1 Not Protectively Marked Hinkley Point C Ross Edwards– Communications Manager

APM SWWE branch presentation Hinkley Point C 6th May 2015

Embed Size (px)

Citation preview

Page 1: APM SWWE branch presentation Hinkley Point C 6th May 2015

1 Not Protectively Marked

Hinkley Point C Ross Edwards– Communications Manager

Page 2: APM SWWE branch presentation Hinkley Point C 6th May 2015

2

Page 3: APM SWWE branch presentation Hinkley Point C 6th May 2015

3

UK overcapacity is expected to largely resolve by ~2016 with system likely to remain in balance until the early 2020s

Existing and under construction UK generation plantGW

Notes: Chart shows forecast installed capacity of power plants in Great Britain by fuel type, based on EDF Energy Best view as of July 2013. Includes embedded generation, excludes interconnection, currently 3.8GW, due to uncertain availability at peak times. Wind capacities de-rated at 10%to reflect limited ability to provide capacity at peak times. The date when new large-scale baseload generation is needed depends on rate of closure for existing plant. Peak demand based on DECC UEP, Oct 2012.

0

10

20

30

40

50

60

70

80

90

2012/13 2015/16 2018/19 2021/22 2024/25 2027/28

Gas

Other

Coal

Increasing need for new capacity

Page 4: APM SWWE branch presentation Hinkley Point C 6th May 2015

4

Security of supply: Safely and reliably meeting future energy demand and

diversifying risk

Low Carbon Meeting emissions

reduction targets and mitigating risk of high CO2

price

Affordability:ensuring reasonable, stable

cost of energy in a world with increasing scarcity of

resources

A Diverse Energy Mix

UK proposes a diverse mix of technologies meet it’s four objectives for energy policy

Economic Growth:High value capital intense

infrastructure projects provide construction jobs, up-skilling

and economic stimulus

Page 5: APM SWWE branch presentation Hinkley Point C 6th May 2015

5

• Providing low carbon electricity for around 5 million homes.

• Can avoid the emission of 10 million tonnesof CO2 a year.

• Capable of generating 7% of the UK’s electricity.

• At least 25,000 different job opportunitiesduring construction and 5,600 on site at the peak.

• £100 million into the local economy each year during peak construction

• 900 operational staff and contribution of around £40 million to the local economyduring each year of its 60 year operation.

Page 6: APM SWWE branch presentation Hinkley Point C 6th May 2015

6

Political support

“Labour supports the development of new nuclear power stations in Britain as part of a balanced, secure and clean energy mix.”- Shadow Secretary of State for Energy and Climate Change Caroline Flint, 21/10/13

78% of MPs support the construction of a new generation of nuclear power stations, to replace the existing fleet as it closes, as one part of the solution to the UK’s energy needs, vs. 13% opposing – ComRes poll with a representative sample of MPs, Feb-March 2013.

“This [Hinkley Point C] is an excellent deal for Britain and British consumers…it will increase energy security and resilience from a safe, reliable, home-grown source of electricity.” - Secretary of State for Energy and Climate Change Ed Davey, 21/10/13

“A landmark in our economic growth - Hinkley nuclear power plant means billions of pounds of investment, thousands of jobs and energy security.”-Prime Minister David Cameron, 21/10/13

Page 7: APM SWWE branch presentation Hinkley Point C 6th May 2015

7

The reactor

• Pressurised Water Reactor based on over 1000 reactor years of evolutionary designs.

• 2 x 1630 MW (electrical)• Evolutionary design:

Increased safety External protection from aircraft

impact and seismic activity• More Efficient: Uses about 17%

less uranium and produces less long-lived radioactive wastes v other designs.

• 60 year operating life

More information at;

http://www.epr-reactor.co.uk

Page 8: APM SWWE branch presentation Hinkley Point C 6th May 2015

Indicative Construction Schedule and Phasing

UK PROTECT - COMMERCIAL8

• Contract for Difference• Funded Decommissioning Programme• IUK Loan Guarantee

UK GovernmentUK Government

• Finalisation of AgreementsEquity Partners and Investors

Equity Partners and Investors

FINAL INVESTMENT

DECISION

Page 9: APM SWWE branch presentation Hinkley Point C 6th May 2015

9

The Hinkley Point C Site

Not Protectively Marked

HPC

Page 10: APM SWWE branch presentation Hinkley Point C 6th May 2015

10

Associated Developments

4 park and ride sites

2 freight management facilities

Jetty and separate wharf

1,510 beds across multiple accommodation campus sites

Bypass in Cannington

Page 11: APM SWWE branch presentation Hinkley Point C 6th May 2015

11

Work to date:

11

Completed

Remediation works - 80% complete

Perimeter fencing – 6.5km

Barn removal – 3 structures

Archaeology

Vegetation clearance – 50 hectares

Site trials for earthworks

Ecological mitigation activity

Electrical switch room

Over 1million m3 of earth moved

Page 12: APM SWWE branch presentation Hinkley Point C 6th May 2015

The HPC industrial delivery team

Responsible Designer

Civil Engineering:

Mechanical , Electrical & HVAC Erection:

Technology Systems:

Not Protectively Marked 12

Page 13: APM SWWE branch presentation Hinkley Point C 6th May 2015

13

www.hinkleysupplychain.co.uk

Establishing the Supply Chain

“This deal means £16 billion of investment coming into the country….

brilliant news for the South West and the Country as a whole”

Prime Minister David Cameron

57% of the value of contracts for our new build project could be awarded to

UK firms.

• 130 local and 89 regional companies already have contracts associated with HPC to a value of almost £85 million.

• Over 2000 companies are registered on Somerset Chamber of Commerce's database.

Page 14: APM SWWE branch presentation Hinkley Point C 6th May 2015

1414

A Pathway from Education, Through Training, to Employment

Inspire Programme

Over 60,000 students engagements across

Somerset.

Expanding Opportunity within the West of England LEP

Area.

Sustainable Employment Opportunities

5,600 workers on site at peak

Over 2000 now registered with the Hinkley Jobs Service

WO

RK

REA

DY

JOB

REA

DY

Education Skills Employment

• 400 Apprentices

• FE/NVQ Short Courses

• £15 million funding for schools and Colleges in the South West

• The Hinkley Strategic Delivery Forum.

Page 15: APM SWWE branch presentation Hinkley Point C 6th May 2015

Not Protectively Marked 15

Being a Good Neighbour

Helping Hands, Willowdown School, March 2015

The Stogursey Parish Lengthsman

Public Drop-In Sessions and Fora

Page 16: APM SWWE branch presentation Hinkley Point C 6th May 2015

16

Any Questions?