4765 CAMERON STREETLAS VEGAS NEVADA 89103
702.736.4041www.southlandind.com
UNIVERSITY OF NEVADA, LAS VEGAS
SHADOW LANE CAMPUS
HEATING HOT WATER REPIPE
599
159
15
PROJECT LOCATION
GOLDRING AVE
W CHARLESTON BLVD
SH
AD
OW
LN
HASTINGS AVE
WILL
OW
ST
WE
ST
WO
OD
DR
ELLIS AVE
SH
AD
OW
LN
VICINITY PLAN
159
RANCHO LN
PROJECT MANAGER: MIKE WOLFEUNLV PLANNING AND CONSTRUCTION4505 S. MARYLAND PKWY, LAS VEGAS, NV 89154OFFICE: 702-895-2470
MECHANICAL SHEET LIST
SHEET NUMBER
SHEET TITLE SCALE
08/1
5/20
17R
EV
IEW
SE
T
SHEET LIST, LEGEND, AND ABBREVIATIONS NTS X
NTS X
X
X
1/4" = 1'-0"
X
NTS X
X
X
ELECTRICAL SHEET INDEXSHEET NUMBER SHEET NAME SCALE IFP
E0.01 NTS
E0.02 NTS
E0.03 NTS
NTS
PLUMBING SHEET INDEXSHEET NUMBER SHEET NAME SCALE IFP
NTS
NTS
SHEET LIST AND ABBREVIATIONS
ELECTRICAL SYMBOLS
ELECTRICAL SPECIFICATIONS
E2.01 FIRST LEVEL CENTRAL PLANT POWER PLAN
E5.01 ELECTRICAL SINGLE LINE DIAGRAM AND SCHEDULES
PL0.01 PLUMBING GENERAL NOTES AND SPECS
PL0.02 PLUMBING LEGENDS AND SYMBOLS
PL1.01.D PLUMBING FLOOR PLAN DEMO
PL1.01 PLUMBING FLOOR PLAN
PL3.01 PLUMBING ELEVATION VIEWS
PL5.01 PLUMBING DETAILS
PL8.01 PLUMBING PIPING DIAGRAM
PL9.01 PLUMBING PIPIING ISOMETRIC
NTS
NTS
NTS
NTS
M0.01
M0.02 GENERAL NOTES, SPECIFICATIONS, AND SCOPE OF WORK
M1.01.D FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PIPING DEMO FLOOR PLAN
M1.01 FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PIPING FLOOR PLAN
M3.01 ELEVATION VIEWS
M5.01 DETAILS
M6.01 EQUIPMENT SCHEDULES
M8.01 HEATING HOT WATER PIPING DIAGRAM AND CONTROLS SEQUENCE OF OPERATION
M9.01 HEATING HOT WATER PIPING ISOMETRIC NTS
NTS
1/4" = 1'-0"
NTS
NTS
X
1/4" = 1'-0"
1/4" = 1'-0"
1/4" = 1'-0"
X
X
X
X
X
X
X
X
X
X
X
X
X
X
NTS
PL6.01 PLUMBING EQUIPMENT SCHEDULES
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:21:55 PM
-
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
CO
VE
R S
HE
ET
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
SYMBOL ABBREV DESCRIPTION
FOV
G
FOR
FOS
RV
RRE
FOV
G
FOR
FOS
RV
RRE
CFS
ATV
DCW
CFS
ATV
DCW
D
CD
PC
HPC
D
CD
PC
HPC
FUEL OIL VENT
RELIEF VENT
REFRIGERANT RELIEF
NATURAL GAS
FUEL OIL RETURN
FUEL OIL SUPPLY
HIGH-PRESSURE CONDENSATE
CONDENSATE DRAIN (DRAIN PAN)
PUMPED CONDENSATE (STEAM)
CHEMICAL FEED SYSTEM
DOMESTIC COLD WATER
ATMOSPHERIC VENT
DRAIN
RLRL
LPC
MPC
HPS
MPS
HG
LPS
RS
LPC
MPC
HPS
MPS
HG
LPS
RS
CHWS
CHWR
HHWR
HHWS
HHWR
CHWR
HHWS
CHWS
LOW-PRESSURE CONDENSATE
MEDIUM-PRESSURE CONDENSATE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
REFRIGERANT LIQUID
HIGH-PRESSURE STEAM
LOW-PRESSURE STEAM
REFRIGERANT HOT GAS
REFRIGERANT SUCTION
MEDIUM-PRESSURE STEAM
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HRWS
HRWR
HRWS
HRWR
HEAT RECOVERY WATER SUPPLY
HEAT RECOVERY WATER RETURN
DIFFERENTIAL PRESSURE SENSORDPS
SPS DIFFERENTIAL STATIC PRESSURE SENSOR
UNDERGROUND PIPING
FS
S
THERMOMETER
PRESSURE GAUGE
AUTOMATIC AIR VENT
MANUAL AIR VENT
FLOW SWITCH (DIFFERENTIAL PRESSURE)
FLEXIBLE CONNECTION (NEOPRENE)
PRESS/TEMP PORT (PETE'S PLUG)
FS
FLEX CONN
FLEX CONN
THERM
AV
MVMV
AV
PG
THERM
PG
STRAINER WITH BLOW-OFF
GROOVED JOINT
FLANGED JOINT
BLIND FLANGE
PIPE TEE, BRANCH OUTLET DOWN
ALIGNMENT GUIDE
PIPE TEE, BRANCH OUTLET UP
PIPE ELBOW TURNED DOWN
PIPE ELBOW TURNED UP
ECCENTRIC REDUCER (OR INCREASER)
CONCENTRIC REDUCER (OR INCREASER)
ANCHOR
CAP
UNION
PRV (SELF CONTAINED)
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
PLUG VALVE
CHECK VALVE
GLOBE VALVE
SOLENOID VALVE
CONTROL VALVE (BALL)
CONTROL VALVE (BUTTERFLY)
STRAINER
PRESSURE SAFETY (RELIEF) VALVE
PRESSURE REGULATING VALVE
PRV
PSV
PRV
BALANCE VALVE
3-WAY CONTROL VALVE
FLEXIBLE CONNECTION (METALLIC)
EXHAUST REGISTER (CEILING MOUNTED)
EXHAUST GRILLE (CEILING MOUNTED)
RETURN REGISTER (CEILING MOUNTED)
LINED DUCT (INSIDE CLEAR SIZE SHOWN)
POINT OF STATIC PRESSURE CHANGE
DUCT SECTION (RETURN OR RELIEF)
VD
M MD
EG
TG
ER
SR
SG
RR
RG
MANUAL VOLUME DAMPER
MOTORIZED VOLUME DAMPER
SIDEWALL SUPPLY GRILLE
SIDEWALL SUPPLY REGISTER
TRANSFER GRILLE
SIDEWALL RETURN GRILLE
SIDEWALL RETURN REGISTER
SIDEWALL EXHAUST GRILLE
SIDEWALL EXHAUST REGISTER
__x__(XL)
ER
EG
RG
RR
CD or SG
__x__(XL)
CEILING DIFFUSER
RETURN GRILLE (CEILING MOUNTED)
DUCT SECTION (EXHAUST)
DUCT SECTION (SUPPLY OR OSA)
DUCT UP
DUCT DOWN
FLEX CONN
AD
SD
FSD
FD
BDD
U/C
H'STAT
D/L
T'STAT
D
M
L
U
C
H
S
TST
DOOR LOUVER
DOOR UNDERCUT
HUMIDISTAT OR HUMIDITY SENSOR
MOTOR LOCATION
SWITCH
THERMOSTAT
FIRE DAMPER
FIRE/SMOKE DAMPER
FLEXIBLE CONNECTION
DUCT SMOKE DETECTOR
ACCESS DOOR
BACKDRAFT DAMPER
A ALARM
ROOM DIFFERENTIAL PRESSURE SENSORdP
FSD
FD
S SMOKE DAMPERS
AFS AIRFLOW MEASURING STATIONAFS
MOISTURE SENSORMS
T'SENSOR TEMPERATURE SENSOR
SYMBOL ABBREV DESCRIPTIONABBREV DESCRIPTION
DISCHARGEDISCH
DRAWING
DOOR LOUVER
DRAIN
DOWN
EFFICIENCY
ELEVATION
DRY BULB TEMPERATURE
ELECTRIC DUCT HEATERELECTRICAL CONTRACTOR
EGGCRATE GRILLE
DISCONNECT SWITCH
EQUIPMENT
ENERGY EFFICIENCY RATIOENTERING AIR TEMPERATUREENTERING WATER TEMPERATURE
EMERGENCY CHILLED WATER
DOMESTIC (POTABLE) COLD WATER
EWTEQUIP
ECHWEEREAT
DB
EGC
ELEV
EDHEC
EFF
D/L
DWGDR
DN
DCWDS
CEILING
CONSTANT AIR VOLUME
CIRCUIT
CONCRETE
COEFFICIENT OF PERFORMANCECLEAN DRY AIR
CEILING DIFFUSER
CIRCUIT BREAKER
CHILLED WATER
BUILDING MANAGEMENT SYSTEM
COMBUSTION INLET AIRCOMBUSTION EXHAUST AIR
CARBON STEEL
DIGITAL INPUT
CONDENSATE DRAIN (DRAIN PAN)
CONTROL PANEL
DEGREE FAHRENHEIT
DIFFERENTIAL PRESSUREDIRECT DIGITAL CONTROL
CUBIC FEET PER MINUTE
DEGREE CELSIUS
CONSTANT VOLUMECHLORINATED POLYVINYL CHLORIDE PIPE
CFM
DPDDC
DI
°C
°F
CV
CPCVCP
CD
COP
CONC
CIACEA
CIRCCBCDA
CS
CHW
CLGCD
BMS
CAV
ACCESS DOOR
ABOVE
AMPERES
AMBIENT
AIR FLOW MEASUREMENT STATION
ACCESS PANEL
ABOVE FINISHED FLOOR
AIR SEPARATOR
AIR HANDLING UNIT
AIR CONDITIONERAIR CHANGES PER HOUR
AUXILIARY
BUILDING
BOTTOM FLAT, BLIND FLANGE
ATMOSPHERE, ATMOSPHERICAUTOMATIC AIR VENT
BACKDRAFT DAMPER
BOTTOM OF DUCT
BRAKE HORSEPOWERBOTTOM OF PIPE
BRITISH THERMAL UNITBRITISH THERMAL UNIT PER HOUR
BF
BHP
BLDGBTUHBTU
BOPBOD
BDD
ATM
AUXAV
ACHAC OR A/C
AMPS
AMBAS
AFSAHU
AFF
AP
AD
ABV
ANALOG INPUTAI
ANALOG OUTPUTAO
CAPACITYCAP
DIGITAL OUTPUTDO
LOW-PRESSURE CONDENSATE
LEAVING WATER TEMPERATURE
MAXIMUM OVERCURRENT PROTECTIONMECHANICAL
MAN-BARS
MAXIMUM CIRCUIT BREAKER SIZEMAXIMUM FUSE SIZE
MANUAL AIR VENT
MAKE UP AIR
LEAVING AIR TEMPERATURE
MAKE UP AIR UNIT
LOW-PRESSURE STEAM
LOCKED ROTOR AMPS
MAX MAXIMUM
MECH
MCBMFSMOP
LPS
MBMV OR MAV
MAU
LBS
MUA
LRALPC
(L)LWTLAT
POUNDS
LINED
HORSEPOWER
HUMIDISTAT
HORIZONTAL
KILOVOLTS
REFRIGERANT HOT GAS
HOUSEKEEPING VACUUM
HEATING, VENTILATING AND AIR CONDITIONING
HEATING HOT WATER
HEAT EXCHANGER
GENERAL CONTRACTOR
HEAT EXHAUST
HAND/OFF/AUTO
NATURAL GAS
KILOVOLT AMPERESKILOWATTS
HIGH-PRESSURE CONDENSATE
INSIDE DIAMETER OR DIMENSION
HIGH-PRESSURE STEAM
HP
H'STAT
KVKVAKW
IDIN
HG
HV
INCHES
HORIZ
HPCHPS
HZ
HHW
HVAC
HOA
HEHX
HTG
GCG
HERTZ
HEATING
GALLONS PER MINUTEGALLONS PER HOUR
GALVANIZED SHEETMETAL
FIBERGLASS REINFORCED PLASTIC
EXTERNAL STATIC PRESSURE
FLOOR SINKFULL LOAD AMPS
FLOOR DRAIN
FAN COIL UNIT
EXHAUST AIR
FIRE DAMPER
FIRE/SMOKE DAMPER
FEET PER MINUTE
EXHAUST REGISTER
EXHAUST GRILLE
FIRE/LIFE SAFETY
EVAPORATIVE
FRP
(F) or F
GSGPMGPH
FLA
F/SD
FSFD
FLR
FDF/LS
FUTURE
FLOOR
(E) or EER
FT
FPM
FCU
ESP
EA
EG
EVAP
FEET
EXISTING
FTR FINNED TUBE RADIATION
GUARDED DRIP PROOFGDP
RECIRCULATION AIR UNIT
REFRIGERANT LIQUID
RELATIVE HUMIDITY
REFRIGERANT SUCTION
RECOMMENDED DUAL ELEMENT FUSE
RETURN REGISTER
REFRIGERANT RELIEF
RUNNING LOAD AMPS
REVOLUTIONS PER MINUTERR
RMRPM
RLAROOM
RG
(R) or RREQ'DRA
RHRE
RDERAU
RHCRRE
RLRS
RELOCATED
RETURN GRILLE
RETURN AIRREQUIRED
RELIEF AIR
REHEAT COIL
OPPOSED BLADE DAMPER
OPEN DRIP PROOF
OVERCURRENT PROTECTIVE DEVICEOUTSIDE DIAMETER OR DIMENSION
PARTS PER MILLION
PLUMBING CONTRACTORPUMPED CONDENSATE
POLYVINYL CHLORIDE
POINT OF CONNECTION
POLYPROPYLENE PIPE
POUNDS PER SQUARE INCH
PRESSURE CHANGE
POLYVINYLIDENE FLUORIDE
PRESSURE GAGEPRESSURE REDUCING STATIONPRESSURE REGULATING VALVEPRESSURE SAFETY (RELIEF) VALVE
PPP
PRS
PSVPRV
PG
POS
PVC
PSI
P
PRESS
PVDF
POSITION
PRESSURE
PPM
POC
PCPC
PH
ODP
OBD
OC
OPDODOSA or OA
PHASE
ON CENTER
OUTSIDE AIR
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPACITY
THOUSAND BTUH
MECHANICAL EQUIPMENT ROOM
MEMORY STOP (ON A VALVE)
MEDIUM-PRESSURE CONDENSATEMEDIUM-PRESSURE STEAM
MINIMUM OR MINUTE
MECHANICAL CONTRACTOR
NON-POTABLE WATERNORMALLY CLOSED
NOT IN CONTRACTNORMALLY OPEN
NET POSITIVE SUCTION HEAD
N.O.N.C.
NPW
NTSNO.
NIC
MBHMTD
(N) or NNPSH
NUMBERNOT TO SCALE
MOUNTED
NEW
MS
MIN
MCCMODMAMCA
MEZZ
MC
MPS
MERMPC
MIXED AIRMODULATING
MEZZANINE
ABBREV DESCRIPTION
PRESSURE CONTROL VALVEPCV
VOLTS DIRECT CURRENT
MANUAL VOLUME DAMPER
UNLESS NOTED OTHERWISE
WET BULB TEMPERATURE
WEATHERPROOF DISCONNECT SWITCH
VOLTS ALTERNATING CURRENT
WATER CLOSETWC
WIRE SIZING AMPS
WATTS
WEIGHT
WB
WSA
WPDSWGT
W
UP THRU ROOF
VENT THROUGH ROOFVARIABLE AIR VOLUME
UNDERCUT
VOLTSVERTICAL
VACVDC
VERTV
VTR
UTR
VAVVD
U/CUNO
SMOKE DETECTOR, SMOKE DAMPERSOUND ATTENUATOR, SUPPLY AIR
TOTAL STATIC PRESSURE
INTERNATIONAL SYSTEM OF UNITS
STM STEAM
TOTAL DYNAMIC HEADTOTAL PRESSURE
TRANSFER GRILLE
SUPPLY REGISTERSUPPLY GRILLE
TERMINAL UNITTHERMOMETER
SUPPLY AIR
THERMOSTAT
TYPICAL
TOP FLAT
TP
TGTSP
TYP
T'STATTFTDH
SR
THERMTU
SASG
STAINLESS STEELSTATIC PRESSURE
SCHEDULESHEET
S/SSP
SASD
SHTSCHEDSI
WIRE MESH SCREENWMS
WITH
TRANSFORMER
WITHOUTW/O
X'MER
W/
FPIU FAN POWERED INDUCTION UNIT
SERIES FAN POWERED VAV TERMINALSFT
HOT WATER UNIT HEATERHWUHHOT WATER BOILERHWB
COMPUTER ROOM AIR CONDITIONINGCRAC
LOOSE VARIABLE FREQUENCY DRIVEVFD
RELIEF VENTRV
PACKAGED ROOF TOP AIR CONDITIONING UNITPRTU
PLATE AND FRAME HEAT EXCHANGERHEX
GRAVITY INTAKEGI
FOP FUEL OIL POLISHER
FOT FUEL OIL STORAGE TANK
FOSP FUEL OIL PUMP
DT FUEL OIL DAY TANK
FM FLOW METER
EXPANSION TANKETENERGY RECOVERY UNITERU
COOLING TOWERCTCHEMICAL POT FEEDERCPFWATER COOLED CENTRIFUGAL CHILLERCHNON CHEMICAL WATER TREATMENTCFWT
AIR COOLED CHILLERACCH
AIR DOOR UNITAD
PACKAGED CENTRIFUGAL SEPARATORCS
SUCTION DIFFUSERSD
BUTTERFLY VALVEBFV
CONDENSER WATER PUMPCWPCHILLED WATER PUMPCHWP
PHWP PRIMARY HEATING WATER PUMP
SECONDARY HEATING WATER PUMPSHWP
TERTIARY HEATING WATER PUMPTHWP
PULSE PURE CONTROL PANELPPCONDUCTIVITY CONTROLLERCC
RAF RELIEF AIR FAN
EXHAUST FANEF
STAIR PRESSURIZATION FANSPF
ELEVATOR PRESSURIZATION FANEPF
LD LINEAR SLOT DIFFUSER
CHEMICAL POT FEEDERCPF
UNDERGROUND FUEL OIL STORAGE TANKUST
AIR COMPRESSORAC
CONDENSING UNITCU
UNIT HEATERUH
EMERGENCY POWER OFFEPO
NEEDLE VALVE
BALANCING VALVE
AUTOMATIC BALANCING VALVE
T
CARBON DIOXIDE SENSORCO 2
CO CARBON MONOXIDE SENSOR
OCCUPANCY SENSOROS
OS OCCUPANCY SENSOR
POC POINT OF CONNECTION
LEGENDABBREVIATIONS
CV XX
EQUIPMENT TYPE
EQUIPMENT NUMBER ORPRIMARY AIR FLOW
UNIQUE IDENTIFIER
EQUIPMENT TAG
HYDRONIC SYSTEM
NORTH/SOUTH
PIPING RISER TAG AIR DIFFUSER TAG
DIFFUSER TYPE
AIRFLOW (CFM)
NECK SIZE
STRUCTURAL GRID
EAST/WESTSTRUCTURAL GRID
XX
XX
XXX
XXX
X.X X
CD-X
X"ø XXX
DSD DUCT SMOKE DETECTOR
SYMBOLS
P/T
CV XX
CV XX
FM INSERTION MAGNETIC FLOW METER
CHANGE OF VALUECOV
BAS BUILDING AUTOMATION SYSTEM
BUFFER TANKBT
BUILDING
HEATING HOT WATER SUPPLYHHWSHEATING HOT WATER RETURNHHWR
DOMESTIC HOT WATERDHW
POD POINT OF DISCONNECTION
SHEET LISTSHEET TITLE
- COVER SHEET
M0.01 SHEET LIST, LEGEND, AND ABBREVIATIONS
M0.02 GENERAL NOTES, SPECIFICATIONS, AND SCOPE OF WORK
M1.01.D FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PIPING DEMO FLOOR PLAN
M1.01 FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PIPING FLOOR PLAN
M3.01 ELEVATION VIEWS
M5.01 DETAILS
M6.01 EQUIPMENT SCHEDULES
M8.01 HEATING HOT WATER PIPING DIAGRAM AND CONTROLS SEQUENCE OF OPERATION
M9.01 HEATING HOT WATER PIPING ISOMETRIC
SHEET NUMBERING SYSTEM
DDS.NN.SS.P
"DD" DENOTES DISCIPLINE DESIGNATOR
"S" DENOTES SHEET SERIES
1 - FLOOR PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - ENLARGED SCALE PLANS
5 - DETAILS
6 - SCHEDULES
7 - DIAGRAMS
8 - CONTROLS
"NN" DENOTES SHEET SEQUENCE NUMBER FOR ALL SHEET SERIES EXCEPT FOR "1" SERIES"NN" FOR SHEET SERIES "1" (FLOOR PLANS) DENOTES BUILDING LEVEL
C - CRAWLSPACE
H - PENTHOUSE
T - TUNNEL
UG - UNDERGROUND
01 - FIRST FLOOR, 02 - SECOND FLOOR, ETC.
RO - ROOF
"SS" DENOTES SECTOR
B - BASEMENT LEVEL
"P" DENOTES PHASING PLANS
9 - 3D
M - MECHANICAL
MH - MECHANICAL HVAC
MP - MECHANICAL PIPING
P - PARKING LEVEL
T - TEMPORARY PLANS
D - DEMO PLANS
0 - GENERAL
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:21:56 PM
M0.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
SH
EE
T L
IST
, LE
GE
ND
, AN
DA
BB
RE
VIA
TIO
NS
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
PROVIDE THE FOLLOWING: - DEMOLITION DRAWINGS OF HEATING HOT WATER SYSTEM PIPING IN CENTRAL PLANT.- HEATING HOT WATER SYSTEM PIPING FOR CONVERSION TO PRIMARY/SECONDARY SYSTEM- ADDITION OF ONE (1) HEATING HOT WATER BUFFER TANK TO PREVENT SHORT CYCLING OF BOILERS.- ADDITION OF TWO (2) PRIMARY HEATING HOT WATER BOILER PUMPS.- CONTROL SEQUENCE OF OPERATION AND POINTS FOR LIST ABOVE.- ADD NEW DIFFERENTIAL PRESSURE SENSOR ON THIRD LEVEL.
