Page one Project: Tsolum River Spirit Park - Armoured Ford Access type: Pedestrian, Horses and ATV's Date: 11-Nov-04 NOTE: For preliminary planning only - Detailed field measurements are needed prior to project commencement …………… Page one …………… Page two …………… Page three …………… Page four …………… Page five …………… Page six …………… Page seven …………… Page eight …………… Page nine …………… Page ten APPENDIX 2 - Stream sizing calculator …………… Page eleven APPENDIX 3 - Example - Sediment control management at a stream crossing …………… Page eleven …………… Page twelve …………… Page thirteen …………… Page fourteen . Copyright: 2000, 2001, 2002, 2003, 2004, 2005 - Eric L Kay MACHINERY AND LABOUR REQUIREMENTS (continued) APPENDIX 1 - Trucking Calculator Work-sheet For additional information on armoured fords, see page 9 APPENDIX 4 - Ford shape and engineering guide MOBILIZATION / DE-MOBILIZATION BLANK APPENDIX 5 - Ford concept drawing - 3D view APPENDIX 6 - Ford concept drawing - Plan/Elevation View DATA ENTRY Armoured Ford - Construction Calculator Utilizing Armour Rock or Flexible Concrete Revetment (Armoured Concrete Block) BIO-ENGINEERING MATERIALS AND LABOUR REQUIREMENTS MATERIALS CALCULATOR I N D E X MATERIALS LIST AND COSTS MACHINERY AND LABOUR REQUIREMENTS I N D E X Prepared by: Eric L Kay Kay and Associates www.kayassociates.com Eric L Kay Associates Ford Construction Calculator V15.xls Page 1 of 14

Armoured Ford construction calculator v15

Embed Size (px)

Citation preview

Page one

Project: Tsolum River Spirit Park - Armoured Ford

Access type: Pedestrian, Horses and ATV's

Date: 11-Nov-04

NOTE: For preliminary planning only - Detailed field measurements are needed prior to project commencement

…………… Page one

…………… Page two

…………… Page three

…………… Page four

…………… Page five

…………… Page six

…………… Page seven

…………… Page eight

…………… Page nine

…………… Page ten

APPENDIX 2 - Stream sizing calculator …………… Page eleven

APPENDIX 3 - Example - Sediment control management at a stream crossing …………… Page eleven

…………… Page twelve

…………… Page thirteen

…………… Page fourteen

.

Copyright: 2000, 2001, 2002, 2003, 2004, 2005 - Eric L Kay

MACHINERY AND LABOUR REQUIREMENTS (continued)

APPENDIX 1 - Trucking Calculator Work-sheet

For additional information on armoured fords, see page 9

APPENDIX 4 - Ford shape and engineering guide

MOBILIZATION / DE-MOBILIZATION

BLANK

APPENDIX 5 - Ford concept drawing - 3D view

APPENDIX 6 - Ford concept drawing - Plan/Elevation View

DATA ENTRY

Armoured Ford - Construction Calculator

Utilizing Armour Rock or Flexible Concrete Revetment (Armoured Concrete Block)

BIO-ENGINEERING MATERIALS AND LABOUR REQUIREMENTS

MATERIALS CALCULATOR

I N D E X

MATERIALS LIST AND COSTS

MACHINERY AND LABOUR REQUIREMENTS

I N D E X

ARMOURED FORD using Flexible Concrete Revetment (Armoured Concrete Block)

Designed and intended to minimize environmental damage and detrimental effects to a streams ecosystem by constructing

an armoured stream crossing where one or a combination of the following conditions exists;

1) POOR AVAILABILITY OF MATERIALS

- Rock rip-rap (armour) is not readily available.

2) HIGH COST OF MATERIALS

- Cost of generating rock is costly. (eg drilling and blasting)

- Transporting rock to the site is costly. (eg long hauling distances and/or poor road conditions)

3) ACCESS TIMES COSTLY

- Access for heavy machinery to the site is costly. (eg long hauling distances and/or poor road conditions)

4) ACCESS FOR TRUCKS AND MACHINERY LIMITED or RESTRICTED

- Transporting rock to the site is not possible. (eg road condition is poor or unsafe or in the event access is restricted due to road failure or failed

bridges etc.)

