30
JOB ORDER COSTING LU’LU’ MAGHFURO (251201004) MOKH. AFIFUDDIN (2512205005) PENDAHULUAN METODOLOGI PENELITIAN PENGAMBILAN DAN PENGOLAHAN DATA PROFIL PERUSAHAAN Akuntansi Manajerial 8 OKTOBER 2012 ANALISIS DAN INTERPRETASI DATA KESIMPULAN 1

Job oredr costing

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Job oredr costing

JOB ORDER COSTINGLU’LU’ MAGHFURO (251201004)

MOKH. AFIFUDDIN (2512205005)

PENDAHULUAN

METODOLOGI PENELITIAN

PENGAMBILAN DAN PENGOLAHAN

DATA

PROFIL PERUSAHAAN

Akuntansi Manajerial

8 OKTOBER 2012

ANALISIS DAN INTERPRETASI DATAKESIMPULAN 1

Page 2: Job oredr costing

LATAR BELAKANG

PENDAHULUAN

UKM Kondisi Saing

Manajemen Keuangan

•PEMESANAN•KEAKURATAN PENENTUAN HARGA

2

Page 3: Job oredr costing

RUMUSAN MASALAH

PENDAHULUAN

HARGA AWAL PEMESANAN

JOB ORDER COSTING

:PERHITUNGAN

AKTUAL

3

Page 4: Job oredr costing

TUJUAN

PENDAHULUAN

• Merancang perhitungan pesanan menggunakan metode Job Order Costing

• Mengetahui perbandingan hasil antara metode Job Order Costing dengan kondisi aktual

MANFAATBahan masukan UKM dalam penentuan HPP

4

Page 5: Job oredr costing

Objek amatan penelitian adalah CV Alam Karya Utama

BATASAN

PENDAHULUAN

Produk amatan adalah rombong Sego N’Jamoer

ASUMSI Tidak terjadi perubahan signifikan pada proses bisnis

5

Page 6: Job oredr costing

SEJARAH

PROFIL PERUSAHAAN

CV Alam Karya •Rombong•Kitchen Set

Bermula Dari PesananKepuasan Pelanggan

Permintaan

•15 rombong/ bulan•3-4 kitchen set/ bulan

10 orang pekerja

6

Page 7: Job oredr costing

Sumber Daya

PROFIL PERUSAHAAN

7

Page 8: Job oredr costing

FLOW CHART

METODOLOGI PENELITIAN8

Page 9: Job oredr costing

BOM TREE

PENGAMBILAN &PENGOLAHAN DATA 9

Page 10: Job oredr costing

BOM

PENGAMBILAN &PENGOLAHAN DATA

Level 0 Level 1 Level 2 Level 3

Rombong

Kerangka Kerangka dasar

Kerangka besi Roda

Tiang besi

Badan Rombong

Badan Utama MultiplexMelamin

Pintu

MultiplexMelamin Sekrup Engsel

Atap Rombong

MultiplexMelamin Hiasan Tambahan

10

Page 11: Job oredr costing

OPC

PENGAMBILAN &PENGOLAHAN DATA 11

Page 12: Job oredr costing

Biaya Bahan Baku (DM)

PENGAMBILAN &PENGOLAHAN DATA

No Material Kebutuhan Harga / unit Harga Total Keterangan

1Tiang besi (t= 50 cm, d= 3 cm, tebal= 0,5 cm)

2 buah Rp 20.000 Rp 40.000  

2Multiplex (p= 200 cm, l= 40 cm)

4 lembar Rp 130.000 Rp 520.000  

3 Kerangka besi dan roda 1 perangkat Rp 300.000 Rp 300.000 Outsource 4 Melamin (pelapis) 5 lembar Rp 85.000 Rp 425.000  

12

Page 13: Job oredr costing

Biaya Bahan Baku (IDM)

