33
A NOVEL INTEGRATED AC/DC/AC CONVERTERS FOR DIRECT DRIVE PERMANENT MAGNET WIND POWER GENERATION SYSTEM by SHEELA AROKIA MARY . J M.E ( EMBEDDED SYSTEM TECHNOLOGIES) Under the Guidance Of Mr.S.Sivasakthi M.E.,M.B.A., Associate Professor Head of the Department Department of EEE

Ppt phase-2

Embed Size (px)

Citation preview

Page 1: Ppt phase-2

A NOVEL INTEGRATED AC/DC/AC CONVERTERS FOR DIRECT

DRIVE PERMANENT MAGNET WIND POWER GENERATION

SYSTEM

by

SHEELA AROKIA MARY . J

M.E ( EMBEDDED SYSTEM TECHNOLOGIES)

Under the Guidance

Of Mr.S.Sivasakthi M.E.,M.B.A.,

Associate Professor

Head of the

Department

Department of EEE

Page 2: Ppt phase-2

To reduce the switching loss & Minimize the

circulating current in the power converters used in

Wind power generation system and to improve the

Power factor & overall performance of the system.

Page 3: Ppt phase-2

24 switches are used in Power converters.

Separate stabilizing circuit is used

Switching losses are high

Presence of Harmonics are high

Page 4: Ppt phase-2

9 switches are used.

Switching losses are reduced.

Circulating current is minimized.

Less harmonics.

Power factor improvement is made.

Page 5: Ppt phase-2

This proposed system has AC/DC/AC converter.

In existing ac-ac converter topologies, 2 level 6 switch

comprising a common dc link capacitor & VSI are

frequently used

In order to minimize the switching loss , we are

implementing a topology of 9 switch USMC for wind

energy conversion system.

For rectification, a 3 switch Vienna rectifier is used.

Page 6: Ppt phase-2

In inverter stage it employs an 6 switch VSI.

Hence the number of switches & switching losses are

reduced.

The circulating current is minimized & Power factor

improvement is made.

As a result harmonics are reduced & overall efficiency

is improved.

Page 7: Ppt phase-2

PWM using PI Controller Technique.

Page 8: Ppt phase-2
Page 9: Ppt phase-2

It converts wind energy into mechanical energy.

Types – horizontal axis wind turbine & vertical axis

wind turbine.

Efficiency & Power generation of wind turbine

depends on increase in height of the tower & speed of

the wind.

Direct drive- Generator directly coupled with turbine.

Page 10: Ppt phase-2

It converts the mechanical power output of wind

turbine into electrical power.

Principle-Faraday’s law of electromagnetic induction.

Can be extremely large – power ratings up to 1500MW

They are known as synchronous machines because

they operate at synchronous speed (speed of rotor

always matches supply frequency)Ns=120 f/p.

Instead of field winding, permanent magnet is used.

Does not require DC supply, Condenser not needed.

So output power is fully utilized and total loss is

reduced, higher efficiency.

Page 11: Ppt phase-2

3 phase AC

sourceLC Filter

Solid

state

switches

Diodes &

capacitive

circuits

DC

Link

Micro controller

based pulse

signal

Page 12: Ppt phase-2

Unidirectional 3phase AC/DC converter.

3 power switches.

PF improvement

Harmonics are reduced.

Page 13: Ppt phase-2
Page 14: Ppt phase-2
Page 15: Ppt phase-2

9 switches.

Converts unstable AC to stable AC voltage.

Switching loss is reduced

Circulating current is minimized.

Overall efficiency is improved.

Page 16: Ppt phase-2
Page 17: Ppt phase-2
Page 18: Ppt phase-2

MATLAB- Simulink

SOFTWARE REQUIREMENTS

Microcontroller

Inductor

Controlled rectifier

Inverter

Gate driver

Page 19: Ppt phase-2
Page 20: Ppt phase-2
Page 21: Ppt phase-2
Page 22: Ppt phase-2
Page 23: Ppt phase-2
Page 24: Ppt phase-2
Page 25: Ppt phase-2
Page 26: Ppt phase-2

Power factor

Disadvantages of lagging power factor

PF improvement equipments

Power triangle

Page 27: Ppt phase-2
Page 28: Ppt phase-2
Page 29: Ppt phase-2
Page 30: Ppt phase-2
Page 31: Ppt phase-2

This paper has comprehensively addressed the

mimization of circulating current and switching losses.

In this method the unstable AC voltage is converted to a

stable AC voltage with power factor improvement.

Experimental verification of the power converters

confirms the good performance and promising features

of the proposed directly driven permanent magnet wind

power generation system.

Page 32: Ppt phase-2

P.Goel,B.Singh,S.S.Muruthy,& N.Kishore,”Isolated wind -

hydro hybrid system using cage generators & battery

storage,”IEEE Trans.Ind.Electron., to appear.

M.Liserre,R.Cardenas,M.Molinas,&J.Rodriguez,”Overview of

multi-MW wind turbines & wind parks,”IEEE

Trans.Ind.Electron.,vol.58,no.4,pp.1081-1095,Apr.2011.

A.Rajaei,M.Mohamadian,S.M.Dehghan,&A.Yazdian,”PMSG-

based variable speed wind energy conversion system using

rectifier,”Euro. Trans.Electr.Power,vol,21,Jan 2011

Page 33: Ppt phase-2