27
RAHIYAD BHARUCH DISTRICT GUJARAT ADITYA SONI BHUPANDRA SALODIA LIPSA SAHOO RACHNA SUDIPTA DINDA

Rahiyad rural planning lab 12-12-12

Embed Size (px)

DESCRIPTION

this is a survey conducted in the village of Rahiyad to find out the pertaining issues after the involvemnt of GIDC. accordingly the proposals for sustaible development have been prepared.

Citation preview

Page 1: Rahiyad   rural planning lab 12-12-12

RAHIYAD BHARUCH DISTRICT

GUJARAT

ADITYA SONI BHUPANDRA SALODIA LIPSA SAHOO RACHNA SUDIPTA DINDA

Page 2: Rahiyad   rural planning lab 12-12-12

IMAGE OF A VILLAGE

Page 3: Rahiyad   rural planning lab 12-12-12

RAHIYAD

Page 4: Rahiyad   rural planning lab 12-12-12

LOCATION MAP and APPROACH

Page 5: Rahiyad   rural planning lab 12-12-12

RAHIYAD

Page 6: Rahiyad   rural planning lab 12-12-12

RAHIYAD

Page 7: Rahiyad   rural planning lab 12-12-12

RAHIYAD INTRODUCTION

ORIGIN 300 Years ago

NOMENCLATURE BY THE NAME OF RAMESHWAR MAHADEV (Local Deity)

INDUSTRY GNFC (TDI Plant)

ESTABLISHMENT OF PANCHAYAT

1956

PROFILE

SOIL TYPE – BLACK SOIL RAINFALL – 900 MM GROUND WATER TABLE – 30 FEET CLIMATE CONDITION – HOT AND DRY

AREA 28 ACRES APPROXIMATELY

NUMBER OF HOUSEHOLDS

314

Page 8: Rahiyad   rural planning lab 12-12-12

GAMTAL MAP SHOWING FADIYAS

Page 9: Rahiyad   rural planning lab 12-12-12

SOCIAL GROUPS

Page 10: Rahiyad   rural planning lab 12-12-12

AMENITIES & RELIGIOUS BUILDINGS

Page 11: Rahiyad   rural planning lab 12-12-12

RAHIYAD DEMOGRAPHICS

1116 1043 1315

1694

1981 1991 2001 2011

POPULATION

POPULATION

-73

272

379

1991 2001 2011

POPULATION GROWTH

POPULATION GROWTH

-6.54%

26.08% 28.82%

1991 2001 2011

GROWTH RATE

GROWTH RATE

898 866

900

988

1981 1991 2001 2011

SEX RATIO

SEX RATIO

-29

133 160

-44

139

219

1981 1991 2001

POPULATION GROWTH - GENDERWISE

MALE POPULATION GROWTH

FEMALE POPULATION GROWTH

-5%

24% 23%

-8%

29% 35%

1991 2001 2011

POPULATION GROWTH RATE - GENDERWISE

MALE POPULATION GROWTH RATE

FEMALE POPULATION GROWTH RATE

453

636

797

1981 1991 2001

LITERATES

LITERATES

343 434

525

110 202

272

1981 1991 2001

LITERACY - GENDERWISE

MALE LITERATES FEMALE LITERATES

58% 78% 76%

21% 42% 44%

1981 1991 2001

LITERACY RATE - GENDERWISE

MALE LITERACY RATE

FEMALE LITERACY RATE

Page 12: Rahiyad   rural planning lab 12-12-12

VILLAGE LEVEL SURVEY

RAHIYAD PRIMARY SCHOOL – (1-8 STD) NO.OF STUDENTS: 260

PANCHAYAT OFFICE: TEMPORARY

Page 13: Rahiyad   rural planning lab 12-12-12

DIFFERENT HOUSE TYPES – FOR SURVEY

Page 14: Rahiyad   rural planning lab 12-12-12

HOUSEHOLD LEVEL SURVEY - ANALYSIS

Page 15: Rahiyad   rural planning lab 12-12-12

RAHIYAD LIVESTOCK

15

18

3 3

0

2 1 1

BULLOCKS BUFFALOES COWS GOATS

HOUSEHOLDS WITH LIVESTOCK PRE 2008HOUSEHOLDS WITH LIVESTOCK

1. PRESENCE OF LIVESTOCK DENOTES DIRECT CONTRIBUTION OF WOMEN TO HOUSEHOLD'S PRODUCTION

2. THE VILLAGE ALSO HAD A CO-OPERATIVE DAIRY FOR A BRIEF PERIOD

3. IN THIS PERIOD WOMEN'S CONTRIBUTION TO THE HOUSEHOLD WAS IN MONETARY TERMS AS WELL

Page 16: Rahiyad   rural planning lab 12-12-12

RAHIYAD OCCUPATION TRANSITION

19.00

1.00

4

7

7

PRE 2008 POST 2008

FARMER FARMER TURNED LABOURER

FARMER TURNED N.A. FARMER TURNED OTHERS

MAJORITY OF THE WORKING CLASS POPULATION IS UNEMPLOYED AND ENGAGES ITSELF IN: 1. CONTRACT LABOR 2. SHOP KEEPING 3. HAWKERS 4. INDUSTRIAL WORKERS

Page 17: Rahiyad   rural planning lab 12-12-12

HOUSEHOLD LEVEL SURVEY - INCOME

PRE GIDC (BEFORE 2009) POST GIDC (AFTER 2009)

