Whitney Electric CompanyWired to the Future Since 1913
StEPP Grant FundingStrategic Environmental Project Pipeline
Author: Tharyn Mulberry, Heaton PrincipalCo-author: Dr. Lee Ann Martinez, CSU
Pueblo/ParentDistrict 60 Staff
Mark Gazette, Director of Facilities Management
Jeff Reed, Project Manager FacilitiesGreg Sinn, Public Relations Officer
Grant Summary$107,480 award to create an environmentally
sustainable campus that integrates green technologies into both operations and curricula
Program components include7.5 kW Wind generator with Weather Bug station6.3 kW Photovoltaic array with Internet
monitoringPV system will offset
146,000 lbs of CO2 1,245 lbs of NOx 125 lbs of SO2
Aerial view of proposed PV location
Model for Heaton Pole Layout
Model for Heaton System Kiosk
Array Location before Installation
Drilling Caissons for Pole Mounts
PV Work in Progress
Finished Solar Photovoltaic Project
Colorado Wind Resource Map
http://www.windpoweringamerica.gov/maps_template.asp?stateab=co
XCEL Energy Comanche Station, Pueblo, CO
XCEL Energy Comanche Station, Pueblo, CO
S-1 Zoning Map
7.5 kW Wind Turbine Challenges
Renderings for Neighborhood Meetings
Drilling the Caisson for the Base
The Turbine arrives from China
Preparing for the tilt-up
Turbine Control Equipment
Proud Papa
Student Choir Composes Song
Screaming Sixth Graders
Questions