Project SLOPE 1 WP 6 – System integration

Kick-Off Meeting - WP6

Embed Size (px)

Citation preview

Page 1: Kick-Off Meeting - WP6

Project SLOPE1

WP 6 – System integration

Page 2: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Agenda

• Work Package Goals• Tasks Overview• Timeline• Deliverables• Task Details• Risks and Mitigation Actions• Open Discussion

Page 3: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Work Package Goals

“Achieve a complete integration of the different components that are part of the SLOPE platform”

WP6 Integration (All Partners)

WP 2 ComponentsForest information

collection and analysisCOA,FLY,GT,ITE,TRE

WP 3 ComponentsIntegration of novel

intelligent harvesting systemsCNR, GRE,KES,ITE,MHG

WP 5 ComponentsForest information

system developmentCNR,TRE,BO

SLOPE PLATFORM

Page 4: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Work Package Goals

• Build a WORKING System • Ready for pilots and on the field testing• 3 integration steps

• 3 main tasks (T.6.2,T.6.3,T.6.4)• Technical and Economical Analysis

• Overall solution costs• Social impacts• Environmental impacts

T.6.2

T.6.3

T.6.4

Page 5: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Tasks and Roles

• T.6.1 Definition of integration Steps• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE

• T.6.2 First Integration - Forest inventory & harvesting systems• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE

• T.6.3 Second integration – Forest management• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE

• T.6.4 – Third integration - System validation• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE

• T.6.5 – Scientific Coordination• Task leader: GRAPHITECH;

Page 6: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Timeline

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

Page 7: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverables

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.03 SLOPE System Field Trials Readiness Assessment Report

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

Page 8: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverable & Milestone

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

MS04 SLOPE System Integration Planning is completed

MS05 Forest Inventory and Intelligent Harvesting system integration

MS07 Forest Management system integrated

MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report

Page 9: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverable & Milestone & Project Meetings

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

MS04 SLOPE System Integration Planning is completed

MS05 Forest Inventory and Intelligent Harvesting system integration

MS07 Forest Management system integrated

MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report

Page 10: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

• D. 6.01 System Integration and Validation Plan• Integration and validation procedures and timeline to validate the SLOPE system• Based on the use cases in WP1

• D.6.03 SLOPE System Field Trials Readiness Assessment Report• Assessment of the initial user experience and recommendations for the field trials

operations. • Guidance and system operation manual for the Field Trials operators

Page 11: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

• D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience• Recommendations for field trials operations

• D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2)• Assessment of the initial user experience (rev. 2)• Recommendations for field trials operations (rev. 2)

• D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3)• Assessment of the initial user experience (rev. 3)• Recommendations for field trials operations (rev. 3)

Page 12: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

• D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Estimation phase

• D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Preliminary results phase

• D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Final results phase

Page 13: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Tasks Details

Page 14: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Task 6.1

Definition of the integration steps• Leader: Graphitech• Participants: KESLA, MHG, FLY, ITENE

Objectives• Develop the integration steps• Develop validation concepts

• Functionalities• Communication

Page 15: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

1. System Architecture Analysis (from T.1.1)• Component Diagram

2. Use case / general process Analysis (from T.1.5)• Functional Requirements (execute A, execute B, etc.)• Non-functional reqirements (speed, reliability, etc.)

Page 16: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

3. Enumerate all needed software components, hardware, tools etc.• Forest model• Mesurement systems• 3D Model Visualisation Software • Other Software

4. Identify and verify connection between components5. Plan how to connect between

1. Forest Model with Harvesting2. Forest Model & Harvesting with Forest Management

Page 17: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

6. For each integration step between two or more subsystems1. For each identified interaction between subsystems components:

1. Describe the interaction2. Describe the expected result3. Define importance level (i.e. low, medium, high)

2. Define minimum threshold to be achieved

Test

Interaction

DescriptionExpected result Obtained Result Achieved

Anomaly

Description

... ... ... ... ... ...

8The user use the 3D

model to…The application shows …. The application HAS shown… YES None

... ... ... ... ... ...

Page 18: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Components to be integrated

WP2

WP3WP5

WP4

SLOPE DBSLOPE DBSLOPE DB

Page 19: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:• D.6.01 System Integration and Validation Plan (M13)

Page 20: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Expectations

• Contribution from each partner for itscomponent

• Joint contribution for each couple of integrated components by the corresponding partners

• More details at next technical meeting

Page 21: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Task 6.2

First Integration - Forest inventory & harvesting systems • Leader: Graphitech• Participants: KESLA, MHG, FLY, GRE, TRE, ITENE

Objectives• Integrate forest model & harvesting measure system & 3D Software• Integration between on the field sensors & tracking system RFID • First Estimate of system costs

Page 22: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

WP2Forest Information

WP3Intelligent Hardware

SLOPE DB

3D ForestModel

• Validate interfaces between these 3 components• Ensure DB consistency

Page 23: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:• D.6.021 System Integration Report I (M23)• D.6.041 SLOPE System Techno-Economic Evaluation Report I

(M23)

Page 24: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Task 6.3

Second integration – Forest management • Leader: MHG• Participants: CNR, BOKU, GRE, TRE, ITENE

Objectives• Integrate on the field data acquisition & forest management• Include WP4 results• More detailed dataset costs

Page 25: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:• D.6.022 System Integration Report II (M29)• D.6.042 SLOPE System Techno-Economic Evaluation Report II

(M29)

Page 26: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Task 6.4

Third integration -System validation• Leader: Graphitech• Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE

Objectives• Whole system validation and testing• Cost and productivity final calculation

Page 27: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

How to achieve these objectives?

• Environment setup (SOA)• Interactons validation one by one• Fix issues one by one until threshold has been reached

(e.g. 80% of tests cases passed)

Page 28: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Deliverables

Reports:• D.6.023 System Integration Report III (M34)• D.6.043 SLOPE System Techno-Economic Evaluation Report III

(M34)• D.6.03 SLOPE System Field Trials Readiness Assessment Report

(M36)

Page 29: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Risks

• Data Formats• DB Model• Reduce Harmonization/adaptation• Images

• Unreliable Services• Hardware interfaces with software

• Rfid• BT

• Unability to reproduce plannedtest field/conditions

• Component testing takes time!

Page 30: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Mitigating Actions

• Exhaustive System Architecture• Exhaustive requirement analysis• Common data model (T.1.4)• Communication

• Skype (Small Group, no desktop sharing)• Webex (up to 25 persons with desktop sharing)

Page 31: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Contacts

CoordinationDr. Raffaele De Amicis

Technical & Scientific CoordinationDr. Federico Prandi

Technical DevelopmentGiulio Panizzoni, Federico Devigili, Daniele Magliocchetti

Project Administration (financial reporting included)Camilla Saiani, Letizia Santato

Page 32: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Open Discussion

Page 33: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Thank you for your attention

DANIELE MAGLIOCCHETTI

[email protected]

Fondazione GraphitechVia Alla Cascata 56C38123 Trento (ITALY)

Phone: +39 0461.283395Fax: +39 0461.283398

Page 34: Kick-Off Meeting - WP6

Kick-off Meeting 8-9/jan/2014

Task 6.5

Scientific Coordination• Leader: Graphitech

Objectives• Technical supervision of technology functionalities as planned• Management of issues related to Software licenses and/or required hardware• Quality Assurance and assessment/evaluation of technology results• Regular reporting of the technical development of the project