OT-500OIL SEPARATOR
Installation, Operation, & Maintenance Guide
LIFETIME GUARANTEED
Built in KANSAS CITY
OT-500OIL SEPARATOR
Installation, Operation, & Maintenance Guide
913-222-1500 [email protected] STRIEMCO.COM
CUSTOMER SERVICE HOURS: 8 AM - 5 PM CST
OVERVIEWStriem Oil Tanker™ model OT-500 is a 560 gallon polyethylene oil separator intended for below-grade installation. It is designed to separate oil and solids from wastewater.
OPERATIONOily wastewater enters through the inlet connection. As the wastewater moves through the unit, solids and immiscible lighter-than-water contaminants are separated based on Stokes' Law. Immiscible, lighter-than-water droplets rise out of the wastewater stream, while sediment and sludge settle to the bottom.
LIFETIME WARRANTYOur products are designed to last the lifetime of the plumbing system in which they are installed. If they don't, we will repair or replace them at no charge. Product damage due to normal wear and tear may be repaired or replaced at a reasonable charge. See website for full details.
OT-500OIL TANKERTM SERIES
560 GALLONOIL SEPARATOR
PUMPING FREQUENCYOT-500 must be maintained prior to reaching maximum oil or sediment capacity for the unit to continue working efficiently.
Pumping frequency depends on the amount of oil and sediment in the wastewater.Monitor oil and sediment levels to determine site specific maintenance schedule requirements.
Oil levels can be tested with a core sampler. Striem recommends a minimum pumping frequency of 6 months.
TROUBLESHOOTING TIPSSlower than usual drainage may indicate a blockage and a need to maintain the oil separator. Ensure the drain lines and diffuser are cleared of all debris in the presence of slow drainage.
Effluent flow fouled with free oil may indicate the OT-500 has exceeded the maximum oil capacity. In the presence of oil in the effluent flow, maintain the unit immediately.
!
MAINTENANCE
1 Always take proper care to ensure a safe and healthy environment while maintaining the oil separator. Avoid the presence of sparks or open flames while maintaining the unit.2 Remove covers.3 Contact a professional pumper contractor to remove all contents of the oil separator, including
oil, sediment, and wastewater.4 Clean the drain lines and diffuser thoroughly of all debris.5 Fill OT-500 with water to outlet invert.6 Inspect cover gaskets for wear and tear and reinsert covers.7 Dispose of contents per local code.
Striem3100 Brinkerhoff
Kansas City, KS 66115Tel: 913-222-1500
Made in the U.S.A
FLOWFLOW
Outlet diffuser
Cover Adapter typ
Closed top
Cover typ
OT-500
**For buried applications only
Sheet Descriptions Sheet #1 - Series overview, Warranty information, Operations & MaintenanceSheet #2 - Installation InstructionsSheet #3 - TeleGlide Riser Installation Instructions
Leak/Seal Testing DO NOT AIR TEST UNIT OR RISER SYSTEM! Doing so may result in property damage, personal injury or death.
To perform a leak/seal test on the base unit, cap/plug all plumbing connections, remove a cover, and fill the unit with water just above thehighest connection. Inspect unit and connections for leaks. Check water level at specific time intervals per local code. Note: This unit has been subjected to a 24 hour water test prior to shipment from the factory.
Lifetime Warranty
Our products are designed to last the lifetime of the plumbing system in which they are installed. If they don't, we will repair or replace them at no charge. Product damage due to normal wear and tear may be repaired or replaced at a reasonable charge.See website for full details.
OIL TANKERS - LARGE EXTERIOR UNITS(Model OT-500)
TROUBLESHOOTING TIPS:
Slower than usual drainage may indicate a blockage and a need to maintain the Oil Tanker. Ensure the drain lines and diffusers are cleared of all debris in the presence of slow drainage.
Effluent flow fouled with free oil may indicate the Oil Tanker has exceeded the maximum oil capacity. In the presence of oil in the effluent flow, maintain the Oil Tanker immediately.
