Welcome to this assessment
It will test your
knowledge in Instrumentation & Control (I&C)
mastery of the contents of Chapter 11 of The Guide1
1 ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015
http://www.editionstechnip.com/fr/catalogue-detail/1111/oil-gas-engineering-guide-the.html
Instrumentation & Control (I&C) knowledge assessment
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
?
Equipment room Control room
System
cabinet
Operator
station
Please name this equipment
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet Operator
station
System
cabinet
Equipment room Control room
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Please name this equipment
?
Operator
station
Marshalling
cabinet
Equipment room Control room
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet Operator
station
Equipment room Control room
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
In which cabinet are the I/O cards installed?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
In which cabinet are the I/O cards installed?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
In which cabinet are the controllers installed?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet
Equipment room Control room
Operator
station
In which cabinet are the controllers installed?
System
cabinet
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
Is this a serial or hard wired link?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
Is this a serial or hard wired link? Hard wired (cross wiring)
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
What do you call this cable?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
What do you call this cable? Secondary (or unit) cable
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
What do you call this cable?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
PT JB
Process line
Marshalling
cabinet System
cabinet
Equipment room Control room
Operator
station
What do you call this cable? Multi(core) cable
HERVE BARON
© 2015 – Hervé Baron
The lead time of a control valve is 1) 3 months 2) 6 months 3) 9 months
HERVE BARON
© 2015 – Hervé Baron
The lead time of a control valve is 1) 3 months 2) 6 months 3) 9 months
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
In your opinion, which Milestone is reached first?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
In your opinion, which Milestone is reached first?
Hardware freeze, for lead time of cabinets. Usually 3 months ahead of Software freeze.
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Hardware freeze means instrument index freeze. Right or Wrong?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Hardware freeze means instrument index freeze. Right or Wrong?
Right: Instrument index 100% complete, i.e., number, type & location of instruments, including within packages for centrally controlled packages.
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Which of the following documents are required to reach Hardware freeze? 1) Plot Plan 2) IFD P&IDs 3) IFC P&IDs 4) Control narratives 5) Safeguarding narratives and Cause & Effect diagrams 6) JB wiring diagrams 7) Packaged units sequence description and diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Which of the following documents are required to reach Hardware freeze? 1) Plot Plan 2) IFD P&IDs 3) IFC P&IDs 4) Control narratives 5) Safeguarding narratives and Cause & Effect diagrams 6) JB wiring diagrams 7) Packaged units sequence description and diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Which of the following documents are required to reach Software freeze? 1) Plot Plan 2) IFD P&IDs 3) IFC P&IDs 4) Control narratives 5) Safeguarding narratives and Cause & Effect diagrams 6) JB wiring diagrams 7) Packaged units sequence description and diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
Which of the following documents are required to reach Software freeze? 1) Plot Plan 2) IFD P&IDs 3) IFC P&IDs 4) Control narratives 5) Safeguarding narratives and Cause & Effect diagrams 6) JB wiring diagrams 7) Packaged units sequence description and diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
What is challenging to meet the schedule?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The main schedule Milestones are the commitments to the Control System Contractor.
There are 2 commitments:
Hardware freeze, for the manufacturing of the marshalling and I/O cabinets,
Software freeze, for the configuration (programming) of the system
What is challenging to meet the schedule?
When control systems of machinery and packages engineered by Vendors are integrated in the Plant control system, the consolidation of information to be transfered to the Integrated Control System Supplier is complex and requires a specific schedule for on-time hardware & software Freeze.
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What do you call such a drawing? Logic analysis & grafcet
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What do you call such a drawing? Logic analysis & grafcet Who issues it?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What do you call such a drawing? Logic analysis & grafcet Who issues it? Package vendors
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
A serial link is a continuous link. Right or Wrong?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
A serial link is a continuous link. Right or Wrong?
Wrong
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The following is adjusted at Site during commissioning/Start-Up:
1) settings of controllers (Proportional, Integral, Derivative)
2) Settings of alarms
3) Setting of trips
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The following is adjusted at Site during commissioning/Start-Up:
1) settings of controllers (Proportional, Integral, Derivative)
2) Settings of alarms
3) Setting of trips
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What is a serial link?
1) a sequential communication regulated by a protocole,
2) a parallel link,
3) a point-to-point connection,
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What is a serial link?
1) a sequential communication regulated by a protocole,
2) a parallel link,
3) a point-to-point connection,
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What does IP level of electrical and instrumentation equipment stand for?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What does IP level of electrical and instrumentation equipment stand for?
Ingress Protection. It means mechanical protection and protection again ingress of water, dust etc. Reference code is IEC 60529 "Degree of Protection provided by enclosures". Typically a certain IP level is specified for outdoor equipment and another one for indoor equipment.
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What do you call the drawing showing all details of wiring, terminations and inter-connections from primary to final element?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
What do you call the drawing showing all details of wiring, terminations and inter-connections from primary to final element?
The loop diagram
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Which documents from a packaged equipment Vendor are critical for instrumentation & Control discipline?
1) General Arrangement
2) P&IDs
3) Instrument index, I/O list
4) Junction boxes drawings
5) C&E diagrams
6) hook-up drawings
7) cable routing drawings
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Which documents from a packaged equipment Vendor are critical for instrumentation & Control discipline?