SCOPE OF WORK
UNLV CONTROL STANDARDSBUILDING AUTOMATION AND CONTROL SYSTEM:
ANY BUILDING AUTOMATION AND CONTROL SYSTEM INSTALLED AT UNLV MUST BE FULLY COMPATIBLE AND TRANSPARENT TO THE EXISTING INSTALLED SYSTEMS INTERFACE PROTOCOL CONNECTIONS MUST BE EVALUATED AND APPROVED BY THE UNLV ENERGY MANAGEMENT AND CONTROLS SYSTEMS REPRESENTATIVES.
THE HONEYWELL ENTERPRISE BUILDINGS INTEGRATOR SHALL PROVIDE THE OPTION TO MONITOR AND REPORT ELECTRICAL, GAS, WATER CONSUMPTION AND OTHER ENERGY CONSUMABLES AND BILLABLE USAGE. THE ABILITY TO CORRECTLY MONITOR AND REPORT THESE CONSUMPTIONS SHALL BE DEMONSTRATED TO FACILITIES MANAGEMENT PERSONNEL BY THE CONTRACTOR. TO INSURE ACCURACY AND OPERABILITY, MEASUREMENTS SHALL BE BY INDEPENDENT INSTRUMENTS. ALL DATA RETRIEVED BY THE SYSTEM SHALL BE CAPABLE OF TRENDING AND HISTORICAL DATA COLLECTION METHODS.
CONTROLS:USE OF ENVIRONMENTAL MANAGEMENT AND CONTROL SYSTEM (EMCS): EVERY BUILDING SHALL BE EVALUATED FOR THE USE OF EMCS. FINAL DECISION REGARDING THE USE OF EMCS SHALL BE MADE BY THE UNLV OFFICE OF PLANNING AND CONSTRUCTION.
EMCS STANDARDIZATION: THE UNLV CAMPUS USES HONEYWELL ENTERPRISE BUILDING INTEGRATOR AND EXCEL 5000 BUILDING CONTROL SYSTEMS AS THE STANDARD EMCS. UNLV FACILITIES MANAGEMENT HAS STANDARDIZED THE CAMPUS EMCS BASED ON THE EQUIPMENT AND TECHNICAL SUPPORT PROVIDED BY HONEYWELL INTERNATIONAL, INC. THE UNLV CAMPUS STANDARD IS TO BE MAINTAINED, AND REPRESENTS THE COST EFFECTIVE METHOD FOR CAMPUS OPERATIONS, MONITORING, AND MAINTENANCE. BUILDINGS ARE MONITORED AND CONTROLLED FROM A CENTRAL COMPUTER STATION LOCATED IN THE CAMPUS SERVICES BUILDING (CSB). ALL EMCS ARE TO BE MONITORED AND CONTROLLED WITH AN INTERNET TCP/IP PROTOCOL TO THE EXISTING CENTRAL EMCS COMPUTER STATION.
ALL PROJECTS ARE TO BE PROVIDED WITH THE MOST CURRENT VERSION OF SOFTWARE AND HARDWARE FOR THE EMCS. MULTIPLE SYSTEMS MUST HAVE FULL ACCESS AND ARCHIVING FOR ALL PROGRAM CHANGES. THE EMCS MUST HAVE FULL CAPABILITY FOR SAVING OF HISTORIES DATA.MODERNIZATION OR REMODEL PROJECTS SHALL COMPLY WITH THIS STANDARD.
CONNECTION TO EMCS CENTRAL STATION: EVERY BUILDING WITH EMCS IS TO BE CONNECTED TO THE CENTRAL EMCS COMPUTER STATIN THE CAMPUS SERVICES BUILDING. THE PREFERRED METHOD IS BY INTERNET TCP/IP PROTOCOL. THE BUILDING PROJECT SHALL PROVIDE ALL WORK, CABLE, ACCESSORIES, AND EQUIPMENT REQUIRED TO CONNECT TO THE CENTRAL STATION. COORDINATION FOR INTERNET CONNECTION IS WITH THE UNLV INFORMATION TECHNOLOGY DEPARTMENT THROUGH THE UNLV OFFICE OF PLANNING AND CONSTRUCTION. IF NO INTERNET CONNECTION IS AVAILABLE THE PROJECT SHALL PROVIDE ALL WORK AND EQUIPMENT REQUIRED TO CONNECT THE BUILDING TO THE CENTRAL EMCS COMPUTER STATION LOCATED IN THE CAMPUS SERVES BUILDING (CSB) AND THE CENTRAL EMCS COMPUTER STATION LOCATED AT THE SHADOW LANE (EBI).
THE EMCS CENTRAL STATION SHALL BE CONFIGURED TO ALLOW THE OPERATOR TO CHANGE THE STATE OF ALL PUMPS, FAN MOTORS, AND VALVES.
INSTALLATION:ANCILLARY EQUIPMENT: ALL RELAYS INSTALLED FOR ENABLE/DISABLE OR START/STOP COMMAND CONTROL MUST BE PANEL MOUNTED OR (DIN) RAIL MOUNTED TYPE. DOUBLE BACK TAPE, TIE-WRAPS, OR RELAY MOUNTING THAT VIOLATES ELECTRICAL PANEL INTEGRITY IS NOT ACCEPTABLE.
ALL EQUIPMENT CONTROLLED SHALL HAVE POSITIVE STATUS PROVIDED BY CURRENT SENSORS OR RELAY CONTACT CLOSURE. DIFFERENTIAL PRESSURE SENSORS INSTALLED ACROSS EQUIPMENT OR MONITORING OF EMCS COMMAND RELAYS ARE NOT ACCEPTABLE METHODS OF DETERMINING EQUIPMENT STATUS. VFD STATUS SHOULD BE PROVIDED BY VFD CONTACT CLOSURE. CURRENT SENSORS FOR VARIABLE SPEED APPLICATIONS ARE NOT AN ACCEPTABLE METHOD OF DETERMINING VFD STATUS.
UNLESS NOTED OTHERWISE, ALL ACTUATORS ARE TO BE ELECTRONIC TYPE (BELIMO, HONEYWELL). AIR HANDLER MIXING DAMPERS SHALL BE PROVIDED WITH INDIVIDUAL ACTUATORS AND CONTROL SIGNALS.
VARIABLE FREQUENCY DRIVE (VFD) CONTROL MUST PROVIDE EMCS INPUT AND VFD OUTPUT TO THE MOTOR, INDICATED ON GRAPHICS. ALL VFD INTERFACE IS TO BE HARDWIRED ENABLE/DISABLE, STATUS, ALARM, SIGNAL, & FEEDBACK TO BMS.
COOLING TOWER VIBRATION SENSOR SHALL BE MONITORED BY THE EMCS.
FILTER ALARMS ARE TO BE PROVIDED BY ANALOG TYPE SENSOR. DIGITAL ALARMS ARE NOT ACCEPTABLE. CALIBRATE SENSORS FOR THE PRESSURE DROP ACROSS THE FILTERS USED. DISPLAY THE FILTER PRESSURE DROP ON THE EMCS CENTRAL COMPUTER GRAPHICS.
ALL CONTROLLERS, REPEATER, ROUTERS, TRANSMITTERS, AND RECEIVERS SHALL BE CLEARLY MARKED ON THE DRAWINGS AND RECORD DRAWINGS AND OPERATOR GRAPHICS.
PROVIDE GRAPHICS TO THE EMS DEPARTMENT FOR REVIEW BEFORE PROGRAMING AND INSTALLATION ON THE EMCS CENTRAL COMPUTER.
SYSTEM MONITORS: FIRE/LIFE SAFETY SYSTEMS WILL PROVIDE A SINGLE INPUT TO THE EMCS SYSTEM TO INDICATE AN ALARM CONDITION WITH THE FIRE/LIFE SAFETY SYSTEM.
GENERAL NOTES
REFRIGERATION LEAK DETECTION SYSTEM SHALL PROVIDE AN ANALOG LEVEL INDICATION OF REFRIGERANT CONCENTRATION IN THE SPACE BEING MONITORED. THE REFRIGERATION SYSTEM MONITOR WILL CONTROL THE EXHAUST FANS. MONITOR THE STATUS OF THE FAN FROM THE EMCS AND INDICATE ON THE GRAPHIC SCREEN.
ALL DDC PANELS SHALL HAVE PORTABLE OPERATOR'S TERMINAL INTERFACE FOR COMMUNICATIONS.
ALL PANEL MOUNTED DEVICES SUCH AS RELAYS, TRANSDUCERS, SWITCHES SHALL BE PROPERLY IDENTIFIED WITH LABELS.
MANUAL CONTROL: ALL FAN AND PUMP EQUIPMENT SHALL HAVE MOTOR CONTROL CENTER HAND CONTROL TO ALLOW FOR MANUAL OPERATION FROM WITHIN THE BUILDING. VARIABLE FREQUENCY DRIVES SHALL BE PROVIDED WITH MANUAL BYPASS PANEL.
GENERAL NOTES1. PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE APPROVED, ENFORCED BUILDING, MECHANICAL, AND PLUMBING CODES AND THE AUTHORITIES HAVING JURISDICTION.2. THE CONSTRUCTION IS WORK OF COMPLEX NATURE WHICH WILL REQUIRE ACCURATE PLANNING, CAREFUL PREPARATION, ATTENTION TO DETAIL, AND CLOSE SUPERVISION BY THE CONTRACTOR WHO WILL BE REQUIRED TO DO THIS WORK IN FULL COOPERATION WITH THE OTHER TRADES.3. THE CONTRACTOR SHALL VERIFY ALL EQUIPMENT, DUCTWORK, AND PIPING LOCATIONS, SIZES, PRESSURE, AND AVAILABILITY PRIOR TO START OF ANY WORK.4. CONTRACTOR SHALL VERIFY ALL EQUIPMENT MODEL NUMBERS, CAPACITIES, SIZES, VOLTAGES, AND ALL OTHER SCHEDULED INFORMATION WITH ALL OTHER APPLICABLE TRADES AND WITH THE EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.5. ALL SUPPLY, RETURN, AND EXHAUST REGISTER CONNECTIONS TO DUCTWORK SHALL BE PROVIDED WITH ACCESSIBLE MANUAL VOLUME DAMPERS. ALTERNATIVELY, ACCESSIBLE MANUAL VOLUME DAMPER MAY BE PROVIDED IN DUCTWORK FEEDER LINES SERVING INDIVIDUAL REGISTERS.6. IN THE EVENT THERE IS A CONFLICT BETWEEN THE CONTRACT DRAWINGS AND THE SPECIFICATIONS, THE SPECIFICATIONS SHALL GOVERN, UNLESS INSTRUCTED OTHERWISE.7. DO NOT CUT OR NOTCH ANY STRUCTURAL MEMBERS WITHOUT STRUCTURAL ENGINEER'S APPROVAL.8. REFER TO ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL DRAWINGS FOR DETAILS OF THE WORK.9. THE CONTRACTOR SHALL COORDINATE FOR CLEARANCES PRIOR TO START OF ANY WORK.10. THESE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ARE NOT INTENDED TO INDICATE ALL NECESSARY OFFSETS OF PIPING. THE CONTRACTOR SHALL INSTALL MATERIAL AND EQUIPMENT IN A MANNER AS TO CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP OPENINGS AND PASSAGEWAYS CLEAR. ALL INSTALLATIONS SHALL BE CONSISTENT WITH NORMALLY ACCEPTABLE INDUSTRY STANDARDS. CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE IN WRITING OF ANY DISCREPANCIES OR CONFLICTS THAT WOULD AFFECT THE SYSTEM PERFORMANCE OR WHICH WOULD INCUR ADDITIONAL COSTS. THIS NOTIFICATION SHALL BE MADE PRIOR TO THE INSTALLATION OF THE ITEMS CONCERNED.11. EQUIPMENT INDICATED ON THESE DRAWINGS IS SHOWN IN APPROXIMATE POSITION(S). CONTRACTOR SHALL VERIFY ALL CONDITIONS INCLUDING EQUIPMENT LOCATIONS, CONNECTION POINTS, AND STRUCTURAL MEMBERS BEFORE INSTALLATION. IN ALL CASES ADEQUATE ACCESS (PER MANUFACTURER'S RECOMMENDATIONS AND CODE COMPLIANCE) FOR MAINTENANCE AND REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED.12. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE CODES. NOTHING SHOWN IN THE PLANS OR STATED IN THE SPECIFICATIONS IS INTENDED TO INDICATE THAT THE INSTALLATION OR CONNECTIONS OF ANY ITEM OR DEVICE SHOULD BE DONE CONTRARY TO THE MANUFACTURER'S INSTRUCTIONS AND ALL APPLICABLE CODES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT THE INSTALLATIONS AND CONNECTIONS OF ALL ITEMS AND DEVICES CONFORMS TO MANUFACTURER'S INSTRUCTIONS AND TO ALL APPLICABLE CODES AND REGULATIONS.13. ALL EQUIPMENT, MATERIAL, AND CONNECTIONS SHALL BE INSTALLED COMPLETE PER MANUFACTURER'S INSTRUCTIONS TO PROVIDE A COMPLETE AND FULLY OPERATIONAL SYSTEM.14. IF THE CONTRACTOR'S USE OF SUBSTITUTE MATERIALS, EQUIPMENT, OR METHODS OF INSTALLATION REQUIRES ANY CHANGES IN OTHER TRADES WORK FROM THAT SHOWN ON THE DRAWINGS, THE EXTRA COST OF THE OTHER TRADES WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR INITIATION THE SUBSTITUTION.15. SUBMITTALS: APPROVAL OF SUBMITTALS DOES NOT RELEASE THE CONTRACTOR FROM OBLIGATIONS TO FULLY COMPLY WITH ALL REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS OR APPLICABLE CODE REGULATIONS.16. BEFORE SUBMITTING BIDS FOR THE WORK THE CONTRACTOR SHALL MAKE A THOROUGH FIELD SURVEY OF THE WORK TO DETERMINE ANY INTERFERENCE THAT MAY AFFECT THE INSTALLATION ON THE WORK.17. THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT, APPURTENANCES, AND OTHER CONTRACTUAL ITEMS REQUIRED FOE THE COMPLETE INSTALLATION OF THE PLUMBING WORK TO THE SATISFACTION OF THE OWNER AND ENGINEER.18. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, AND INSPECTIONS REQUIRED TO COMPLETE THE MECHANICAL WORK.19. SEISMIC BRACING AND ANCHORAGE OF PIPES SHALL BE PER IBC AND SMACNA SEISMIC MANUAL, “GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS.”20. AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT. PROVIDE MAINTENANCE MANUAL TO THE OWNER.
OTHER WORK1. CONTRACTOR SHALL PERFORM ALL ELECTRICAL WORK TO MAKE A COMPLETE INSTALLATION FOR THIS PROJECT. REFER TO RELATED DRAWINGS FOR THE SCOPE OF WORK.2. CONTRACTOR SHALL PERFORM ALL ARCHITECTURAL AND STRUCTURAL WORK TO MAKE A COMPLETE INSTALLATION FOR THIS PROJECT. INSTALLATION OF THE NEW UNITS ALONG WITH ALL ACCESSORIES SHALL MEET ALL ENFORCED BUILDING AND STRUCTURAL CODES.3. FIELD VERIFY EXISTING CONDITIONS, CAPACITIES AND CONSULT WITH PLANNING AND CONSTRUCTION DEPARTMENT AND THEIR REQUIREMENTS PRIOR TO BID.
SPECIFIC NOTES1. MAINTAIN BUILDING FIRE ALARM SYSTEM IN OPERATION.2. SEAL ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, AND CEILINGS TO MAINTAIN RATING.3. PATCH AND PAINT SURFACES TO MATCH ORIGINAL CONDITIONS.4. REMOVE ALL DEMOLISHED MATERIALS BACK TO THE SOURCE.5. REPAIR PENETRATIONS THROUGH THE ROOF TO MAINTAIN ROOF WARRANTY.
DEMOLITION NOTES1. CONTRACTORS SHALL VISIT THE SITE AND MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE EXISTING CONDITIONS AND VERIFY THE EXISTING SITE CONDITIONS PRIOR TO BIDDING.2. ALL WORK REQUIRED TO CHANGE THE EXISTING HVAC INSTALLATION AS INDICATED SHALL BE PROVIDED.3. REMOVE ALL DUCTWORK, MISCELLANEOUS ITEMS, AND PIPING THAT INTERFERES WITH NEW CONSTRUCTION. EXTEND AND RECONNECT ANY INTERRUPTED SYSTEM TO OF EXISTING SYSTEMS WHICH REMAIN.4. EXCEPT AS MAY BE SPECIFICALLY INDICATED OTHERWISE, ALL MATERIALS AND EQUIPMENT REMOVED FROM THE EXISTING INSTALLATION IN THE COURSE OF PERFORMING THE INDICATED WORK (AND NOT INDICATED TO BE REUSED) SHALL BE TREATED AS FOLLOWS:
a. ALL ABANDONED DUCTS, PIPES, BOXES, FITTINGS, AND DIFFUSERS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE.b. ALL OTHER ITEMS REMOVED SHALL BE TURNED OVER TO THE OWNER, OR DISPOSED OF AS DIRECTED BY THE OWNER.
5. CONTRACTOR SHALL CLEAN ALL REMAINING ITEMS THAT ARE TO BE REUSED OR ARE TO REMAIN.6. CONTRACTOR SHALL REMOVE ALL DUCTWORK AND EXPOSED PIPES THAT ARE NOT IN USE.7. CONTRACTOR SHALL PROVIDE ALL NECESSARY WORK AND MATERIALS TO MAINTAIN ALL EXISTING HVAC SYSTEMS IN OPERATION DURING AND AFTER CONSTRUCTION.8. ALL EXISTING SYSTEMS INCLUDING EQUIPMENT, DUCTS, PIPES, AND OTHER ITEMS WHICH ARE NOT TO BE DEMOLISHED SHALL REMAIN IN SERVICE THROUGHOUT THE CONSTRUCTION PERIOD.9. UNLESS NOTED ON DRAWINGS, ALL EXISTING DUCTS, PIPES, BOXES, AND OTHER HVAC SYSTEMS IN AREAS WHERE NEW WORK OCCURS SHALL BE REMOVED, EXCEPT WHEN SUCH ITEMS ARE REQUIRED TO MAINTAIN SERVICES TO OTHER AREA. IN SUCH CASES, CONTRACTOR SHALL RELOCATE THESE ITEMS AND PROVIDE DUCTS, PIPES, DAMPER, BOXES, AND CONTROL WHERE REQUIRED TO ACCOMMODATE THE NEW WORK. PROVIDE ACCESS DOORS WHERE ITEMS REQUIRE ACCESS. CONTRACTOR SHALL REMOVE ANY EXISTING ITEM, WHEN SUCH ITEM IS CONCEALED AND DOES NOT INTERFERE WITH NEW WORK.10. ALL ABANDONED DUCTS, PIPES, BOXES, DIFFUSERS SHALL BE REMOVED COMPLETELY BACK TO THE SOURCE. CAP STUB-OUTS THAT REMAIN.11. INFORMATION GIVEN ON THE DRAWINGS ABOUT EXISTING INSTALLATIONS HAS BEEN OBTAINED FROM THE EXISTING CONDITIONS BUT CANNOT BE GUARANTEED ACCURATE IN ALL RESPECTS.12. THESE DEMOLITION NOTES REFER TO ALL MECHANICAL SHEETS WHERE DEMOLITION WORK IS BEING CARRIED OUT.13. NEW AND/OR EXISTING EQUIPMENT INDICATED ON THESE DRAWINGS IS SHOWN IN APPROXIMATE POSITION(S). CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING EQUIPMENT LOCATIONS, CONNECTION POINTS, AND STRUCTURAL MEMBERS PRIOR TO INSTALLATION. IN ALL CASES ADEQUATE ACCESS (PER MANUFACTURER'S RECOMMENDATIONS AND CODE COMPLIANCE) FOR MAINTENANCE AND REPLACEMENT OF EQUIPMENT SHALL BE PROVIDED.14. CONTRACTOR SHALL VERIFY ALL LOCATIONS, SIZES, CONNECTION POINTS, AND AVAILABILITY OF ALL EXISTING ITEMS (I.E. DUCTWORK, ETC.) PRIOR TO INSTALLATION OF ANY MATERIAL OR EQUIPMENT.
WATER BALANCEBALANCING SERVICES WILL BE PERFORMED BY AN AABC CERTIFIED AGENCY. THE AGENCY WILL BE CONTRACTED BY UNLV. THIS AGENCY SHALL BE A COMPANY SPECIALIZING IN THE ADJUSTING AND BALANCING OF SYSTEMS WITH AT LEAST THREE YEARS DOCUMENTED EXPERIENCE CERTIFIED BY AABC. WORK SHALL BE PERFORMED UNDER THE SUPERVISION OF AN AABC CERTIFIED TEST AND BALANCE ENGINEER AND REGISTERED ENGINEER. THE REPORT SHALL BE PRESENTED TO THE OWNER IN BOTH DIGITAL AND PAPER FORMAT.
1. WHERE WATER FLOW RATES ARE NOT INDICATED IN THE SCHEDULES, MEASURE THE EXISTING FLOWS BEFORE WORK IS STARTED. REPORT THE MEASURED DATA TO THE ENGINEER AND THE CONTROLS CONTRACTOR.
