33
Teamnet Engineering

Teamnet Engineering - Company Profile

Embed Size (px)

Citation preview

Page 1: Teamnet Engineering - Company Profile

Teamnet Engineering

Page 2: Teamnet Engineering - Company Profile

Table of Contents

1. Company profile

2. Reference projects, SCADA Projects and Industrial Automations

3. Research & Development and Innovation projects

4. Certifications

5. Customers and Collaborators

Page 3: Teamnet Engineering - Company Profile

Company profile

Page 4: Teamnet Engineering - Company Profile

• Teamnet Group founded in 2001

• In TOP 3 IT&C integrators in Romania

• 93 mil. EUR turnover in 2014

• 20+ R&D European projects

• 800 employees

• 1.500 + certifications of the team

members

Teamnet Engineering - A company of the Teamnet Group

Page 5: Teamnet Engineering - Company Profile

Teamnet Engineering - Skills

We provide the entire

development cycle of a

complex project

Design

Technological processes

Modelling of industrial processes

Intelligent automatic driving systems

Electrical systems, industrial automation and SCADA systems

Application specific software

Implementation

Technologicalenvironmental solutionsand other industrial processes

Water and sewage works, as well as water treatment stations, pumping, collection, water network systems

Waste management systems, automatic waste sorting stations, waste incinerators

Industrial automation and SCADA systems

Entrepreneurship

General contracting for complex works

Consulting

Water and sewage systems

Waste management systems

Automation andelectrical

engineering

SCADA (Supervisory Control and Data

Acquisition)

Industrial water treatment systems

Page 6: Teamnet Engineering - Company Profile

Teamnet Engineering SCADA products and activities

Products

Technological installations

Design, industrial automation, software

Industrial communications for automation systems

Activities

Provider of solutions for environmentaltechnologies

Commissioning of technological installations

Design, Research & Development, Industrial Automation

Specific software for industrial applications

Page 7: Teamnet Engineering - Company Profile

Reference projects, SCADA Projects and Industrial Automation

Page 8: Teamnet Engineering - Company Profile

Upgrading of wastewater treatment stations in Bistrița - Năsăud County - Bistrița, Salva, Năsăud, Sângeorz Băi

Page 9: Teamnet Engineering - Company Profile

Name Number of equivalent inhabitants

Bistrița 131.000

Beclean 20.000

Salva 20.000

Sângeorz-B i 12.000

Total beneficiaries

183.000

Sângeorz-

Salva

BecleanBistrița

Addressable population in the modernization project of wastewater treatment stations in Bistriţa County

Page 10: Teamnet Engineering - Company Profile

• fully functional purge system for both sewage and sludge from the wastewater treatment processfrom Salva, Beclean, Sângeorz-

• a new water and sewage infrastructure by using the optimized collection and wastewater treatment plants systems

• supplement of the water treatment capacity through the rehabilitation of the activated sludge basins, as well as primary and secondary decanters

• the works were carried out within the POS MEDIU 1 program

• new purification station /Salva;

• wastewater transfer collector from the existing wastewater treatment plant to the new waste water treatment plant Salva;

• transformation of the existing wastewater treatment station

in a transfer pumping station.

• the works were carried out within the POS MEDIU 1 program

Sângeorz-

• expansion of the new wastewater treatment plant Sangeorz Bai built under another contract with funding from CNIfunds;

• collector main transfer pumping station to the treatment plant Rodna transfer Sângeorz ;

• transforming the existing wastewater treatment plant in Rodna in a transfer pump

