portfolio
2006 - 2012
surface & texture
YICHEN LU
* born in Taipei, Taiwan, 01.11.1981
Bachelor degree of Science - Geography
National Taiwan University, Taipei, Taiwan | 10.1999 ~ 6.2003
|Education
CV Yichen LuTel :+ 43 664 5809050Email :[email protected] :parkgasse 8/ 14 - 15, 1030, Vienna, Austria
YICHEN
LU
|Skills
_AUTO CAD_MAYA_RHINO + GRASSHOPPER MODELING_MENTALRAY(basic)_ADOBE PHOTOSHOP/ ILLUSTRATOR/INDESIGN/AFTEREFFECT
_LASER CUTTING _3D-PRINTING_CNC Milling
_MANDARIN (ORAL AND WRITTEN)_PROFICIENT IN ENGLISH (ORAL AND WRITTEN)
Laboratory of Environmental& Form (LEF)Taipei, Taiwan | 8.2004 ~ 7.2005Designed a concept for the Plateform of the historic Chul‐Chen rail-way station in Taiwan. Worked in a team for making the proposal of the east village Townscape renovation project.
National Taiwan University Building and Planning Research FoundationTaipei, Taiwan | 6.2003 ~ 7.2004Community Planning Project in Matsu:Designed and organized traditional wedding festival to revitalizing old villages.
|Working Experience
Coop Himmelb(l)au | 2.2011 ~ 4.2011Vienna,AustriaTirana, Albania parliament competition, 1st prize
1:100 Mocape Shenzhen fasade structure working model
1:200 Tirana, Albania parliament competition model
Rainer Pirker ArchiteXture | 7.2008 ~ 9.2008Vienna,Austria/Shenzhen,ChinaInternational competitionSouth China University of Science and Technology,2nd prize 5 weeks working in a group in Shenzhen, China, and making propos-als from the scale of campus. From master planning to architecture design; as well as concerning about the student life and the interact-ing between the school and the local community.
architecture
mag.arch
bsc
computer program
fabrication
language
planning
Magistra der Architekturstudio Wolf D. Prix and diploma with Hani Rashid
Universität Für Angewandte kunst Wien| 10.2005 ~ 2.2012
|Research & Diploma
portfolio
2006 - 2012
YICHEN
portfolio
2006 - 2012
YICHEN
The concept for this project is dealing primarily with a favela neighborhood close to the center of the city of Sao Paulo in Brazil.
The specific site was choosen through an analytic process of producing a series of mappingsof existing path configurations, population flux, density distribution, hydrology and morphological studies present in the existing ever changing favela.
The specific site for this architecture is situated at top an sunken basin facing sever issues associated with issues of human mobility and flooding. The Project loos at the making of a new configuration based on existing and anticipated urban flows, metamorphosis and new situations of growth and change to the fabric of the Favela. The architectural studies and work proposed are being created by intersecting two layers of artificial landscapes across the existing basin, as well as integrating predetermined pathways and systems incorporating new aspects and modalities of circulation and flow.
The resulting architecture celebrates the notion of an urban void to be filled with program and people forming a new morphology made up of social fields and thereby improving and enhancing the existing and new neighborhoods it will in-variably impact.
Social condenser - Favela montageDiploma project 10.2011-2.2012
diploma with Hani Rashid
#01
site, exsisting favela situation conceptual illustration-layering
site plan
portfolio
2006 - 2012
YICHEN ortfo
2006 -
YICH
Social condenser - Favela montageDiploma project
original site situation
site analysis -mapping slope analysis
site analysis -mapping exsisting building on landscape
site analysis - mapping hydrological analysis
conceptual illustration - mobility implatation
conceptual idea - lift the flooded houses
conceptual idea - replacement
portfolio
2006 - 2012
YICHEN
portfolio
2006 - 2012
YICHEN
flow simulation circulation massing opitimization voronoi structure according to surface curvature
portfolio
2006 - 2012
YICHEN
1:200 physical model150cm * 120cm
portfolio
2006 - 2012
YICHEN
representation of endless house / Friedrich KieslerResearch Project#02
kiesler - physical model
structure system-triangulation model structure system-generic model
to compare the generic and the triangulated model, the material load, the dead load and the life load perfomance comparison structure design
loads
deformation
view
3.2010-6.2010, group project
STEEL 12/6STEEL 5/5
STRUCTURAL GLAZINGCOMPOSITE PANEL:
0,1 METAL SHEET2-7 INSULATION0,1 METAL SHEET
BA
GLASS DOOR
2 FLOORING7 SCREED8 INSULATION0,3 FOIL50 RC20 GRAVEL
40/20
SECTION A-B
+- 0,00 +- 0,00
METAL SHEET
STEEL 19/9
GRUNDRISS
GRAVEL
METAL SHEET
portfolio
2006 - 2012
YICHEN
|Texture
portfolio
2006 - 2012
YICHEN
Based on climate analysis, the 6000 people popmusic concerthall pervide open air circulation tocool down the inner space.By distrubute the speaker and the movement ofthe sound refl ecter, the accoustic issue could besolved.