PART 1 - GENERAL1. THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT, APPURTENANCES, AND OTHER CONTRACTUAL REQUIREMENTS REQUIRED FOR THE COMPLETE INSTALLATION OF THE MECHANICAL WORK TO THE SATISFACTION OF THE OWNER AND ENGINEER.2. THE MECHANICAL WORK SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH ALL LEGALLY CONSTITUTED AUTHORITIES AND CODES HAVING JURISDICTION. NO WORK INDICATED ON DRAWINGS OR SPECIFICATIONS SHALL BE PERFORMED WITH PLAN CHECK APPROVAL AND VALID PERMITS.3. THE CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, APPARATUS, ACCESSORIES (I.E. THE ENTIRE INSTALLATION) AS FURNISHED BY HIM FOR A PERIOD OF ONE YEAR. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY ITEM WHICH MAY PROVE DEFECTIVE WITHIN ONE (1) YEAR FROM THE DATE THE APPARATUS IS ACCEPTED AND PLACED IN OPERATION WITHOUT ANY ADDITIONAL COST TO THE OWNER. 4. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, AND INSPECTIONS REQUIRED TO COMPLETE THE WORK.5. THE DRAWINGS INDICATE IN DIAGRAMMATIC FORM THE ARRANGEMENTS DESIRED FOR PRINCIPAL APPARATUS, PIPING, CONDUIT, ETC., AND SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE. SCALED AND FIGURED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. BEFORE PROCEEDING WITH ANY WORK CHECK AND VERIFY EXISTING CONDITIONS, DIMENSIONS, SIZES, AND ASSUME FULL RESPONSIBILITY FOR FITTING-IN OF EQUIPMENT, MATERIALS, AND ADJUSTMENT OF ANY EXISTING DUCTWORK AND PIPING (INCLUDING PROVISION FOR OFFSETS, BENDS, ELBOWS, ETC.).6. THE CONTRACTOR SHALL MAKE A THOROUGH FIELD SURVEY TO DETERMINE ANY EXISTING CONDITION THAT MAY AFFECT THE INSTALLATION OF THE WORK. BY THE ACT OF SUBMITTING A BID, THE CONTRACTOR IS DEEMED TO HAVE MADE A FIELD SURVEY AND HAS ACCEPTED THE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, AND PATCHING TO COMPLETE THE INSTALLATION OF THE MECHANICAL WORK. ALL EXPOSED FINISHED AREAS THAT ARE DAMAGED AS A RESULT OF THIS WORK SHALL BE REPAIRED TO MATCH THE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.8. ALL CONSTRUCTION SITES SHALL BE PROPERLY PROTECTED WITH BARRICADES, WARNING FLAGS, FENCING, AND LIGHTS AS REQUIRED BY CODE AND THE OWNER'S SECURITY DEPARTMENT. PROVIDE SHORING, BRACING, AND ACCESS LADDERS AS REQUIRED BY CODE. TAKE EXTRA CARE TO INSTRUCT ALL PERSONNEL ON SAFETY PROCEDURES. TAKE CARE TO AVOID DAMAGE TO ADJACENT DUCTWORK, PIPING, AND ELECTRICAL SERVICES.9. SCHEDULE UTILITY SHUT-DOWNS AT LEAST TWO (2) DAYS IN ADVANCE THROUGH THE OWNER. PROVIDE CONTINUOUS “FIRE WATCH GUARD” TO ALL AREAS AFFECTED BY SHUT-DOWN OF ANY FIRE PROTECTION WATER SERVICE. THE CONTRACTOR'S OPERATIONS SHALL CAUSE NO UNNECESSARY INCONVENIENCE TO THE BUILDING'S PREMISES. THE ACCESS RIGHTS TO THE PUBLIC SHALL BE CONSIDERED AT ALL TIMES SCHEDULE DURING OFF-HOURS, WEEKENDS, AND NIGHTS AS REQUIRED.10. SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AT LEAST THIRTY (30) DAYS PRIOR TO THE START OF ANY WORK. NO WORK INDICATED ON ANY OF THE PLANS OR SHOP DRAWINGS SHALL BE PERFORMED UNTIL THE SHOP DRAWINGS HAVE BEEN APPROVED BY THE ENGINEER.11. IF THE CONTRACTOR'S USE OF SUBSTITUTE MATERIALS, EQUIPMENT, OR METHODS OF INSTALLATION REQUIRES ANY CHANGES IN OTHER TRADES WORK FROM THAT SHOWN ON THE DRAWINGS, THE EXTRA COST OF THE OTHER TRADES WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR INITIATING THE SUBSTITUTION.12. APPROVAL OF THE SUBMITTALS DOES NOT RELEASE THE CONTRACTOR FROM OBLIGATIONS TO FULLY COMPLY WITH ALL REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS OR APPLICABLE CODES.13. THE CONTRACTOR SHALL SUBMIT TWO (2) COMPLETE SETS OF AS-BUILT DRAWINGS, ONE (1) COMPLETE SET OF AS-BUILT DRAWINGS IN ELECTRONIC PDF FORMAT, TWO (2) COMPLETE SETS OF OPERATION AND MAINTENANCE MANUALS, AND ONE (1) COMPLETE SET IN ELECTRONIC PDF FORMAT TO THE OWNER AS PERMANENT RECORDS AT SUCCESSFUL COMPLETION OF THE WORK BEFORE FINAL PAYMENT CAN BE APPROVED BY THE OWNER'S REPRESENTATIVE.
PART 2 - MATERIALS1. NEW VARIABLE FREQUENCY DRIVES (VFD) SHALL BE BY ABB. NO SUBSTITUTIONS WILL BE ALLOWED IN THIS PROJECT. SEE SCHEDULES FOR ADDITIONAL INFORMATION.2. NEW CONTROL EQUIPMENT SHALL BE BY HONEYWELL, MODEL EXCEL 5000. NO SUBSTITUTIONS WILL BE ALLOWED IN THIS PROJECT.3. DUCTWORK SHALL BE PROVIDED AS FOLLOWS:
a. ALL DUCTWORK SHALL BE NEW GALVANIZED SHEET METAL. DUCT GAGES, CONSTRUCTION, SUPPORT, SEISMIC RESTRAINT, AND INSTALLATION SHALL BE FOR MEDIUM PRESSURE DUCTWORK AND IN ACCORDANCE WITH THE MECHANICAL CODE, IC, AND SMACNA DUCTWORK CONSTRUCTION HANDBOOKS. DUCTWORK MATERIALS AND JOINTS SHALL MEET STANDARDS FOR MEDIUM PRESSURE DUCTWORK AND SHALL MEET, AS A MINIMUM, THE QUALITY OF THE EXISTING INSTALLATION IN THIS BUILDING.b. ALL TRANSVERSE JOINTS SHALL BE SEALED AIRTIGHT WITH HARDCAST DT FIBERGLASS TAPE SATURATED WITH HARDCASE RTA-50. THE TAPE SHALL EXTEND 1-INCH ON BOTH SIDE OF THE SEAM OR JOINT.
4. DUCT INSULATION: MINERAL FIBER BLANKET, ASTM C 553, TYPE II WITH FACTORY APPLIED FSK JACKET.5. SHUTOFF SINGLE-DUCT AIR TERMINAL UNITS CONFIGURATION: VOLUME-DAMPER ASSEMBLY INSIDE UNIT CASING WITH CONTROL COMPONENTS LOCATED INSIDE A PROTECTIVE METAL SHROUD.
a. CASING: 0.034-INCH STEEL.b. CASING LINING: 1/2-INCH THICK, COATED, FIBROUS-GLASS DUCT LINER COMPLYING WITH ASTM C 1071; SECURED WITH ADHESIVE.c. ACCESS: REMOVABLE PANELS FOR ACCESS TO DAMPERS AND OTHER PARTS REQUIRING SERVICE, ADJUSTMENT, OR MAINTENANCE; WITH AIRTIGHT GASKET.d. VOLUME DAMPER: GALVANIZED STEEL WITH PERIPHERAL GASKET AND SELF-LUBRICATING BEARINGS. e. HOT-WATER HEATING COIL: COPPER TUBE, MECHANICALLY EXPANDED INTO ALUMINUM-PLATE FINS; LEAK TESTED UNDERWATER TO 200 PSIG; AND FACTORY INSTALLED. f. DDC CONTROLS: DAMPER OPERATORS AND MICROPROCESSOR-BASED CONTROLLER AND ROOM SENSOR SHALL BE HONEYWELL.
6. PIPING SHALL BE PROVIDED AS FOLLOWS:a. 2” AND LESS: TYPE L, DRAWN TEMPER COPPER TUBING, WROUGHT COPPER FITTINGS, AND SOLDERED JOINTS.b. 2-1/2” AND LARGER: NEW SEAMLESS STEEL PIPE, ASTM A53 OR A106, SCHEDULE 40 BLACK STEEL; WITH ANSI/ASTM B16.3 MALLEABLE IRON OR ASTM A234 FORGED STEEL WELDING TYPE FITTINGS; AND WITH WELDED JOINTS.
7. VALVES: 2” AND SMALLER SHALL BE 2-PIECE BRONZE WITH STAINLESS STEEL BALL, TFE SEAT, AND LEVER OPERATOR FOR SCREWED, OR SOLDERED CONNECTION. BY NIBCO OR STOCKHAM. PROVIDE LEVER ARM EXTENSION TO CLEAR INSULATION ON ALL VALVES. 2-1/2” AND LARGER SHALL BE 150 CWP, IRON, SINGLE FLANGE BUTTERFLY WITH EPDM SEAT AND STAINLESS STEEL DISC. LUG TYPE BODY.8. DIELECTRIC UNIONS SHALL BE PROVIDED TO JOIN DISSIMILAR MATERIALS TO PREVENT GALVANIC CORROSION, BY NIBCO OR WATTS.9. PIPE INSULATION: MINERAL OR GLASS FIBERS BONDED WITH A THERMOSETTING RESIN. ASTM C 547, TYPE I, GRADE A, WITH FACTORY APPLIED FSK JACKET.10. PIPE SHALL BE LABELED TO IDENTIFY SYSTEM AND FLOW DIRECTION.11. PRE-MOLDED PIPE FITTING COVERS: ONE-PIECE PVC. CONFORM TO FEDERAL SPECIFICATION L-P-535, COMPOSITION A, TYPE II, AND SHALL BE CEEL-CO SERIES 100, CERTAINTEED “SNAP-FORM” OR ZESTON.12. INSTALL WIRING AND CABLE IN CONDUIT. PROVIDE SEPARATE CONDUITS FOR POWER AND SIGNAL WIRING. INSTALL PLASTIC END SLEEVES AT ALL CONDUIT TERMINATIONS. 13. WHERE LOW VOLTAGE POWER IS REQUIRED PROVIDE TRANSFORMERS FROM SPARE IN NEAREST ELECTRICAL PANEL.14. INSTALL COMPONENTS IN ACCORDANCE WITH NEC AND LOCAL AMENDMENTS. 15. LABEL EACH WIRE AT TERMINAL CONNECTIONS. TO SHOW ITEM SERVED. COLOR CODE CABLE WITH DIAGRAMS. 16. GROUND ELECTRICAL SYSTEMS PER MANUFACTURER'S REQUIREMENTS AND NEC.17. FLOW METER: ONICON F-3500 SERIES. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
SPECIFICATIONS
MINIMUM PIPE INSULATION THICKNESS
FLUID OPERATINGTEMP AND FLUID
INSULATION CONDUCTIVITY NOMINAL PIPE OR TUBE SIZE (INCHES)
CONDUCTIVITY BTU/IN/(H*FT^2*°F)^B MEAN RATING TEMPERATURE, °F <1 1 TO < 1-1/2 1-1/2 TO < 4 4 TO < 8 ≥ 8
> 350 0.32 - 0.34 250 4.5 5.0 5.0 5.0 5.0
251 - 350 0.29 - 0.32 200 3.0 4.0 4.5 4.5 4.5
201 - 250 0.27 - 0.30 150 2.5 2.5 2.5 3.0 3.0
141 - 200 0.25 - 0.29 125 1.5 1.5 2.0 2.0 2.0
105 - 140 0.21 - 0.28 100 1.0 1.0 1.5 1.5 1.5
40 - 60 0.21 - 0.27 75 0.5 0.5 1.0 1.0 1.0
<40 0.20 - 0.26 75 0.5 1.0 1.0 1.0 1.5
NOTES:A. FOR PIPING SMALLER THAN 1-1/2 INCH (38 MM) AND LOCATED IN PARTITIONS WITHIN CONDITIONED SPACES, REDUCTION OF THESE THICKNESSES BY 1 INCH (25 MM) SHALL BE PERMITTED (BEFORE THICKNESS ADJUSTMENT REQUIRED IN FOOTNOTE B) BUT NOT TO A THICKNESS LESS THAN 1 INCH (25 MM).B. FOR INSULATION OUTSIDE THE STATED CONDUCTIVITY RANGE, THE MINIMUM THICKNESS (T) SHALL BE DETERMINED AS FOLLOWS:T = R{(1 + T/R)K/K – 1}WHERE:T = MINIMUM INSULATION THICKNESS,R = ACTUAL OUTSIDE RADIUS OF PIPE,T = INSULATION THICKNESS LISTED IN THE TABLE FOR APPLICABLE FLUID TEMPERATURE AND PIPE SIZE,K = CONDUCTIVITY OF ALTERNATE MATERIAL AT MEAN RATING TEMPERATURE INDICATED FOR THE APPLICABLE FLUID TEMPERATURE (BTU × IN/H × FT2 × °F) ANDK = THE UPPER VALUE OF THE CONDUCTIVITY RANGE LISTED IN THE TABLE FOR THE APPLICABLE FLUID TEMPERATURE.C. FOR DIRECT-BURIED HEATING AND HOT WATER SYSTEM PIPING, REDUCTION OF THESE THICKNESSES BY 1-1/2 INCHES (38 MM) SHALL BE PERMITTED (BEFORE THICKNESS ADJUSTMENT REQUIRED IN FOOTNOTE B BUT NOT TO THICKNESSES LESS THAN 1 INCH (25 MM).D. PER 2012 IECC TABLE C403.2.8
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:21:56 PM
M0.02
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
GE
NE
RA
L N
OT
ES
,S
PE
CIF
ICA
TIO
NS
, AN
D S
CO
PE
OF
WO
RK
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
K
J
H
G
F
4 5 6 74.5 5.5
WOMEN108
EXIST.MECH104B
EXIST.MECH104A
EXIST.MECH
104
EXIST. DATA106
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
VESTIBULE100D
5
(E)HWP
6
(E)HWP
2
(E)B
1
(E)B
(E)3" HWR
(E)3" HWR
(E)3" HWS(E)3" HWR
(E)5" HWS
(E)5" HWS
(D)3"
(D)3"
(E)5" HWS
(E)5" HWS
(E)4" HWS
(E)2 1/2" HWR
(E)2 1/2" HWR
(E)5" HWS
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)5" HWS
1
2
(D)3"
(D)3"
(E)2 1/2" HWS
(E)2 1/2" HWR
8
(E)2 1/2" HWR
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)4" HWS
(E)4" HWR
43
(E)4" HEATING HOT WATER SUPPLY OUT TO SYSTEM.
(E)4" HEATING HOT WATER RETURN FROM SYSTEM.
(D)3"
(D)3"
5
(E)4" HEATING HOT WATER SUPPLY OUT TO SYSTEM.
(E)4" HEATING HOT WATER RETURN FROM SYSTEM.
6
7
(E)5" HWS
(E)AHU-2
(E)AHU-1
1
(E)DHWHX
1
(E)DHWP
4
M3.01
3
M3.01
(D)5"
9
9
9
9
9
9
9
9(D)3"
AREA OF WORK 10
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
As indicated
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:02 PM
M1.01.D
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
FIR
ST
LE
VE
L -
CE
NT
RA
L P
LAN
TH
EA
TIN
G H
OT
WA
TE
R P
IPIN
GD
EM
O F
LOO
R P
LAN
0 2' 4' 8' 1/4" = 1'-0"1
FIRST LEVEL - CENTRAL PLANT HHW PIPING DEMO FLOOR PLAN
1
2
3
4
5
6
7
(E)2" HEATING HOT WATER RETURN DOWN FROM ROOF ADJACENT TO COOLING TOWERS.
(E)2" HEATING HOT WATER SUPPLY UP TO ROOF ADJACENT TO COOLING TOWERS.
(E)2 1/2" HEATING HOT WATER SUPPLY TO AHU-1.
(E)2 1/2" HEATING HOT WATER RETURN FROM AHU-1.
EXISTING DOMESTIC HOT WATER TANK.
EXISTING DOMESTIC HOT WATER PUMP SERVES DOMESTIC HOT WATER TO HOT WATER STORAGE TANK.
(E)2 1/2" HEATING HOT WATER SUPPLY AND RETURN TO THIRD LEVEL.
8 EXISTING HEATING HOT WATER MOTORIZED CONTROL VALVE TO BE REMOVED.
9
10
DEMO EXISTING HEATING HOT WATER PIPING.
REFER TO DEMO ELEVATION VIEWS ON SHEET M3.01.
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
K
J
H
G
F
4 5 6 74.5 5.5
2
M3.01
1
M3.01
WOMEN108
EXIST.MECH104B
EXIST. MECH104A
EXIST.MECH
104
EXIST. DATA106
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
VESTIBULE100D
5
(E)HWP
6
(E)HWP
2
(E)B
1
(E)B
(E)3" HWR
(E)3" HWR
(E)3" HWS(E)3" HWR
(E)5" HWS
(E)5" HWS
(E)5" HWS
(E)4" HWS
(E)2 1/2" HWR
(E)2 1/2" HWR
(E)5" HWS
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)5" HWS
1
2
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)4" HWS
(E)4" HWR
43
(E)4" HEATING HOT WATER SUPPLY OUT TO SYSTEM.
(E)4" HEATING HOT WATER RETURN FROM SYSTEM.
5
(E)4" HEATING HOT WATER SUPPLY OUT TO SYSTEM.
(E)4" HEATING HOT WATER RETURN FROM SYSTEM.
4" HWR
5" HWS
1
BT
1
DHWHXP10
(E)2 1/2" HWS
7
HHWPP8
HHWPP
(E)5" HWS
4" HWS
4" HWR
7
(E)5" HWS
8
9 9
4" HWR
4" HWR4" HWS
(E)5" HWS
12
FM13
FM
(E)AHU-2
(E)AHU-1
VFD
VFD
11VFD
TEMPERATURE CONTROL PANEL LOCATION
144ø EA
4ø EA
1
WH
2
WH
15
4ø SA
4ø SA
16
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
As indicated
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:21:59 PM
M1.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
FIR
ST
LE
VE
L -
PLA
NT
HE
AT
ING
HO
T W
AT
ER
PIP
ING
FLO
OR
PLA
N
0 2' 4' 8' 1/4" = 1'-0"1
FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PIPING FLOOR PLAN
1
2
3
4
5
6
7
(E)2" HEATING HOT WATER RETURN DOWN FROM ROOF ADJACENT TO COOLING TOWERS.
(E)2" HEATING HOT WATER SUPPLY UP TO ROOF ADJACENT TO COOLING TOWERS.
(E)2 1/2" HEATING HOT WATER SUPPLY TO AHU-1.
(E)2 1/2" HEATING HOT WATER RETURN FROM AHU-1.
EXISTING DOMESTIC HOT WATER TANK.
(E) DOMESTIC HOT WATER PUMP SERVES DOMESTIC HOT WATER TO (E) HOT WATER STORAGE TANK.
(E)2 1/2" HEATING HOT WATER SUPPLY AND RETURN TO THIRD LEVEL.
8
9
NEW HEATING HOT WATER BUFFER TANK.
NEW HEATING HOT WATER PRIMARY PUMP.
10 NEW HEATING HOT WATER PUMP SERVING DOMESTIC HOT WATER HEAT EXCHANGER.
11 VFD LOCATION FOR NEW HEATING HOT WATER PUMP SERVING DOMESTIC HOT WATER HEAT EXCHANGER (DHWHXP).
12 LOCATION FOR ONICON F-3500 FLOW METER ON SECONDARY LOOP HEATING HOT WATER SUPPLY PIPING. SEE TO SHEET M3.01.
13 LOCATION FOR ONICON F-3500 FLOW METER ON PRIMARY LOOP HEATING HOT WATER RETURN PIPING DOWNSTREAM OF BUFFER TANK. SEE SHEET M3.01.
14 REFER TO ELEVATION VIEWS ON SHEET M3.01.
15 NEW 4-INCH EXHAUST FLUE DUCT UP THROUGH CEILING OPENING.
16 NEW 4-INCH DUCT UP THROUGH CEILING OPENING FOR WATER HEATER COMBUSTION AIR.
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
EXISTING 3" HEATING HOT WATER PIPING FROM SECONDARY HEATING HOT WATER PUMPS
5" HWS
(E)2 1/2" HWR
(E)5" HWS
(E)2 1/2" HWS
(E)2 1/2" HWR (E)2 1/2" HWS
(E)2 1/2" HWS
EXISTING 2 1/2" HEATING HOT WATER SUPPLY PIPING UP TROUGH ROOF
EXISTING 2 1/2" HEATING HOT WATER PIPING RETURN UP TROUGH ROOF
EXISTING 2 1/2" HEATING HOT WATER SUPPLY PIPING TO AHU-1
4" HWR
(E)5" HWS
(E)5" HWS
4"
HW
R
(E)3" HWR
3" HWR
3
FM
FM
1
1
7
HHWPP
2
(E)B
1
BT
EXISTING 3" HEATING HOT WATER PIPING TO SECONDARY HEATING HOT WATER PUMPS
4" HWS
4" HWR
4" HWR
HEATING HOT WATER PIPING CAPPED
4" BYPASS PIPE 3" HWS
4"
HW
R
22
4" HWS
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)4" HWR
(E)2 1/2" HWS
3" HWS 3" HWS
3" HWR
(E)5" HWS
3" HWR
EXISTING 4" HEATING HOT WATER PIPING TO/FROM EAST WALL
EXISTING 2 1/2" HEATING HOT WATER PIPNG UP/FROM ROOF
3
2
(E)B
1
(E)B
1
BT
EXISTING DOMESTIC HOT WATER STORAGE TANK
EXISTING 4" HEATING HOT WATER PIPING TO/FROM EAST WALL
4" HWR
HEATING HOT WATER PIPING CAPPED
EXISTING 3" HEATING HOT WATER PIPING FROM SECONDARY HEATING HOT WATER PUMPS
EXISTING DOMESTIC HOT WATER HEAT EXCHANGER
EXISTING DOMESTIC HOT WATER STORAGE TANK
EXISTING 2 1/2" HEATING HOT WATER SUPPLY PIPING UP TROUGH ROOF
EXISTING 2 1/2" HEATING HOT WATER PIPING RETURN UP TROUGH ROOF
EXISTING 2 1/2" HEATING HOT WATER SUPPLY PIPING TO AHU-1
EXISTING 3" HEATING HOT WATER PIPING TO SECONDARY HEATING HOT WATER PUMPS
(E)2 1/2" HWR
(E)5" HWS (E)2 1/2" HWS
(E)2 1/2" HWR (E)2 1/2" HWS
(E)2 1/2" HWS
(E)5" HWS
(E)5" HWS
(E)2 1/2" HWR
(D)3"
(D)2 1/2"
(D)3"
(D)3" (D)3"
(D)2 1/2"
(D)5"
(D)5" (D)2 1/2"(E)2 1/2" HWS
2
(E)B
EXISTING 4" HEATING HOT WATER PIPING TO/FROM EAST WALL
EXISTING 2 1/2" HEATING HOT WATER PIPNG UP/FROM ROOF
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)4" HWR
(E)2 1/2" HWS
(E)5" HWS
2
(E)B
1
(E)B
EXISTING DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED AND DISPOSED
EXISTING DOMESTIC HOT WATER STORAGE TANK
(D)3"
(D)2 1/2" (D)3"(D)3"
(D)3" (D)3"
(D)3"(D)3"
(D)3"
(D)2 1/2"
(D)3"
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
SHEET NOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
1/2" = 1'-0"
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:04 PM
M3.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
ELE
VA
TIO
N V
IEW
S
0 2' 4' 6' 1/2" = 1'-0"1
1 - EAST ELEVATION VIEW
0 2' 4' 6' 1/2" = 1'-0"2
2 - NORTH ELEVATION VIEW
ONICON F-3500 FLOW METER LOCATION.