PUMPING FREQUENCY:
Oil Tanker must be maintaned prior to reaching maximum oil or sediment capacity for the unit to continue working efficiently.
Pumping frequency depends on the amount of oil and sediment in the wastewater.
Monitor oil and sediment levels to determine site specific maintenance schedule requirements.Oil levels can be tested with a core sampler. Striem recommends a minimum pumping frequency of 90 days.
MAINTENANCE
Always take proper care to ensure a safe and healthy environment while maintaining the Oil 1.Tanker. Avoid the presence of sparks or open flames while maintaining the unit.Remove covers.2.Contact a professional pumper contractor to remove all contents of the Oil Tanker, including 3.oil, sediment, and wastewater. Clean the drain lines and diffusers thoroughly of all debris.4.Fill OT-500 with water to outlet invert. 5.Inspect cover gaskets for wear and tear and replace covers.6.Dispose of contents per local code.7.
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
OVERVIEW
Striem Oil Tankers separate oil and other immiscible lighter-than-water contaminants from wastewater to keep them from entering the sewage system.
OPERATION
Oily wastewater enters through the inlet connection. As the wastewater moves through the unit, solids and immiscible lighter-than-water contaminants are separated based on Stokes' Law. Immisicble, lighter-than-water droplets to rise out of the wastewater stream, while sediment and sludge settles to the bottom.
OIL TANKER INSTALLATION,OPERATION, AND MAINTENANCE GUIDE
ECO:12/16/2020MJ REV:DATE:DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED.
SHEET NUMBER: 1 of 3
FOR BURIED APPLICATIONS ONLY
LEAK/SEAL TESTINGDo not air test unit or Teleglide Riser system! Doing so may result in property damage, personal injury or death. To perform a leak/seal test on the base unit, cap/plug all plumbing connections, remove the cover, and fill the unit with water just above the highest connection. Inspect unit and connections for leaks. Check water level at specific time intervals per local code. Note: This unit has been subjected to a 24 hour water test prior to shipment from the factory.
WARNINGDO NOT AIR PRESSURE TEST UNIT!
DOING SO MAY RESULT IN PROPERTY DAMAGE, SERIOUS BODILY INJURY, OR DEATH!
Refer to Installation Instructions for correct testing procedure.
AIR
913-222-1500 [email protected] STRIEMCO.COM
CUSTOMER SERVICE HOURS: 8 AM - 5 PM CST
Striem3100 Brinkerhoff
Kansas City, KS 66115Tel: 913-222-1500
Made in the U.S.A
EXCAVATION AND BACKFILL DETAIL
Finished Grade
Crushed gravelor sand
Riser to finished grade
Native soil
Deadman for high water table installation to be 12" wide x 12" tall and 103" long, typical both sides (by others)
OT-500
Lifting Lug
VEN
T
VEN
T
FLOW FLOW
Two-way cleanouttee (by others)
Sanitary Vent(by others)
Clean out to grade onoutlet pipe of each unit(by others)
Oil Tanker vents toatmosphere(by others)
Nylon straps for anchoring when required.
(Available with HDK-500)
Corrosion resistantturnbuckle
(Available with HDK-500)Deadmen & Anchorswhen required(by others)
Finished Grade Risers to grade
OT-500
INSTALLATION INSTRUCTIONS EXCAVATION
Surrounding soil must be undisturbed soil or well compacted engineering fill.1.Measure the width and length of the tank and excavate a hole that is a minimum of 18" greater than the tank on all sides.2.Depth of excavation shall be 12" deeper than tank bottom.3.After the excavation is complete create a well compacted support layer of sand/gravel mixture so that ground supporting 4.tank is a minimum of 12" above native soil.
UNIT INSTALLATIONLower and center the unit into hole using Striem lifting lug kit (included). Do not use chains or accessways to move the unit. 1.Ensure the covers are level with finished grade.2.Fill unit with water before backfilling to stabilize unit and prevent float out during backfilling.3.
