Transcript

Validation and Utilization of Physics-Based Simulated Ground Motions for Bridge Performance Assessment

Investigators: Jawad Fayaz1, Sarah Azar2, Mayssa Dabaghi2 and Farzin Zareian1

1Department of Civil and Environmental Engineering, University of California, Irvine2Department of Civil and Environmental Engineering, American University of Beirut, Lebanon

Sim #1

Sim #2

Sim #100

20

15

10

5

0

0.15

0.10

0.05

0.0

-0.05

-0.10

-0.15

0 1 2 3 4 5

GM History

Zero Level

Zero Level Crossing

Cumulative Zero Level Crossings

2nd Order Polynomial

0 1 2 3 4 5

NGAWest2 Recorded GMs Physics-Based GMs (Cybershake 15.12)

π₯𝐧(𝑬𝑫𝑷)= π’‡π’Žπ’‚π’ˆ + π’‡π’…π’Šπ’” + 𝒇𝒇𝒍𝒕 + π’‡π’‰π’π’ˆ+ π’‡π’”π’Šπ’•π’† + 𝒇𝒔𝒆𝒅 + π’‡π’‰π’šπ’‘ + π’‡π’…π’Šπ’‘

π₯𝐧(𝑹𝒁𝒁)= π’‡π’Žπ’‚π’ˆ + π’‡π’…π’Šπ’” + 𝒇𝒇𝒍𝒕 + π’‡π’‰π’π’ˆ+ π’‡π’”π’Šπ’•π’† + 𝒇𝒔𝒆𝒅 + π’‡π’‰π’šπ’‘ + π’‡π’…π’Šπ’‘

RZZ Parameters

Engineering Demand Parameters (EDP)

π₯𝐧 𝑬𝑫𝑷

= 𝒇𝑰𝒂,π’Žπ’‚π’‹+ 𝒇𝑰𝒂,π’Žπ’Šπ’

+ π’‡π’‡π’Žπ’Šπ’…,π’Žπ’‚π’‹+ π’‡π’‡π’Žπ’Šπ’…,π’Žπ’Šπ’

+ π’‡π’‡β€²π’Žπ’‚π’‹+ π’‡π’‡β€²π’Žπ’Šπ’

+ π’‡π‘»π’Žπ’Šπ’…,π’Žπ’‚π’‹+ π’‡π‘»π’Žπ’Šπ’…,π’Žπ’Šπ’

Rot50CDR

Acc YAcc X

CyberShake 15.12

(All Sites)

Recorded GM Sites

Selected CyberShake

Sites

CB14 Form CB14 FormLinear Regression Fitted Normal Distribution

100 CyberShake Simulations

Recorded GMs

π„π―πžπ§π­ 𝐏𝐚𝐫𝐚𝐦𝐞𝐭𝐞𝐫𝐬 (𝑴,𝑹, π‘½π’”πŸ‘πŸŽ) 𝐑𝐙𝐙 𝐏𝐚𝐫𝐚𝐦𝐞𝐭𝐞𝐫𝐬 (𝑰𝒂, π’‡π’Žπ’Šπ’…, π‘«πŸ“βˆ’πŸ—πŸ“) 𝐄𝐃𝐏(π‘Ήπ’π’•πŸ“πŸŽπ‘ͺ𝑫𝑹)

Goal: Compare and Validate

Simulated GMs against the

Recorded GMs using statistical

relationships between the

corresponding Event parameters,

RZZ parameters, and EDP of

Bridge structures.

Conclusions:

1. RZZ parameters can be too

stringent to perform validation of

simulated ground motions.

2. Relations between the Event

parameters and EDP, and RZZ

parameters and EDP for

recorded and simulated GMs

tend to be statistically similar.

Recommended