22
The Basics of Capital Budgeting 12-1 Should we build this plant?

4 the basic of capital budgeting

Embed Size (px)

Citation preview

Page 1: 4 the basic of capital budgeting

The Basics of Capital Budgeting

12-1

Should we build this

plant?

Page 2: 4 the basic of capital budgeting

Analysis of potential additions to fixed assets. Long-term decisions; involve large expenditures. Very important to firm’s future.

12-2

What is capital budgeting?

Page 3: 4 the basic of capital budgeting

1. Estimate CFs (inflows & outflows).2. Assess riskiness of CFs.3. Determine the appropriate cost of capital.4. Find NPV and/or IRR.5. Accept if NPV > 0 and/or IRR > WACC.

12-3

Steps to Capital Budgeting

Page 4: 4 the basic of capital budgeting

Independent projects – if the cash flows of one are unaffected by the acceptance of the other.

Mutually exclusive projects – if the cash flows of one can be adversely impacted by the acceptance of the other.

12-4

What is the difference between independent and mutually exclusive projects?

Page 5: 4 the basic of capital budgeting

1. Net Present Value (NPV) 2. Internal Rate of Return (IRR) 3. Modified Internal Rate of Return (MIRR) 4. Regular Payback 5. Discounted Payback

11-5

Criteria for deciding:

Page 6: 4 the basic of capital budgeting

Normal cash flow stream – Cost (negative CF) followed by a series of positive cash inflows. One change of signs.

Nonnormal cash flow stream – Two or more changes of signs. Most common: Cost (negative CF), then string of positive CFs, then cost to close project. Nuclear power plant, strip mine, etc.

12-6

What is the difference between normal and nonnormal cash flow streams?

Page 7: 4 the basic of capital budgeting

Sum of the PVs of all cash inflows and outflows of a project:

12-7

Net Present Value (NPV)

N

0tt

t

)r 1 (CF

NPV

Page 8: 4 the basic of capital budgeting

12-8

What is Project S’s NPV?

Page 9: 4 the basic of capital budgeting

11-9

What is Project S’s NPV?

Page 10: 4 the basic of capital budgeting

NPV= PV of inflows – Cost

= Net gain in wealth Independent projects: If NPV exceeds zero, accept the

project. Mutually exclusive projects: Accept the project with

the highest positive NPV. If no project has a positive NPV, reject them all.

12-10

Rationale for the NPV Method

Page 11: 4 the basic of capital budgeting

N

0tt

t

IRR) (1CF

0

12-11

Internal Rate of Return (IRR)

IRR is the discount rate that forces PV of inflows equal to cost, and the NPV = 0:

Page 12: 4 the basic of capital budgeting

They are the same thing. Think of a bond as a project. The YTM on the bond

would be the IRR of the “bond” project.

12-12

How is a project’s IRR similar to a bond’s YTM?

Page 13: 4 the basic of capital budgeting

Independent projects: If IRR exceeds the project’s WACC, accept the project.

If IRR is less than the project’s WACC, reject it.

Mutually exclusive projects. Accept the project with the highest IRR, provided that IRR is greater than WACC. Reject all projects if the best IRR does not exceed WACC.

12-13

Rationale for the IRR Method

Page 14: 4 the basic of capital budgeting

12-14

Multiple IRRs

Page 15: 4 the basic of capital budgeting

The discount rate at which the present value of a project’s cost is equal to the present value of its terminal value, where the terminal value is found as the sum of the future values of the cash inflows, compounded at the firm’s cost of capital.

11-15

Modified Internal Rate of Return (MIRR)

Page 16: 4 the basic of capital budgeting

11-16

Modified Internal Rate of Return (MIRR)

Page 17: 4 the basic of capital budgeting

The number of years required to recover a project’s cost, or “How long does it take to get our money back?”

Calculated by adding project’s cash inflows to its cost until the cumulative cash flow for the project turns positive.

12-17

What is the payback period?

Page 18: 4 the basic of capital budgeting

12-18

Calculating Payback

Page 19: 4 the basic of capital budgeting

Strengths Provides an indication of a project’s risk and liquidity. Easy to calculate and understand.

Weaknesses Ignores the time value of money. Ignores CFs occurring after the payback period.

12-19

Strengths and Weaknesses of Payback

Page 20: 4 the basic of capital budgeting

Uses discounted cash flows rather than raw CFs.

12-20

Discounted Payback Period

Page 21: 4 the basic of capital budgeting

11-21

Conclusions

Five capital budgeting decision criteria: NPV, IRR, MIRR, Payback and Discounted PaybackNPV is the single best criterion.NPV – direct measure of value the project adds to

shareholder wealthIRR & MIRR – measures profitabilityPayback and Discounted Payback – measures

liquidity

Page 22: 4 the basic of capital budgeting

11-22

END