BACKFILLING & FINISHED CONCRETE SLABBefore backfilling and pouring of slab secure covers and risers (if necessary) to the unit. 1.Backfill evenly all around tank using crushed aggregate material approximately 3/4" size rock, or sand, with no fines.2.When backfilling, ensure backfill is worked under the unit using a probe to ensure the unit is fully supported. 3.Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.4.Thickness of concrete around cover to be determined by specifying engineer. If traffic loading is required the concrete slab 5.dimensions shown are for guideline purposes only. Concrete to be 28 day compressive strength to 4000 PSI with 6 ± 1% air entrainment.6.NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected with tie wire.7.Rebar to be 2-1/2" from edge of concrete.8.Rebar spacing 12" grid. 4" spacing around access openings.9.
DEADMAN ANCHORINGDeadmen should be constructed according to the American Concrete Institute (ACI) code.1.Deadmen should be 12" wide x 12" tall and 103" long.2.Each deadman should have 2 anchor points for connection to a 3,500 lbs. rated turnbuckle.3.The deadmen shall be installed tangent to the tank footprint.4.Nylon straps rated to 3,333 lbs. each should be connected to a turnbuckle on each side. Turnbuckles should be secured to 5.the deadmen anchor points on each side of the tank such that the tank is held down.
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
8"
45°
4"
139" Minimum
4"
85-3/4"Minimum
2-1/2"
Rebar
OT-500
TOP VIEW Rebar Finished Grade
Concrete pad must extend18" outside the unit footprint
OIL TANKER INSTALLATION,OPERATION, AND MAINTENANCE GUIDE
ECO:12/16/2020MJ REV:DATE:DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED.
SHEET NUMBER: 2 of 3
Striem3100 Brinkerhoff
Kansas City, KS 66115Tel: 913-222-1500
Made in the U.S.A
EXCAVATION AND BACKFILL DETAIL
Finished Grade
Crushed gravelor sand
Riser to finished grade
Native soil
Deadman for high water table installation to be 12" wide x 12" tall and 103" long, typical both sides (by others)
OT-500
Lifting Lug
VEN
T
VEN
T
FLOW FLOW
Two-way cleanouttee (by others)
Sanitary Vent(by others)
Clean out to grade onoutlet pipe of each unit(by others)
Oil Tanker vents toatmosphere(by others)
Nylon straps for anchoring when required.
(Available with HDK-500)
Corrosion resistantturnbuckle
(Available with HDK-500)Deadmen & Anchorswhen required(by others)
Finished Grade Risers to grade
OT-500
INSTALLATION INSTRUCTIONS EXCAVATION
Surrounding soil must be undisturbed soil or well compacted engineering fill.1.Measure the width and length of the tank and excavate a hole that is a minimum of 18" greater than the tank on all sides.2.Depth of excavation shall be 12" deeper than tank bottom.3.After the excavation is complete create a well compacted support layer of sand/gravel mixture so that ground supporting 4.tank is a minimum of 12" above native soil.
UNIT INSTALLATIONLower and center the unit into hole using Striem lifting lug kit (included). Do not use chains or accessways to move the unit. 1.Ensure the covers are level with finished grade.2.Fill unit with water before backfilling to stabilize unit and prevent float out during backfilling.3.
BACKFILLING & FINISHED CONCRETE SLABBefore backfilling and pouring of slab secure covers and risers (if necessary) to the unit. 1.Backfill evenly all around tank using crushed aggregate material approximately 3/4" size rock, or sand, with no fines.2.When backfilling, ensure backfill is worked under the unit using a probe to ensure the unit is fully supported. 3.Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.4.Thickness of concrete around cover to be determined by specifying engineer. If traffic loading is required the concrete slab 5.dimensions shown are for guideline purposes only. Concrete to be 28 day compressive strength to 4000 PSI with 6 ± 1% air entrainment.6.NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected with tie wire.7.Rebar to be 2-1/2" from edge of concrete.8.Rebar spacing 12" grid. 4" spacing around access openings.9.