• the works were carried out within the POS MEDIU 1 program

Beclean

• new purification station

• transfer wastewater collector Bata Beclean

• the works were carried out within the POS MEDIU 1 program

Page 11: Teamnet Engineering - Company Profile

Upgrading wastewater treatment stations in Bistrița

Roughwater

Thin grate

Fine grate

Sand and fat separation

Primary decanters

Primary sludge

Coagulant dosing if needed

nitrogen recirculation Secondary decanters effluent

Line 2

Line 1

Line 3

effluentSecondary decanters

Secondary decanters

recirculated mud

Coagulant dosing if neededExcess sludge

Excess sludge

recirculated mud

nitrogen recirculation

Coagulant if needed

nitrogen recirculation

recirculated mud

Page 12: Teamnet Engineering - Company Profile

Upgrading wastewater treatment stations in Sângeorz – Băi

Page 13: Teamnet Engineering - Company Profile

Upgrading wastewater treatment stations in Salva

Page 14: Teamnet Engineering - Company Profile

Upgrading wastewater treatment stations in Beclean

Page 15: Teamnet Engineering - Company Profile

Sistemul de managemet integrat al deșeurilor din județul Bihor - Beiuș, Marghita, Salonta, Săcuieni, Stei

Page 16: Teamnet Engineering - Company Profile

Name Number of equivalent inhabitants

Salonta 17.735

Marghita 15.770

Beiu 10.667

S cuieni 11.526

Stei 6.529

Total beneficiaries 62.227

Stei

Marghita

Salonta

Beiu

Addressable population in the SMID Bihor project (Integrated waste management system)

Page 17: Teamnet Engineering - Company Profile

SMID Bihor (Integrated waste management system)

• This project solves operational and environmental problems

caused by waste generation and management, such as an

integrated waste management system is elaborated.

Sorting stations are designed for the following capabilities:

• BEIU : 7000 tonnes/year, operable 260 days a year with 1 eight-hour shift, thus 26.7 tonnes/day or about 3.3 tons/hour.

• MARGHITA: 4,500 tonnes/year, operable 260 days a year with 1 six-hour shift, thus 17.3 tonnes/day or about 2.9 tonnes/hour.

• SALONTA: 4,500 tonnes/year, operable 260 days a year with 1 six-hour shift, thus 17.3 tonnes/day or about 2.9 tonnes/hour

Transfer stations are designed for the following capabilities:

• BEIU : 16.100 tonnes/year , operable 312 days a year with 1 eight-hour shift

• MARGHITA: 10.600 tonnes/year, operable 312 days a year with 1 eight-hour shift

• SALONTA: 9.900 tone/year, operable 312 days a year with 1 eight-hour shift

• S CUIENI: 13.000 tone/year, operable 312 days a year with 1 eight-hour shift

• STEI: 3.500 tone/year, operable 312 days a year with 1 eight-hour shift

Page 18: Teamnet Engineering - Company Profile

Automation and SCADA system for wastewater treatment plant expansion - Galați

Page 19: Teamnet Engineering - Company Profile

Projected capacity: 370,000 equivalent inhabitants :

• Max. dry weather daily flow rate: 66,00 m3/day

• Rainy weather max. flow: 9,200 m3/hour

The water line has been extended with :

• Four lines for biological treatment with nutrient removing, 70,000 m3

• Four final clarification pools 23,600 m3

• Four final clarification pools, 8,000 Nm3/h. 250 kW

• Chemical dosing plant for phosphorus removal

• Recirculated and surplus mud pumping station

• Buffer pool for surplus thicken sludge. Anaerobic digestor, 6,000 m3

• Motor/generator combined equipment with biogas 130 m3/h / 260 kW

Page 20: Teamnet Engineering - Company Profile

Galați WWTP2 automation system - SCADA operating interface

Page 21: Teamnet Engineering - Company Profile

Galați WWTP2 automation system - SCADA operating interfaces

Page 22: Teamnet Engineering - Company Profile

Extension and rehabilitation of wastewater treatment plants in Arges County

Other projectsModernization of the wagons loading

system to the CF Ramp (SCADA), integration and connection with the

OpenTAS ROMINSERV SRL Bucharest computer system

Automation and SCADA system for WWTP wastewater treatment plants -

Pechea and Lie

Integrated solid waste management system in Vaslui County

Technical support for the Ministry of Environment and Climate Change of Romania

Development of the monitoring system of Vidraru dam

Tranforming finishing demineralized water for Termoelectrica Midia within -

Technical Project; Details of execution

Modernization of existing water chemical treatment of the SC Electrocentrale Oradea

