Page 1: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

METHOD OF WORKMODIFICATION and REPAIR

SUNGAI DANAU BRIDGE

1

KONTRAKTOR UTAMA

Page 2: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

2

Page 3: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

OWNER :

PU BINAMARGA

SCOPE OF WORK :

*) ENGINEERING SERVICE,

MODIFICATION & REPAIR,

( Steel Structure System )

QUANTITY OF WORK :

*) 1 SAP

SIZE OF MODUL :

SEE DRAWING

PROJECT :

PEMELIHARAAN JALAN

DAN JEMBATAN

LOCATION :

KALIMANTAN SELATAN PROVINCE

CONTRACTOR :

PT. PANJI BANGUN PERSADA

PREPARED :

*) PT. BANGUN INTI

GLOBAL

3

Page 4: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

4

Page 5: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

1. Pekerjaan perbaikan dan penggantianstruktur baja dalam seksi ini sesuaidengan gambar rencana.

2. Pekerjaan perbaikan dan penggantiantermasuk pekerjaan pemotongan danpenyambungan, pelurusan kembalistruktur baja adalah untuk pekerjaanperbaikan elemen baja yang mengalamikerusakan akibat karat atau lainsebagainya.

3. Pemotongan dan penyambungankembali dengan baja yang baru dapatmenggunakan las, baut mutu tinggi ataubaut biasa sesuai dengan persyaratanstruktur yang akan disambung.

5

Page 6: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

6

Page 7: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Lokasi jembatan berada di – Kec. Sungai Danau –Kabupaten Tanah Laut – Kalimantan Selatan. MerupakanJEMBATAN UTAMA sebagai Urat Nadi Ekonomi dari BatuLicin ke Tanah Bumbu atau ke Banjarmasin.

Page 8: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

TYPE A

TAMPAK JEMBATAN TYPE AYANG RUSAK

TYPE A

TAMPAK JEMBATAN TYPE AYANG RUSAK

TOP CORD

TAMPAK TOP CORD JEMBATANYANG RUSAK

TOP CORDYANG RUSAK

RAILINGYANG RUSAK

TAMPAK TOP CORD DAN RAILINGYANG RUSAK

DIAGONALYANG RUSAK

5 9 10 11 12

TAMPAK NO DIAGONAL YANG RUSAKNO. 5;9;10;11 DAN 12

DIAGONALRUSAK PARAH

12

TAMPAK DIAGONAL RUSAK PARAHNO. : 12

8

Page 9: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

9

PEMASANGAN STRUKTUR MATI PADA JEMBATAN (PIPA DLL)

MENGAKIBATKAN SIFAT ELASTIS DAN SUSPENDED JEMBATAN BERKURANG ATAU HILANG

PEMASANGAN STRUKTUR MATI PADA JEMBATAN (PIPA DLL)

Page 10: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

10

Page 11: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Jalan DatarKecepatan

Rendah

Jaringan Pipa menyatu dengan

Jembatan

Menikung menanjak Kecepatan Tinggi

Tidak ada rambu peringatan

Ketinggian Maksimal

Tidak ada rambu peringatan

Ketinggian Maksimal

Menikung menanjak Kecepatan Tinggi

Tidak ada rambu Peringatan

Kecepatan Maksimal

Page 12: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Jalan DatarKecepatan

Rendah

Menikung menanjak Kecepatan Tinggi

Menikung menanjak Kecepatan Tinggi

Jalan DatarKecepatan

Rendah

Gaya Centrifugal ke Dinding Jembatan

Struktur Jembatan yang Banyak Rusak

Tidak Ada Rambu Kecepatan

Page 13: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

RUSAK

TIDAK ADA PERINGATAN KETINGGIAN

UPPER CORD RUSAK

TIDAK ADA PERINGATAN KETINGGIAN

UPPER CORD RUSAK

TIDAK ADA PERINGATAN KECEPATAN

GAYA CENTRIFUGAL MENGHANTAM STRUKTUR

GAYA CENTRIFUGAL MENGHANTAM STRUKTUR

SISI KIRI BATU LICIN

GAYA CENTRIFUGAL MENGHANTAM STRUKTURSISI KIRI DARI BATU LICIN

RUSAK

Page 14: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

14

Page 15: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Kendaraan membawa alat berat DARI BATU LICIN,

karena berat, menikung dan menanjak kendaraan di-GAS

untuk menambah power.

