Upload
jamielee05
View
188
Download
0
Embed Size (px)
Citation preview
Project Introduction
For this assignment, we are required to find a specific empty land in a group of 2
students, to initiate a small construction project. The size of the land shall between
50m x 50m (2500m2) – 50m x 70m (3500m
2).
Individually, we have to propose a project that serves on any one or combination of
two of the following purposes such as recreation area, commercial area, industrial area,
agricultural area, tourism area and residential area.
To do this project, we are required to study types of building development which
includes site analysis & evaluation, suggestions, rationale, benefits and the needs of
the project to the client and to the community.
Objective
The objectives of this project is enable us to develop an understanding of the building
team, its organization, duties and inter-relations within which they will seek
employment, career progression or further study.
On top of that, it is also help to develop an awareness of their professional
responsibilities and to appreciate their profession in the construction industry.
Introduction to our Site
The plot of land we have looked upon is an unused and undeveloped piece of barren
land at Jalan Semenyih, Kajang Selangor thus we have decided that this plot of land
was a great area to develop because it is surrounded by commercial, residential,
educational and recreation area. It is also has some facilities around such as hospital,
petrol station and bank.
There are so many reasons why we choose this site to develop, but the main reason is
because of the prime location to set up practically anything we wanted to. With the
surrounding area consisting mainly of upper middle class residential, commercial area
and in recent months property there has been much development, thus is a great
potential increase in land value in the near future.
Site Plan
The size of site that we had chosen is 70m x 50m (3500m2).
Site Observation
Difference view of our site
The entrance and exit to the site
The residential area around our site, mostly double and single storey terrace/link
houses, lack of condominium or apartment around this area.
Shop lots nearby our site
There is a recreation park but no sport complex around this area.
Site Analysis
Show the direction of sunset and sunrise
The sunrises from east and set on the west.
Conclusion
At the end of this project, we have concluded the importance of developing a coherent
working relation among the various professionals of the construction industry. A
proper communication channel in organizing and coordinating the team is also
significant in such a way so as to create an effective working team to successfully
achieve the goal in managing a project. Besides, we are also able to document our
observations as well as produce systematic and convincing presentation and reports,
from all the research and analysis that we have done. From that, we enhance the
ability to justify the feasibility of a development and improve the proposal to serve the
purpose of the development.