NEW HEATING HOT WATER PRIMARY PUMPS SERVING ASSOCIATED BOILER.
NEW HEATING HOT WATER BUFFER TANK. REFER TO SHEET M6.01 FOR EQUIPMENT SCHEDULE. REFER TO SHEET M5.01 FOR DETAILS.
1
2
3
0 2' 4' 6' 1/2" = 1'-0"3
3 - EAST DEMO ELEVATION VIEW
0 2' 4' 6' 1/2" = 1'-0"4
4 - NORTH DEMO ELEVATION VIEW
A. "(D)" DENOTES DEMOLITION OF EXISTING PIPING.
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
CONCENTRIC REDUCER
ISOLATION VALVE
FLANGED INLET
CHECK VALVE
PG
CONCENTRIC REDUCER
BALANCING VALVE
STRAINER
PG
HEATING HOT WATER TO PUMP
HEATING HOT WATER FROM PUMP
1. PROVIDE THREE PIPE DIAMETERS OF STRAIGHT PIPE UPSTREAM OF THE CHECK VALVE.2. PUMP SHALL BE SUSPENDED FROM CEILING THROUGH THE USE OF PIPE SUPPORTS.
P/T
P/T
THERM
4" HEATING HOT WATER RETURN TO BOILERS
CHECK VALVE
ISOLATION VALVE
ISOLATION VALVE
PG
PG
CHECK VALVE
THERM
THERM
4" HEATING HOT WATER RETURN TO BOILERS
1" NPT DRAIN
3/4" NPT TOP VENT
1. REFER TO EQUIPMENT MANUFACTURER INSTALLATION MANUAL DURING INSTALLATION OF BUFFER TANK.2. INSTALL HOSE VALVE CONNECTION TO BOTTOM DRAIN.
AV SEE SCHEDULE ON SHEET FOR SPECIFICATION.
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:04 PM
M5.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
DE
TA
ILS
NTS1
PUMP DETAIL (HHWPP-7, HHWPP-8)
NTS2
BUFFER TANK DETAIL (BT-1)
NTS3
ONICON FLOW METER DETAIL
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
CENTRIFUGAL PUMP SCHEDULEEQUIPMENT TAG MANUFACTURER MODEL LOCATION SERVICE FLOW
[GPM]HEAD
[FT WC]MOTOR VARIABLE FREQUENCY
DRIVEOPERATING WEIGHT
[LBS]NOTES
SIZE[HP]
V/PH/HZ
(E)HWP-5 TACO FL 2510C BOILER ROOMHEATING HOT WATER
SECONDARY LOOP300 60 7-1/2 480/3/60 YES - 1
(E)HWP-6 TACO FL 2510C BOILER ROOMHEATING HOT WATER
SECONDARY LOOP300 60 7-1/2 480/3/60 YES - 1
HWPP-7 BELL & GOSSETT 60-STOCK BOILER ROOMHEATING HOT WATER PRIMARY
LOOP150 30 2 208/3/60 NO 75.0 2, 3, 4
HWPP-8 BELL & GOSSETT 60-STOCK BOILER ROOMHEATING HOT WATER PRIMARY
LOOP150 30 2 208/3/60 NO 75.0 2, 3, 4
NOTES
1. EXISTING HEATING HOT WATER PUMP TO REMAIN.
2. REFER TO SHEET M5.01 FOR EQUIPMENT DETAILS.
3. PUMP TO BE SECURED TO EQUIPMENT THROUGH THE USE OF PIPE SUPPORTS.
4. PROVIDE WITH ECCENTRIC REDUCER ON DISCHARGE/SUCTION SIDE.
HOT WATER BOILER SCHEDULEEQUIPMENT
TAGMANUFACTURER MODEL CAPACITY MAX. FLOW
[GPM]MIN. FLOW
[GPM]MAX. EWT
[°F]MAX. LWT
[°F]MIN. EWT
[°F]MIN. LWT
[°F]NOTES
INPUT[MBH]
MAX. OUTPUT [MBH]
MIN. OUTPUT [MBH]
(E)B-1 P-K THERMIFIC NM-2000 2,000 1,700 1,190 150 120 168 190 132 160 1,2
(E)B-2 P-K THERMIFIC NM-2000 2,000 1,700 1,190 150 120 168 190 132 160 1,2
NOTES1. EXISTING BOILER
2. BOILER HAS MAXIMUM SUPPLY TEMPERATURE OF 190°F AND MINIMUM OF 160°F.
HEATING HOT WATER BUFFER TANKEQUIPMENT TAG
MANUFACTURER MODEL TYPE CAPACITY [GAL]
DIAMETER [IN]
HEIGHT [IN]
MAXIMUM OPERATING TEMP
[°F]
MAX. WORKING PERSSURE
[PSI]
PRI./SEC. CONNECTION
[IN]
SHIPPING WEIGHT
[LBS]
OPERATING WEIGHT
[LBS]
NOTES
BT-1 WESSELS HBT-210 2-PORT 210 30 75 450 125 4 458 2201 1, 2, 3, 4, 5, 6
NOTES
1. BODY OF TANK MADE WITH ASME APPROVED CARBON STEEL 5. INCLUDE 1/2" ELASTOMERIC INSULATION. PROVIDED BY MANUFACTURER
2. AUXILIARY CONNECTION: 3/4" NPT TOP VENT 6. PROVIDE SPIRAL THERM VTP-1 AUTOMATIC AIR VENT
3. AUXILIARY CONNECTION: 1" NPT BOTTOM DRAIN
4. DESIGNED AND CONTRUCTED PER ASME CODE SECTION VIII, DIVISION 1.
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:05 PM
M6.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
EQ
UIP
ME
NT
SC
HE
DU
LES
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
P/TPG THERM
P/TPG THERM
(E)5
" H
HW
S
3" HHWS3" HHWR
HHWS HHWS
HHWR HHWR
DPS 13
(E)5" (E)5"
(E)5" (E)5"P/T P/T
P/T P/T
(E)5
" H
HW
S
(E)5
" H
HW
S
8
12
9
(E)4" HHWR
(E)3" HHWR
(E)2 1/2" HHWR
3" HHWS
(E)5
" H
HW
S
(E)2 1/2" HHWR
FM
EXISTING ONICON F-3500 INSERTION
MAGNETIC FLOW METER
10
10
1
CONSTANT
HIGH FIRE OUTPUT: 1,700 MBHLOW FIRE OUTPUT: 1,190 MBH
ENABLE/DISABLE
STATUS
ALARM
VFD
ENABLE/DISABLE
STATUS
ALARM
SPEED
FEEDBACK
VFD
ENABLE/DISABLE
STATUS
ALARM
SPEED
FEEDBACK
PG PG
1
CONSTANT
ENABLE/DISABLE
STATUS
ALARM
PG PG
FM
EXISTING ONICON F-3500 INSERTION MAGNETIC FLOW METER
3" HHWR
4"
HH
WR
11
11
T
T
T
11
HIGH FIRE OUTPUT: 1,700 MBHLOW FIRE OUTPUT: 1,190 MBH
4" HHWS
7
6
(E)HWP
5
(E)HWP
1
(E)B
2
(E)B
8
HHWPP
7
HHWPP
NEW 210 GALLON BUFFER TANK
2
1
BT
T
11
4" HHWS
4" H
HW
S
4" HHWS
4" H
HW
S
4" HHWS
4" HHWS
5
6
4
(E)2 1/2" HHWS
(E)2" HHWS
(E)4" HHWS
(E)3" HHWS
3
HHWS HHWS
HHWR HHWR
DPS 14
4" HHWS
T
11
15
BOILER
LEAD / LAG SEQUENCE:ASSIGN STATUS TO THE PUMPS, AND BOILERS AS LEAD AND LAG ACCORDING TO RUNTIME HOURS. ROTATE EQUIPMENT IN THE LEAD / LAG SEQUENCE AFTER 320 (ADJ) HOURS OF OPERATION. MAINTAIN FLOW WHILE PUMPS ARE SWITCHED. EACH SECONDARY PUMP SHALL HAVE ITS OWN VARIABLE FREQUENCY DRIVE (VFD). WITH THE HAND-OFF-AUTO (HOA) SWITCH IN THE “ON” POSITION, THE ASSOCIATED PUMP SHALL TURN ON. WITH THE HOA SWITCH IN THE “AUTO” POSITION, THE ASSOCIATED PUMP SHALL BE UNDER NORMAL CONTROL. EACH PRIMARY PUMP WILL OPERATE WITH THE ASSOCIATED BOILER. ENABLE THE BOILER WHEN THE OUTDOOR AIR TEMPERATURE IS BELOW THE USER SELECTED SETPOINT(INITIALLY 70°F, WITH A 10°F DEAD-BAND, OFF AT 80°F; ADJ). THE BOILER WILL ALSO BE ENABLED WHEN DOMESTIC HOT WATER TANK IS BELOW 115°F SETPOINT(ADJ.). CONTINUE TO RUN THE ASSOCIATED BOILER PUMP FOR 5 MINUTES(ADJ.) AFTER THE BOILER IS STOPPED.
CONSTANT FLOW HEATING HOT WATER PRIMARY PUMPS:EACH PRIMARY PUMP WILL ENABLE WHEN ASSOCIATED BOILER IS ENABLED. PRIMARY PUMP WILL MODULATE TO MAINTAIN BOTH OF THE FOLLOWING:1. HEATING HOT WATER SUPPLY TEMPERATURE SETPOINT.2. MINIMUM FLOW OF 120 GPM TO ASSOCIATED BOILER.
VARIABLE FLOW HEATING HOT WATER SECONDARY PUMPS:LEAD SECONDARY HEATING HOT WATER PUMP TO BE ENABLED WHEN EITHER BOILER IS ENABLED. THE HEATING HOT WATER PUMPS WILL MODULATE TO MAINTAIN BOTH OF THE FOLLOWING:1. MINIMUM TEMPERATURE OF 140°F HEATING HOT WATER RETURN.2. HEATING HOT WATER SYSTEM DIFFERENTIAL PRESSURE SETPOINT OF 10 PSI(ADJ.). DIFFERENTIAL PRESSURE IS LOCATED ON 3RD LEVEL IN LOCKER ROOM 324A AND 1ST LEVEL ABOVE CEILING IN CORRIDOR 100A.3. SECONDARY LOOP FLOW MUST NOT EXCEED THE FLOW OF THE PRIMARY LOOP.
IF THE LEAD SECONDARY PUMP CANNOT MEET SETPOINT AFTER 4 MINUTES ENABLE THE LAG PUMP. START THE LAG PUMP AT ITS MINIMUM SPEED AND SLOWLY INCREASE THE SPEED TO MATCH THE LEAD PUMP. IF THE DP SENSOR INDICATES MORE THAN 2 PSI OVER SETPOINT DECREASE THE SETPOINT 1 PSI EACH MINUTE. IF THE DP SENSOR INDICATES MORE THAN 2 PSI UNDER SETPOINT INCREASE THE SETPOINT 1 PSI EACH MINUTE.
TEMPERATURE SENSORS: GRAPHICALLY INDICATE THE TEMPERATURE OF THE HEATING HOT WATER SUPPLY AND RETURN LEAVING AND ENTERING THE CENTRAL PLANT AS SENSED BY TEMPERATURE SENSORS.
BOILER CONTROL:BOILER WILL MODULATE BETWEEN HIGH AND LOW FIRE TO MAINTAIN 180°F HEATING HOT WATER SUPPLY.
ALARMS:AN ALARM CONDITION SHALL BE INDICATED UPON FAILURE OF EITHER BOILER AND/OR IF THE SECONDARY HEATING HOT WATER TEMPERATURE FALLS BELOW 132°F(ADJ.).
EMERGENCY SHUT-DOWN:HARDWIRE THE BOILER SHUT-DOWN SWITCHES TO THE BOILER CONTROL PANEL.
HEATING HOT WATER SYSTEM SEQUENCE OF OPERATIONS
CONTROL POINTS LIST
POINTS INPUT OUTPUT
ANALOG DIGITAL ANALOG DIGITAL
HEATING HOT WATER SYSTEM
TE
MP
ER
AT
UR
E
0-10
VD
C
4-20
MA
ST
AT
US
ALA
RM
0-10
VD
C
4-20
MA
2-10
VD
C
ST
AR
T/S
TO
P
LE
D A
T A
LAR
M P
AN
EL
BOILER-1 ENABLE X
BOILER-1 STATUS X
BOILER-1 ALARM X X
BOILER-2 ENABLE X
BOILER-2 STATUS X
BOILER-2 ALARM X X
BOILER-1 PRIMARY PUMP ENABLE X
BOILER-1 PRIMARY PUMP STATUS X
BOILER-2 PRIMARY PUMP ENABLE X
BOILER-2 PRIMARY PUMP STATUS X
HEATING HOT WATER SECONDARY PUMP-1 ENABLE X
HEATING HOT WATER SECONDARY PUMP-1 STATUS X
HEATING HOT WATER SECONDARY PUMP-1 SPEED X
HEATING HOT WATER SECONDARY PUMP-2 ENABLE X
HEATING HOT WATER SECONDARY PUMP-2 STATUS X
HEATING HOT WATER SECONDARY PUMP-2 SPEED X
BOILER-1 SUPPLY TEMPERATURE X
BOILER-2 SUPPLY TEMPERATURE X
HEATING HOT WATER SUPPLY TEMPERATURE X
HEATING HOT WATER RETURN TEMPERATURE X
HEATING HOT WATER PRIMARY LOOP FLOW X
HEATING HOT WATER SECONDARY LOOP FLOW X
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
SHEET NOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:06 PM
M8.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
HE
AT
ING
HO
T W
AT
ER
PIP
ING
DIA
GR
AM
AN
D C
ON
TR
OLS
SE
QU
EN
CE
OF
OP
ER
AT
ION
NTS1
HEATING HOT WATER DIAGRAM AND CONTROLS SEQUENCE OF OPERATION
1
2 REFER TO DETAIL ON SHEET M5.01.
A. REFER TO LEGEND FOR SYMBOL DEFINITIONS ON SHEET M0.01.
B. EXTEND NEW CONTROLS TO CONNECT TO UPGRADED BUILDING AUTOMATION SYSTEM. NEW DDC SYSTEM SHALL BE PROVIDED BY HONEYWELL AND SHALL COMMUNICATE ALL CONTROL POINTS TO THE HONEYWELL CONTROL SYSTEM.
3 EXISTING 2 1/2" HEATING HOT WATER SUPPLY TO AHU-1
4EXISTING 2 1/2" HEATING HOT WATER SUPPLY TO SYSTEM UP THROUGH CEILING TO UPPER LEVELS
5 EXISTING 4" HEATING HOT WATER SUPPLY TO BUILDING PROCEEDING EAST
6
7
EXISTING 4" HEATING HOT WATER RETURN FROM EAST SIDE OF BUILDING
EXISTING 2 1/2" HEATING HOT WATER RETURN FROM AHU-1
EXISTING 3" HEATING HOT WATER SUPPLY TO BUILDING PROCEEDING NORTH
8
9 EXISTING 3" HEATING HOT WATER RETURN FROM NORTH SIDE OF BUILDING
10 VFD ENABLE/DISABLE, STATUS, ALARM, SIGNAL AND FEEDBACK TO BE HARDWIRED TO BMS
NEW HEATING HOT WATER PRIMARY PUMP
INSTALL NEW TEMPERATURE SENSOR COMPATIBLE WITH EXISTING DDC CONTROLS.
11
EXISTING 2 1/2" HEATING HOT WATER RETURN FROM SYSTEM DOWN FROM UPPER LEVEL
12
13 NEW HEATING HOT WATER LOOP DIFFERENTIAL PRESSURE SENSOR TO BE LOCATED ON 3RD LEVEL IN LOCKER ROOM 324A.
NEW HEATING HOT WATER LOOP DIFFERENTIAL PRESSURE SENSOR TO BE LOCATED ON 1ST LEVEL ABOVE CORRIDOR 100A.
14
BUFFER TANK TO UTILIZE EXISTING CONCRETE PAD LOCATED IN BOILER ROOM.15
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)2 1/2" HWS
(E)5" HWS
(E)5" HWS
(E)5" HWS
4" HWS
(E)2 1/2" HWS
4" HWS
4" HWR
4" HWR
4" HWR
(E)2 1/2" HWS
(E)2 1/2" HWR
(E)3" HWR
(E)3" HWS
(E)3" HWR
(E)3" HWS
(E)3" HWR
(E)3" HWR
(E)4" HWS
(E)4" HWR
(E)2 1/2" HWR
(E)2 1/2" HWR
(E)5" HWS
(E)5" HWS
(E)5" HWS
(E)5" HWS
(E)2 1/2" HEATING HOT WATER PIPING TO AHU-1
(E)2 1/2" HEATING HOT WATER PIPING FROM AHU-1
(E)4" HWR
(E)4" HWS
(E)4" HEATING HOT WATER SUPPLY AND RETURN PIPING TO/FROM EAST WALL
(E)3" HEATING HOT WATER PIPING TO/FROM NORTH WALL.
4" HWS
4" HWR
4" HWR
4" HWR
4" HWR
(E)2 1/2" HEATING HOT WATER PIPING TO BE CAPPED
4ø EA
4ø EA
4ø EA
4ø EA
4ø SA
4ø SA
4ø EA
4ø SA
3ø SA 3ø SA
3" HWR
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:07 PM
M9.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
HE
AT
ING
HO
T W
AT
ER
PIP
ING
ISO
ME
TR
IC
NTS1
HEATING HOT WATER PIPING ISOMETRIC
4
3
3
7
22
6
6
1
2
3
E)2 1/2" HEATING HOT WATER PIPING UP TO/FROM THIRD LEVEL.
EXISTING HEATING HOT WATER PUMP.
4
5
6
7
NEW HEATING HOT WATER BUFFER TANK
NEW WATER HEATER SERVING DOMESTIC HOT WATER.
NEW HEATING HOT WATER PRIMARY PUMP.
(E)2 1/2" HEATING HOT WATER PIPNG UP TO/FROM ROOF.
ONICON F-3500 FLOW METER LOCATION
1
1
5
(E)HWP
6
(E)HWP
1
BT
7
HHWPP
8
HHWPP
2
(E)B
1
(E)B
8
9
8
9
NEW EXHAUST AIR DUCT FROM WATER HEATER.
NEW SUPPLY AIR TO WATER HEATER.
1
WH
2
WH
5
5
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
1. SEE ARCHITECTURAL DRAWINGS FOR EXACT PLUMBING FIXTURE LOCATIONS, MOUNTING HEIGHTS AND QUANTITIES.
2. HANDICAPPED PLUMBING FIXTURES SHALL BE MOUNTED AT REQUIRED HEIGHTS AND WITH ALL RELATED ACCESSORIES AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
3. COORDINATE PLUMBING SYSTEMS WITH WORK OF ALL OTHER TRADES PRIOR TO FABRICATION OR INSTALLATION. PROVIDE ALL FITTINGS, OFFSETS AND TRANSITIONS AS REQUIRED FOR A COMPLETE WORKABLE INSTALLATION.
4. COORDINATE LOCATION OF ALLL ROOF OPENINGS WITH STRUCTURAL, MECHANICAL, AND ARCHITECTURAL PLANS PRIOR TO INSTALLATION.
5. PLATFORMS, CURBS, AND FLASHINGS FOR PLUMBING EQUIPMENT SHALL BE AS INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS, UNLESS NOTED OTHERWISE. COORDINATE EXACT SIZES OR REQUIRED OPENINGS AND SUPPORTS FOR FURNISHED EQUIPMENT.
6. COORDINATE WITH ELECTRICAL SECTION PRIOR TO ORDERING EQUIPMENT FOR AVAILABLE VOLTAGES AT EQUIPMENT.
7. PIPING OVER ELECTRICAL ROOMS CONTAINING MAIN DISTRIBUTION PANELS OR MOTOR CONTROL CENTERS, AND OTHER CRITICAL AREAS SHALL BE KEPT TO A MINIMUM AND SHALL NOT BE EXPOSED. SPECIAL PRECAUTIONS SHALL BE TAKEN TO PROTECT THESE AREAS FROM POSSIBLE LEAKAGE FROM NECESSARY OVERHEAD PIPING SYSTEMS.
8. VERIFY ALL EXISTING UTILITIES LOCATION, SIZE, DEPTH, PRESSURE, AND AVAILABILITY PRIOR TO START OF WORK AT POINT OF CONNECTION.
9. KEEP ALL PIPING CLEAR FROM LOAD BEARING FOOTINGS.
10. LAVATORIES IN PUBLIC RESTROOMS SHALL BE EQUIPPED WITH THE FOLLOWING:A. OUTLET DEVICES THAT LIMIT FLOW TO A MAXIMUM OF .5 GPM.B. DEVICES THAT LIMIT THE OUTLET TEMPERATURE TO A MAXIMUM OF 110F.
11. ALL WATER CONNECTIONS TO HVAC EQUIPMENT SHALL BE PROTECTED BY APPROVED REDUCED PRESSURE BACKFLOW DEVICES. DEVICES SHALL BE ACCESSIBLE FOR TEST AND MAINTENANCE.
12. ALL HOSE BIBBS, WALL HYDRANTS AND JANITATORIAL SERVICE SINKS AHALL BE EQUIPPED WITH APPROVED PROPERLY INSTALLED ATMOSPHERIC TYPE VACUUM BREAKER.
13. INSTALL SANITARY AND STORM PIPING 3" AND SMALLER WITH A 2% MIN. SLOPE AND 4" OR LARGER WITH A 1% MIN SLOPE.
14. ALL CLEANOUTS SHALL BE INSTALLED PER SECTION 707.0 AND SECTION 719.0 OF THE 2012 EDITION OF THE UNIFORM PLUMBING CODE.