PENGAMBILAN &PENGOLAHAN DATA

No Material Kebutuhan Harga / unit Harga Total 1 Lem Fox 600 gram 1 kaleng Rp 35.000 Rp 35.000 2 Sekrup 1 gross = 150 buah Rp 1.750 Rp 1.750 3 Cat 3 warna @ 1 kaleng Rp 35.000 Rp 105.000 4 Amplas 5 lembar Rp 2.500 Rp 12.500 5 Engsel Pintu 6 pasang Rp 5.000 Rp 30.000

13

Page 14: Job oredr costing

Biaya Tenaga Kerja (Labor)

PENGAMBILAN &PENGOLAHAN DATA

NoNama

PekerjaJob Description

Gaji Borongan (1 rombong)

Penyelesaian 1 Rombong

(hari)Hourly Rate

1 Bpk AsepProses Pertukangan (pengukuran, pemotongan dan penggabungan)

Rp 357.143,003

Rp 14.880,96

2 Bpk BudiProses Pertukangan (pengukuran, pemotongan dan penggabungan)

Rp 357.143,00 Rp 14.880,96

3 Bpk PraptoProses Penghalusan, Pemasangan

Engsel (Serabutan)Rp 178.572,00 2 Rp 11.160,75

4 Bpk Karyo Proses Pengecatan, Finishing Rp 250.000,00 3 Rp 10.416,67

Biaya Overhead Pabrik(Labor) Listrik rata-rata sebesar Rp. 200.000,00

14

Page 15: Job oredr costing

Materials Requisition Form M1

PENGAMBILAN &PENGOLAHAN DATA

Dunia Rombong Materials Requisition Form Requisition No. : M1 Date : 02-Okt-12Job No. : A1  

Description Quantity Unit Cost Total Cost Tiang besi (t= 50 cm, d= 3 cm, tebal= 0,5 cm) 2 buah Rp 20.000 Rp 40.000 Total Rp 40.000   Autorized  

SignatureCV Alam Karya utama

15

Page 16: Job oredr costing

Materials Requisition Form M2

PENGAMBILAN &PENGOLAHAN DATA

Dunia Rombong Materials Requisition Form

Requisition No. : M2 Date : 02-Okt-12Job No. : A1  

Description Quantity Unit Cost Total Cost

Multiplex (p= 200 cm, l= 40 cm, t = 12 mm) 3 lembar Rp 130.000 Rp 390.000

Multiplex (p= 100 cm, l= 40 cm, t = 12 mm) 2 Rp 65.000 Rp 130.000 Total Rp 520.000   Autorized   Signature CV Alam Karya utama

16

Page 17: Job oredr costing

Materials Requisition Form M3

PENGAMBILAN &PENGOLAHAN DATA

Dunia Rombong Materials Requisition Form

Requisition No. : M3 Date : 02-Okt-12Job No. : A1  

Description Quantity Unit Cost Total Cost Kerangka besi dan roda 1 perangkat Rp 300.000 Rp 300.000 Total Rp 300.000      Autorized   Signature CV Alam Karya utama

17

Page 18: Job oredr costing

Materials Requisition Form M4

PENGAMBILAN &PENGOLAHAN DATA

Dunia Rombong Materials Requisition Form

Requisition No. : M4 Date : 02-Okt-12Job No. : A1  

Description Quantity Unit Cost Total Cost

Melamin (pelapis) warna putih 5 lembar Rp 85.000 Rp 425.000 Total Rp 425.000   Autorized   Signature CV Alam Karya utama

18

Page 19: Job oredr costing

Employee Time Ticket

PENGAMBILAN &PENGOLAHAN DATA 19

Page 20: Job oredr costing

Manufacturing Overhead Cost

PENGAMBILAN &PENGOLAHAN DATA

Kebutuhan Listrik

Kebutuhan listrik 1 (satu bulan) = Rp 200.000Kebutuhan listrik 1 produk =

Kebutuhan listrik 1 bulan =

20

Page 21: Job oredr costing

Manufacturing Overhead Cost

PENGAMBILAN &PENGOLAHAN DATA

Bahan Baku Tidak Langsung

No Material Kebutuhan Harga / unit Harga Total 1 Lem Fox 600 gram 1 kaleng Rp 35.000 Rp 35.000 2 Sekrup 1 gross = 150 buah Rp 1.750 Rp 1.750 3 Cat 3 warna @ 1 kaleng Rp 35.000 Rp 105.000 4 Amplas 5 lembar Rp 2.500 Rp 12.500 5 Engsel Pintu 6 pasang Rp 5.000 Rp 30.000

Total Rp 184.250

21

Page 22: Job oredr costing

Manufacturing Overhead Cost

PENGAMBILAN &PENGOLAHAN DATA

Jumlah Jam Kerja dalam 1 Produk

Dihitung berdasarkan hari kerja dikalikan dengan jam kerja standar harian.