Menikung menanjak Kecepatan Tinggi, karena berat menimbulkan GAYA CENTRIFUGAL TINGGI kesisi

jembatan.

Gaya Centrifugal ke SISI JEMBATAN

Kecepatan tinggi dan Gaya Tinggi

mengakibatkan tidak bisa langsung berhenti.

TITIK KENDARAAN MENAMBAH

KECEPATAN – DITITIK TIKUNGAN DARI

BATU LICIN

TIANG LAMPU PENERANGAN

Page 16: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

DIAGONALYANG RUSAK

TITIK GAYA CENTRIFUGAL DAN

MOMENTUM TERBESAR

1. Kemungkinan sangat besarJembatan ditabrak-diiris olehKendaraan Berat/ Trailer dariBatu Licin bermuatan DOZERdengan Type D8 UP ( > 30Ton).

2. Kec. Lebih > 20 Km/jam,sehinggaCentrifugal meng-akibatkan - PISAU/BLADE -DOZER mengiris MemberJembatan.

3. Moment terbesar terjadi diMember no. 10 & 11,SUSPENDED JEMBATANDIPERKECIL STRUTUR PIPAPDAM – akibatnya TRUSSJEMBATAN TIDAK BISALENTUR MAKSIMAL danBETON MENJADI RETAK –STRUKTUR JEMBATAN TIDAKBISA DEFLECTION OPTIMAL.

4. Dimember No. 12 Kendaraanberhenti dan Dozer Kondisiakan jatuh dari Kendaraan.

REPAIR GANTI GANTI GANTI GANTI

Page 17: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

AKIBAT BENTURAN DAN IRISAN DARI BLADE DOSER – SEPERTI DI IRIS - MEMBER JEMBATAN SOBEK DAN MENGAKIBATKAN KERUSAKAN /SOBEKAN MEMBER STRUKTUR JEMBATAN

AKIBAT BENTURAN, MOMENT DARI KECELAKAAN, dan JEMBATAN TIDAK LAGI SUSPENDED KARENA ADANYA STRUKTUR KAKU DI BADAN JEMBATAN (PIPA PDAM) – STRUKTUR BETON JEMBATAN RETAK.

KARENA BENTURAN DAN MOMENTUM BESAR – DAN

STRUKTUR TIDAK SUSPENDED MENGAKIBATKAN RETAKAN

JEMBATAN.

Page 18: BIG - Methode of repair steel bridge Sungai Danau - Indonesia
Page 19: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

19

Page 20: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

20

Page 21: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

21

Page 22: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

22

Page 23: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

1. AASHTO M 164M01 High Strength Bolts for Structural Steel Joints, HTB 8,8 – 365 lb.ft

2. ASTMA233 Arc Welding Electrode A70163. ASTMA307 Mild Steel Bolts and Nuts (Grade A) HTB, 4. ASTM A36 Standard Specification for Carbon Structural

Steel SM 4905. ASTM A514 Standar Specification for highyield strength

quenched and tempered alloy steel plate, suitable for welding SM 490, A7016,

6. ASTM A588/A588M Standar Specification for high-strength lowalloy structural steel, up to 50 Ksi (345 Mpa) minimum yield point, with armospheric corrosion resistance,

7. AWS D1.588 Bridge Welding code Arc Weld Steel.

23

Page 24: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

24

Page 25: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Penentuan Keberhasilan Modifikasi dan Repair Struktur Jembatan :

1. Mengembalikan fungsi teknis jembatan kepada Design semula atau mendekati semula,

2. Mengembalikan bentuk dan design jembatan pada kondisi semula atau mendekati semula,

3. Temporary struktur harus mampu menahan gaya secara temporer,

4. Pelaksanaan modifikasi, perbaikan dan penggantian elemen harus dipastikan tidak menimbulkan adanya gaya tambahan,

5. Jika memungkinkan tidak menghalangi atau menghentiakan aktifitas ekonomi yang ada Kendaraan yang lewat,

6. Tidak MEMBERI TAMBAHAN STRUKTUR.7. Tidak MEMBERI dan TAMBAHAN BIAYA BARU diluar biaya

yang telah direncanakan JIKA TIDAK URGENT.