1) General Arrangement
2) P&IDs
3) Instrument index, I/O list
4) Junction boxes drawings
5) C&E diagrams
6) hook-up drawings
7) cable routing drawings
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Where are located the main processors of a Process Control System?
1) in the workstation in the control room
2) in the system cabinets in the technical rooms
3) in the marshalling cabinet in the technical rooms
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Where are located the main processors of a Process Control System?
1) in the workstation in the control room
2) in the system cabinets in the technical rooms
3) in the marshalling cabinet in the technical rooms
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Process discipline issues "Process Data sheets" and Instrumentation discipline issues "Mechanical data sheets" of instruments. Right or Wrong?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Process discipline issues "Process Data sheets" and Instrumentation discipline issues "Mechanical data sheets" of instruments. Right or Wrong?
Right, Instrument data sheets include mechanical data from Piping
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Pressure gauge/transmitters are fitted a diaphragm seals in case of:
1) low pressure
2) high pressure
3) liquid service
4) risk of plugging of impulse line/instrument
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Pressure gauge/transmitters are fitted a diaphragm seals in case of:
1) low pressure
2) high pressure
3) liquid service
4) risk of plugging of impulse line/instrument
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
In which document(s) are the set points of process controllers indicated?
1) Process description
2) Instrument list
3) Instrument data sheet
4) Operating Manual
5) Process Flow Diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
In which document(s) are the set points of process controllers indicated?
1) Process description
2) Instrument list
3) Instrument data sheet
4) Operating Manual
5) Process Flow Diagrams
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The low low level instrument is part of which system:
1) Process Control System (DCS)
2) Safety Instrumented System (SIS)
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The low low level instrument is part of which system:
1) Process Control System (DCS)
2) Safety Instrumented System (SIS)
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The Safety Instrumented System (SIS) includes
1) The ESD system
2) The PSD system
3) The F&G system
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
The Safety Instrumented System (SIS) includes
1) The ESD system
2) The PSD system
3) The F&G system
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
A single equipment shutdown is performed by
1) The ESD system
2) The Process Control system
3) The PSD system
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
A single equipment shutdown is performed by
1) The ESD system
2) The Process Control system
3) The PSD system
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Hardwired logic is non-programmable. Right or Wrong?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Hardwired logic is non-programmable. Right or Wrong?
Right
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Remote Terminal Units (RTU) are local control stations. Right or wrong?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Remote Terminal Units (RTU) are local control stations. Right or wrong?
Right
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Which segregation is made between signals (different JBs)?
1) Control / Shutdown
2) Analog / Digital
3) IS/non-IS
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
Which segregation is made between signals (different JBs)?
1) Control / Shutdown
2) Analog / Digital
3) IS/non-IS
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
To which of the following is a package PLC normally connected?
1) DCS
2) MCC
3) PDCS
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
To which of the following is a package PLC normally connected?
1) DCS
2) MCC
3) PDCS
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
By which system are these valves controlled? 1) The Process Shutdown System (PSD)? 2) The Emergency Shutdown System (ESD)? 3) Process Control System (DCS)?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
By which system are these valves controlled? 1) The Process Shutdown System (PSD)? 2) The Emergency Shutdown System (ESD)? 3) Process Control System (DCS)?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
By which system are these valves controlled? 1) The Process Shutdown System (PSD)? 2) The Emergency Shutdown System (ESD)? 3) Process Control System (DCS)?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
By which system are these valves controlled? 1) The Process Shutdown System (PSD)? 2) The Emergency Shutdown System (ESD)? 3) Process Control System (DCS)?
HERVE BARON
© 2015 – Hervé Baron
I&C knowledge assessment test
That’s all for now folks, but I won’t be long with tests on knowledge acquisition for the other chapters of the guide…
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Discipline presentation: activities and deliverables
Table of Contents
The overall process
Methods & tools
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
Discipline presentation: activities and deliverables
HERVE BARON
© 2015 – Hervé Baron
Complex activities, such as
QRA, are explained through a practical example.
HERVE BARON
© 2015 – Hervé Baron
A sample of all common Engineering documents is
included
Use this to specify what you
want to your Engineering supplier !
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
The overall process
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
Methods & tools
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide - 2nd edition
This book is destined to both:
Oil & Gas companies Project execution personnel
Oil & Gas contractors Project execution personnel
Date of publication: March, 2015.
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide 2nd edition
If your are on the Client side, i.e., contracting Engineering services, this book will help you to:
Specify to an Engineering supplier what you want: what deliverables and with what contents,
Set a standard in Engineering execution that you and your supplier can adhere to: design stages/gates, methods to be used, etc.
Specify the progress report you want, with the meaningful indicators,
Ask the right questions to assess the true progress,
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide 2nd edition
If your are on the Contractor side, i.e., performing Engineering activities, this book will help you to:
Understand the work of each discipline and the overall picture,
Challenge what one discipline tells you,
Understand the critical areas,
Put in place the right methods to be successful,
HERVE BARON
© 2015 – Hervé Baron
The Oil & Gas Engineering Guide 2nd edition
Order from the publisher:
http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html
Or on Amazon:
http://www.amazon.com/Oil-Gas-Engineering-Guide-2ND/dp/2710811510/ref=sr_1_1?ie=UTF8&qid=1437160937&sr=8-1&keywords=the+oil+and+gas+engineering+guide