48%

7%

13%

13%

19% INR 0-10,000

INR 10,001-20,000

INR 20,001-30,000

INR 30,001-40,000

INR >40,000

16%

42% 23%

3% 16%

INR 0-50,000

INR 50,001-1,00,000

INR 1,00,001-1,50,000

INR 1,50,001-2,00,000

INR >2,00,001

INCOME RANGE

1.00 1.00

19.00

5.00 2.00 1.00 1.00

CONSTRUCTIONCONTRACTOR

COOKER REPAIRS FARMER LABOURER PANDIT POST MASTER TRADER

OCCUPATION PRE 2008

OCCUPATION

1 1 2 1 1 1 1 1 1 1 1

18

1 1 1 2 1 1 1 2 1 1

AP

PR

ENTI

CE

BU

SIN

ESS

CA

NTE

EN

CA

RP

ENTE

R

CA

RTI

NG

CH

EMIS

T

CO

NST

RU

CTI

ON

CO

NTR

AC

TOR

CO

OK

ER R

EPA

IRS

DR

IVER

FAR

MER

HER

DIN

G/M

ILC

HIN

G

LAB

OU

RER

S

LAU

ND

RY

MA

ID

MA

SON

PA

ND

IT

PH

OTO

STA

TO

UTL

ET

SUP

ERV

ISO

R

TEA

CH

ER

TRA

DER

TRO

LLEY

OP

ERA

TOR

WA

TCH

MA

N

OCCUPATION POST 2008 OCCUPATION

Page 18: Rahiyad   rural planning lab 12-12-12

INFERENCE OF SURVEY RAHIYAD

GIDC –RAHIYAD (YEAR 2008)

ACQUIRED AGRICULTURAL LANDS FROM

VILLAGERS

MONETARY GAIN TO VILLAGERS

LOSS OF MEANS OF LIVELIHOOD

(YEAR 2008)

HOUSING CONDITION IMPROVED

(2009-2012)

GIDC –DAHEJ (YEAR 1992)

ISSUE - UNEMPLOYMENT

GENERATE EMPLOYMENT

SUSTAINABLE LIVELIHOOD

Page 19: Rahiyad   rural planning lab 12-12-12

SUSTAINABLE LIVELIHOOD

VERMI COMPOSTING AND

PISCICULTURE

IMPROVEMENT OF BASIC

INFRASTRUCTURE

EXISTING DRAINAGE CONDITION FOR REPRESENTATION PURPOSE ONLY

Page 20: Rahiyad   rural planning lab 12-12-12

IMPROVEMENT OF PHYSICAL INFRASTRUCTURE

ELECTRICITY

WATER SUPPLY

DRAINAGE SYSTEM

THERE IS NO FACILITY FOR STORM WATER DRAINAGE AND SOLID WASTE MANAGEMENT

Page 21: Rahiyad   rural planning lab 12-12-12

ROAD MAP

Page 22: Rahiyad   rural planning lab 12-12-12

IMPROVEMENT OF PHYSICAL INFRASTRUCTURE

Page 23: Rahiyad   rural planning lab 12-12-12

PROPOSAL CURRENT STATE OF POND

UTILISATION OF NATURAL RESOURCE OF THE VILLAGE FOR CREATING EMPLOYMENT FOR THE VILLAGERS FOR THEIR SUSTAINABILITY.

ADVANTAGE : SKILL OF FISHING AMONGST CERTAIN PERSENTAGE OF VILLAGERS.

INITIAL CAPITAL REQUIRED = 10,000 RUPEES

ADDITIONAL CAPITAL REQUIRED = 40,000 RUPEES

YIELD = 30-35 QUINTAL PER ACRE

MARKET PRICE: 70-200 RUPEES PER KILOGRAM

FEASIBILITY

NATURAL RESOURCE

SUSTAINABLE LIVELIHOOD

Page 24: Rahiyad   rural planning lab 12-12-12

PROPOSAL : COMPOSITE FISH CULTURE

SHG

(SELF-HELP

GROUP)

FISHERIES DEVELOPMENT DEPARTMENT

SUSTAINABLE SOURCE OF LIVELIHOOD

LOCAL TALENT FOR ERP

ERP :ENTERPRISE RESOURCE PLANNING

Source : Society for Research and Initiatives for Sustainable Technologies and Institutions SRISTI

Page 25: Rahiyad   rural planning lab 12-12-12

PROPOSAL : VERMICOMPOST

SHG

(SELF-HELP GROUP)

VERMICOMPOST

TO SUPPORT PISCICULTURE

LOCAL TALENT FOR ERP

ERP :ENTERPRISE RESOURCE PLANNING

SOURCE: biotechpark.org.in urbanfishfarmer.com

Page 26: Rahiyad   rural planning lab 12-12-12

PROPOSAL VIABILITY

• TARGET GROUP

• SC-ST-OBC (BPL)

VERMICOMPOST SHG

• SGSY

• FINANCING RATION

• 1:9

GOVERNMENT SCHEME

• FISH FEED SUPPLYING SUBSIDIARY TO FISH CULTURE ACTIVITY

MARKET

• TARGET GROUP

• WOMEN

FISH CULTURE

• NRLM

• MKSY

GOVERNMENT SCHEME • NABARD

• FUNDING RATION

• 1:9

FUNDING

• EXISTING TRADE LINKS IN INDIA AND ABROAD

MARKET

VERMICOMPOST ACTIVITY

FISH CULTURE ACTIVITY

Page 27: Rahiyad   rural planning lab 12-12-12

JAB KHETI THI TO ZAMEEN KA BATWARA THA

PAR GHAR PARIVAR TO EK THA, WO MAA HI TO THI NAA

JAB MAA KO HI GAWAAN DIYA TO PARIVAR TOOT GAYA

GHAR KA EK BETA CHALA GAYA SHEHAR

TO EK GAON MEIN HI REH GAYA