25

Page 26: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

26

Page 27: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Peralatan :1. Pemasangan Bolts & Nuts Kunci Moment 30 kgm atau disesuaikan

dengan mutu serta diameter baut (HTB 8.8) yang dipasang. 2. Alat potong Cut Saw, Cutting Torg,3. Alat penyambung Travo Las Kap. Min 300 A,4. Penarik Hyd Jack, Chain Block kap 5 Ton.

Persiapan Kerja :1. Koordinasi dengan dinas terkait, Kepolisisan lalu lintas dalam

menentukan Trafick Management,2. Merencanakan Trafick Management, Arus Lalu Lintas, Kecepatan

Berkendara dan lain-lain,3. Menyiapkan Rambu, Peringatan, Bendera Tanda, Lampu Tanda

dan lain-lain,4. Menyiapkan Temporary struktur, sebagai pengganti sementara

struktur yang akan diperbaiki atau diganti,5. Menyiapkan peralatan secara perfect sehingga perbaik-an atau

penggantian struktur tidak memakan waktu lama.

27

Page 28: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

28

Page 29: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

29

Page 30: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

30

Page 31: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

31

Page 32: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

32

Page 33: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

33

ABCDEF

1’

G

2’3’4’5’6’7’8’

1. Member No. 1,2. Member No. 2,3. Member No. 3,4. Member No. 4,5. Member No. 5,6. Member No. 6,7. Member No. 7.

8. Member No. 8,9. Member No. 9,10. Member No. 10,11. Member No. 11,12. Member No. 12,13. Member No. 13,14. Member No. 14.

MEMBER : BOOTOM JOINT :

1. Bottom Joint No. 1’,2. Bottom Joint No. 2’,3. Bottom Joint No. 3’,4. Bottom Joint No. 4’,5. Bottom Joint No. 5’,6. Bottom Joint No. 6’,7. Bottom Joint No. 7’.8. Bottom Joint No. 8’

TOP JOINT :

1. Top Joint No. A,2. Top Joint No. B,3. Top Joint No. C,4. Top Joint No. D,5. Top Joint No. E,6. Top Joint No. F,7. Top Joint No. G.

= BAGUS = RUSAK/PATAH

Page 34: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

34

Page 35: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Site Identification :1. Survey dan pengukuran riel di site (Jembatan Existing),2. Identifikasi kerusakan dan solusi Modif & Repair struktur,3. Rekord dan penuangan dalam sket,4. Membandingkan dengan Design awal.

35

Telah dilakukan tanggal 5 November 2015

Page 36: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

36

Page 37: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

STREGHT CALCULATION :1. Kalkulasi dan perhitungan gaya Design (Jembatan Existing),2. Kalkulasi dan perhitungan gaya riel setelah accident,3. Kalkulasi dan Perhitungan –MEMBER - pengganti,4. Kalkulasi Modifikasi, Repair dan Penggantian Member.

37

1. Member 1 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN2. Member 2 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN3. Member 3 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN4. Member 4 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN5. Member 5 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN6. Member 6 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN7. Member 7 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN8. Member 8 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN9. Member 9 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN10. Member 10 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN11. Member 11 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN12. Member 12 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN13. Member 13 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN 14. Member 14 BB = 2,76KN, BH = 1,28KN, BHk=1,35KN, BHTk = 4,12KN

BB = Dead Load, BH=Life Load, BHt=Life Load c/w Momentum, BHTk=Tot. Life Load c/w Momentum

Page 38: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

MEMBER EXISTING 8 mm

88

Page 39: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

39

Page 40: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Deflection Model :1. Permodelan Deflesi setelah Modifikasi, Repair atau Penggantian,2. Penentuan Dimensi –MEMBER / DIAGONAL pengganti,,3. Rekord dan Penuangan dalam Design,

40

DEFLECTION SUSPENDED MAX 25 MM

Page 41: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Streght Model :1. Kalkulasi dan perhitungan STREGHT MEMBER pengganti,2. Perhitungan Sambungan dan Joint Bolts Nurs,3. Design Drawing & Fabrication Drawing,