Jam kerja = 8 hari x 8 jam = 64 jam

22

Page 23: Job oredr costing

Manufacturing Overhead Cost

PENGAMBILAN &PENGOLAHAN DATA

Perhitungan POHR

POHR =Budgeted manufacturing-overhead cost

Budgeted amount of cost driver (or activity base)

23

Page 24: Job oredr costing

Job Order Cost Sheet

PENGAMBILAN &PENGOLAHAN DATA

Job No. : A1 02/10/2012Job Name : Rombong Sego N'Jamoer 07/10/2012

Req. No Ticket Jam Kerja Amount Hours Amount

M1 1 8 119.048Rp 8 Rp25.528M2 2 8 119.048Rp 8 Rp25.528M3 3 8 119.048Rp 8 Rp25.528M4 4 8 119.048Rp 8 Rp25.528

5 8 119.048Rp 8 Rp25.5286 8 119.048Rp 8 Rp25.5287 8 89.286Rp 8 Rp25.5288 8 89.286Rp 8 Rp25.5289 8 83.333Rp 8 Rp25.52810 8 83.333Rp 8 Rp25.52811 8 83.333Rp 8 Rp25.528

Total 88 1.142.858Rp 88 Rp280.808

Direct Materials 1.285.000Rp Direct Labor 1.142.858Rp Manufacturing Overhead 280.808Rp Total Cost 2.708.666Rp Unit Cost 2.708.666Rp

35101

Manufacturing Overhead

Dunia Rombong Job-Cost Sheet

Cost Sumary

Rate

3191319131913191319131913191

300.000Rp

3191319131913191

1.285.000Rp

Date Initiated :Date Completed :

425.000Rp

Direct Labor Direct Materials Amount

40.000Rp 520.000Rp

24

Page 25: Job oredr costing

Perhitungan Job Order Costing

ANALISIS & INTERPRETASI DATA

Tipe/Karakteristik Pesanan

Nilai POHR

25

Page 26: Job oredr costing

Perbandingan Hasil Job Order Costing dengan Perhitungan Aktual

ANALISIS & INTERPRETASI DATA

JOB ORDER COSTING1 unit rombong Sego N’Jamoer membutuhkan biaya produksi Rp 2.708.666.

PERHITUNGAN AKTUAL1 unit rombong Sego N’Jamoer senilai Rp 5.300.000

KEUNTUNGANRp 2.591.334 = 48,9 % HARGA PRODUK

26

Page 27: Job oredr costing

KESIMPULAN

1. Job Order Costing merupakan sistem kalkulasi biaya berdasarkan pesanan, dimana biaya yang dikumpulkan akan dibebankan ke unit produksi.

2. Berdasarkan hasil perhitungan yang telah diuraikan sebelumnya maka didapat hasil perhitungan 1 unit rombong Sego N’Jamoer membutuhkan biaya produksi Rp 2.708.666. Dimana sebagai perbandingan, 1 unit rombong Sego N’Jamoer dijual senilai Rp 5.300.000.

KESIMPULAN & SARAN 27

Page 28: Job oredr costing

SARAN

Pengklasifikasian tipe/karakteristik pesanan rombong dengan POHR. Hal ini ditujukan untuk

menyederhanakan dan memudahkan proses perhitungan kebutuhan biaya produksi menggunakan

metode Job Order Costing.

KESIMPULAN & SARAN 28

Page 29: Job oredr costing

DOKUMENTASI KUNJUNGAN

Page 30: Job oredr costing

Terima KasihTerima Kasih

30