15. ROOF DRAINS AND STORM DRAIN SYSTEM SIZED PER CITY OF LAS VEGAS REQUIREMENT OF 2" PER HOUR AVERAGE RAINFALL.
16. INTERIOR DOMESTIC HOT WATER RETURN PIPING SHALL BE INSULATED WITH 1" FIBERGLASS WITH A K-FACTOR OF .27 AT 75 DEGREES FARENHEIT, NON-COMBUSTIBLE, WITH AN ALL SERVICE JACKET AND WITH PVC FITTING COVERS IN ACCORDANCE WITH THE 2012 INTERNATIONAL ENERGY CODE.
17. PLUMBING MATERIALS INSTALLED IN A DUCT OR PLENUM SHALL NOT EXCEED A FLAME SPREAD INDEX OF MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF MORE THAN 50.
18. FLOOR DRAINS OR SIMILAR TRAPS SUBJECT TO INFREQUENT USE SHALL BE PROTECTED WITH A TRAP SEAL PRIMER.
19. SEISMIC BRACING PACKAGE TO BE INCLUDED AS A DEFFERED SUBMITTAL.
GENERAL NOTES
CODE NOTES
BUILDING CODES
2012 INTERNATIONAL BUILDING CODE
2012 NATIONAL ELECTRIC CODE
2012 UNIFORM MECHANICAL CODE
2012 UNIFORM PLUMBING CODE
2012 INTERNATIONAL ENERGY CONSERVATION CODE
2012 INTERNATIONAL FIRE CODE
NEVADA STATE FIRE MARSHAL REGULATIONS
PLUMBING SPECIFICATIONS
2.03 PIPE SUPPORTS
A. SOIL, WASTE, AND VENT:
B. WATER PIPING:
C. GAS PIPING:
PART 3 - EXECUTION
3.01 GENERAL
A. INSTALL MATERIALS AND EQUIPMENT IN AN ARRANGEMENT WHICH
TO DEFINE THE BASIC FUNCTIONS REQUIRED. PROVIDE ALL WORK,
PARTS LISTS, INSTRUCTIONS, WARRANTIES, ETC., WHICH WERE
MATERIAL, ETC., NECESSARY TO ACCOMPLISH THESE REQUIREMENTS.
MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED
AND ARE A PART OF THE WORK INCLUDED. HOWEVER, NO CHANGES
THAT ALTER THE CHARACTER OF THE WORK WILL BE PERMITTED. DO
B. IF A CONFLICT OCCURS BETWEEN THE DESIGN DRAWINGS AND
SPECIFICATIONS, PROMPTLY NOTIFY THE ARCHITECT AND/OR
ENGINEER. AT THAT POINT, AN INTERPRETATION WILL BE MADE BY
THE ARCHITECT AND/OR ENGINEER AND THIS DECISION SHALL BE
CONSIDERED PART OF THE CONTRACT DOCUMENTS.
A. USE SUFFICIENT JOURNEYMEN, CRAFTSMEN AND COMPETENT
SUPERVISORS TO ENSURE PROMPT, PROPER, AND SAFE EXECUTION OF
A. EXERCISE CAUTION AT ALL TIMES TO PROTECT ALL PERSONS AND
PROPERTY. FURNISH TO EACH EMPLOYEE, EMPLOYMENT AND A
PLACE OF EMPLOYMENT WHICH IS FREE FROM RECOGNIZED HAZARDS
THAT ARE CAUSING, OR LIKELY TO CAUSE, DEATH OR SERIOUS INJURY
B. FURNISH AND MAINTAIN GUARDS, RAILINGS, FENCES, CANOPIES,
LIGHTS, WARNING SIGNS, ETC., WHICH ARE REQUIRED BY LAW
AND/OR NECESSARY TO PROTECT ALL PERSONS AND PROPERTY.
C. BE FAMILIAR WITH AND COMPLY WITH ALL APPLICABLE CODES AND
LAWS, AND IN PARTICULAR, THE CODE OF FEDERAL REGULATIONS, AS
ADMINISTERED BY THE INDUSTRIAL COMMISSION OF NEVADA.
1.05 SAFETY PRECAUTIONS
OR HARM TO EMPLOYEES.
1.06 SUBMITTALS
NOT SCALE THE DESIGN DRAWINGS.
1.04 QUALIFICATIONS OF WORKMEN
THE WORK.
DELIVERED WITH THE MATERIALS AND EQUIPMENT UTILIZED
IN THE PROJECT. IDENTIFY EACH ITEM BY DESIGNATION
APPEARING ON THE DRAWINGS. AN ELECTRONIC COPY WILL BE
2. AT A TIME DESIGNATED, PROVIDE A SUITABLE OPERATOR,
MECHANIC OR ENGINEER TO GO OVER THE SYSTEM WITH
OWNER'S REPRESENTATIVE TO THOROUGHLY FAMILIARIZE HIM
WITH THE OPERATIONS AND MAINTENANCE OF THE SYSTEM.
A. FURNISH AND INSTALL NEW PRODUCTS OF ESTABLISHED AND
REPUTABLE AMERICAN MANUFACTURERS. ITEMS OF EQUIPMENT
USED FOR THE SAME PURPOSE SHALL BE OF THE SAME
B. SYSTEMS SHALL BE COMPLETE AND OPERABLE. ANY ACCESSORIES
REQUIRED FOR OPERATION OF THE SYSTEMS SHALL BE INCLUDED AS
THOUGH SPECIFICALLY INDICATED TO BE PROVIDED. PROVIDE
SHUT-OFF VALVES FOR SUPPLY LINES TO EACH INDIVIDUAL ITEM OF
EQUIPMENT. ALL VALVES SHALL BE CONCEALED WITHIN FIXTURE OR
EQUIPMENT WHERE POSSIBLE.
C. SPECIFIC REFERENCE TO A MANUFACTURER'S PRODUCT IS ONLY TO
ESTABLISH TYPE, QUALITY, AND PERFORMANCE REQUIRED. THESE
QUALIFICATIONS ARE IN ADDITION TO THE REQUIREMENTS SHOWN
ON THE PLANS AND ELSEWHERE IN THESE SPECIFICATIONS. LISTING
OF ALTERNATE EQUIPMENT MANUFACTURERS SHALL NOT BE
CONSTRUED AS AN UNCONDITIONAL APPROVAL OF THE PRODUCTS OF
THOSE MANUFACTURERS.
A. SEE PLUMBING MATERIALS MATRIX ON SHEET PL0.02
2.02 PIPING MATERIALS
PART 2 - PRODUCTS
2.01 GENERAL PRODUCTS
MANUFACTURER.
A. GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIAL
CONDITIONS, AND OTHER RELATED PORTIONS OF DIVISION 1, APPLY
A. COMPLY WITH ALL NATIONAL, STATE, COUNTY, AND CITY CODES,
ORDINANCES, ETC., HAVING JURISDICTION, INCLUDING RULES AND
REQUIREMENTS OF UTILITY SERVING AGENCIES.
B. INCORPORATE ALL CODES, ORDINANCES, ETC., INTO THE BASE BID
AND INSTALLATION OF WORK. NO ADDITIONAL FUNDS SHALL BE
ALLOCATED FOR WORK REQUIRED TO CONFORM TO REGULATIONS
AND REQUIREMENTS AND/OR TO OBTAIN APPROVAL OF WORK.
C. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND LICENSES. WHEN
REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED
BY LOCAL AUTHORITIES. PRIOR TO FINAL APPROVAL, FURNISH
ARCHITECT WITH CERTIFICATES OF INSPECTION AND APPROVALS BY
A. DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE ONLY INTENDED
LOCAL AUTHORITIES.
1.03 DESIGN DRAWINGS
1.02 REGULATIONS, CODES, PERMITS AND INSPECTIONS
TO THIS SECTION.
PART 1 - GENERAL
1.01 CONDITIONS
1. MAINTAIN ACCURATE UNCEASING RECORDS OF ANY AND ALL
CHANGES FROM THE CONTRACT DOCUMENTS AND SHOP
DRAWINGS. UPON COMPLETION OF THE PROJECT, DELIVER TO
THE OWNER, ONE (1) SET OF LEGIBLE AND REPRODUCIBLE
COPIES OF THESE RECORD DRAWINGS.
1. UPON COMPLETION OF THE PROJECT, DELIVER TO THE OWNER,
A ONE (1) YEAR GUARANTEE OF THE SYSTEM, MATERIAL AND
WORK PERFORMED. GUARANTEE THE ENTIRE COST, INCLUDING
MATERIALS AND/OR LABOR, OF ALL WORK REQUIRED AND
NECESSITATED BY DEFECT OF MATERIALS AND/OR
C. MANUAL AND OPERATION INSTRUCTIONS:
1. UPON THE COMPLETION OF THE PROJECT, DELIVER TO THE
OWNER, A HARD BOUND "OWNER'S MANUAL". INCLUDE IN THE
MANUAL INSTRUCTIONS PREPARED SPECIFICALLY FOR THE
SYSTEMS PROVIDED, ALONG WITH ALL PAPERS, DESCRIPTIONS,
WORKMANSHIP.
B. GUARANTEE:
A. RECORD DRAWINGS:
SPACING OF SIX FEET FOR 1/2" SIZE, EIGHT FEET FOR 3/4" OR 1"
A. TEST ALL SYSTEMS IN ACCORDANCE WITH ALL APPLICABLE CODES,
REGULATIONS, ORDINANCES, ETC., IN PARTICULAR THE UNIFORM
PLUMBING CODE, 2012 EDITION, AND AS FOLLOWS:
B. IF ANY TEST SHOWS THE WORK TO BE DEFECTIVE IN ANY WAY OR AT
VARIANCE WITH SPECIFICATION REQUIREMENTS, MAKE ALL
NECESSARY CHANGES AND REMEDY ALL DEFECTS.
C. TEST PIPING SYSTEMS AFTER INSTALLATION AND PRIOR TO BEING PUT
INTO USE, COVERED OR CONCEALED BY INSULATION, BACKFILLING,
3.04 DISINFECTION OF DOMESTIC WATER PIPING SYSTEM
A. DISINFECT WATER PIPING IN STRICT CONFORMANCE WITH THE
REQUIREMENTS OF THE STATE OF NEVADA "WATER SUPPLY
REGULATIONS", SECTION 3, AND LOCAL REQUIREMENTS.
WILL GIVE THE GREATEST PRACTICAL EASE OF OPERATION AND
SIZE, AND TEN FEET FOR 1-1/4" OR LARGER.
SERVICE BY THE OWNER.
OR BUILDING CONSTRUCTION.
B. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH ALL
MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES.
C. PERFORM ALL WORK IN ACCORDANCE WITH THE BEST TRADE
PRACTICES. INSTALL ALL MATERIALS AND EQUIPMENT SQUARELY
WITH THE BUILDING LINES. PROVIDE RIGID PERMANENT BASES AND
SUPPORTS FOR ALL WORK. CONSTRUCT AND BRACE EQUIPMENT,
PIPING, ETC., SO THAT THERE WILL BE NO VIBRATION AND/OR
RATTLING WHEN THE SYSTEM IS IN OPERATION.
D. COVER AND PROTECT ALL EQUIPMENT AND MATERIALS FROM
WEATHER, THEFT, ETC., UNTIL DATE OF COMPLETION. PLUG AND/OR
CAP ALL OPEN ENDS OF INSTALLED PIPING.
A. CONCEAL ALL PIPING IN WALLS, FURRED SPACES, PIPE SPACES, OR
ABOVE CEILINGS, AS SHOWN ON THE DRAWINGS. GROUP
PIPING WHEREVER PRACTICAL AND INSTALL UNIFORMLY IN
STRAIGHT PARALLEL LINES, SQUARELY WITH BUILDING LINES.
B. SUPPORT HORIZONTAL PIPING ABOVE GRADE WITH PIPE HANGERS. DO
NOT USE PERFORATED METAL TAPE. ARRANGE PIPING SO THAT THERMAL
EXPANSION DOES NOT CAUSE STRESS. INSTALL AND SECURE PIPING
SO THAT HOT AND COLD LINES, AND LINES OF DISSIMILAR METALS
C. VERIFY ALL EQUIPMENT DIMENSIONS AND REQUIREMENTS FOR
ROUGH-IN WORK. BENDING OR OFFSETTING OF FINISHED PIPING
CONNECTIONS AND COCKING OF FITTINGS OR TRIM WILL NOT BE
ACCEPTABLE. DO NOT SUPPORT ANY PIPING WEIGHT FROM
D. SANITARY: LAY PIPING AT A UNIFORM 1/4" PER FOOT GRADE. MAKE
ALL JOINTS CLOSE AND SQUARE. USE FITTINGS FOR ALL TURNS AND
OFFSETS. UNIFORMLY GRADE AND COMPACT TRENCHES PRIOR TO LAYING
PIPING. PROVIDE CONTINUOUS SUPPORT FOR ALL PIPING.
E. VENTS THROUGH ROOF SHALL BE SEALED WITH A SEAMLESS LEAD
FLASHING SYSTEM OF 4 LB. LEAD. VENT PIPE EXPOSED TO SUNLIGHT
SHALL BE PAINTED WITH A WATER-BASE SYNTHETIC LATEX PAINT.
F. PIPING CONNECTIONS TO PLUMBING FIXTURES, EXPOSED PIPING AND
FITTINGS SHALL BE CHROME PLATED.
G. CUTTING AND PATCHING SHALL BE APPROVED BY THE ARCHITECT
SPACING OF FIVE FEET UP TO 3/4" SIZE, SIX FEET UP TO 1-1/4"
SIZE, AND EIGHT FEET UP TO 2" SIZE. SUPPORT WATER PIPING IN
1. HANGERS SHALL BE KIN-LINE NO. 455 W/ A MAXIMUM
2. HANGERS SHALL BE KIN-LINE NO. 455F WITH A MAXIMUM
1. HANGERS SHALL BE KIN-LINE NO. 450F WITH A MAXIMUM
WALLS WITH LSP "WATER FAB" KITS.
1. HANGERS SHALL BE KIN-LINE NO. 455 WITH A MAXIMUM
SPACING OF FIVE FEET.
SPACING OF FOUR FEET.
EQUIPMENT.
PRIOR TO PERFORMING THE WORK.
3.03 TESTING REQUIREMENTS
3.02 INSTALLATION
ARE NOT IN CONTACT.
GIVEN TO THE OWNER AS WELL.
PIPE SUPPORTS AND HANGERS SHALL COMPLY WITH MSS SP-58 AND SP-69.
2.04 NATURAL GAS PIPING SYSTEM:
EQUATIONS 1216.3(1)(2).
A. GAS PIPING WILL BE SIZED BASED ON 2012 UPC TABLES 12/8-12 AND
C. GAS PRESSURE REGULATORS WILL BE PROVIDED ON MEDIUM PRESSURE
GAS PIPING SYSTEM TO ALL GAS FIRED MECHANICAL EQUIPMENT AND
B. ASSUMED SITE AVAILABLE GAS PRESSURE OF 5 PSI.
KITCHEN AREAS.
1-INCH VENT UP TO 30 FEET AND INCREASE ONE PIPE SIZE EVERY 30 FEET
TO TERMINAL POINT, OR FOLLOWING MANUFACTURER'S RECOMMENDATIONS.
D. GAS PRESSURE REGULATOR WILL BE PROVIDED WITH A MINIMUM OF
E. BUILDING GAS METER TO BE PROVIDED BY OTHERS.
SHEET LISTSHEET TITLE
PL0.01 PLUMBING GENERAL NOTES AND SPECS
PL0.02 PLUMBING LEGENDS AND SYMBOLS
PL1.01.D PLUMBING FLOOR PLAN DEMO
PL1.01 PLUMBING FLOOR PLAN
PL3.01 PLUMBING ELEVATION VIEWS
PL5.01 PLUMBING DETAILS
PL8.01 PLUMBING PIPING DIAGRAM
PL9.01 PLUMBING PIPIING ISOMETRIC
PL6.01 PLUMBING EQUIPMENT SCHEDULES
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
12" = 1'-0"
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:08 PM
PL0.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
GE
NE
RA
L N
OT
ES
AN
DS
PE
CS
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
ACID VENT
SYMBOL
ACID WASTE
COMPRESSED AIR
CONDENSATE
DOMESTIC COLD WATER
DOMESTIC COLD WATER - [TYPE]
DOMESTIC HOT WATER
DOMESTIC HOT WATER - [TYPE]
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN - [TYPE]
GARAGE DRAIN
GREASE WASTE
HAZARDOUS RADON VENT
INDUSTRIAL COLD WATER
INDUSTRIAL COLD WATER - [TYPE]
INDUSTRIAL HOT WATER
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL VENT
INDUSTRIAL WASTE
IRRIGATION WATER
LIQUID PROPANE
NATURAL GAS
NATURAL GAS - [TYPE]
NATURAL GAS VENT
PUMPED DRAIN
RECLAIM WATER
DESCRIPTION
INDIRECT WASTE
PLUMBING SYSTEMS
SANITARY SEWER
SANITARY VENT
STORM DRAIN
STORM OVERFLOW DRAIN
SUBSOIL DRAIN
TEPID WATER
TEPID WATER RETURN
AV
AW
CA
CD
DCW
DCW[XX]
DHW
DHW[XX]
DHWR
DHWR[XX]
GD
GW
HRV
IW
ICW
ICW[XX]
IHW
IHWR
IV
IW
IRW
LPG
G
G[XX]
GV
PD
RW
SAN
V
SD
OSD
SSD
TW
TWR
NON-POTABLE WATERNPW
ANGLE VALVE
SYMBOL
AQUASTAT
AUTOMATIC AIR VENT
BACKFLOW PREVENTER - DOUBLE CHECK VALVE
BACKFLOW PREVENTER - REDUCED PRESSURE VALVE
BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
CAP ON END OF PIPE
CHECK VALVE
CLEANOUT PLUG
CLEANOUT TO GRADE
CONCENTRIC REDUCER
EXPANSION JOINT
FLEXIBLE CONNECTION (BRAIDED)
FLOOR CLEANOUT
FLOOR DRAIN WITH P-TRAP
FLOOR SINK
FLOW IN DIRECTION OF ARROW
FLOW SWITCH
GAS COCK, GAS STOP
GATE VALVE
GLOBE VALVE
HOSE BIBB
MANUAL AIR VENT
MOTOR-OPERATED VALVE (SPECIFY TYPE)
DESCRIPTION
ECCENTRIC PIPE CHANGE
PIPE ANCHOR
PIPE BRANCH – BOTTOM CONNECTION
PIPE BRANCH – TOP CONNECTION
PIPE GUIDE
PIPE RISE OR DROP
PIPE RISER DOWN
PIPE RISER UP
PLUG VALVE
POINT OF CONNECTION
PRESSURE AND TEMPERATURE PORT
PRESSURE GAUGE WITH GAUGE COCK
PRESSURE REDUCING VALVE (GAS PRESSURE REGULATOR)
PRESSURE REGULATING VALVE
PRESSURE REGULATING VALVE (SELF-CONTAINED)
PRESSURE SWITCH
RECESSED WALL HYDRANT
SOLENOID VALVE
STEAM TRAP
STRAINER
TEE
TEMPERATURE MIXING VALVE
TEMPERATURE PRESSURE RELIEF VALVE
PRESSURE RELIEF (SAFETY) VALVE
AV
CO
COTG
FCO
FS
HB
MV
M
P/T
PG
PS
WH
S
T
TMV
THERMOMETER
UNION
WALL CLEANOUT
WATER HAMMER ARRESTER
THERM
WCO
WHA
PLUMBING SYMBOLS
POINT OF DISCONNECTIONTAG LEGEND
01
TYPE
1001COMMENT
TYPE ABBREVIATION
TYPE ID
PROJECT UNIQUE ID
COMMENT
300
TYPE-ID
1001COMMENT
TYPE ABBREVIATION + INSTANCE ID
GPM
PROJECT UNIQUE ID
COMMENT
EQUIPMENT INSTANCE TAG
EQUIPMENT TYPE TAG W/GPM
DESCRIPTIONTAG
BLV-01 TYPE ABBREVIATION + TYPE ID VALVE TAG
PIPE RISER TAG (ONE SYSTEM)
PIPE RISER TAG (MULTI SYSTEM)
A 2
CHWS SYSTEM
COLUMN GRID LETTER + NUMBER
SYSTEM 1SYSTEM 2SYSTEM 3SYSTEM 4SYSTEM 5DESTINATION
A 2
01 ID
COLUMN GRID LETTER + NUMBER
RISER DESTINATION (LAST LINE)
LIST OF SYSTEMS (SIZE + ABBREVIATION)
TYPE ABBREVIATION + TYPE ID PLUMBING FIXTURE TAGSH-01
MINIMUM WATER FIXTURE UNITS -DOMESTIC COLD WATER
PIPE SIZE GPMVELOCITY
(MAX. 8 FPS)FLUSH TANK - FU FLUSH VALVE - FU
1/2" 2 2.79 1 0
3/4" 5 3.43 6 0
1" 10 4.02 14 0
1 1/4" 17 4.47 25 0
1 1/2" 28 4.99 48 11
2" 57 5.89 108 40
2 1/2" 101 6.76 195 84
3" 157 7.39 308 140
4" 299 8.00 591 282
6" 669 8.00 1332 652
NOTE:1. DOMESTIC PIPING SYSTEMS DESIGNED TO 2.54 PSI FRICTION LOSS / 100 FT AND A MAX VELOCITY OF 8 FT/S
MINIMUM WATER FIXTURE UNITS -DOMESTIC HOT WATER
PIPE SIZE GPMVELOCITY
(MAX. 5 FPS)FLUSH TANK - FU FLUSH VALVE - FU
1/2" 2 2.79 1 0
3/4" 5 3.43 6 0
1" 10 4.02 14 0
1 1/4" 17 4.47 25 0
1 1/2" 28 4.99 48 11
2" 48 5.00 90 31
2 1/2" 74 5.00 143 57
3" 106 5.00 206 89
4" 187 5.00 367 170
6" 418 5.00 830 401
NOTE:1. DOMESTIC HOT WATER PIPING SYSTEMS DESIGNED TO 2.54 PSI FRICTION LOSS / 100 FT AND A MAX VELOCITY OF 5 FT/S
UPC APPENDIX A WATER PRESSURE CALCULATION
BLDG HEIGHT = 25'-0"
25' X 0.433 P.S.I. PER FOOT = 10.825 P.S.I
MIN. FIXTURE PRESSURE = 25 P.S.I
BACKFLOW PREVENTER = 5 PSI
WATER METER 5 PSI
TOTAL 55.825 PSI
MAX. HORZ. PIPE = 327 FEET
MAX. VERT. PIPE = 25
HORZ. PIPE LENGTH TAP TO METER 10
HORZ PIPE LENGTH METER TO BUILIDING 10
FITTING LOSS (ASSUME 50%) = 186 FEET
TOTAL 558 FEET
EXISTING BOOSTER PUMP PRESSURE = 60 P.S.I.
