BORE ESR (E - G)

MADHUBAN JN. TO MADHUBAN ESR JN. (B - H)

MADHUBAN JN. TO MADHUBAN BORE ESR (H- C)

MADHUBAN JN. TO MAIDAN J N. (H- I )

MAIDAN JN. TO MAIDAN ESR (I - J )

MAIDAN JN. TO RAMNAGAR ESR (I - K)

634.00 MT

517.00 MT

700.00 MT

480.0

0 M

T

498.00 MT

80.00 MT

1496.00 MT

90.00 MT

3003

.00 M

T

CLEAR WATER FROM BAVLA TALUKANARMADA HEAD WORKSBASED ON SSNNL CANAL (25 KM)

PROPOSED PUMP165 HP SUBMERSIBLE

GL 39.00GL 39.00

GL 39.00

DI STRIBUTI ON NETWORK FOR TP SCHEME 2 AREA ANDOLD GAMTAL AREA

LEGEND

DISTRIBUTION NETWORK FOR SRINAGAR ESRDISTRIBUTION NETWORK FOR SRINAGAR ESR

DISTRIBUTION NETWORK FOR YOGESHWAR ESRDISTRIBUTION NETWORK FOR YOGESHWAR ESR

DI STRI BUTI ON NETWORK IN THENORTH ZONE AND TP SCHEME 1 AREA

DISTRIBUTION NETWORK FOR RUPAL ESRDISTRIBUTION NETWORK FOR RUPAL ESR

DISTRI BUTI ON NETWORK I N THE MARKET AREA,HARI J ANWAS,RABARIVAS AND TP 3 AREA

DISTRIBUTION NETWORK FOR MADUBAN ESRDISTRIBUTION NETWORK FOR MADUBAN ESR

DISTRI BUTI ON NETWORK IN THENORTH ZONE