21
Electric Vehicle Readiness: Case Studies from Oregon Presented by: David Mayfield, Principal Sustainable Transportation Strategies October 11th, 2011

Electric Vehicle Readiness: Case Studies from Oregon

Embed Size (px)

DESCRIPTION

Presented at Mid-Ohio Regional Planning Commission's 2011 Sustainability Summit as part of Clean Fuel Ohio's "Driving Change" Session.

Citation preview

Page 1: Electric Vehicle Readiness: Case Studies from Oregon

Electric Vehicle Readiness:

Case Studies from Oregon

Presented by:

David Mayfield, Principal

Sustainable Transportation Strategies

October 11th, 2011

Page 2: Electric Vehicle Readiness: Case Studies from Oregon

1990 2000 2010 2020 2030 2040

2.0

e+10

2.5

e+10

3.0

e+10

3.5

e+10

4.0

e+10

4.5

e+10

Annual CO2 Equivalent Emissions

All Vehicle Efficiency & Fuels Scenarios

Year

Pounds C

O2 E

quiv

ale

nts

Med Lt Veh EffHigh Lt Veh Eff

EV & High Lt Veh EffEV & High All Veh EffEV, High All Veh Eff & Low Carb Fuel

Electric Drive and Oregon’s

Greenhouse Gas Modeling

1. Land Use Form

2. Technological

Advances

3. Pricing

Factors Important for GHG Reductions:

Source: Brian Gregor, ODOT

Page 3: Electric Vehicle Readiness: Case Studies from Oregon

2040 Plan for Metro Portland:

Urban Centers

• Portland Central City

• Regional Centers

• Town Centers

• Station Communities

• Connecting Corridors

Page 4: Electric Vehicle Readiness: Case Studies from Oregon

Urban Form Linked to

Modal Choices

• Transit-Oriented

Development for Housing

and Jobs

• Increased Value of Land &

Improvements

• Increased Pedestrian and

Bike Trips

• Reduced Reliance on

Automobile

Page 5: Electric Vehicle Readiness: Case Studies from Oregon

Electric Light Rail Transit

Page 6: Electric Vehicle Readiness: Case Studies from Oregon

Portland Streetcar and Aerial Tram

Page 7: Electric Vehicle Readiness: Case Studies from Oregon

Increased Urban Density

and Street Vehicles

• Density Lowers VMT

• Reduces Vehicular Speed

• Adds More Cars Compared to

Light Trucks, Vans, SUVs

18

24

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003

DV

MT

/ P

ers

on

Portland Only Portland-Vancouver U.S. National Average

Sources: Andy

Cotugno, Portland

Metro; Danilo Santini,

Argonne National

Laboratories

Page 8: Electric Vehicle Readiness: Case Studies from Oregon

Small, Efficient EVs

for High Density Urban Areas

Green Light Motors

Segway Nissan

Brammo

Page 9: Electric Vehicle Readiness: Case Studies from Oregon

Freight and Service Vehicles

Ford Transit

Connect

Navistar

Page 10: Electric Vehicle Readiness: Case Studies from Oregon

Early State Initiatives Aid EV Readiness

• Tax Credits for Hybrid Car Sales

• Tax Credits for EVs

• Tax Credits for Charging Stations

• Public Utility Commission Investigates

EV Infrastructure Deployment

• State Building Codes Division Streamlines

Charging Station Permitting

Page 11: Electric Vehicle Readiness: Case Studies from Oregon

Working Group Recommendations

• Create Statewide EV

Executive Council

• Promote State EV Fleet

Purchases

• Create Program for Free

Home Audits

• Business Energy Tax

Credit for EV

Manufacturing

• Transportation

Electrification Tax

Credit

• Create EV Center of

Excellence

Page 12: Electric Vehicle Readiness: Case Studies from Oregon

2010-2012: Oregon Participates in

EV Project

• Deployment Guidelines

• 10-Year Plan for Public Charging Stations

• 2-Year Plan for Public Charging Stations

• Blink! Charger Network Installed in 2011

Page 13: Electric Vehicle Readiness: Case Studies from Oregon

Demographics of Early Adopters

Page 14: Electric Vehicle Readiness: Case Studies from Oregon

Recent Stakeholder Activities

• Drive Oregon

• Smart Grid Oregon

• Portland Auto Show

• Portland General Electric

Installs First DC Fast Charger

Page 15: Electric Vehicle Readiness: Case Studies from Oregon

Recent State Initiatives

• 8 Fast-Charging

Stations Along I-5

• Up to 20 More Fast-

Charging Stations

• Business Oregon

Leads DOE Grant

Page 16: Electric Vehicle Readiness: Case Studies from Oregon

DOE Grant Summary

1. Next Generation

Deployment Strategy

2. Policies and

Inducements

3. Training, Marketing,

and Outreach

4. Utility Planning and

Analysis

Page 17: Electric Vehicle Readiness: Case Studies from Oregon

Portland’s EV Readiness

• Allow Charging in the ROW

• Program for Garage-Free EV Owners

• Promote an EV Business Cluster

• Create Sustainable Municipal Fleet

• Partner with

– Freight Community

– Car Share

– Transit Providers

Page 18: Electric Vehicle Readiness: Case Studies from Oregon

Portland’s Electric Avenue

Page 19: Electric Vehicle Readiness: Case Studies from Oregon

Readiness Activities in Oregon’s

Smaller Cities

• Adoption of New Code Language

• FAQs and EV Station Maps

• Purchase and Installation of EV Charging Stations

• Providing Free Charging

• Promotion of EVs at Sustainability Fairs

Page 20: Electric Vehicle Readiness: Case Studies from Oregon

Lessons Learned

• Utilities

• Rapid Technological

Change

• Governmental

Leadership

• Charging Station

Providers

Page 21: Electric Vehicle Readiness: Case Studies from Oregon

Contact Information:

David Mayfield, Principal

Sustainable Transportation Strategies

(503) 701-0142

[email protected]