30
Kristine A. Hayes Munson, MBA, PMP, CIA State Street

How do you know bp improvements scqaa

Embed Size (px)

DESCRIPTION

Kristine A. Hayes Munson, PMP, CIA, Vice President presented at our SCQAA- San Fernando Valley chapter.

Citation preview

Page 1: How do you know  bp improvements scqaa

Kristine A. Hayes Munson, MBA, PMP, CIA

State Street

Page 2: How do you know  bp improvements scqaa

Photos of Attendees on December 11 2013 at Intuit Office

www.scqaa.net

Page 3: How do you know  bp improvements scqaa

You will be able to apply systems thinking to business process improvement projects after:

◦ Selecting key performance indicators (KPI)

◦ Knowing when to implement change or when to leave a process “as is”

◦ Determining whether or not proposed changes will positively or negatively impact the project

Page 4: How do you know  bp improvements scqaa

Managed an user acceptance testing project to onboard a client to a major system within firm

Project went from greenish-amber to red in less than a week with no major fires

SVP comment on the project: ◦ The team is working frantically ◦ The team is not working hard enough

Page 5: How do you know  bp improvements scqaa

“There is no such thing as a fact concerning an empirical observation. Any two people may have different ideas about what is important to know about any event. Get the facts!” —W. Edward Deming

Page 6: How do you know  bp improvements scqaa

Process Improvement Projects Revisited

Key Performance Indicators

Why Change?

◦ Special Cause and Common Cause Variation

◦ The Plan-Do-Check-Act Cycle

Seeing is Understanding

◦ Deming’s Red Bead Experiment

◦ Deming’s Funnel Experiment

Understanding My Project

Page 7: How do you know  bp improvements scqaa

Change Agent

◦ Identify and articulate the need for a business process change

◦ Document and vet requirements for the proposed change

◦ Facilitate the proposed change

◦ Help businesses do their business better.

Page 8: How do you know  bp improvements scqaa

Acceptance & Evaluation Criteria Definition

Brainstorming

Interviews

Document Analysis

Focus Groups

Observation

Organization Modeling

Process Modeling

Prototyping

Requirements Workshops

Risk Analysis

Root Cause Analysis

Scenarios & Use Cases

Scope Modeling

Survey/Questionnaire

Page 9: How do you know  bp improvements scqaa

What are our results?

Page 10: How do you know  bp improvements scqaa

Translate collected data and information into knowledge

Make the right management decisions and take the right action

◦ Implement appropriate, planned changes

◦ Allow the process to function “as is”

Page 11: How do you know  bp improvements scqaa

Select 3-5 key performance indicators (KPI)

◦ Understand the overall business objectives

◦ Ask stakeholders what is most important

◦ Identify the impact of not completing the project

Make KPIs “SMART”

Remember may need to be “bad” at some things in order to be “good”

• Ensure stakeholders including the project team know

and understand the KPIs

Page 12: How do you know  bp improvements scqaa

Think about a process improvement project on which you are currently working.

◦ Identify what are the 3-5 KPIs?

◦ What are you going to be intentionally bad at?

Page 13: How do you know  bp improvements scqaa

We observe variation from our expectations

Page 14: How do you know  bp improvements scqaa

How do we decide whether or not to “change,” “fix” or “improve” something?

How do we determine if a change will positively and/or negatively impact a project?

Page 15: How do you know  bp improvements scqaa

Common Cause

◦ Fall inside the control limits

Special Cause

◦ Something that is special, not part of the system of common causes

◦ Fall outside the control limits

Page 16: How do you know  bp improvements scqaa

Mistake 1

◦ To react to an outcome as if it came from a special cause, when actually it came from common causes of variation.

Mistake 2

◦ To treat an outcome as if it came from common causes of variation, when actually it came from a special cause

Page 17: How do you know  bp improvements scqaa

When you discover that you are riding a dead horse, the best strategy is to dismount. In many companies more advanced strategies are often employed, such as:

Changing riders Arranging to visit other countries to see how others ride dead horses

Appointing a committee to study the horse Lowering the standards so that dead horses can be included

Reclassifying the dead horse as ‘living impaired’ Hiring outside contractors to ride the dead horse Harnessing several dead horses together to increase the speed

Providing additional funding and/or training to increase the dead horse’s performance

Doing a productivity study to see if lighter riders would improve the dead horse’s performance

Declaring that as the dead horse does not have to be fed, it is less costly, carries lower

overhead, and therefore contributes substantially more to the mission of the organization than do some other horses

Rewriting the expected performance requirements for all horses…

Page 18: How do you know  bp improvements scqaa

A

B

C

D

Page 19: How do you know  bp improvements scqaa

Perception of

Cause and Effect

Experience

Page 20: How do you know  bp improvements scqaa

Plan

Do Check

Act

Plan a change or

a test, aimed at

improvement –Which option

to test?

– What is

anticipated

result?

Carry out the change

or test (preferably

on a small scale)

Study the results.

What did we learn?

What went wrong?

Adopt the change, or

abandon it or

run through

the cycle again

Beware of

Unintended Consequences

Page 21: How do you know  bp improvements scqaa

Help Wanted

◦ 3 willing project team members (must be brave)

◦ 2 team leads (must be able to count)

◦ 1 business analyst (must be able to count)

◦ 1 project manager (must be able to add & use PowerPoint)

◦ 1 senior manager (sets the rules – me)

Page 22: How do you know  bp improvements scqaa
Page 23: How do you know  bp improvements scqaa

Wrong to rank people ◦ Demoralizing ◦ Really ranking the effect of the process on

people

Futility of pay for performance; rewarding and punishing the process

Display of bad management; procedures were rigid

No basis to assume that best team member would be the best in the future

Page 24: How do you know  bp improvements scqaa

Help Wanted

◦ 1 will project team member (must be able to hold funnel)

◦ 1 business analyst (must be able to use a marker)

◦ 1 senior manager (sets the rules – me)

No one gets fired in this experiment.

Page 25: How do you know  bp improvements scqaa

Avoid management tampering

◦ Taking action based on the belief that a common cause is a special cause

◦ Overreacting

◦ Causes losses – management by results

◦ Increases variation

Sometimes the process should just be left alone

Page 26: How do you know  bp improvements scqaa

What is the most important decision I face right

now because of observed variation?

◦ What long-term consequence do the short-term

issues have?

◦ How does this decision relate to the project’s

3-5 KPIs?

How will we determine if this variation is a special

cause or a common cause variation?

How does this knowledge impact your decision?

How will you test your decision?

Page 27: How do you know  bp improvements scqaa

You will be able to apply systems thinking to monitoring and controlling after:

◦ Selecting key performance indicators (KPI)

◦ Knowing when to implement change or when to leave a project “as is”

◦ Determining whether or not proposed changes will positively or negatively impact the project

Page 28: How do you know  bp improvements scqaa

“The truth is often buried deeper than where your intuition can reach. Uncovering it starts with the willingness to stop treating your beliefs as facts.” — Frances Frei and Anne Morriss

“Learning the word ‘no’ is the hardest lesson for

many project managers.”

— Jim Johnson

Page 30: How do you know  bp improvements scqaa

Kristine A. Hayes Munson, MBA, PMP, CIA

[email protected]

+949-932-1476

For SCQAA- San Fernando Valley Chapter

Sujit Ghosh [email protected]