- Access for heavy machinery to the site is not possible. (eg road condition is poor or unsafe or in the event access is restricted due to road failure

or failed bridges etc.)

Prepared by: Eric L Kay

Kay and Associates www.kayassociates.com

Eric L Kay Associates Ford Construction Calculator V15.xls Page 1 of 14

Page two

Ford Construction Calculator

DATA ENTRY unit

STREAM CHARACTERISTICS

Stream width (active) Bank Full Width 5 meter(s) 100 mm 1,000 mm 800 mm

Stream flank flood apron width - LEFT 5 meter(s) 100 mm 800 mm 800 mm

Stream flank flood apron width - RIGHT 5 meter(s) 100 mm 800 mm 800 mm

Stream discharge fall width 0 meter(s) 100 mm 1,000 mm 800 mm

Stream discharge energy dissipator apron width 1 meter(s) 100 mm 1,000 mm 800 mm

Stream bed slope (percent) 2 percent

Heel in width - Upstream side 0.5 meter(s) 100 mm 1,000 mm 800 mm

Heel in width - Downstream side 0.5 meter(s) 100 mm 1,000 mm 800 mm

Ditchline length to shape - LEFT

Ditchline length to shape - RIGHT

Ditchline length to armour - LEFT 0 meter(s) 100 mm 300 mm 150 mm

Ditchline length to armour - RIGHT 0 meter(s) 100 mm 300 mm 150 mm

Running surface Outlsope/Inslope - Minimum (percent) 2 percent

Running surface Outlsope/Inslope - Maximum (percent) 5 percent

ROAD CHARACTERISTICS

Road width reguirement for expected traffic 1.4 meter(s)

Road approach apron length - LEFT 2 meter(s) 100 mm 600 mm 100 mm

Road approach apron length - RIGHT 2 meter(s) 100 mm 600 mm 100 mm

Heel in width - road approach apron - LEFT 0 meter(s) 100 mm 1,000 mm 800 mm

Heel in width - road approach apron - RIGHT 0 meter(s) 100 mm 1,000 mm 800 mm

Road approach apron Left steepness (percent) 10 percent

Road approach apron Right steepness (percent) 10 percent

Road approach to ford area left steepness (percent) 6 percent

Road approach to ford area right steepness (percent) 6 percent

Approach road surface sediment cross drain - LEFT no logical Y/N (EG cross drain onto vegetated area)

Approach road surface sediment cross drain - RIGHT no logical Y/N (EG cross drain onto vegetated area)

Bedding materials required under ACB,s? yes logical Y/N (Eg. Coarse sands)

(only if leveling of native materials is impractical)

Fill materials required between ACB's? yes logical Y/N (Eg. No native coarse gravels on site)

20% void between blocks, fill with coase native gravels

`

NOTE; 'Heel-in' may also be commonly referred to as; 'rounding down', 'rolling-in' and other terms. See diagrams for

further details. Ensure that the 'heeled-in' design depth be sufficiently below the anticipated scour depth eg. Erosion

during a peak high-water event (flood) or the natural movement of stream-bed materials. A minimum depth of 1 meter is

recommended.

(minus)

size

block

thicknessthickness

Rock

(note: views LEFT/RIGHT are looking up the stream)

ACB;s RockMeas-

urem-

entrip-rap

Eric L Kay Associates Ford Construction Calculator V15.xls Page 2 of 14

Page three

Ford Construction Calculator

(note: views LEFT/RIGHT are looking up the stream)

MATERIALS CALCULATOR

Quantities and Volumes

Stream width (active) Bank Full Width 7 sq meters 7 sq meters 7 cu meters

Stream flank flood apron width - LEFT 7 sq meters 7 sq meters 5.6 cu meters

Stream flank flood apron width - RIGHT 7 sq meters 7 sq meters 5.6 cu meters

Stream discharge fall width 0 sq meters 0 sq meters 0 cu meters

Stream discharge energy dissipator apron width 1.4 sq meters 1.4 sq meters 1.4 cu meters