41

Page 42: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

42

Page 43: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

43

Force adn deflection Model FRAME MEMBER No. # 5:

1. Permodelan FRAME2. Permodelan SOLID FRAME3. Pemodelan SOLID DEFLECTION4. Permodelan SOLID FORCE5. Penentuan Dimensi – MEMBER / DIAGONAL pengganti,,

MEMBER NO. #5

Page 44: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

44

5

Page 45: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

45

5

Page 46: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

46

5

Page 47: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

47

5

Page 48: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

48

Page 49: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

49

MEMBER NO. #9

Force adn deflection Model FRAME MEMBER No. # 9 :

1. Permodelan FRAME2. Permodelan SOLID FRAME3. Pemodelan SOLID DEFLECTION4. Permodelan SOLID FORCE5. Penentuan Dimensi – MEMBER / DIAGONAL pengganti,,

Page 50: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

50

9

Page 51: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

51

9

Page 52: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

52

9

Page 53: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

53

9

Page 54: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

54

Page 55: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

55

MEMBER NO. #10

Force adn deflection Model FRAME MEMBER No. # 10 :

1. Permodelan FRAME2. Permodelan SOLID FRAME3. Pemodelan SOLID DEFLECTION4. Permodelan SOLID FORRCE5. Penentuan Dimensi – MEMBER / DIAGONAL pengganti,,

Page 56: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

56

10

Page 57: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

57

10

Page 58: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

58

10

Page 59: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

59

10

Page 60: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

60

Page 61: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

61

MEMBER NO. #10

Force adn deflection Model FRAME MEMBER No. # 10 :

1. Permodelan FRAME2. Permodelan SOLID FRAME3. Pemodelan SOLID DEFLECTION4. Permodelan SOLID FORCE5. Penentuan Dimensi – MEMBER / DIAGONAL pengganti,,

Page 62: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

62

11

Page 63: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

63

Page 64: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

64

Page 65: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

65

Page 66: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

66

Page 67: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

67

MEMBER NO. #12

Force adn deflection Model FRAME MEMBER No. # 12:

1. Permodelan FRAME2. Permodelan SOLID FRAME3. Pemodelan SOLID DEFLECTION4. Permodelan SOLID FORCE5. Penentuan Dimensi – MEMBER / DIAGONAL pengganti,,

Page 68: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

68

12

Page 69: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

69

12

Page 70: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

70

12

Page 71: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

71

12

Page 72: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

72

Page 73: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

MEMBER DIAMBIL 10 mm

99

Page 74: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

74

Page 75: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Fabrication :1. Pembuatan Cutting List,2. Pemotongan Cutting,3. Welded dengan pengangkuran jika dikhawatirkan

pada saat pelaksanaan akan terjadi puntiran,4. Galvanized,5. Finishing Fabrikasi,6. Mobilisasi.

75

Page 76: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

76

CUTTING MAL : CUTTING :

GALVANIZED : WELDED :

FINISHING : MOBILIZATION :

Page 77: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

77

Page 78: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

78

Page 79: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Setting dam Penyetelan :

1. Sebelum dilakukan DISMANTLING MEMBER UTAMA yang RUSAK dilakukan penyetelan ulang terhadap TEMPORARY STRUCTURE untuk menjamin keselamatan, keamanan dan kekuatan selama penggantian,

2. Penandaan titik-titik JOINTING dan BM pasangan.

79

Page 80: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

ERECTION STRUKTUR PENGGANTI :1. Dilakukan pengecekan dan pengukuran ulang

terhadap struktur pengganti yang akan dipasang,2. Dilakukan penentuan BM dari struktur pengganti

dengan Jembatan,3. Erection dan penggantian struktur yang RUSAK

secara Hati-hati, Terencana dan Cepat menghindari kelelahan TEMPORARY STRTUKTUR dan Jembatan.