portfolio
2006 - 2012
YICHEN
open air accoustic roofTaipei Pop Music Center#03
sound intensity transition
10.2009-1.2010
winter wind_cold air circulation
summer wind_air circulation and ventilation
portfolio
2006 - 2012
YICHEN
6 7 8
shadow simulation for four season
urban view
urban view
In a multi-cultural environment, the goal is to create a distributed public spaces, a polycentric network in the neighborhood, in order to minimizing the confrontation that occurs in bigger, shared playgrounds.
Centered around children who are the roles of least resistance to merging and communication. Playgrounds are conceived of many small playgrounds displayed according to the demand along the urban fabric.
portfolio
2006 - 2012
YICHEN
der 15. Bezirk Spielplatz, ReinDorf Strasse
street transformationCommunity Design#04
site surveyreindorf strasse, 15distrcct vienna conceptual rendering
10.2009-6.2010
Soften the street, melt the boundary; there is no line betweens pe-destrian and moto way; there is no sign to tell you what to do. The street is playground.
portfolio
2006 - 2012
YICHEN
A
portfolio
2006 - 2012
YICHEN
Instead of a static exhibition, Yingge comtemperary museum of art is dynamic space sequences.A system of circulation is designed as public space which is like semi outdoor corridors moving around or cutting through exhibition spaces.
利用坡道與樓層的安排產生一系列高高低低,富有流動性的空間序列.利用流動的概念,暗喻當代美術館應該化靜態的展覽為動態活動場域並能轉化所在的地方成為人群與創意的發生地.美術館的動線為一序列的公共空間同時也是半戶外廊道圍繞或是切開各個展覽空間,提供休憩與瞭望自然與城市景觀的空間
an alluvial landscapeNew Taipei City Museum of Art#05
08.2011
circulation
volume
skin study_opening
skin study_solar radiation
program
circulation and fl oorcomposition
|Surface
portfolio
2006 - 2012
YICHEN
portfolio
2006 - 2012
YICHEN
Fluid Dynamic in the RESPONSE OF CRISISpower rise / Vienna, Austria
#012009
wind and skin simulation
portfolio
2006 - 2012
YICHEN
Fluid Dynamic ocean research center 2008
#02
portfolio
2006 - 2012
YICHEN Cliff Housefi ctional site#03 2007
portfolio
2006 - 2012
YICHEN Roof Extention _ part 1
A Conversationwith OSCAR NIEMEYER
#042007
ortfolio
2006 - 2012
YICHEN
roof geomatry
section model series
The roof is a not only a sculpture, but a respond to the environment. This is a process setup for transitting the roof from a graphic pattern into (3 di-mensional) inhabitable typology. Instead of having chemocline between base-ment and ground floor, building and landscape, the continuous chain reaction dissolves the confines of vertical movement in the original building.
The reaction settings come from the adaptation of the roof geometry. By giving the geometry an idea of nature forces continuously impact on the site, the new reborn responds to the surroundings, seamlessly imbedded in the environment and smoothly articulate in itself. The ambulant sunlight, the fluent nature trails would lead us percept the space.
Roof Extention_part 2 a Conversation with OSCAR NIEMEYER 2007
portfolio
2006 - 2012
YICHEN
#05
|masterplan
International competition south china university of science and technology,2nd prize, 2008
portfolio
2006 - 2012
YICHEN
portfolio
2006 - 2012
YICHEN
site analysis
strategies
model work samples1,2,3 MOCAPE 1:100 fasade modelcoop himmelb(l)au
4,8south china university of science and technologyRainer Pirker architeXture
5-9exhibition modelRainer Pirker architeXture
portfolio
2006 - 2012
YICHEN 82
82
1 6
103 9
54
7
model work samplesTirana, Albania parliament competition,1st prize
coop himmelb(l)au,02,2011
portfolio
2006 - 2012
YICHEN