Heel in width - Upstream side 0.7 sq meters 0.7 sq meters 0.7 cu meters

Heel in width - Downstream side 0.7 sq meters 0.7 sq meters 0.7 cu meters

Ditchline length to shape - LEFT

Ditchline length to shape - RIGHT

Ditchline length to armour - LEFT 0 sq meters 0 sq meters 0 cu meters

Ditchline length to armour - RIGHT 0 sq meters 0 sq meters 0 cu meters

Road approach apron length - LEFT 2.8 sq meters 2.8 sq meters 1.68 cu meters

Road approach apron length - RIGHT 2.8 sq meters 2.8 sq meters 1.68 cu meters

Heel in width - road approach apron - LEFT 0 sq meters 0 sq meters 0 cu meters

Heel in width - road approach apron - RIGHT 0 sq meters 0 sq meters 0 cu meters

TOTAL VOLUME MATERIALS 29.4 sq meters 29.4 sq meters 24.36 cu meters

Bedding materials required under ACB,s?

(only if leveling of native materials is impractical) yes logical Y/N

Bedding material : SandDepth : 150 mm

Volume required : 4.41 cu meters

Fill materials required between ACB's?

20% void between blocks, fill with coase native gravels yes logical Y/N

Bedding material : Coarse gravel or 1" minus crushDepth : 100 mm

Volume required : 2.94 cu meters

For assistance in calculating site-specific dimensions contact Eric L Kay at [email protected]

(not required for rock)

Flexible Concrete

Revetment / Armoured

Concrete Block (ACB's)

Armour Rock (ROCK) Well-

graded material that has a specified size range

calculated with reference to expected water energy

forces. eg. 100mm-400mm

ROCK

ACB;s ROCK

ACB;s

Eric L Kay Associates Ford Construction Calculator V15.xls Page 3 of 14

Page four

Ford Construction Calculator

MATERIALS LIST AND COSTS

ACB's Cost extension

ACB;s Blocks 29.4 Sq meters 40.00$ 1,176.00$

Woven Geotextile Fabric 29.4 Sq meters 2.00$ 58.80$

Trucking - Plant to staging point 0 -$

Trucking - Staging point to jobsite 1 hours 75.00$ -$

Helicopter - Staging point to jobsite hours 1,200.00$ -$

Machine time to move blocks on site 0 hours 85.00$ -$

Bedding materials required under ACB,s? yes logical Y/N

Bedding material : Sand

Depth : 150 mm

Volume required : 4.41 cu meters 12.00$ 52.92$

Fill materials required between ACB's?

20% void between blocks, fill with coase native gravels yes logical Y/N

Bedding material : Coarse gravel or 1" minus crush

Depth : 100 mm

Volume required : 2.94 cu meters 16.00$ 47.04$

Trucking for bedding & fill materials 1 hr Round trip

Truck capacity : 11 cu meters

Trucking hours required : 1.0 hours 55.00$ 55.00$

ACB's COSTS 1,389.76$

ROCK (volume required) 24.36 cu meters

From existing Rock Quarry

Drilling and blasting costs cu meters 4.00$ -$

Machine time to sort and load hrs excavator 135.00$ -$ Mob and demob for drill and blasting -$

Mob and demob for loading excavator -$

Purchased from a Rock Quarry cu meter

Large Rip-Rap 0 20.00$ -$

Sorted and graded 54 cu meters 25.00$ 1,350.00$ Other

Trucking of rock

Round trip time : 5 hr Round trip

Truck capacity : 9 cu meters

Trucking hours required : 15.0 hours 75.00$ 1,125.00$

ROCK COSTS 2,475.00$

For costs on Articulated Concrete Blocks, contact your local supplier

Note: Trilock block cost below is an

approximation only.

Please see your local distributor for

pricing for your particular job.