S.A. - approval documentation for intervention works; Technical project;

Details of execution

Page 23: Teamnet Engineering - Company Profile

Research, Development and Innovation Projects

Page 24: Teamnet Engineering - Company Profile

VIBROCHANGE

Vibrational Process

Sensors & Transducers

Detection / Diagnosis / Communication

Modeling / Identification / Fusion

Signal Processing

Ultrasonicwaves

Acoustic Waves

MechanicWaves

Experimental Model

Decisions

We offer an innovative solution for automatic monitoring andconditional maintenance systems, which can optimize coststhrough the early detection of defective industrial equipmentoperation.

Experimental model for the detection

and diagnosis of the changes in the

vibration processes of industrial

equipment, using advanced

techniques of measurement and

predictive analysis, in order to prevent

abnormal operation and to avoid

economic or environmental disaster.

Page 25: Teamnet Engineering - Company Profile

BIOCON Advanced control system of a BIORAFINERY-type installation

Biorafinery-type installation: anaerobic digestor + fotobioreactor

Page 26: Teamnet Engineering - Company Profile

BIOCONAdvanced control system of a BIORAFINERY-type

installation

• Modeling of processes of anaerobic digestionand photosynthetic growth of microalgae andthe identification of the second process, basedon of the experiments carried out on the pilotplant.

• Study of the process of obtaining methanethrough anaerobic wastewater treatment basedon the mathematical model, through numericsimulation

• Study on the use of biomass residues remainingfollowing the extraction of biodiesel as asubstrate for biogas production in anaerobicstep;

• Synthesis of control algorithms for bothprocesses (complex processes and powerfullynon-linear) treated individually and coupled tothe HILS structure adopted within the project

Page 27: Teamnet Engineering - Company Profile

Certifications

Page 28: Teamnet Engineering - Company Profile

Indusoft

ANRE

ISWAARA

MOLDSWA

Certifications

Page 29: Teamnet Engineering - Company Profile

• Quality management system according to ISO 9001

• Environmental management system according to ISO 1400

• Occupational health and safety management system according to OHSAS

18001

• Information security management system according to ISO 27001

• Social responsibility management systems according to SRM 8000

• ANRE type B certification for design and execution of Electrical installations

• ANRE authorized electricians gr. IIIA/IIIB, IIA/IIB

• Integrating System and Software Provider Indusoft Web Studio (Schneider)

• Integrating System and Software Provider Siemens Germany

• Integrating System and Software Provider (RASI) Rockwell Software

Page 30: Teamnet Engineering - Company Profile

Customers and collaborators

Page 31: Teamnet Engineering - Company Profile

Customers at Local and Regional level

Bihor County Council

Galați City Hall SC Farming Matering SRL

Rompetrol SA - Năvodari

Dunărea de Jos University of Galați

Apă Canal SA Galați Arcelor Mittal Galați

Tehnopol SRL Galați

Rominserv SRL București

UEFISCDI Bucharest

Vega93 SRL Galați

Biogest International GmbH Germany

Passavant GmbH Germania

GE Power Franta (part of General

Electric SUA Group)

Arcelor Mittal Tubular Products Galati

UZINA TERMOELECTRICA MIDIA SA

Electrocentrale Oradea SA

SC Aquabis SA

Tancrad SRL Brăila Indas SRL București

Page 32: Teamnet Engineering - Company Profile

Collaborators

“Dunarea de

Jos”

University of

Galati

Page 33: Teamnet Engineering - Company Profile

Thank you!www.teamnet.ro