Proposal 2(2nd & 3rd Floor)

Nurafiqah Zariful | 0321196

2

Introduction

Benefits

Impacts

3rd Floor & Details

Add on features

From external to internal

2nd Floor & Details

External Pocket Garden

Materials Used

Detailed Cost Plan

Conclusion & References

3

4

5

6-9

10

11

12

13

14-15

16-17

18

Our commercial building is based on sports center called CF Sports, named after two clients, Chau Xet Nee, and me. A 5 storey building including 1 floor of basement parking. Our sport center is a one stop place for people that are into sports and fitness. Where people can work out, relax and even spend time with their family in one of our main attraction drop off pool. They can also find all types of sports accessories, from diving accessories to football, just about anything. We offer different types of fitness class including yoga, zumba and aerobic. What is best about our sport center is, it opens 24hours per day!

We chose this site because of its accessability. The site is centred by housing, commercial, religious and tourism area where people always go.

3BENEFITS

Easy accessibility to the site location.

2 minutes away from the town by car.

Nearby housing area, people from this area

can easily go to the location at anytime they

want.

I was told that no traffic jam is ever

happened in this location, therefore people

will not get worried of the traffic to go here.

Only 5 minutes away from religious areas

such as Mosque, Chinese temple and Church

by road transport.

24 hours open; sometimes people would just

feel like having their workout in a quiet

condition or while not everyone is around.

4

Lack of parking area; only consist of 1 floor

basement parking and no extra space around

that area as it was fully covered by forest. If

there were too many customers, they would

be having trouble on the parking.

The road to access the location was not well

maintained.

5

IMPACTS

3rd FLOOR

Consist of; Swimming pools (Kids, Adults & Jacuzzi ) Small stall by the pool Toilets / Changing Rooms (Male & Female) Sauna Outside Shower Counter (for towels rent) Barbeque Area with tables, chairs and huts Stairs Elevator

6

DETAILS

The Drop off Swimming PoolOne of the main attractions of the building, known as “The Drop Off” because of the visual effect of water extending to the horizon, vanishing, or extending to "infinity." It is use to describe perimeter overflow pools. This only applies in adult’s swimming pool with a height of 2 to 4.5 meters high. This is why it is strictly for adults only.

The JacuzziWith a height of 1 meter and warm or sometimes hot water with massage of a Jacuzzi help people to relax and have a spa with an outdoor view.The kid’s swimming pool

7

With only a height of 0.5 to 0.8 meters high even babies are allowed to swim in (but of course with guards or safety).

illustration

Stall by thev poolToo tired spending hours swimming? Have a rest at the infinity pool. They offers fresh juices, salads and all kinds of healthy foods (since it’s a fitness center, why need to serve fats?)

The Sauna

8

Besides, Jacuzzi, they’ll somehow need sauna! With a relaxation piano rhymes music played when in used.

9

Barbecue & Sitting AreaWe provide a place to chill in confortable and natural concept.

ADD ON FEATURES TO THE SWIMMING POOL

10

FROM EXTERNAL TO INTERNAL

11

2ND FLOOR

Consist of;

Dance Room

Rock Climbing

First Aid Room

Workout Area

Toilets (Male & Female)

12

External Pocket Garden

13

Materials Used

WALL

One brick thick of wall

FINISHES

FLOORING

Non-Slippery tiles, mainly for 3rd floor (Swimming Pool Area)

14

ROOF

Flat roof with skyline view

Rubber Gym Floor Tiles, mainly for workout area.

For other small rooms such as Dance Room and First Aid.

WINDOWS

Double layered thick glass

15

Smooth wooden flooring

DOORS

Sliding doors

DETAILED COST

PLAN

16

Elements COST B$

1 PRELIMINARIESA Site Preparation 4,782.30B Setting Out 140.00

I Total for Preliminaries 4,922.302 SUBSTRUCTUREA Piling 13,650.00B Substructure 28,197.00

IITotal for Substructure (2A - 2B)

41,847.00

3 SUPERSTRUCTUREA Frame 16,575.00B Upper Floors 10,140.00

CRoof Structure & Finish

46,800.00

D Staircase 12,168.00E Walls 9,750.00F Windows 13,338.00G Doors 11,076.00

III Total for Superstructure (3A - 3G) 119,847.00

4FINISHES (External & Internal)

A Wall FinishesPlastering and Painting

23,049.00

Glazed Wall Tile 7,293.00

B Floor FinishesHomogeneous Tile 14,469.00Laminate Flooring 12,519.00

C Ceiling FinishesGypsum 15,054.00Timber T&G Ceiling 5,226.00

IVTotal for Finishes (4A - 4C)

77,610.00

5 FURNISHING, FITTINGS AND FIXTURES

AFittings and Furnishings

11,622.00

VTotal for Furnishing, Fittings and Fixtures (5A)

11,622.00

6 SERVICESA Sanitary Appliances 4,485.00B Plumbing Installations 8,385.00

VITotal for Services (6A - 6B)

12,870.00

TOTAL COST FOR BUILDING (1A - 6B) $268,718.30

7 MECHANICAL & ELECTRICAL WORKS

VII Total for M&E 78,195.008 EXTERNAL WORKS & SERVICESA Earthworks 0.00B Fencing 11,934.00D Roads & Carparks 9,594.00E Stormwater Drains 4,719.00F Foul Drainage 9,867.00G External Water Supply 7,020.00

VIII Total for External Works & Services (8A - 8G) 43,134.00

TOTAL COST FOR BUILDING AND EXTERNAL WORKS (1A - 7G)

$390,047.30

17

Doing this project is a lot tougher than I thought. I had never experience on doing a proposal but this can help to improve better and also helps me to understand more on how proposal report should include.

http://en.wikipedia.org/wiki/Infinity_edge_pool

http://buddesigns.com/3465/cozy-and-modern-swimming-pool-design-ideas/

18