Eric L Kay Associates Ford Construction Calculator V15.xls Page 4 of 14

Page five

Ford Construction Calculator (continiued on page 6)

(hours) (24" 300lb)

Vibratory

Flatdeck plate

Excavator with Hiab compactor

Shape Stream width (active) Bank Full Width 1.0 hr

Shape Stream flank flood apron width - LEFT .5 hr

Shape Stream flank flood apron width - RIGHT .5 hr

Shape Stream discharge fall width .1 hr

Shape Stream discharge energy dissipator apron width .1 hr

Excavate Heel in width - Upstream side .5 hr

Excavate Heel in width - Downstream side .5 hr

Shape Road approach apron length - LEFT .5 hr

Shape Road approach apron length - RIGHT .1 hr

Excavate Heel in width - road approach apron - LEFT .1 hr

Excavate Heel in width - road approach apron - RIGHT .1 hr

Shape Approach road surface sediment cross drain - LEFT .0 hr

Shape Approach road surface sediment cross drain - RIGHT .0 hr

Place Bedding material for ACB;s blocks 1.0 hr

Shape Ditchlines 1.0 hr

Place Geotextile fabric (Non-woven) for rock installation

Place Geotextile fabric (woven) for ACB;s installationPlace ACB;s blocks

Backfill "Heel-in" areas of ACB;s installation 1.0 hr

Compact "Heel-in" areas of ACB;s installation 4.0 hr

Fill in ACB;s Interspace areas 1.0 hr

labour Spreading and leveling sand baselabour Keep ground moisture content correct for compacting

labour Operating vibrator compactor - base preparation 8.0 hr

labour Operating vibrator compactor - 'heel-in' areasLabour/Excavator Install and monitor water diversion channel

labour Stream damming for pumping around

labour Install pumps for pumping around

labour Monitor and keep pumps operating

Excavator Spreading and placing of gravel fill (voids in between ACB's 4.0 hrExcavator Placing of rock armour (large rip-rap) .0 hr 10.0 hr

(hours) (24" 300lb)

Vibratory

Flatdeck plate

Excavator with Hiab compactor

TOTALS: 12 0 22

Hourly RATE: 125.00$ 85.00$ 12.00$

Extension: 1,500.00 - 264.00

For assistance in estimating labour and machine times, contact your local Articulated Concrete Block Supplier or Eric L

Kay at [email protected]

Action wo

MACHINERY AND LABOUR REQUIREMENTS

Average of 6.25sq m per man

per hour to lay fabric and

place trilock blocks.

Eric L Kay Associates Ford Construction Calculator V15.xls Page 5 of 14

Page six MACHINERY AND LABOUR REQUIREMENTS (continued)

(contiued from page 6)

Pump for Dewatering Sandbags 4 man

maintaining Pump for stream crew

dampness for (state size diversion Hand Rock/gravel

compaction and quantity) labour truck

.0 hr

4.7 hr.0 hr

4.0 hr1.0 hr

2.0 hr

2.0 hr2.0 hr

1.0 hr

1.0 hr

1.0 hr

4.0 hr

Pump for Dewatering Sandbags 4

maintaining Pump for stream man crew

dampness for (state size diversion Hand Rock/gravel

compaction and quantity) 0 labour truck

0 0 0 26.7 0

10.00$ 12.00$ 35.00$ 125.00$

- - - 3,738.56 -

For assistance in estimating labour and machine times, contact your local Articulated Concrete Block Supplier or Eric L

Kay at [email protected]

work times per machine / unit / man

Eric L Kay Associates Ford Construction Calculator V15.xls Page 6 of 14

Page seven

Ford Construction Calculator

Area to treat with bio-engineering and treatment types

(sq meter) Extension

sq meters Grass seeding, dry -$ -$

sq meters Fertilizer -$ -$

sq meters Grass seeding, Hydroseed -$ -$

sq meters Grass seeding, Bonded Fibre Matrix -$ -$

sq meters Grass sod -$ -$

sq meters other -$ -$

sq meters Live staking with Willow Whips -$ -$

sq meters Contour wattling -$ -$

sq meters Planting of live plugs -$ -$

sq meters other -$ -$

sq meters other -$ -$

sq meters other -$ -$

TOTALS: -$

For assistance in estimating Boi-engineering requirements, contact Eric L Kay at [email protected] (For a

description and how-to of Bio-engineering, Eric also has a handbook availble, contact him for a complimentary copy)

Cost

Bioengineering typeArea

Please refer to "Boi-engineering Calculator" spreadsheet for calcualtions for area's to be treated and for

details of treatments. (For a copy of the spreadsheet send an email to [email protected])