DEADMAN ANCHORINGDeadmen should be constructed according to the American Concrete Institute (ACI) code.1.Deadmen should be 12" wide x 12" tall and 103" long.2.Each deadman should have 2 anchor points for connection to a 3,500 lbs. rated turnbuckle.3.The deadmen shall be installed tangent to the tank footprint.4.Nylon straps rated to 3,333 lbs. each should be connected to a turnbuckle on each side. Turnbuckles should be secured to 5.the deadmen anchor points on each side of the tank such that the tank is held down.
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
8"
45°
4"
139" Minimum
4"
85-3/4"Minimum
2-1/2"
Rebar
OT-500
TOP VIEW Rebar Finished Grade
Concrete pad must extend18" outside the unit footprint
OIL TANKER INSTALLATION,OPERATION, AND MAINTENANCE GUIDE
ECO:12/16/2020MJ REV:DATE:DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED.
SHEET NUMBER: 2 of 3
Striem3100 Brinkerhoff
Kansas City, KS 66115Tel: 913-222-1500
Made in the U.S.A
EXCAVATION AND BACKFILL DETAIL
Finished Grade
Crushed gravelor sand
Riser to finished grade
Native soil
Deadman for high water table installation to be 12" wide x 12" tall and 103" long, typical both sides (by others)
OT-500
Lifting Lug
VEN
T
VEN
T
FLOW FLOW
Two-way cleanouttee (by others)
Sanitary Vent(by others)
Clean out to grade onoutlet pipe of each unit(by others)
Oil Tanker vents toatmosphere(by others)
Nylon straps for anchoring when required.
(Available with HDK-500)
Corrosion resistantturnbuckle
(Available with HDK-500)Deadmen & Anchorswhen required(by others)
Finished Grade Risers to grade
OT-500
INSTALLATION INSTRUCTIONS EXCAVATION
Surrounding soil must be undisturbed soil or well compacted engineering fill.1.Measure the width and length of the tank and excavate a hole that is a minimum of 18" greater than the tank on all sides.2.Depth of excavation shall be 12" deeper than tank bottom.3.After the excavation is complete create a well compacted support layer of sand/gravel mixture so that ground supporting 4.tank is a minimum of 12" above native soil.
UNIT INSTALLATIONLower and center the unit into hole using Striem lifting lug kit (included). Do not use chains or accessways to move the unit. 1.Ensure the covers are level with finished grade.2.Fill unit with water before backfilling to stabilize unit and prevent float out during backfilling.3.
BACKFILLING & FINISHED CONCRETE SLABBefore backfilling and pouring of slab secure covers and risers (if necessary) to the unit. 1.Backfill evenly all around tank using crushed aggregate material approximately 3/4" size rock, or sand, with no fines.2.When backfilling, ensure backfill is worked under the unit using a probe to ensure the unit is fully supported. 3.Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.4.Thickness of concrete around cover to be determined by specifying engineer. If traffic loading is required the concrete slab 5.dimensions shown are for guideline purposes only. Concrete to be 28 day compressive strength to 4000 PSI with 6 ± 1% air entrainment.6.NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected with tie wire.7.Rebar to be 2-1/2" from edge of concrete.8.Rebar spacing 12" grid. 4" spacing around access openings.9.
DEADMAN ANCHORINGDeadmen should be constructed according to the American Concrete Institute (ACI) code.1.Deadmen should be 12" wide x 12" tall and 103" long.2.Each deadman should have 2 anchor points for connection to a 3,500 lbs. rated turnbuckle.3.The deadmen shall be installed tangent to the tank footprint.4.Nylon straps rated to 3,333 lbs. each should be connected to a turnbuckle on each side. Turnbuckles should be secured to 5.the deadmen anchor points on each side of the tank such that the tank is held down.
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
8"
45°
4"
139" Minimum
4"
85-3/4"Minimum
2-1/2"
Rebar
OT-500
TOP VIEW Rebar Finished Grade
Concrete pad must extend18" outside the unit footprint
OIL TANKER INSTALLATION,OPERATION, AND MAINTENANCE GUIDE
ECO:12/16/2020MJ REV:DATE:DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED.