BUILDING PRESSURE LOSS = 45.825 PSI
DIFFERENCE 14.175 P.S.I.
MAX ALLOWABLE PRESSURE DROP =
14.175 P.S.I.-------------------------
558 FEET= 2.54 P.S.I / 100 FEET
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
12" = 1'-0"
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:09 PM
PL0.02
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
LE
GE
ND
S A
ND
SY
MB
OLS
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
K
J
H
G
F
4 5 6 74.5 5.5
WOMEN108
EXIST.MECH104B
EXIST. MECH104A
EXIST.MECH
104
EXIST. DATA106
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
VESTIBULE100D
5
(E)2" DHW
(E)1/2" DHW
(E)3" G
(E)3" G
(E)1" DHWR
(E)2 1/2" G (E)2 1/2" G
(E)2 1/2" G(E)2 1/2" G
(E)4" G
(E)3 1/2" G
(E)3" G
(E)5" G
(E)2 1/2" G
(E)1" DHW
(E)2" DCW
(E)2" DCW
(E)2" DCW
(E)5" G
(E)5" G
(E)5" G
(E)1" DHWR
(E)2" DHW
(E)1" DHWR
(E)1" DHWR
(E)1/2" DHW (E)2" DCW
(E)2" DHW
(E)2" DHW
(E)2 1/2" G2" DHW
1" DHW
(E)3" G
WOMEN108
EXIST.MECH104B
EXIST. MECH104A
EXIST.MECH
104
EXIST. DATA106
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
VESTIBULE100D
5
(E)1" DOMESTIC HOT WATER PIPING TO BUILDING.
8
9
1
(E)DHWP
(E)1/2" DOMESTIC HOT WATER SERVING SINK
(E)2" NATURAL GAS PIPING IS CAPPED
3
2
4
6
1
3
(E)2 1/2" NATURAL GAS PIPING UP TO UPPER LEVELS
7 7
3
PL3.01
1
(E)DHWHX
2 1/2" G
(E)2" G
(E)2 1/2" NATURAL GAS PIPING TO EXISTING GAS METER AND REGULATOR ASSEMBLY
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
As indicated
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:11 PM
PL1.01.D
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
FLO
OR
PLA
N D
EM
O
0 2' 4' 8' 1/4" = 1'-0"1
FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PLUMBING FLOOR PLANDEMO
1
2
3
4
EXISTING 2" DOMESTIC COLD WATER FROM BOOSTER PUMP ASSEMBLY.
(E)3" NATURAL GAS PIPING UP TO ROOF TO SERVE EXISTING POWER GENERATOR
REFER TO PLUMBING DETAIL SHEET PL5.01 FOR (E)2 1/2" NATURAL GAS PIPING DIAGRAM
EXISTING DOMESTIC WATER CHECK VALVE TO BE EXAMINED AND REPLACED IF NECESSARY.
EXISTING DOMESTIC HOT WATER AND DOMESTIC HOT WATER RETURN TO/FROM SOUTH SIDE OF BUILDING.
EXISTING DOMESTIC HOT WATER AND DOMESTIC HOT WATER RETURN TO/FROM NORTH SIDE OF BUILDING.
2 1/2" NATURAL GAS PIPING SERVING HEATING HOT WATER BOILER.
EXISTING DOMESTIC HOT WATER STORAGE TANK.
EXISTING DOMESTIC HOT WATER RECIRCULATION PUMP.
5
6
7
8
9
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
K
J
H
G
F
4 5 6 74.5 5.5
WOMEN108
EXIST.MECH104B
EXIST. MECH104A
EXIST.MECH
104
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
VESTIBULE100D
5
(E)4" HEATING HOT WATER SUPPLY OUT TO SYSTEM.
8
1
(E)DHWP
2" DHW 2" DHW
1
WH
2
WH
(E)2" DHW (E)1" DHWR
(E)1/2" DHW
(E)1/2" DOMESTIC HOT WATER
SERVING SINK
(E)3" G
(E)3" G
(E)1" DHWR
2" DHWR
(E)2 1/2" G (E)2 1/2" G
(E)2 1/2" G(E)2 1/2" G
(E)4" G
(E)3 1/2" G
(E)3" G
(E)5" G
(E)2 1/2" G
(E)1" DHW
(E)2" DCW
(E)2" DCW
(E)2" DCW
(E)5" G
(E)5" G
(E)5" G
(E)1" DHWR
1 1/2" G
1 1/2" G
(E)1" DHWR
(E)1" DHWR
(E)1/2" DHW (E)2" DCW
2" DHW
2" DHW
FLOW
FLOW
1 1/2" DHW
1 1/2" DHW
1" DHWR
(E)2" DHW
2" DHW
2" DHW
(E)2 1/2" G
3
2
4
2" DHW
1" DHWR
1" DHW
6
1
3
(E)2 1/2" NATURAL GAS PIPING UP TO UPPER LEVELS3" G
7 7
1
PL3.01
2
PL3.01
10
9
1" DHWR
NEW TEMPERATURE MIXING VALVE
2" DHW 2" DHW
TMV-1
GPR-111
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
As indicated
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:10 PM
PL1.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
FLO
OR
PLA
N
0 2' 4' 8' 1/4" = 1'-0"1
FIRST LEVEL - CENTRAL PLANT HEATING HOT WATER PLUMBING FLOOR PLAN
EXISTING 2" DOMESTIC COLD WATER FROM BOOSTER PUMP ASSEMBLY
(E)3" NATURAL GAS PIPING UP TO ROOF TO SERVE EXISTING POWER GENERATOR
REFER TO PLUMBING DETAIL SHEET PL5.01 FOR (E)2 1/2" NATURAL GAS PIPING DIAGRAM
EXISTING DOMESTIC WATER CHECK VALVE TO BE EXAMINED AND REPLACED IF NECESSARY.
EXISTING DOMESTIC HOT WATER AND DOMESTIC HOT WATER RETURN TO/FROM SOUTH SIDE OF BUILDING.
EXISTING DOMESTIC HOT WATER AND DOMESTIC HOT WATER RETURN TO/FROM NORTH SIDE OF BUILDING.
2 1/2" NATURAL GAS PIPING SERVING HEATING HOT WATER BOILER.
EXISTING DOMESTIC HOT WATER STORAGE TANK.
NATURAL GAS PIPING TO EXISTING NATURAL GAS METER.
EXISTING DOMESTIC HOT WATER RETURN RECIRCULATION PUMP
SEE SHEET PL5.01 FOR GAS PRESSURE REDUCING VALVE DETAIL
1
2
3
4
5
6
7
8
9
10
11
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
EXISTING DOMESTIC HOT WATER STORAGE TANK
2" DHW1 1/2" DHW2" DHW
1
(E)DHWP
2" DHW
2" DHW
2" DHW
1 1/2" DHW
2" DHW
1 1/2" G 1 1/2" G
1 1/2" DHW
1 1/2" G
2" DHW
1 1/2" DHW 1 1/2" DHW
1 1/2" G
1 1/2" DHW
(E)2" DHWR (E)2" DHW
(E)2" DHW
(E)2" DHW (E)2" DHW
(E)2" DHW
(E)2" DHW
(E)2" DHW EXISTING DOMESTIC HOT WATER STORAGE TANK
1
(E)DHWHX
1
(E)DHWP
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
SHEET NOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
1/2" = 1'-0"
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:12 PM
PL3.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
ELE
VA
TIO
N V
IEW
S
0 2' 4' 6' 1/2" = 1'-0"1
PLUMBING NORTH ELEVATION VIEW
0 2' 4' 6' 1/2" = 1'-0"2
WATER HEATER NORTH ELEVATION VIEW
0 2' 4' 6' 1/2" = 1'-0"3
PLUMBING NORTH DEMO ELEVATION VIEW
A. REFER TO SHEET M8.01 FOR DETAILS
B. REFER TO SHEET M9.01 FOR ISOMETRIC
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
(E)5" G (E)5" G
(E)2 1/2" G (E)FUME HOOD3 CFH
(E)1/2" G
(E)1/2" G
(E)1/2" G
(E)1/2" G
(E)FUME HOOD3 CFH
(E)SAFETY CABINET3 CFH
(E)BENCH OUTLET3 CFH
(E)1/2" G
(E)BENCH OUTLET3 CFH
(E)2 1/2" G
(E)BENCH OUTLET3 CFH
(E)CEILING OUTLET3 CFH
(E)BENCH OUTLET3 CFH
(E)2 1/2" G
(E)CEILING OUTLET
3 CFH
(E)BENCH OUTLET3 CFH
(E)FUME HOOD3 CFH
(E)FUME HOOD3 CFH
(E)1/2" G
(E)1/2" G
(E)1/2" G (E)1/2" G
(E)1/2" G(E)1/2" G
(E)MAU-3315 CFH
(E)1 1/2" G
(E)MAU-3315 CFH
(E)1 1/2" G
(E)BENCH OUTLET3 CFH
(E)BENCH OUTLET3 CFH
(E)BENCH OUTLET3 CFH
(E)BENCH OUTLET3 CFH
(E)CEILING OUTLET3 CFH
(E)BENCH OUTLET3 CFH
(E)CEILING OUTLET
3 CFH
(E)FUME HOOD3 CFH
(E)1/2" G
(E)BENCH OUTLET3 CFH
(E)FUME HOOD3 CFH
(E)1/2" G(E)CEILING
OUTLET3 CFH
(E)MAU-3315 CFH
(E)1 1/2" G
(E)1/2" G(E)3/4" G
(E)1/2" G (E)1/2" G
(E)1/2" G
(E)BENCH OUTLET3 CFH
(E)1/2" G
(E)1 1/2" G
(E)1/2" G(E)BENCH OUTLET3 CFH
(E)1/2" G
(E)1/2" G
(E)BENCH OUTLET3 CFH
(E)1/2" G(E)1/2" G(E)1/2" G(E)1/2" G
(E)1/2" G
(E)1/2" G
(E)1/2" G (E)1/2" G
(E)CEILING OUTLET
3 CFH
(E)CEILING OUTLET
3 CFH
(E)CEILING OUTLET
3 CFH
(E)CEILING OUTLET3 CFH
(E)2 1/2" G
(E)3/4" G
(E)4" G (E)3 1/2" G (E)3" G
3/4" G
(E)HEATING HOT WATER BOILER
2,000 CFH
(E)POWER GENERATOR923 CFH
(E)ROOTS METER MODEL 5H175; 5000 CFH;
EXISTING TOTAL DEVELOPED LENGTH = 250'
EXISTINGTOTAL CFH = 5,952 CFH
(E)2 1/2" G
(E)HEATING HOT WATER BOILER
2,000 CFH
NEW HEATING HOT WATER BOILER
400 CFH
NEW HEATING HOT WATER BOILER
400 CFH
40' NEW
3'3'
1
2
NEW SELF CONTAINED PRESSURE REGULATOR
1 1/2" G
1 1/2" G
1 1/2" G 1 1/2" G
LENGTH = 50'
CFH = 800 CFH
EXISTING NATURAL GAS PIPING
NEW NATURAL GAS PIPING
TOTAL DEVELOPED LENGTH = 250'
NEW CFH = 6752 CFH
NEW TOTAL NATURAL GAS PIPING
G
GAS VALVE
DIRT LEG
G
4" HOUSE KEEPING PAD
RECIRCULATING PUMP
FINISHED FLOOR
CHECK VALVE
STRAINER (TYPICAL)
BALL VALVE
EXPANSION TANK
HWCP
-
DCW
DHWS
DHWR
G
DI-ELECTRIC NIPPLE
THERMOMETER
A.S.M.E. RATEDTEMPERATURE ANDPRESSURE RELIEF VALVE
FULL SIZE DISCHARGE LINEROUTED DOWN TO FLOORDRAIN WITH 90° ELBOWTURNED DOWN AT DRAIN.
WATER HEATER
P/T
P/T
P/T
TEMPERED WATER SUPPLY
HOT WATER SUPPLY
THERMOMETER
THERMOSTATIC MIXING VALVE
COLD WATER SUPPLY
GATE VALVE
STRAINER
CHECK VALVE
UNION
STRAINER
GATE VALVE
GATE VALVE
THERMOMETER
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:13 PM
PL5.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
DE
TA
ILS
NTS1
GAS DIAGRAM
NTS2
GAS WATER HEATER DETAIL
1 SOUTHWEST GAS TO PROVIDE GAS METER WITH ENOUGH CAPACITY TO SUFFICE LOAD REQUIREMENTS.
2 NEW HIGH PRESSURE GAS PIPING AT 5 PSI PER TABLE UPC 1216.2(6).
NTS3
THERMOSTATIC MIXING VALVE DETAIL
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
DOMESTIC BOILER SCHEDULEEQUIPMENT TAG MANUFACTURER MODEL GAS DATA MAX. FLOW
[GPM]STORAGE CAPACITY
[GAL]
NAT. GAS LINE CONN. [IN]
NOTES
RECOVERY [GPH]
TEMP RISE [°F]
LWT [°F]
INPUT[MBH]
VENT [IN]
WH-1 AO SMITH BTH-400(A) 576 80 140 399,900 4 150 119 1 1/2 1,2
WH-1 AO SMITH BTH-400(A) 576 80 140 399,900 4 150 119 1 1/2 1,2
NOTES
1. COMBUSTION AIR INTAKE AND EXHAUST PIPED OUTDOORS WITH PVC PIP PER MANUFACTURER'S RECOMMENDATIONS
2. TWO UNITS MANIFOLDED TOGETHER TO PROVIDE DOMESTIC HOT WATER
GAS PRESSURE REGULATOR SCHEDULEEQUIPMENT TAG MANUFACTURER MODEL TYPE LOCATION SERVICE MAXIMUM GAS
FLOW[CFH]
INLET PRESSURE[PSIG]
OUTLET PRESSURE
[IN. WC]
PIPE INLET [INCHES]
PIPE OUTLET[INCHES]
VENT SIZE
[INCHES]
SPRINGCOLOR
ORIFICESIZE
PIPE CONNECTION REMARKS
GPR-1 GOVERNOR 30051DC 1/2" VENTLESS CENTRAL PLANTWATER
HEATERS800 5 11 3/4 1 1/2 NO VENT BLACK - SCREWED 1,2
NOTES1. GAS REGULATOR SHALL COMPLY WITH CSA 6.22 FOR LINE PRESSURE VENTLESS REGULATORS
2. OVER PRESSURE DEVICE REQUIRED
THERMOSTATIC MIXING VALVE SCHEDULEEQUIPMENT TAG MANUFACTURER MODEL TYPE LOCATION SERVICE CAPACITY
[GPM]PRESSURE DROP
VALVE[PSI]
HOT WATER INLET[°F]
COLD WATER INLET[°F]
WATER OUTLET[°F]
REMARKS
TMV-1 LEONARD LV-985-SW-LF THERMOSTATIC BOILER ROOMDOMESTIC HOT
WATER216 50 140 60 130 1, 2
NOTES
1. ASSE 1017 CERTIFIED
2. TOP OR BOTTOM SUPPLY CONNECTIONS
3. CUPC CERTIFIED
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
12" = 1'-0"
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:13 PM
PL6.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
EQ
UIP
ME
NT
SC
HE
DU
LE
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
NEW WATER HEATER-1(400 MBTU)
EXISTING 200 GALLON DOMESTIC HOT WATER STORAGE TANK
1 1/2" NATURAL GAS
2" DOMESTIC HOT WATER TO WATER HEATERS
2" DOMESTIC HOT WATER FROM WATER HEATERS
(E)5" NATURAL GAS FROM METER
3/4" NATURAL GAS
NEW SELF CONTAINED PRESSURE REGULATOR
1 1/2" NATURAL GAS
1 1/2" NATURAL GAS
1" DOMESTIC HOT WATER RETURN FROM BUILDING
2" DOMESTIC HOT WATER TO BUILDING
2" DOMESTIC COLD WATER FROM BOOSTER PUMP
2" DOMESTIC HOT WATER TO BUILDING
140°F
130°F
EXISTING DOMESTIC HOT WATER RECIRCULATION PUMP
NEW TEMPERATURE MIXING VALVE
1 1/2" DHW
1 1/2" DHW
2" DHW
2" DHW
1" DHWR
1" DHWR
(E)5" NATURAL GAS TO BOILER ROOM
(E)5" NATURAL GAS
NEW WATER HEATER-2(400 MBTU)
1
(E)1" DHWR
(E)1" DCW
(E)2" DHW
2" DHWR
2
THERM
CHECK VALVE BALL VALVE
CHECK VALVE
BALL VALVE
BALL VALVE
CHECK VALVE
BALL VALVE
BALL VALVE
CHECK VALVE
GPR-1 TMV-1
(E)5" NATURAL GAS
1 1/2" DHW
1 1/2" DHW
2" DHW
2" DHW
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:14 PM
PL8.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
DO
ME
ST
IC H
OT
WA
TE
R D
IAG
RA
M
NTS1
DOMESTIC HOT WATER DIAGRAM
1 EXISTING DOMESTIC HOT WATER PUMP LOCATED IN BOILER ROOM TO REMAIN.
GAS PRESSURE REGULATOR TO BE LOCATED IN CENTRAL PLANT.2
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
(E)DOMESTIC HOT WATER STORAGE TANK
2" DHW
2" DHW
1 1/2" G
1 1/2" G
2" DHW
1 1/2" G
1 1/2" DHW
2" DHWR
2" DHW
2" DHW
(E)1" DHWR
(E)5" G
(E)3" G
(E)2 1/2" G
(E)5" G
(E)2" DCW
3/4" G
1 1/2" G
(E)2" DCW
(E)2" G
1 1/2" DHW
1 1/2" DHW
(E)3" G
(E)5" G
(E)4" G
(E)3 1/2" G
(E)3" G
(E)1" DHWR
(E)1/2" DHW
(E)2" DHW
(E)1" DHWR
(E)1/2" DHW
(E)1/2" DHW
(E)1/2" DHW
2" DHWR
(E)1" DHWR
(E)2 1/2" G
(E)2 1/2" G
(E)2 1/2" G
(E)2" DHW
(E)2" DHW
(E)1" DHWR
(E)1" DHWR
(E)1" DHWR
(E)1" DHWR
(E)2" DCW
(E)2" DCW
(E)5" G
(E)2" DCW
2 1/2" G
(E)1" DHWR
(E)1" DHWR
(E)2" DHW
(E)5" G
(E)5" G
(E)2 1/2" G
2" DHW
1 1/2" DHW
(E)2" DHW
EXISTING 1" DOMESTIC HOT WATER PIPING TO BUILDING
EXISTING 1" DOMESTIC HOT WATER RETURN PIPING FROM BUILDING
EXISTING 2" DOMESTIC HOT WATER PIPING TO BUILDING
EXISTING 1/2" DOMESTIC HOT WATER PIPING TO SERVE SINK
EXISTING 3" NATURAL GAS PIPING TO TO ROOF TO SERVE POWER GENERATOR
EXISTING 1" DOMESTIC HOT WATER PIPING TO BUILDING
(E)1" DHW
(E)1" DHWR
EXISTING 1" DOMESTIC HOT WATER RETURN PIPING FROM BUILDING
EXISTING 2 1/2" NATURAL GAS PIPING TO GAS METER
EXISTING 2" DOMESTIC COLD WATER PIPING FROM BOOSTER PUMP
EXISTING 2 1/2" NATURAL GAS PIPING UP TO BUILDING
(E)2" G CAPPED
2" DHW
2" DHW
TMV-1
2" DHW
2" DHW
2" DHW
2" DHW
2" DHW
GPR-1
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 4:22:15 PM
PL9.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017SI
JB
SM
UNLV
PLU
MB
ING
PIP
ING
ISO
ME
TR
IC
NTS1
DOMESTIC HOT WATER PIPING ISOMETRIC
1
WH
2
WH
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
2
(E)B
1
(E)B1,700 CFH
1,700 CFH
SHEET NUMBERING SYSTEM
DDS.NN.SS.P
"DD" DENOTES DISCIPLINE DESIGNATOR
"S" DENOTES SHEET SERIES
1 - LIGHTING PLANS
2 - POWER PLANS
3 - AUXILIARY PLANS
4 - ENLARGED SCALE PLANS
5 - SIGNLE LINE DIAGRAMS
6 - SCHEDULES
7 - DIAGRAMS
"NN" DENOTES SHEET SEQUENCE NUMBER FOR ALL SHEET SERIES EXCEPT FOR "1" SERIES"NN" FOR SHEET SERIES "1" (FLOOR PLANS) DENOTES BUILDING LEVEL
C - CRAWLSPACE
H - PENTHOUSE
T - TUNNEL
UG - UNDERGROUND
01 - FIRST FLOOR, 02 - SECOND FLOOR, ETC.