BIO-ENGINEERING MATERIALS AND LABOUR REQUIREMENTS

Eric L Kay Associates Ford Construction Calculator V15.xls Page 7 of 14

Page eight

Ford Construction Calculator

Mobilization Demobilization Total hours cost extension

Excavator Lowbed 3 3 6 75.00$ 450.00$

Walking time 2 2 4 125.00$ 500.00$

Gravel trucks Travel time 5 5 10 75.00$ 750.00$

Rock Drill Lowbed time 3 3 6 75.00$ 450.00$

Travel time 2 2 4 75.00$ 300.00$

trucking time cost extension

ACB's transported to site from staging area eg flatdeck with hiab 5 60.00$ 300.00$

travel time cost extension

Machine to move stuff around on site eg bobcat or backhoe 5 55.00$ 275.00$

TOTAL of Mobilization / De-mobilization costs : 3,025.00$

MOBILIZATION / DE-MOBILIZATION

Eric L Kay Associates Ford Construction Calculator V15.xls Page 8 of 14

Page nine

Ford Construction Calculator

For further information on armoured fords, see Powerpoint presentation at www.kayassociates.com/powerpoint/ford.htm,

and a reprint of the magazine article on Fords at www.kayassociates.com/articles/ford.htm or send an email to:

[email protected]

BLANK

Eric L Kay Associates Ford Construction Calculator V15.xls Page 9 of 14

Page ten For use in assistance in appoximating

times and costs. NOTE: Does not take into

account mobilization and demobilization or

standby time or minimum billing hours or that

there may be delays for traffic or other factors.

Project: Date: 28-Jul-04

INSTRUCTIONS Spreading equipment

Enter your data into the bright YELLOW boxes Equipment type

Machine used for loading the trucks Rate

Loader type Ex 200 Excavator Road Grading

Loader hourly rate 88.32$ Grader type

Truck Type Capacity Rate

Truck type T/A Truck 12 Cubic yards Km of road graded per DAY 12

Truck Rate 65.00$ Km of road graded per HOUR 1.2

Materials Road width (m) Material depth (mm) Road length (m) Volume

Volume Calculation 7.0 600 40 168.0 Cubic Meters

23.6 inches 219.7 Cubic Yards

2.0 Lineal meters Total number

6.4 Lineal feet of truckloads 20.0

Trucking time calculator Loading Trucks time calculator

Truck capacity 12 Cu Yards Bucket Capacity (yards) 1

Truck capacity 9.2 Cu Meters Bucket Capacity (meters) 0.8

% of full capacity 90% Seconds per cycle 20

Actual truck load 8.3 Cu Meters Minutes per cycle 0.33

Trucking distance 9 Km (one way) Cycles per minute 3.0Trucking distance 18 Km (round trip) Buckets per truckload 10.8

Truck Travel Speed 40 Km/hr (average) Rounded UP buckets 11.0

Truck travel time 27 Minutes Minutes to load truck 3.7

Loading time/truck 4.0 Minutes (rounded up) Minutes to load truck (rounded up) 4.0

Dumping time/truck 2 Minutes

Truck cycle time 33 Minutes

Optimum number of Trucks 7.3 (Assuming there is adequate passingRounded down number of trucks 7.0 places for the trucks on the road)

7.0

Trucking/Loading Truck (trucking) Loader (loading) NOTE:Cost calcuator Time (HRS) Cost Time (HRS) Cost Equipment times

Calculated values 11.0 715.00$ 2.0 176.64$ are rounded up

User entered values 12.0 780.00$ 2.0 176.64$

Spreading equipment Road Grading

Cost calcuator Time (HRS) Cost Cost calcuator Time (HRS) Cost

Calculated values 2.0 -$ Calculated values 1.0 -$ User entered values -$ User entered values -$

S U M M A R Y Calculated values User entered values

Truck Loader Time Cost 176.64$ 176.64$ Ex 200 Excavator

Trucking Time Cost 715.00$ 780.00$ T/A Truck

Spreading equipment Time Cost -$ -$ 0Road Grading Time Cost -$ -$ 0

891.64$ 956.64$

Calculated values User entered values

TOTAL COSTS

For latest version of the Trucking estimating guide contact [email protected]

