EMBANKMENT CONSTRUCTION
S.R.V Engineering CollegeSembodai 614809
CE6504 – HIGHWAY ENGINEERING
Department Of Civil Engineering
INTRODUCTION
When the sub grade line of highway is raised the existing ground level, the embankment is constructed.
NECESSITY OF Constructing THE PAVEMENT
Make the subgrade level above the ground water table
Satisfy the vertical alignment of a highway.
Design and construction stagesEvaluate the embankment heightEmbankment materialsCompaction and its materialsConstruct the embankment with equal
slopesCheck settlement
Design of embankmentThe embankment design
elements are as follows…..Selection of dimensionsSlopesSettlement analysisMaterialsDrainage
Selection of dimensionsThe dimensions are select due to
the roadway width , height and its side slopes.
Width - its fixed as per IS recommendations . It may be single, two and multiple lane roads.
Height - its based on desired grade line of the highway and the topography
Side slope - in this basis generally flat slope is considered , because of the erosion control
Stability of slopesSloping surfaces are subjected to get
shearing stresses at all intervalsIf the shear stress more, then a surface is
formed at a failure.For the failure of slope the main reason is
shear stresses are non uniform at all intervals
If the failure problem arrives means correct the slope shape to the normal sloping points
Types of slopes
Infinite slope: it’s the type of slope which is give equal extent and uniform slope to the normal surface conditions.
Finite slope: in this type the slope having limited height
Settlement and stability foundation
It occur due to compression of fill material in the subgrade.
Compaction is the main program of settlementIf the compaction is not even then the
settlement is collapseF.o.s should be more than three means there is
no other problems due to settlement, if problem arise convert equal stresses depends upon F.O.S
Selection of embankment materials
The embankment materials should have the strength and stability.
Silts and clays are not a constructing soil,
On the site locating soil is best to the embankment foundation
The soil properties may contain the following characteristics Soil have more strength and stability.High plastic soils should be avoided
during constructionSoil should have good drainage
properties.Clay soils are not satisfy the drainage
conditionsThe high density compacted soils should
be prepared in the construction.
Drainage systemEmbankment height is highly notified on
8m.Such a locations some of damages may
occur the cause of rain waterWhen rain water falls highly means
erosion will occur on the slopes and shoulders.
This erosion may be turn into road pavement
Cont…Here this possible cause
embankment drainage is important one.
Soil type, height of embankment, high rainfall, are the reasons may appear the erosion
Let us we the following image how to the embankment drainage working on a highway
EMBANKMENT WEAK SOILSIn the location weak soil attained
special designs are consideredIf the un suitable soil presents in
the subgrade means the soil remove that place by the use of deep foundation
The structure design conditions are not satisfy, immediately the structure redesigned by the use of light weight materials.
Cont…Removing poor materials in subgrade
Replace good resisting materials
Treating the soil such improve the properties
constructionThe construction techniques may
depends upon the following cases..Borrow pit – excavate soilborrow pit may represent the IRC classification. It should locate the road boundary It should be in rectangular shapeEvery borrow pits having a distance of 5mThe maximum depth is 1.5m… this depth is
limited depth of borrow pit
Cleaning of natural ground• This process may undertaken the
earthwork for a embankment construction
• Its consist of removing trees, roots, obstacles etc..
• The top soil is retained and highly compacted soil is placed on the surface
Compaction due to original ground
Dry density of soil may be have the density of 90%.
In the original ground (that means loosening soil) watering and rolling is provided in the layers of 25cm.
This watering, rolling treatment has extended to a depth of 0.5m.
Compaction of embankmentEarlier embankment is constructed
by rollingSoil is dumped on the ground surfaceThe water content should be in 2%Required water added on the site Soil spread along over the surface
with a depth of 25cmThe mechanical equipment is
needed to compaction
Cont…Standard three wheel steel tyred
rollers are used to the compaction
Compaction of each layer is called as lift.
This main method is called as compaction
The End