RO - ROOF
"SS" DENOTES SECTOR
B - BASEMENT LEVEL
"P" DENOTES PHASING PLANS
P - PARKING LEVEL
T - TEMPORARY PLANS
D - DEMO PLANS
0 - GENERAL
E - ELECTRICAL
SHEET LISTSHEET TITLE
E0.01 SHEET LIST AND ABBREVIATIONS
E0.02 ELECTRICAL SYMBOLS
E0.03 ELECTRICAL SPECIFICATIONS
E2.01 FIRST LEVEL CENTRAL PLANT POWER PLAN
E5.01 ELECTRICAL SINGLE LINE DIAGRAM AND SCHEDULES
ABBREV DESCRIPTION
DISCHARGEDISCH
DRAWING
DOOR LOUVER
DRAIN
DOWN
EFFICIENCY
ELEVATION
DRY BULB TEMPERATURE
ELECTRIC DUCT HEATERELECTRICAL CONTRACTOR
EGGCRATE GRILLE
DISCONNECT SWITCH
EQUIPMENT
ENERGY EFFICIENCY RATIOENTERING AIR TEMPERATUREENTERING WATER TEMPERATURE
EMERGENCY CHILLED WATER
DOMESTIC (POTABLE) COLD WATER
EWTEQUIP
ECHWEEREAT
DB
EGC
ELEV
EDHEC
EFF
D/L
DWGDR
DN
DCWDS
CEILING
CONSTANT AIR VOLUME
CIRCUIT
CONCRETE
COEFFICIENT OF PERFORMANCECLEAN DRY AIR
CEILING DIFFUSER
CIRCUIT BREAKER
CHILLED WATER
BUILDING MANAGEMENT SYSTEM
COMBUSTION INLET AIRCOMBUSTION EXHAUST AIR
CARBON STEEL
DIGITAL INPUT
CONDENSATE DRAIN (DRAIN PAN)
CONTROL PANEL
DEGREE FAHRENHEIT
DIFFERENTIAL PRESSUREDIRECT DIGITAL CONTROL
CUBIC FEET PER MINUTE
DEGREE CELSIUS
CONSTANT VOLUMECHLORINATED POLYVINYL CHLORIDE PIPE
CFM
DPDDC
DI
°C
°F
CV
CPCVCP
CD
COP
CONC
CIACEA
CIRCCBCDA
CS
CHW
CLGCD
BMS
CAV
ACCESS DOOR
ABOVE
AMPERES
AMBIENT
AIR FLOW MEASUREMENT STATION
ACCESS PANEL
ABOVE FINISHED FLOOR
AIR SEPARATOR
AIR HANDLING UNIT
AIR CONDITIONERAIR CHANGES PER HOUR
AUXILIARY
BUILDING
BOTTOM FLAT, BLIND FLANGE
ATMOSPHERE, ATMOSPHERICAUTOMATIC AIR VENT
BACKDRAFT DAMPER
BOTTOM OF DUCT
BRAKE HORSEPOWERBOTTOM OF PIPE
BRITISH THERMAL UNITBRITISH THERMAL UNIT PER HOUR
BF
BHP
BLDGBTUHBTU
BOPBOD
BDD
ATM
AUXAV
ACHAC OR A/C
AMPS
AMBAS
AFSAHU
AFF
AP
AD
ABV
ANALOG INPUTAI
ANALOG OUTPUTAO
CAPACITYCAP
DIGITAL OUTPUTDO
LOW-PRESSURE CONDENSATE
LEAVING WATER TEMPERATURE
MAXIMUM OVERCURRENT PROTECTIONMECHANICAL
MAN-BARS
MAXIMUM CIRCUIT BREAKER SIZEMAXIMUM FUSE SIZE
MANUAL AIR VENT
MAKE UP AIR
LEAVING AIR TEMPERATURE
MAKE UP AIR UNIT
LOW-PRESSURE STEAM
LOCKED ROTOR AMPS
MAX MAXIMUM
MECH
MCBMFSMOP
LPS
MBMV OR MAV
MAU
LBS
MUA
LRALPC
(L)LWTLAT
POUNDS
LINED
HORSEPOWER
HUMIDISTAT
HORIZONTAL
KILOVOLTS
REFRIGERANT HOT GAS
HOUSEKEEPING VACUUM
HEATING, VENTILATING AND AIR CONDITIONING
HEATING HOT WATER
HEAT EXCHANGER
GENERAL CONTRACTOR
HEAT EXHAUST
HAND/OFF/AUTO
NATURAL GAS
KILOVOLT AMPERESKILOWATTS
HIGH-PRESSURE CONDENSATE
INSIDE DIAMETER OR DIMENSION
HIGH-PRESSURE STEAM
HP
H'STAT
KVKVAKW
IDIN
HG
HV
INCHES
HORIZ
HPCHPS
HZ
HHW
HVAC
HOA
HEHX
HTG
GCG
HERTZ
HEATING
GALLONS PER MINUTEGALLONS PER HOUR
GALVANIZED SHEETMETAL
FIBERGLASS REINFORCED PLASTIC
EXTERNAL STATIC PRESSURE
FLOOR SINKFULL LOAD AMPS
FLOOR DRAIN
FAN COIL UNIT
EXHAUST AIR
FIRE DAMPER
FIRE/SMOKE DAMPER
FEET PER MINUTE
EXHAUST REGISTER
EXHAUST GRILLE
FIRE/LIFE SAFETY
EVAPORATIVE
FRP
(F) or F
GSGPMGPH
FLA
F/SD
FSFD
FLR
FDF/LS
FUTURE
FLOOR
(E) or EER
FT
FPM
FCU
ESP
EA
EG
EVAP
FEET
EXISTING
FTR FINNED TUBE RADIATION
GUARDED DRIP PROOFGDP
RECIRCULATION AIR UNIT
REFRIGERANT LIQUID
RELATIVE HUMIDITY
REFRIGERANT SUCTION
RECOMMENDED DUAL ELEMENT FUSE
RETURN REGISTER
REFRIGERANT RELIEF
RUNNING LOAD AMPS
REVOLUTIONS PER MINUTERR
RMRPM
RLAROOM
RG
(R) or RREQ'DRA
RHRE
RDERAU
RHCRRE
RLRS
RELOCATED
RETURN GRILLE
RETURN AIRREQUIRED
RELIEF AIR
REHEAT COIL
OPPOSED BLADE DAMPER
OPEN DRIP PROOF
OVERCURRENT PROTECTIVE DEVICEOUTSIDE DIAMETER OR DIMENSION
PARTS PER MILLION
PLUMBING CONTRACTORPUMPED CONDENSATE
POLYVINYL CHLORIDE
POINT OF CONNECTION
POLYPROPYLENE PIPE
POUNDS PER SQUARE INCH
PRESSURE CHANGE
POLYVINYLIDENE FLUORIDE
PRESSURE GAGEPRESSURE REDUCING STATIONPRESSURE REGULATING VALVEPRESSURE SAFETY (RELIEF) VALVE
PPP
PRS
PSVPRV
PG
POS
PVC
PSI
P
PRESS
PVDF
POSITION
PRESSURE
PPM
POC
PCPC
PH
ODP
OBD
OC
OPDODOSA or OA
PHASE
ON CENTER
OUTSIDE AIR
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPACITY
THOUSAND BTUH
MECHANICAL EQUIPMENT ROOM
MEMORY STOP (ON A VALVE)
MEDIUM-PRESSURE CONDENSATEMEDIUM-PRESSURE STEAM
MINIMUM OR MINUTE
MECHANICAL CONTRACTOR
NON-POTABLE WATERNORMALLY CLOSED
NOT IN CONTRACTNORMALLY OPEN
NET POSITIVE SUCTION HEAD
N.O.N.C.
NPW
NTSNO.
NIC
MBHMTD
(N) or NNPSH
NUMBERNOT TO SCALE
MOUNTED
NEW
MS
MIN
MCCMODMAMCA
MEZZ
MC
MPS
MERMPC
MIXED AIRMODULATING
MEZZANINE
ABBREV DESCRIPTION
PRESSURE CONTROL VALVEPCV
VOLTS DIRECT CURRENT
MANUAL VOLUME DAMPER
UNLESS OTHERWISE NOTED
WET BULB TEMPERATURE
WEATHERPROOF DISCONNECT SWITCH
VOLTS ALTERNATING CURRENT
WATER CLOSETWC
WIRE SIZING AMPS
WATTS
WEIGHT
WB
WSA
WPDSWGT
W
UP THRU ROOF
VENT THROUGH ROOFVARIABLE AIR VOLUME
UNDERCUT
VOLTSVERTICAL
VACVDC
VERTV
VTR
UTR
VAVVD
U/CU.O.N.
SMOKE DETECTOR, SMOKE DAMPERSOUND ATTENUATOR, SUPPLY AIR
TOTAL STATIC PRESSURE
INTERNATIONAL SYSTEM OF UNITS
STM STEAM
TOTAL DYNAMIC HEADTOTAL PRESSURE
TRANSFER GRILLE
SUPPLY REGISTERSUPPLY GRILLE
TERMINAL UNITTHERMOMETER
SUPPLY AIR
THERMOSTAT
TYPICAL
TOP FLAT
TP
TGTSP
TYP
T'STATTFTDH
SR
THERMTU
SASG
STAINLESS STEELSTATIC PRESSURE
SCHEDULESHEET
S/SSP
SASD
SHTSCHEDSI
WIRE MESH SCREENWMS
WITH
TRANSFORMER
WITHOUTW/O
X'MER
W/
FPIU FAN POWERED INDUCTION UNIT
SERIES FAN POWERED VAV TERMINALSFT
HOT WATER UNIT HEATERHWUHHOT WATER BOILERHWB
COMPUTER ROOM AIR CONDITIONINGCRAC
LOOSE VARIABLE FREQUENCY DRIVEVFD
RELIEF VENTRV
PACKAGED ROOF TOP AIR CONDITIONING UNITPRTU
PLATE AND FRAME HEAT EXCHANGERHEX
GRAVITY INTAKEGI
FOP FUEL OIL POLISHER
FOT FUEL OIL STORAGE TANK
FOSP FUEL OIL PUMP
DT FUEL OIL DAY TANK
FM FLOW METER
EXPANSION TANKETENERGY RECOVERY UNITERU
COOLING TOWERCTCHEMICAL POT FEEDERCPFWATER COOLED CENTRIFUGAL CHILLERCHNON CHEMICAL WATER TREATMENTCFWT
AIR COOLED CHILLERACCH
AIR DOOR UNITAD
PACKAGED CENTRIFUGAL SEPARATORCS
SUCTION DIFFUSERSD
BUTTERFLY VALVEBFV
CONDENSER WATER PUMPCWPCHILLED WATER PUMPCHWP
PHWP PRIMARY HEATING WATER PUMP
SECONDARY HEATING WATER PUMPSHWP
TERTIARY HEATING WATER PUMPTHWP
PULSE PURE CONTROL PANELPPCONDUCTIVITY CONTROLLERCC
RAF RELIEF AIR FAN
EXHAUST FANEF
STAIR PRESSURIZATION FANSPF
ELEVATOR PRESSURIZATION FANEPF
LD LINEAR SLOT DIFFUSER
CHEMICAL POT FEEDERCPF
UNDERGROUND FUEL OIL STORAGE TANKUST
AIR COMPRESSORAC
CONDENSING UNITCU
UNIT HEATERUH
EMERGENCY POWER OFFEPO
OCCUPANCY SENSOROS
ABBREVIATIONS
CHANGE OF VALUECOV
BAS BUILDING AUTOMATION SYSTEM
BUFFER TANKBT
BUILDING
HEATING HOT WATER SUPPLYHHWSHEATING HOT WATER RETURNHHWR
DOMESTIC HOT WATERDHW
POWER DISTRIBUTION UNITPDU
UNINTERRUPTED POWER SUPPLYUPS
PHOTOVOLTAICPV
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 2:16:15 PM
E0.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017JB
SP
SP
UNLV
SH
EE
T L
IST
AN
D A
BB
RE
VIA
TIO
NS
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
SYMBOL DESCRIPTION
POWER DEVICE SYMBOLS
RECESSED WALL MOUNTED 4-PORT USB CHARGING OUTLET, +18” AFF U.O.N.
RECESSED WALL MOUNTED JUNCTION BOX FOR SYSTEMS FURNITUREBRANCH CIRCUITS (FINAL CONNECTION TO SYSTEMS FURNITURE POWERWHIP IS NOT INCLUDED), +18" AFF U.O.N.
RECESSED WALL MOUNTED JUNCTION BOX
JUNCTION BOX
JUNCTION BOX WITH FINAL EQUIPMENT CONNECTION
SURFACE MOUNTED THERMAL MANUAL MOTOR STARTER SWITCH
SURFACE MOUNTED DUPLEX RECEPTACLE, +18" AFF U.O.N.
SURFACE MOUNTED SWITCHED DUPLEX RECEPTACLE, +18" AFF U.O.N.
SURFACE MOUNTED DUPLEX RECEPTACLE WITH GROUND FAULT INTERRUPTING PROTECTION, +18" AFF U.O.N.
SURFACE MOUNTED DUPLEX RECEPTACLE ON CIRCUIT DESIGNATED FORCOMPUTER POWER, +18" AFF U.O.N.
SURFACE MOUNTED DUPLEX ISOLATED GROUND RECEPTACLE , +18" AFFU.O.N.
SURFACE MOUNTED QUADRUPLEX RECEPTACLE, +18" AFF U.O.N.
SURFACE MOUNTED SWITCHED QUADRUPLEX RECEPTACLE, +18" AFF U.O.N.
SURFACE MOUNTED QUADRUPLEX RECEPTACLE WITH GROUND FAULTINTERRUPTING PROTECTION, +18" AFF U.O.N.
SURFACE MOUNTED QUADRUPLEX RECEPTACLE ON CIRCUIT DESIGNATED FOR COMPUTER POWER, +18" AFF U.O.N.
SURFACE MOUNTED QUADRUPLEX ISOLATED GROUND RECEPTACLE, +18"AFF U.O.N.
SURFACE MOUNTED SINGLE RECEPTACLE, +18" AFF U.O.N.
RECESSED WALL MOUNTED DUPLEX RECEPTACLE, +18” AFF U.O.N.
RECESSED WALL MOUNTED SWITCHED DUPLEX RECEPTACLE, +18” AFF U.O.N.
RECESSED WALL MOUNTED DUPLEX RECEPTACLE WITH GROUND FAULTINTERRUPTING PROTECTION, +18" AFF U.O.N.
RECESSED WALL MOUNTED DUPLEX RECEPTACLE ON CIRCUIT DESIGNATEDFOR COMPUTER POWER, +18" AFF U.O.N.
RECESSED WALL MOUNTED DUPLEX ISOLATED GROUND RECEPTACLE, +18" AFF U.O.N.
RECESSED WALL MOUNTED QUADRUPLEX RECEPTACLE, +18” AFF U.O.N.
RECESSED WALL MOUNTED SWITCHED QUADRUPLEX RECEPTACLE, +18" AFF U.O.N.
RECESSED WALL MOUNTED QUADRUPLEX RECEPTACLE WITH GROUND FAULT INTERRUPTING PROTECTION, +18" AFF U.O.N.
RECESSED WALL MOUNTED CLOCK HANGER RECEPTACLE, +84” AFF U.O.N.
RECESSED "FIRE DEPARTMENT OUTLET", L5-20R NEMA TYPE TWIST LOCKRECEPTACLE WITH WEATHERPROOF COVER PAINTED "FIRE-ALARM RED".MARKED "ONLY FOR FIRE DEPARTMENT USE", AND CONNECTED TOEMERGENCY CIRCUIT. MOUNT WITHIN 24" OF FIRE HOUSE VALVE
RECESSED WALL MOUNTED QUADRUPLEX RECEPTACLE ON CIRCUITDESIGNATED FOR COMPUTER POWER, +18" AFF U.O.N.
RECESSED WALL MOUNTED QUADRUPLEX ISOLATED GROUND RECEPTACLE,+18" AFF U.O.N.
RECESSED WALL MOUNTED SINGLE RECEPTACLE, +18” AFF U.O.N.
RECESSED WALL MOUNTED SPECIALTY OUTLET, NEMA CONFIGURATIONINDICATED, +18" AFF U.O.N.
RECESSED WALL MOUNTED DUPLEX RECEPTACLE WITH TWO USB CHARGINGPORTS, +18" AFF U.O.N.
RECESSED WALL MOUNTED JUNCTION BOX WITH FINAL EQUIPMENTCONNECTION
RECESSED WALL MOUNTED JUNCTION BOX FOR FINAL CONNECTION TOSYSTEMS FURNITURE WHIP, +18" AFF U.O.N.
SYMBOL DESCRIPTION
SURFACE MOUNTED SPECIALTY OUTLET NEMA CONFIGURATION INDICATED,+18" AFF U.O.N.
SURFACE MOUNTED DUPLEX RECEPTACLE WITH TWO USB CHARGING PORTS,+18" AFF U.O.N.
SURFACE MOUNTED 4-PORT USB CHARGING OUTLET, +18'' AFF U.O.N.
SURFACE MOUNTED JUNCTION BOX
SURFACE "FIRE DEPARTMENT OUTLET", L5-20R NEMA TYPE TWIST LOCKRECEPTACLE WITH WEATHERPROOF COVER PAINTED "FIRE-ALARM RED".MARKED "ONLY FOR FIRE DEPARTMENT USE", AND CONNECTED TOEMERGENCY CIRCUIT. MOUNT WITHIN 24" OF FIRE HOUSE VALVE
SURFACE MOUNTED JUNCTION BOX WITH FINAL EQUIPMENT CONNECTION
SURFACE MOUNTED JUNCTION BOX FOR SYSTEMS FURNITURE POWERBRANCH CIRCUITS (FINAL CONNECTION TO SYSTEMS FURNITURE POWERWHIP IS NOT INCLUDED), +18" AFF U.O.N.
SURFACE MOUNTED JUNCTION BOX FOR FINAL CONNECTION TO SYSTEMSFURNITURE POWER WHIP
SURFACE MOUNTED RACEWAY WITH MULTI-OUTLET ASSEMBLY, LETTERINDICATES TYPE (PROJECT SPECIFIC)
JUNCTION BOX FOR SYSTEMS FURNITURE POWER BRANCH CIRCUITS (FINALCONNECTION TO SYSTEMS FURNITURE POWER WHIP IS NOT INCLUDED)
JUNCTION BOX FOR FINAL CONNECTION TO SYSTEMS FURNITURE POWERWHIP
FLUSH MOUNTED POKE-THRU FITTING FOR FINAL CONNECTION TO SYSTEMSFURNITURE POWER WHIP
FLUSH MOUNTED MULTI-SERVICE FURNITURE FEED POKE-THRU FITTING WITHDUAL FINAL CONNECTIONS TO SYSTEMS FURNITURE POWER WHIP ANDCOMMUNICATIONS WHIP
FLUSH MOUNTED FLOOR BOX FOR FINAL CONNECTION TO SYSTEMSFURNITURE POWER WHIP
FLUSH MOUNTED MULTI-SERVICE FURNITURE FEED FLOOR BOX FOR DUALFINAL CONNECTIONS TO SYSTEMS FURNITURE POWER WHIP ANDCOMMUNICATIONS WHIP
FLUSH MOUNTED POKE-THRU FITTING WITH QUADRUPLEX RECEPTACLE
FLUSH MOUNTED POKE-THRU FITTING WITH ISOLATED GROUND DUPLEXRECEPTACLE
FLUSH MOUNTED POKE-THRU FITTING WITH ISOLATED GROUNDQUADRUPLEX RECEPTACLE
FLUSH MOUNTED FLOOR BOX FITTING WITH DUPLEX RECEPTACLE
FLUSH MOUNTED FLOOR BOX FITTING WITH QUADRUPLEX RECEPTACLE
FLUSH MOUNTED FLOOR BOX FITTING WITH ISOLATED GROUND DUPLEXRECEPTACLE
FLUSH MOUNTED FLOOR BOX FITTING WITH ISOLATED GROUND QUADRUPLEXRECEPTACLE
DUPLEX RECEPTACLE RECESSED IN CEILING
QUADRUPLEX RECEPTACLE RECESSED IN CEILING
DROP CORD RECEPTACLE
EMERGENCY POWER OFF PUSH BUTTON, +48'' AFF U.O.N
POWER POLE WITH DIVIDED RACEWAY FOR POWER AND COMMUNICATIONSCABLING
FLUSH MOUNTED POKE-THRU FITTING WITH DUPLEX RECEPTACLE
SUBSCRIPTS USED WITH CONJUNCTION OF DEVICES ABOVE:
CM - COFFEE MAKERCP - COPIERD - DRYERDL - DOOR LOCK DEVICEDW - DISHWASHERF - FAX MACHINEGD - GARBAGE DISPOSALHG - HOSPITAL GRADEHT - HOSPITAL GRADE/TAMPER RESISTANTMD - MOTORIZED DAMPERMW - MICROWAVE
OC - OVER COUNTERP - PRINTERPJ - PROJECTORPS - PROJECTION SCREENREF - REFRIGERATORSD - SMOLKE DAMPERTR - TAMPER RESISTANTTV - TELEVISIONVAV - VAV CONTROL TRANSFORMER OR FAN ONLYW - WASHERWP - WEATHERPROOF
C
J
P
P
J
C
J
P
J
M
P
J
J
P
P
A
J
P
D
D
P
EPO
GENERAL CIRCUITING INFORMATION
BASED ON SYMBOL
LIGHT FIXTURE (TYP)
POWER DEVICE / EQUIPMENT (TYP)
APNL1a
LIGHT FIXTURE TYPE
PANEL DESIGNATION FOR CIRCUIT
LIGHTING ZONE DESIGNATION
PNL1
PANEL DESIGNATIONFOR CIRCUIT
CIRCUIT NUMBER DESIGNATION
CIRCUIT NUMBER DESIGNATION
PNL1,3,5
PANEL DESIGNATIONFOR CIRCUIT
CIRCUIT NUMBER DESIGNATION
SYMBOL DESCRIPTION
ELECTRICAL EQUIPMENT SYMBOLS
MAJOR ELECTRICAL EQUIPMENT (GENERATOR, SWITCHBOARD, SWITCH GEAR, MOTOR CONTROL CENTER, PDU, UPS, ETC) SHALL BE DIMENSIONED PER EQUIPMENT MANUFACTURER'S SIZE
480/277 VOLT DISTRIBUTION PANEL
208/120 VOLT DISTRIBUTION PANEL
FLUSH MOUNTED 208/120 VOLT BRANCH CIRCUIT PANEL
SURFACE MOUNTED CONTROL CABINET AS INDICATED ON PLAN
FLUSH MOUNTED CONTROL CABINET AS INDICATED ON PLAN
TRANSFORMER (PLAN)
ELECTRICAL METER (PLAN)
SURFACE MOUNTED 480/277 VOLT BRANCH CIRCUIT PANEL
FLUSH MOUNTED 480/277 VOLT BRANCH CIRCUIT PANEL
SURFACE MOUNTED 208/120 VOLT BRANCH CIRCUIT PANEL
MOTOR CONNECTION, NUMBER INDICATED NON-FRACTIONAL HORSEPOWER
NON-FUSED DISCONNECT SWITCH: FIRST NUMBER INDICATES AMPERE RATING AND SECOND NUMBER INDICATES POLES, "INT" INDICATES CONNECTION TO DISCONNECT SWITCH INTEGRAL TO EQUIPMENT.
FUSIBLE DISCONNECT SWITCH: FIRST NUMBER INDICATES AMPERE RATING,SECOND NUMBER INDICATES POLES, AND THIRD NUMBER INDICATES FUSESIZES, "INT" INDICATES CONNECTION TO DISCONNECT SWITCH INTEGRAL TO EQUIPMENT.
