Transcript
  • 5/23/2018 Tour Programma for Visit to Ghedo Substation

    1/2

    IRCON International Ltd,

    Project Office, Adis Ababa, Ethiopia

    Date : 24.12.2008

    Sub : Supply of Substation Euip!ent, EAEP "#$%%&LO' ( : )oint Site *isit

    Pro+ra!!e alon+ ith Consultant for -hedo Substation.

    During our preliminary submission of drawings and discussion with consultant, the

    consultant desires some change in the location of 33 ! outgoing feeder from the

    contract document.

    "he consultant also desires a #oint site $isit to the %hedo substation for finali&ing the

    location of 33 ! outgoing feeders.

    'n this regard, it is proposed to undertae the site $isit along with the consultant as per

    the following tentati$e schedule.

    ". *isit to -hedo Substation:

    /0ro! (1."(.(##2 to (2."(.(##23

    i( Date of Departure from )ddis : 2*.12.2008

    ii( +oad +oute to be ollowed : )ddis - )mbo%hedo

    iii( /tay at )mbo : 2*thDec. 2008

    i$( )rri$al at )dis : 28

    th

    Dec, 2008$( )pproimate Distance to and fro( : *00 m

    $i( roposed penditure on account of Diesel : " 5006 appro.(

    $ii( roposed penditure on account of 7otel

    )ccommodation" 300 per day for 3

    persons for 1 days including one consultant(

    /ub#ect to actual receipt(

    : " 5006 appro.(

    $iii( Drining 9ater " per bottle, 8bottle per day for 2 days

    : " 5

    'otal E4penditure E'5 "2%6$&

    't is re;uested that the abo$e site $isit programme and proposed ependiture may

    indly appro$e.

    /ubmitted for appro$al please.

    /SAN)A7 NA7A839-$Electrical

    -, Ethiopia

  • 5/23/2018 Tour Programma for Visit to Ghedo Substation

    2/2


Recommended