9
ROOM full Of passiOn Architecture

Magazine

  • Upload
    lam-yu

  • View
    123

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Magazine

ROOMfull

Of

passiOn

Architecture

Page 2: Magazine

INDEX

1. ARHITECT'S PROFILE

2. COMPANY DESCRIPTIONS

3. PROJECT 1

4. PROJECT 2

Page 3: Magazine

ARCHITECT’S PROFILE

Mr. Arron studied diploma in Pertubuhan Arkitek Ma-laysia (PAM) in 1999 and get his diploma in 2001. Then, he continued his degree with Universiti Teknolo-gi Malaysia Space (UTM Space) in Jalan Semarak after his diploma and graduated in 2004.His working experiences start after he finished his SPM in second-ary school. He was working and studied as a part time student. He started as a apprentice for part 2 archi-tects and became a draft man. After he graduated, he starts his own company called as Arch & Tech Design Concept in 2004 which is right after his graduation. He starts off with drafting and soon began to get his own projects.Mr. Arron Vickneshwaran Batumalai is a graduated architect with a part 1 certificate but still he starts his own company right af-ter his graduation with the working experience he gained when he was working after his SPM.

rron Vickneshwaran Batumalai is a 37 years old architect who currently runs his own company called as Arch & Tech DesignCon-cept.

A

Page 4: Magazine

COMPANY DESCRIPTIONS

A rch & Tech Design Concept is an Architectur-al Design and Construction management company spe-cializing in providing design and consultation

in all respective areas for residential, commercial and industrial. The company was established in the year 2004 as a company providing design, drafting and con-struction management services, we are specialized in delivering Conceptual Design in Architectural works and Design Built Project for the past respective years.Arch & Tech approaches each project as a new de-sign exercise that requires a fresh perspectives and an open minded. Our approach is to research the project parameters, site context, feasibility studies, submission and by-laws, budgetary and construc-tion management. We work with our clients to explore and define their requirements. We fuse creative ex-perimentation with technical knowledge to come up with innovative yet practical solutions. Arch & Tech see effective client and end user involvement in proj-ects as being critical to a successful project outcome.

Page 5: Magazine

A Bunglow House in Bukit Rimau

PROJECT 1

Q : How many months/years does

required to complete this bunga-

low ?

A : approximately 10 to 12 months for

the whole building to finish together with all the interior design, finishings and furniture complete.

Q : How much is the cost to build ?

A : a normal bungalow house can cost

1.5 million to 1.8 million but it all de-

pends on the clients interest whether

they want it a simple bangalow house

or a fancy and modern one.. But the low-

est i have done until now is 1.3 milion.

Page 6: Magazine

Q : How many workers are required for this

small project ?

A : it requires about 2 - 3 people for the

consultant team and 3 - 4 people for the project

managing team.

Q : Your roles and responsibility in the proj-

ect ?

A : basically architects are the main people

in a project. We are the ones who design a

certain building. We are the ones who play

the major role here. Before the construction,

we have to produce drawings and explain the

drawings to the client and to the team mem-

bers like civil engineer, mechanical engineer

and to the contractors. During the construc-

tion, we have to be aware of what is happen-

ing around us during the project and moni-

tor all the sections.After the construction,

we have do the last paperwork and record

all the things that happened during the con-

struction.We also must be very precise and

be very detail in all things so that there wont

be any issues with the clients after the con-

struction is done. Architects will be the ‘Cap-

tain’ of the team when a project commence.

Page 7: Magazine

TNB 33kV SSU Project Permanis

PROJECT 2

Q : How many months/years does required

to complete this type of big scale project ?

A : for this type of projects, it can take up to 2

years maximum to complete and of course with

all the interior, finishing and furniture if required.

Q : How much is the cost to build ?

A : About 15 to 25 million us dollars

Page 8: Magazine

Q : How many workers are required for

this project ?

A : 4 person for each consultant and managing

teams.

Q : Your roles and responsibility in the

project ?

A : the roles and reponsibilities are the same

as I mentiod earlier in the project 1. But you

will be carrying even a big responsibilities

compared to project 1. Here I want to tell you

about the drawings we, architects need to pro-

duce. First, we have to come up with a concept

design as our client requires. Then, do amand-

ments to the concept drawing if there is any

changes.After that we can carry out the proj-

ect construction. After the building is complet-

ed, produce a record drawing of what are the

changes have take place during constuction.

We must carefully explain all the details to the

contractor or any other worker there so they

would understand and carry out the exact plan.

Page 9: Magazine

0323566 03249660324251

032499803243660325939

Group Members : Wong Lieng Kam Tang Lam YuOng Ke QiSow Wei HennTeng Li YikKelvin Douglas