Ford Construction Calculator

Material depth (inches)

Use this guide to assist in calculating trucking times for Rock,

Gravels or Sand

Trucking Calculator

Ver 1.6

User entered number of trucks

APPENDIX 1 - Trucking Calculator Work-sheet

Distance covered with one truckload

Distance covered with one truckload

Eric L Kay Associates Ford Construction Calculator V15.xls Page 10 of 14

Page eleven

Ford Construction Calculator

ESTIMATE Q100 - using Forest Road Engineering Method

Where Q = Flood return interval of appoximately xx years eg. Q 2 = 2 years and Q 100 = 100 years

3.70

2.40

0.30

0.92

2.75

British Columbia Ministry of Forests

APPENDIX 3 - Example - Sediment control management at a stream crossing

Wbf (width bank full)W2 (Width, stream bed)

Dbf (Depth, banf full)

Q 2 area (Bankfull area)

meters

meters

meters

Q 100 area (Bankfull area x 3)

Square meters

APPENDIX 2 - Stream sizing calculator

Square meters

Wbf (width, bank full)

Dbf (Depth, bankfull)

W2 (Width, stream bed)

Eric L Kay Associates Ford Construction Calculator V15.xls Page 11 of 14

Page twelve

Ford Construction Calculator

Vehicle Dimension Summary Table BC Ministry of Forests - Kamloops Forest Region

Vehicle Center Angle Minimum Minimum Max ht of Minimumclassification clear of sag crest crest curve in water crossing

height departure curve curve 4m horiz distance width

mm % mm mm mm mmTwo Compact Pick-up 270 50% 4400 3000 750 700

wheel Full size Pick-up 270 45% 5400 3800 570 900

drive Extended cab Pick-up 300 43% 6300 4850 430 1000

trucks Crew cab Pick-up 300 39% 7100 7000 280 1000

Max : 300 50% 7100 7000 750 1000

Min : 270 39% 4400 3000 280 700Four Compact Pick-up 370 61% 4200 3100 730 600

wheel Full size Pick-up 300 45% 5800 4200 510 900

drive Extended cab Pick-up 350 50% 5400 4040 530 800

trucks Crew cab Pick-up 340 46% 6900 6200 330 1000

Compact Sport Utility 300 55% 4000 2680 910 600Full size Sport Utility 310 38% 6100 3300 670 900

Max : 370 61% 6900 6200 910 1000

Min : 300 38% 4000 2650 330 600

Special fire protection vehicle 430 32% 9300 3350 680 1300

Sub-classification

APPENDIX 4 - Ford shape and engineering guide

Angle of entry Angle of departurecenter clear height

Minium sag curve

Minium crest curve

Stream bed)

Approach ramp

armoured prevent

tracking of sediment

and vehicle damageWidth equal to

stream bed width

Stream bed is level but with

depression to maintain fish passage in

low flows

15% gradient

Maximum gradients

dependant on vehicle type

15% gradient

Width and depth of armoured channel equal to Q100

Approach ramp

armoured prevent

tracking of sediment and

vehicle damage

Suggested approach gradients

Two wheel drive - 15% max

Four wheel drive - 20% max

Width equal to

stream bed width

Existing road

Eric L Kay Associates Ford Construction Calculator V15.xls Page 12 of 14

Page thirteen

Ford Construction Calculator

For full-size drawings (.jpg or .dwg or other format) send an email request to [email protected]

For full-size paper copies or electronic copies of these drawings (available in different file formats) , please Email

[email protected] or call Eric at 1-250-337-5096

APPENDIX 5 - Ford concept drawing - 3D view

Eric L Kay Associates Ford Construction Calculator V15.xls Page 13 of 14

Page fourteen

Ford Construction Calculator

For full-size drawings (.jpg or .dwg or other format) send an email request to [email protected]

For full-size paper copies or electronic copies of these drawings (available in different file formats) , please Email

[email protected] or call Eric at 1-250-337-5096

APPENDIX 6 - Ford concept drawing - Plan/Elevation View

Eric L Kay Associates Ford Construction Calculator V15.xls Page 14 of 14