Technology evolution - March 2017
Eduardo Allison - Technical Bid Manager for Mexico, Central America and Caribbean
Expertise built
from 35 years of
wind industry
experience
Portfolio of wind solutionsFrom siting to aftersales, our offering spans across turbines and services
2
Our presence in the regionProjects under construction or O&M phase
3
# Country Projects MW
1 México 10 636
2 Dominican Republic 3 83
3 Nicaragua 2 79
4 Costa Rica 3 54
5 Guatemala 2 75
6 Jamaica 1 36
7 Honduras 1 60
Total 22 1,023
2MW
3MW
Platform
Current onshore platformsProven platforms with proven track records
• Introduced in 2000 and incrementally improved over
the years
• +18,000 units installed globally*
• +35 GW installed across 45 countries
• Well suited for sites with infrastructure constraints
• Introduced in 2010, now third generation
• +4,000 units installed globally*
• +13 GW installed across 34 countries
• Grid compliant across the world due to full converter
solution
* As of December 31,2016
4
Evolution of the 2 MW platform
* AEP=Annual Energy Production. Comparison of AEP performance in IEC II (V90-1.8 MW® IEC II vs V100-2.0 MW®). Actual
performance depends on site specific conditions.
** Power modes applicable, suitability and performance depends on site specific conditions
6
Continued focus on lowering Cost of Energy
V100-2.0 MW®
V110-2.0 MW®
• Introduction of 2.2
MW power mode
2.0/2.2 MW
2015
IEC I
IEC II
IEC III
Prototype
Installation
+20%AEP increase
since 2009*
V100-2.0MW®
V110-2.0 MW™
• Upgrade to 2.0 MW
nominal rating
• New 110 m rotor
• V100-2.0 MW wind
class upgrade
2.0 MW
20142000/2004/2009
• V80/90-1.8/2.0 MW
built based on
previous model V66-
1.75 MW
V80-2.0MW®
V90-1.8/2.0 MW®
V100-1.8/2.0MW®
1.8/2.0 MW
Continuous evolution delivers increased performance
The upgraded 2 MW platform
Blades
• Aerodynamic add-ons for
increased power production and
sound power performance
Improved cooling system
• Higher operational
temperature (45˚C)
Generator
• Improved power production in
higher temperature and altitudes
Balance of Plant
• Increased reactive power
capability
Switchgear
• Standard Vestas switchgear
program integrated into safety
system
7
Adaptive Wind Sensing
• Advanced algorithms to calibrate
upwind position and wind speed
2MW Platform turbine options
9
• Yaw Power Backup
• Shadow Detection
• Obstacle Collision Avoidance System
(OCAS™)
• Aviation Marking (Tower/Blade/Nacelle)
• Load & Power Modes
• Ice detection
• Fire Suppression
• Low temperature option
• CMS
• Bat mitigation
• Low Voltage Metering - New
• Lightning detection system - New
Versatile: Greater configurabilityMaximise AEP, lower CoE for each unique site
The 2 MW platform allows customers to choose the optimal turbine
configuration for each unique site, supported by Vestas’ vast
operational experience, site specific design capabilities,
sophisticated load models and unique wind and site capabilities.
9
ROTOR SIZE TOWER
CONFIGURATION
POWER & SOUND
OPTIMISED
MODES
PROJECT
OPTIMISATION
6 HH, up
to 125m
V100
V110= 2 rotors
Classification: Confidential
1
0
The upgraded 3 MW platform
adds versatility by broadening
the portfolio of turbine
combinations
The evolution of the 3 MW platformSignificant AEP increase driving down Cost of Energy
V105-3.3 MW®
V112-3.3 MW®
V117-3.3 MW®
V126-3.3 MW®
V105-3.45 MW™
V112-3.45 MW™
V117-3.45 MW™
V126-3.45 MW™
V136-3.45 MW™
• V112-3.0 MW first
member of “new” 3
MW Platform
V90-3.0 MW®
V112-3.0 MW®
• Upgrade to 3.3 MW
nominal rating
• New rotors: 105m,
117m, 126m
• Upgrade to 3.45 MW
nominal rating
• New rotor: 136m
3.0 MW 3.3 MW 3.45 MW
2010 2012/13 2015
*AEP=Annual Energy Production. Compared to V112-3.0 MW/V90-3.0 MW Actual performance depends on site specific conditions.
+18-35%
AEP
increase
since
2010*
IEC I
IEC II
IEC III
YEAR OF
ANNOUNCEMENT
11
Power Optimised Modes up to 3.6 MW is available for all 3MW platform, boosting Annual
Energy Production (AEP) by up to 2.5 percent*
Power Optimised Modes to boost performance
*V136-3.45 MW™ with 3.6 MW Power Optimized Mode compared to V136-3.45 MW™ at 3.45 MW
12
+2.5% AEP*
Multiple Power
Optimised Modes up
to 3.6 MW
Power boost
consistent from 12
m/s and to cut-out
Power Optimised Modes up to 3.6 MW is available for V136-3.45 MW™ in both IEC IIIA
and IEC IIB wind conditions
Power Optimised Modes Applicability
V136-3.45 MW™
product envelope at
20 year lifetime
Full range of Power Optimised
Modes available for IEC IIIA &
IEC IIB conditions
3.6 MW Power Optimised Mode
requiring matching service
strategy beyond 8.0 m/s to
maintain 20 year lifetime
13
Note
Boosting Annual Energy Production through Power Optimised Modes has limited grid,
and temperature implications
Sound Power Level, Grid, and Temperature
• Derating above +20°C ambient temperature
• 3.6 MW Power Optimised Mode grid
performance for V136-3.45 MW™ similar to
when applied to other Vestas 3 MW variants
Classification: Confidential14
Vastly increased number of standard turbine combinations
Broadened portfolio for greater configurability
16 hub
heights
up to 166m
• Power modes
• Load modes
• Operating strategy
• Site layout optimisation
• Grid solutions
• Sound power
performance
+ +
V105
V112
V117
V126
V136
= 5 rotors
15
Local teams
throughout the region
Technological evolutionMain highlights
16
+2.5%
AEP*
+1 GWinstalled
Versatile configurations3.6 MW mode available for 3MW platform
Expertise from
35 years of wind
experience
Copyright Notice
The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be
reproduced or copied in any form or by any means - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior
written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S.
You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility
or liability whatsoever for the results of use of the documents by you.
Thank you for your attention
Eduardo Allison OjedaTechnical Bid [email protected]+521 55 4566 2760