80

Page 81: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

PENYETELAN STRUKTUR PENGGANTI :1. Selama penggantian lakukan penyetelan dengan

pengamatan tehdapat PERGERAKAN JEMBATAN dan TEMPORARY STRUKTUR,

2. SETEL SESUAI DESIGN –MODIF & REPAIR yang telah disusun.

81

Page 82: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

82

Page 83: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

:1. Seluruh Bolts & Nuts di lokasi struktur yang RUSAK – HARUS DIGANTI – karena kelelahan

yang pasti telah terjadi dan bernilai besar,2. Lakukang pengencangan dengan Kunci SOK, untuk pengencangan dan Test Terhadap

KEKENCANGAN Bolts & Nuts Lakukan dengan Kunci Moment 365 lb.ft,3. Lakukan dengan URUTAN SESUAI DENGAN BERSELANG SELING AGAR TERJADI BEBAN

YANG MERATA DAN SEIMBANG.

83

Page 84: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

84

Page 85: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

85

URGENT...!!!

Page 86: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

86

URGENT...!!!

Page 87: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

87

Page 88: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

JALUR BERGILIR DARI

BANJARMASIN

Rambu PENYETOPAN,MT – bergilir – dari

Batu Licin

Rambu PENYETOPAN,MT – bergilir – dari

Banjarmasin

Rambu PERINGATAN,MT – bergilir – dari

Batu Licin

Rambu PERINGATAN,MT – bergilir – dari

Batu Licin

JALUR BERGILIR DARI BATU LICIN

GARIS – RAMBU PEMBATAS PEKERJAAN

Page 89: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

89

MOHON MAAF..!!PERJALANAN ANDA TERGANGGU

ADA PEKERJAAN PENGGANTIAN TIANG JEMBATANHATI – HATI ...!! KECEPATAN MAX. 5 Km/Jam

MOHON MAAF..!!PERJALANAN ANDA TERGANGGU

ADA PEKERJAAN PENGGANTIAN TIANG JEMBATANHATI – HATI ...!! KECEPATAN MAX. 5 Km/Jam

TRAFICT MANAGEMENT :

1. PEMBERIAN PERINGATAN KECEPATAN MAX. 5 Km/Jam,2. PEMBERIAL RAMBU TANDA – ADANYA PEKERJAAN PENGGANTIAN TIANG JEMBATAN,3. PEMBERIAL LAMPU TANDA – ROTATING LAMP,4. PEMBERIAL BARIKADE PEKERJAAN – SEPANJANG JEMBATAN DENGAN TIANG, TALI DAN HOSE LIGHT,5. PENGATURAN LALU LINTAS – SATU ARAH – LALU LINTAS BERGILIR,

Page 90: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

90

MOHON MAAF..!!PERJALANAN ANDA TERGANGGU

ADA PENGGANTIAN TIANG JEMBATANKECEPATAN MAX. 5 Km/Jam

MOHON MAAF..!!PERJALANAN ANDA TERGANGGU

ADA PEKERJAAN PENGGANTIAN TIANG JEMBATANHATI – HATI ...!! KECEPATAN MAX. 5 Km/Jam

ROTATING LAMP

2 m

2 m

TRAFICT MANAGEMENT :

1. PEMBERIAN PERINGATAN KECEPATAN MAX. 5 Km/Jam,2. PEMBERIAL RAMBU TANDA – ADANYA PEKERJAAN PENGGANTIAN TIANG

JEMBATAN,3. PEMBERIAL LAMPU TANDA – ROTATING LAMP,4. PEMBERIAL BARIKADE PEKERJAAN – SEPANJANG JEMBATAN DENGAN TIANG,

TALI DAN HOSE LIGHT,5. PENGATURAN LALU LINTAS – SATU ARAH – LALU LINTAS BERGILIR,

Page 91: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

TRAFICT MANAGEMENT :1. Lakukan Koordinasi dengan Polisi Lalu lintas

masalah TRAFICT MANAGEMENT yang telah disusun,

2. Beri Rambu, Tulisan Peringatan, Bendera dan Penjaga Trafict dengan perlengkapan sesuai rencana,

3. Letakan Rambu, Tulisan Peringatan dan lain-lain dengan Jarak Minimal 50 m’ dan Maksimal 100 m’ dari lokasi Jembatan,

4. Pada Malam hari beri Rambu Peringantan dan Lampu Tanda sebagai pemberitahuan adannya KEGIATAN PROYEK.

91

Page 92: BIG - Methode of repair steel bridge Sungai Danau - Indonesia

Sunyoto,Telp. : 0813-88955450Web. : www.globalintigroup.comChannel : www.youtube.com/user/globalinti3E mail : [email protected]