25

Pueblo School District 60 Renewable Energy Demonstration Project

Embed Size (px)

Citation preview

Page 1: Pueblo School District 60 Renewable Energy Demonstration Project
Page 2: Pueblo School District 60 Renewable Energy Demonstration Project

Whitney Electric CompanyWired to the Future Since 1913

Page 3: Pueblo School District 60 Renewable Energy Demonstration Project

StEPP Grant FundingStrategic Environmental Project Pipeline

Author: Tharyn Mulberry, Heaton PrincipalCo-author: Dr. Lee Ann Martinez, CSU

Pueblo/ParentDistrict 60 Staff

Mark Gazette, Director of Facilities Management

Jeff Reed, Project Manager FacilitiesGreg Sinn, Public Relations Officer

Page 4: Pueblo School District 60 Renewable Energy Demonstration Project

Grant Summary$107,480 award to create an environmentally

sustainable campus that integrates green technologies into both operations and curricula

Program components include7.5 kW Wind generator with Weather Bug station6.3 kW Photovoltaic array with Internet

monitoringPV system will offset

146,000 lbs of CO2 1,245 lbs of NOx 125 lbs of SO2

Page 5: Pueblo School District 60 Renewable Energy Demonstration Project

Aerial view of proposed PV location

Page 6: Pueblo School District 60 Renewable Energy Demonstration Project

Model for Heaton Pole Layout

Page 7: Pueblo School District 60 Renewable Energy Demonstration Project

Model for Heaton System Kiosk

Page 8: Pueblo School District 60 Renewable Energy Demonstration Project

Array Location before Installation

Page 9: Pueblo School District 60 Renewable Energy Demonstration Project

Drilling Caissons for Pole Mounts

Page 10: Pueblo School District 60 Renewable Energy Demonstration Project

PV Work in Progress

Page 11: Pueblo School District 60 Renewable Energy Demonstration Project

Finished Solar Photovoltaic Project

Page 12: Pueblo School District 60 Renewable Energy Demonstration Project

Colorado Wind Resource Map

http://www.windpoweringamerica.gov/maps_template.asp?stateab=co

Page 13: Pueblo School District 60 Renewable Energy Demonstration Project

XCEL Energy Comanche Station, Pueblo, CO

Page 14: Pueblo School District 60 Renewable Energy Demonstration Project

XCEL Energy Comanche Station, Pueblo, CO

Page 15: Pueblo School District 60 Renewable Energy Demonstration Project

S-1 Zoning Map

Page 16: Pueblo School District 60 Renewable Energy Demonstration Project

7.5 kW Wind Turbine Challenges

Page 17: Pueblo School District 60 Renewable Energy Demonstration Project

Renderings for Neighborhood Meetings

Page 18: Pueblo School District 60 Renewable Energy Demonstration Project

Drilling the Caisson for the Base

Page 19: Pueblo School District 60 Renewable Energy Demonstration Project

The Turbine arrives from China

Page 20: Pueblo School District 60 Renewable Energy Demonstration Project

Preparing for the tilt-up

Page 21: Pueblo School District 60 Renewable Energy Demonstration Project

Turbine Control Equipment

Page 22: Pueblo School District 60 Renewable Energy Demonstration Project

Proud Papa

Page 23: Pueblo School District 60 Renewable Energy Demonstration Project

Student Choir Composes Song

Page 24: Pueblo School District 60 Renewable Energy Demonstration Project

Screaming Sixth Graders

Page 25: Pueblo School District 60 Renewable Energy Demonstration Project

Questions