SHEET NUMBER: 2 of 3
EXCAVATION
1 Surrounding soil must be undisturbed soil or well compacted engineering fill.2 Measure the width and length of the tank and excavate a hole that is a minimum of 18" greater
than the tank on all sides.3 Depth of excavation shall be 12" deeper than tank bottom.4 After the excavation is complete create a well compacted support layer of sand/gravel mixture so
that ground supporting tank is a minimum of 12" above native soil.
UNIT INSTALLATION
1 Lower and center the unit into hole using Striem lifting lug kit (included). Do not use chains or accessways to move the unit.2 The water table must not exceed the tank height prior to the addition of risers.3 Ensure the unit covers are level with finished grade.4 Fill OT-500 with water before backfilling to stabilize the unit and prevent float out during backfilling.
BACKFILLING & FINISHED CONCRETE SLAB
1 Before backfilling and pouring of the slab, secure covers and risers (if necessary) to the unit.2 Backfill evenly all around the tank using crushed aggregate material approximately 3/4" size rock,
or sand, with no fines.3 When backfilling, ensure backfill is worked under the unit using a probe to ensure the unit is
fully supported.4 Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.5 Thickness of the concrete around the cover to be determined by the specifying engineer. If traffic
loading is required the concrete slab dimensions shown are for guideline purposes only.6 Concrete to be 28 day compressive strength to 4000 PSI with 6 ± 1% air entrainment.7 NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected with tie wire.8 Rebar to be 2 1/2" from edge of concrete.9 Rebar spacing 12" grid. 4" spacing around access openings.
DEADMAN ANCHORING (IF NECESSARY)
1 Deadmen should be constructed according to the American Concrete Institute (ACI) code.2 Deadmen should be 12" wide x 12" tall and 103" long.3 Each deadman should have (2) anchor points for connection to (2) 3,500 lbs. rated turnbuckles.4 The deadmen shall be installed tangent to the tank footprint.5 Nylon straps rated to 3,333 lbs. each should be connected to a turnbuckle on each side. Turnbuckles
should be secured to the deadmen anchor points on each side of the tank such that the tank is held down.
INSTALLATION
Striem3100 Brinkerhoff
Kansas City, KS 66115Tel: 913-222-1500
Made in the U.S.A
3"
CutMark
2-1/2" Minimum Lower clamp
Upper clampGasket
Unit/Adapter
Riser/Adapter
X
Finished Grade
Jobsite piping
X+5.25"
CoverAdapter
ShortRiser Long
RiserUpper clamp Lower clamp
Neck Gasket
Cut line
Mark
Tank Neck
Riser
6.5°
6.5°
Finished Grade
CoverAdapter
MarkedRiser
TankNeck
Finished Grade
TeleGlide Riser (24 Series) Installation Guidelines
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8 AM-5 PM CST
Place OT-500 so that the pipe connections line up with jobsite piping. Measure dimension X to determine riser height needed. Select the required risers from the adjacent table. Riser chart shows quantity for each tank manway.
Loosen upper clamp with nut driver bit (included with tank). If no risers are needed, adjust cover adapter height as needed. Ensure 2-1/2" minimum engagement is maintained. If risers are needed, remove covers from cover adapters, and cover adapters from the unit.
Insert cover adapters into the required risers until they stop. Tighten upper clamp to keep risers from shifting. Risers are installed from short to long. From the cover adapter, measure the riser height needed, X + 5.25" down the sidewall of the risers. Mark the location with grease pencil (included with tank). Cover adapter may need to be adjusted outward for some dimension ranges. If mark is at the end of riser, no cutting is required.
Uninstall cover adapters and risers. Extend mark made in step 3 around the circumference of the riser. Cut along line with jigsaw, circular saw, or reciprocating saw. Make a mark around the circumferance of the riser 3" from the cut end of riser. If no cuts were needed, make the mark 3" from the bottom of the bottom riser.
Wipe clean all riser and cover adapter sidewalls. Insert the first riser into the tank neck until the mark made in step 4 is in-line with the top of the neck gasket. This will ensure your risers reach the finished grade measured in step 1.
Install risers and cover adapters into the tank neck starting from the marked riser, moving up to finished grade. Upper clamps may need to be loosened or removed to aid in assembly.
Tighten all clamps to 14 lbs. of torque. Reinstall covers on cover adapters. If tilting of the cover adapter is required to be flush with finished floor, it must be done after all clamps are tightened. A 6.5° tilt is the maximum.
If jobsite riser height conditions change after the previous steps have been completed, there is still room for vertical adjustment. As long as the minimum engagement of 2-1/2" on all joints are maintained, the adapters and risers may be adjusted/cut as many times as necessary.
1 2 3 4
5 6 7 8
OIL SEPARATOR INSTALLATION,OPERATION AND MAINTENANCE GUIDE
ECO:12/08/2020MJ REV:DATE:DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED.
SHEET NUMBER: 3 of 3
• Place unit so that the pipe connections line up with jobsite piping. • Measure dimension X to determine riser height needed. • Select the required risers from the adjacent table. Riser chart shows quantity for each tank manway.
1 • Loosen upper clamp with nut driver bit (included with tank).
• If no risers are needed, adjust cover adapter height as needed. • Ensure 2-1/2" minimum engagement is maintained.
• If risers are needed, remove covers from cover adapters, and cover adapters from the unit.
2
• Uninstall cover adapters and risers• Extend mark made in step 3 around the circumference of
the riser. • Cut along line with jigsaw, circular saw, or reciprocating saw.
• Make a mark around the circumferance of the riser 3" from the cut end of riser.
• If no cuts were needed, make the mark 3" from the bottom of the bottom riser.
4
• Insert cover adapters into the required risers until they stop. • Tighten upper clamp to keep risers from shifting. Risers
are installed from short to long. • From the cover adapter, measure the riser height needed, X + 5.25" down the sidewall of the risers.
• Mark the location with china marker (included with tank). • Cover adapter may need to be adjusted outward for some dimension ranges. If mark is at the end of riser, no cutting is required.
3
TELEGLIDE RISER | INSTALLATION INSTRUCTIONS
• Wipe clean all riser and cover adapter sidewalls. • Insert the first riser into the tank neck until the mark made in step 4 is in-line with the top of the neck gasket. This will ensure your risers reach the finished grade measured in step 1.
5
• Install risers and cover adapters into the tank neck starting from the marked riser, moving up to finished grade. • Upper clamps may need to be loosened or removed to aid in assembly.
6
• Tighten all clamps to 14 lbs. of torque.• Reinstall covers on cover adapters.• If tilting of the cover adapter is required to be flush with
finished floor, it must be done after all clamps are tightened. A 6.5° tilt is the maximum.
7
• If jobsite riser height conditions change after the previous steps have been completed, there is still room for vertical adjustment.
• As long as the minimum engagement of 2-1/2" on all joints are maintained, the adapters and risers may be adjusted/cut as many times as necessary.
8
CORRUGATED PIPE RISER KIT (CPRK) AVAILABLE AS ALTERNATE RISER SOLUTION. SEE CPRK INSTALLATION INSTRUCTIONS FOR MORE DETAILS.
Cover Adapter
Riser Height Needed Risers Required Per Manway
0" - 5" None5" - 24" SR24 (1)
24" - 39" LR24 (1)39" - 43" SR24 (2)43" - 58" SR24 (1), LR24 (1)58" - 72" LR24 (2)72" - 90" SR24 (1), LR24 (2)
90" - 106" LR24 (3)Cover Adapter with Slick StickTM
0 - 2 1/2" None2 1/2" - 21 1/2" SR24 (1)
21 1/2" - 36 1/2" LR24 (1)36 1/2" - 40 1/2" SR24 (2)40 1/2" - 55 1/2" SR24 (1), LR24 (1)55 1/2" - 69 1/2" LR24 (2)69 1/2" - 87 1/2" SR24 (1), LR24 (2)
87 1/2" - 103 1/2" LR24 (3)