FUSIBLE DISCONNECT SWITCH: FIRST NUMBER INDICATES AMPERE RATING,SECOND NUMBER INDICATES POLES, AND * INDICATES FUSE SIZES TO BECOORDINATED WITH MANUFACTURER OF EQUIPMENT SERVED, "INT" INDICATES CONNECTION TO DISCONNECT SWITCH INTEGRAL TO EQUIPMENT.
MOTOR STARTER CONTROLLER, NUMERAL INDICATES NEMA SIZE
VARIABLE FREQUENCY DRIVE
COMBINATION MOTOR STARTER CONTROLLER AND DISCONNECT SWITCH,NUMERAL INDICATES NEMA SIZE
COMBINATION VARIABLE FREQUENCY DRIVE AND DISCONNECT SWITCH,NUMERAL INDICATES NEMA SIZE
NON-FUSED DISCONNECT SWITCH WITH FINAL EQUIPMENT CONNECTION: FIRST NUMBER INDICATES AMPERE RATING AND SECOND NUMBER INDICATES POLES
FUSIBLE DISCONNECT SWITCH WITH FINAL EQUIPMENT CONNECTION: FIRSTNUMBER INDICATES AMPERE RATING, SECOND NUMBER INDICATES POLES, AND * INDICATES FUSE SIZES TO BE COORDINATED WITH MANUFACTURER OFEQUIPMENT SERVED
COMBINATION MOTOR STARTER CONTROLLER AND DISCONNECT SWITCH WITH FINAL EQUIPMENT CONNECTION, NUMERAL INDICATES NEMA SIZE
FUSIBLE DISCONNECT SWITCH WITH FINAL EQUIPMENT CONNECTION: FIRSTNUMBER INDICATES AMPERE RATING, SECOND NUMBER INDICATES POLES,AND THIRD NUMBER INDICATES FUSE SIZES
COMBINATION VARIABLE FREQUENCY DRIVE AND DISCONNECT SWITCH WITH FINAL EQUIPMENT CONNECTION, NUMERAL INDICATES NEMA SIZE
MOTOR STARTER CONTROLLER WITH FINAL EQUIPMNENT CONNECTION, NUMERAL INDICATES NEMA SIZE
VARIABLE FREQUENCY DRIVE WITH FINAL EQUIPMENT CONNECTION
#
T
30/3/15
30/3/*
00
VFD
00
VFD
VFD
30/3
30/3/15
30/3/*
00
VFD
SYMBOL DESCRIPTION
SINGLE LINE SYMBOLS
AMP METER
AUTOMATIC TRANSFER SWITCH
BUSWAY
CURRENT TRANSFORMER
NORMALLY CLOSED (N.C.) RELAY
SOLAR (PV) PANELS
A
E N
L
CBFRTRTG
CIRCUIT BREAKER
CONTACTOR/CONTROLLER
CTRA
CTRA
DIRECT CURRENT (DC) BATTERIES
DRAW-OUT CIRCUIT BREAKERCBFR
TRTG
DRAW-OUT FUSED CIRCUIT BREAKER
FUSZ
CBFRTRTG
EXTENSION/CONTINUATION MARK
FUSED SWITCHSWSZ
FUSZ
GENERATOR
CBFR
TRTG
CBFR
TRTG
GRAPHIC LINE BREAK
GROUND CONNECTION
INVERTER
KEY LOCKK
METERM
MICROTURBINE
MOTORHP
NON-FUSED SWITCHSWSZ
NORMALLY OPEN (N.O.) RELAY
RECTIFIER
RELAY### ###
RESISTOR BANK
STATIC SWITCH
SURGE ARRESTOR
SWITCHED MOTOR CONTROLLER
TAP BOX
TERMINATION/CONNECTION POINT
TRANSFORMER
VOLT METER
V
CTRA
WIND TURBINE
FUSED
FEEDER DESIGNATIONX X
XXX
INDUCTOR
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 2:16:17 PM
E0.02
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017JB
SP
SP
UNLV
ELE
CT
RIC
AL
SY
MB
OLS
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
ELECTRICAL SPECIFICATIONS
PART 1 - CONDITIONS
A. GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIAL CONDITIONS, AND OTHER RELATED PORTIONS OF DIVISION 1 APPLY TO THIS SECTION.
B. COORDINATE WITH LOCAL UTILITIES SERVING THIS PROJECT FOR POWER, TELEPHONE, AND CABLE TV. CONTRACTOR SHALL INCLUDE IN THE BASE BID ALL COSTS FOR TRENCHING ,BACKFILL, CONDUIT, AND CABLING AS REQUIRED FOR COMPLETE AND OPERABLE INSTALLATION OF ALL UTILITY SYSTEMS AND EQUIPMENT.
C. ALL WORK FOR UTILITY COMPANY INSTALLATION SHALL COMPLY WITH UTILITY COMPANY STANDARDS AND REGULATIONS. CONTRACTOR SHALL INSTALL ALL UTILITY COMPANY CONDUITS, STRUCTURES, VAULTS AND PADS, ETC.,AS INDICATED ON THE UTILITY COMPANY SERVICE DRAWINGS FOR THIS PROJECT. OBTAIN A COPY OF ALL FINAL UTILITY SERVICE DRAWINGS AND PROVIDE ALL EQUIPMENT AND WIRING AS INDICATED. CONTRACTOR IS RESPONSIBLE FOR ALL INSTALLATION COSTS AND INPSECTION FEES FOR UTILITY COMPANY.
D. COORDINATE ALL MATERIAL DELIVERIES AND STORAGE DURING CONSTRUCTION. PROTECT ALL MATERIALAND EQUIPMENT FROM WEATHER, THEFT, OR DAMAGE. CONTRACTOR SHALL REPLACE ANY DAMAGED OR STOLEN MATERIALS WITHOUT COST TO THE OWNER.
E. COORDINATE WITH OWNER ALLOWABLE WORKING HOURS, LOCATION FOR PARKING, ETC., PRIOR TO BID AND INCLUDE ALL COSTS IN BASE BID.
F. REMOVE ALL TRASH AND CONSTRCUTION DEBRIS GENERATED AS A RESULT OF THE ELECTRICAL PORITON OF THE WORK. KEEP PROJECT SITE CLEAR OF ALL DEBRIS THROUGHOUT CONSTRUCTION PERIOD.
G. VISIT THE PROJECT SITE AND THOROUGHLY INVESTIGATE EXISTING CONDITIONS, INCLUDING EXISTING UNDERGROUND UTILITIES, PRIOR TO SUBMITTING BID. CAREFULLY EVALUATE ALL EXISTING MATERIAL, EQUIPMENT, ETC., WHICH IS TO BE REMOVED, REINSTALLED, ALTERED OR MODIFIED, AND INCLUDE ALL THESE COSTS IN THE BASE BID. DETERMINE EXISTING INSTALLATION WORK WHICH IS TO REMAIN TO SERVE AREAS OUTSIDE THE LIMITS OF THIS WORK AND INCLUDE ALL COSTS IN BASE BID FOR WORK WHICH MAY BE REQUIRED TO MAINTAIN EXISTING SERVICES. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL LABOR AND MATERIAL THAT IS REQUIRED FOR RELOCATION OR MODIFICATION NECESSARY TO MAINTAIN THE EXISTING ELECTRICAL, COMMUNICATION, FIRE ALARM SYSTEM, ETC., INSTALLATIONS BEYOND THE LIMITS OF CONSTRUCTION.
H. WHERE WORK IS INDICATED OR REQUIRED IN AN AREA NOT DEFINED AS BEING RENOVATED, INCLUDE IN THE BASE BID ALL COSTS REQUIRED TO REMOVE, RELOCATE, REINSTALL, REPAIR AND/OR REPLACE EXISTING CONSTRUCTION AS MAY BE NECESSARY TO COMPLETE THE REQUIRED WORK. ALL AFFECTED AREAS SHALL BE RESTORED TO THE ORIGINAL OR BETTER CONDITION TO THE SATISFACTION OF THE ENGINEER, ARCHITECT, AND OWNER. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL LABOR AND MATERIAL THAT IS REQUIRED FOR THIS WORK. WORK REQUIRED IN EXISTING FINISHED AREAS MUST BE COORDINATED WITH THE ARCHITECT AND OWNER TO ASSURE MINIMAL DISRUPTION OF NORMAL ACTIVITIES.
I. PLAN THE SEQUENCE OF DEMOLITION AND CONSTRUCTION SO THAT THE ENTIRE PROJECT IS CARRIED OUT WITH MINIMUM INTERRUPTIONS. AT LEAST TWO WEEKS PRIOR TO DEMOLITION, THE CONTRACTOR SHALL SUBMIT HIS PLAN FOR THE WORK, AND THE WORK SHALL NOT START WITHOUT THE OWNER'S APPROVAL.
J. CONFER WITH THE MANUFACTURER'S OF EXISTING EQUIPMENT AND SYSTEMS THAT ARE TO BE REWORKED OR EXTENDED, PRIOR TO ANY MODIFICATIONS TO INSURE THE INTEGRITY OF THE ORIGINAL EQUIPMENT WILL NOT BE REDUCED AND TO CONFIRM THAT SUCH MODIFICATIONS ARE FEASIBLE.
K. WHERE EXISTING ELECTRICAL WORK AND EQUIPMENT PREVENT PROPER CONSTRUCTION OF NEW WORK AS INDICATED, REMOVE, REROUTE OR IN OTHER WAYS ALTER EXISTING WORK IN ORDER TO ACCOMMODATE NEW WORK REQUIREMENTS. PROVIDE TEMPORARY WIRING AND APPARATUS AS REQUIRED TO FACILITATE PHASING OF THE WORK.
L. ALL WIRING FOR ALL NEW AND REPLACEMENT ITEMS WHICH ARE BEING PROVIDED AS PART OF THIS PROJECT SHALL BE NEW AND OF THE TYPES IDICATED IN THE CONTRACT DOCUMENTS. UNDER NO CIRCUMSTANCES WILL EXISTING WIRING BE PERMITTED TO BE REUSED. THIS INCLUDES WIRING FOR REPLACEMENT LIGHTING FIXTURES AND WIRING DEVICES FROM THE SOURCE OF POWER SUPPLY (PANELBOARDS) TO THE LAST FIXTURE OR DEVICE ON EACH CIRCUIT. EXISTING WIRING FOR LIGHTING FIXTURES AND WIRING DEVICES RENDERED OBSOLETE OR BEING REPLACED SHALL BE DISCONNECTED AND REMOVED IN THEIR ENTIRETY. THE EXISTING REACEWAYS MAY BE REUSED IF FEASIBLE AND NOT DAMAGED. OTHERWISE, NEW RACEWAYS SHALL BE PROVIDED AS PART OF THIS PROJECT.
M. WHERE THE PROJECT ENCOMPASSES DEMOLITION OF WALLS AND RELOCATION OR REPLACEMENT OF EXISTING ELECTIRCAL EQUIPMENT, FEEDERS, BRANCH WIRING, SIGNAL CABLES, ETC., WITH NEW WORK. REMOVE, REINSTALL, OR RELOCATE THAT PORTION OF THE EXISTING EQUIPMENT, SYSTEM, WIRING, FIXTURES AND DEVICES, ETC., WHICH APPLIES TO THE ELECTRICAL TRADE IN ACCORDANCE WITH THE CURRENT CODE REQUIREMENTS.
N. IN AREAS WHERE NEW CEILING, PARTITION WALLS, OR DOORS ARE ADDED, ANY EXISITNG SYSTEMS, SUCH AS FIXTURES, POWER, COMMUNICATION, FEEDERS, AND DEVICES ARE DESIGNATED TO REMAIN, RELOCATE AND REWORK THE EXISTING CIRCUITYR AND PROVIDE AND EXTEND ADDITIONAL MATERIALS AS REQUIRED TO INSURE PROPER OPERATION IN ACCORDANCE WITH CURRENT CODE REQUIREMENTS.
O. REPLACE CEILING TILES DAMAGED DURING THE WORK WITH NEW TILES TO MATCH THE EXISTING IN EVERY RESPECT.
P. ALL CODE VIOLATIONS ENCOUNTERED RELATING TO EXISTING CONDITIONS WHICH IS OR MAY BE AFFECTED BY THIS PROJECT SHALL BE IDENTIFIED AS TO TYPE OF VIOLATION, LOCATION, DESCIPTION AND CODE SECTION AS PART OF THIS PROJECT. THIS INFORMATION SHALL BE IN TYPEWRITTEN FORM AND GIVEN TO THE OWNER AND ENGINEER.
Q. RETURN ALL EQUIPMENT AND DEVICES REMOVED AND NOT RE-USED TO THE OWNER PER THEIR INSTRUCTIONS.
R. ALL RACEWAYS ABANDONED SHALL HAVE ALL WIRING REMOVED BACK TO NEXT ACTIVE SOURCE. ALL RACEWAYS ABANDONED SHALL BE REMOVED UNLESS NOTED OTHERWISE.
S. FIRE PROTECTION AND FIRE ALARM SYSTEMS SHALL NOT BE DISCONNECTED OR TAKEN OUT OF SERVICE WITHOUT FIRST OBTAINING APPROVAL FROM THE OWNER AND FIRE DEPARTMENT. COMPLY WITH THE FIRE DEPARTMENT'S REQUIREMENTS. PROVIDE ON SITE FIRE TRAINED WATCHMAN AS REQUIRED.
T. CONTRACTOR SHALL VERIFY AVAILABLE SPACE AND AMPACITY OF EXISTING SWITCHBOARDS, DISTRIBUTION PANELS, AND PANELBOARDS AFFECTED BY THE ADDITION OF NEW LOADS. PROVIDE WRITTEN DOCUMENTATION TO THE ARCHITECT / ENGINEER. DOCUMENTATION SHALL INCLUDE A MINIMUM 30 - DAY RECORDING (THREE PHASE AMPERES, KILOWATTS, AND POWER FACTOR).
U. THE TERM "PROVIDE" MEANS TO FURNISH AND INSTALL.
PART 2 - REGULATIONS, CODES, PERMITS, AND INSPECTIONS
A. COMPLY WITH ALL NATIONAL, STATE, COUNTY, CITY, AND LOCAL CODES AND ORDINANCES HAVING JURISDICTION, INCLUDING RULES AND REQUIREMENTS OF UTILITY SERVING AGENCIES.
B. INCORPORATE ALL CODES AND ORDINANCES INTO THE BASE BID AND INSTALLATION OF WORK. NO ADDITIONAL FUNDS WILL BE ALLOCATED FOR WORK REQUIRED TO CONFORM TO REGULATIONS AND REQUIREMENT AND / OR TO OBTAIN APPROVAL OF WORK.
C. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND LICENSES. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
D. ALL INSTALLATIONS AT A MINIMUM SHALL COMPLY WITH THE FOLLOWING:1. NEVADA STATE PUBLIC WORKS DIVISION ADOPTED STANDARDS2. NATIONAL ELECTRIC CODE.3. APPLICABLE NFPA STANDARDS.4. HEALTH CODES.5. FIRE CODE AS ADOPTED BY AUTHORITY HAVING JURISDICTION.6. THE NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
STANDARDS.7. AMERICAN NATIONAL STANDARDS INSTITUTE.8. ALL LOCALL ADOPTED AMENDMENTS, CODES, AND ORDINANCES
IN THE JURISDICTION OF THE PROJECT.9. ALL ELECTRICAL COMPONENTS AND DEVICES SHALL BE U.L.
LISTED OR OTHER RECOGNIZED TESTING FACILITY.ALL CODES AND STANDARDS SHALL BE THE LATEST EDITIONS AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION FOR THIS PROJECT. OBTAIN CURRENT COPIES OF ALL LOCALLY ADOPTED CODES AND ORDINANCES PRIOR TO BID AND INCLUDE ALL COSTS TO COMPLY WITH CODES AND ORDINANCES IN BASE BID.
PART 3 - DESIGN DRAWINGS
A. DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE ONLY INTENDED TO DEFINE THE BASIC FUNCTIONS REQURIED. PROVIDE ALL MATERIAL, ETC. NECESSARY TO ACCOMPLISH THESE REQUIREMENTS. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED AND ARE A PART OF THE WORK INCLUDED. HOWEVER, NO CHANGES THAT ALTER THE CHARACTER OF THE WORK WILL BE PERMITTED. DO NOT SCALE THE DRAWINGS.
B. IF A CONFLICT OCCURS BETWEEN THE DESIGN DRAWINGS AND SPECIFICATIONS, BID THE GREATER QUALITY AND / OR QUANTITY.
PART 4 - SUBMITTALS
A. SHOP DRAWINGS1. PRIOR TO ORDERING OR INSTALLATION OF ANY MATERIAL AND /
OR EQUIPMENT TO THE JOB-SITE, SUBMIT SIX (6) HARD BOUND AND INDEXED COPIES OF A BROCHURE COMPLETELY DESCRIBING ALL SYSTEMS, COMPONENTS, MATERIAL, AND EQUIPMENT PROPOSED TO BE USED. ANY PIECE OF EQUIPMENT PLACED ON THE JOB WITHOUT PRIOR APPROVAL WILL BE SUBJECT TO REMOVAL.
2. PROVIDE SHOP DRAWING LAYOUT OF ALL ROOMS WITH ELECTRICAL DISTRIBUTION EQUIPMENT. LAYOUT SHALL SHOW LOCATIONS OF ELECTRICAL EQUIPMENT AND SHALL BE DRAWN TO SCALE.
B. RECORD DRAWINGSMAINTAIN ACCURATE CONTINUOUS RECORDS OF ANY AND ALL CHANGES FROM THE CONTRACT DOCUMENTS AND SHOP DRAWINGS. UPON COMPLETION OF THE PROJECT, DELIVER TO THE OWNER, ONE (1) SET OF LEGIBLE AND REPRODUCIBLE COPIES OF THESE RECORD DRAWINGS.
C. GUARANTEEALL LABOR, MATERIAL, SYSTEMS, AND EQUIPMENT SHALL BE GUARANTEED FOR ONE (1) YEAR FROM PROJECT COMPLETION. GUARANTEE THE ENTIRE COST, INCLUDING MATERIALS AND / OR LABOR, OF ALL WORK REQUIRED AND NECESSITATED BY DEFECT OF MATERIALS AND / OR WORKMANSHIP. AS A CONDITION OF SUPPLYING MATERIAL FOR THIS PROJECT THE MANUFACTURERS AND SUPPLIERS AGREE TO DEFEND, HOLD HARMLESS, AND TO INDEMNIFY OWNER, ENGINEER, ARCHITECT AND ALL RELATED SUBSIDIARIES AGAINST ANY LIABILITY ARISING OUT OF PROJECT FAILURE OR MANUFACTURING DEFECT OF THE EQUIPMENT PROVIDED.
D. MANUAL AND OPERATING INSTRUCTIONS1. UPON COMPLETION OF THE PROJECT, DELIVER TO THE OWNER, A
HARD BOUND "OWNER'S MANUAL". INCLUDE IN THE MANUAL INSTRUCTIONS PREPARED SPECIFICALLY FOR THE SYSTEMS PROVIDED, ALONG WITH ALL PAPERS, DESCRIPTIONS, PARTS LISTS, INSTRUCTIONS, WARRANTIES, ETC., WHICH WERE DELIVERED WITH THE MATERIALS AND EQUIPMENT UTILIZED IN THE PROJECT. IDENTIFY EACH ITEM BY DESIGNATION APPEARING ON THE DRAWINGS.
2. AT THE TIME DESIGNATED, PROVIDE A SUITABLE OPERATOR, ELECTRICIAN, OR ENGINEER, TO REVIEW THE SYSTEM WITH OWNER'S REPRESENTATIVE TO THOROUGHLY FAMILIARIZE HIM WITH THE OPERATIONS AND MAINTENANCE OF THE SYSTEM.
PART 5 - GENERAL PRODUCTS
A. RACEWAYS1. MINIMUM RACEWAY SIZE IS 1/2" UNLESS NOTED OTHERWISE2. CONDUIT SHALL BE ELECTRICAL METALLIC TUBING (EMT),
INTERMEDIATE METALLIC CONDUIT (IMC), OR RIGID GALVANIZED STEEL CONDUIT (RGS).
3. FLEXIBLE METAL CONDUIT MAY BE USED FOR FINAL CONNECTION TO LIGHT FIXTURES AND FOR FINAL CONNECTION TO MOTORS.
4. METAL CLAD CABLE (TYPE MC) MAY NOT BE USED. 5. CONDUIT INSTALLED CONCEALED MAY BE EMT OR IMC, UNLESS NOTED
OTHERWISE.6. CONDUIT SUBJECT TO PHYSICAL DAMAGE SHALL BE RGS, UNLESS
NOTED OTHERWISE.7. UNDERGROUND OR IN-SLAB CONDUIT SHALL BE PVC COATED RGS,
UNLESS NOTED OTHERWISE.
B. CONDUIT FITTINGS1. IMC AND RGS: NON-SPLIT THREADED STEEL, ZINC DIE CAST IS NOT
ACCEPTABLE2. EMT: SET SCREW TYPE.3. BUSHINGS SHALL BE METALLIC INSULATED TYPE.4. FACTORY BENDS SHALL BE USED FOR ANY CONDUIT SIZE 2" OR
LARGER. UNDERGROUND BENDS SHALL BE PVC COATED RGS.
C. OUTLET / JUNCTION / PULL BOXES1. OUTLET BOXES SHALL BE PROVIDED AS SHOWN OR REQUIRED BY
CODE.2. OUTLET BOXES SHALL BE CODE GUAGE GALVANIZED STEEL, 4"
SQUARE AND 2 - 1/8" DEEP WITH PLASTER RING.3. PROVIDE RAISED COVERS AND FIXTURE STUDS FOR OUTLET BOXES
WHERE REQUIRED.4. PROVIDE BLANK COVERS FOR OUTLET BOXES WITHOUT DEVICES.5. PROVIDE 6" SEPARATION BETWEEN BACK - TO - BACK OUTLET BOXES.6. BOXES FOR OUTDOOR USE AND DAMP LOCATIONS SHALL BE
WEATHERPROOF GASKETED CAST METAL TYPE.7. BOXES IN HAZARDOUS LOCATIONS SHALL BE CAST FREE ALUMINUM
OR AS REQUIRED TO SUIT INTENDED APPLICATION.8. ALL BOXES SHALL BE SIZED PER NEC REQUIREMENTS FOR NUMBER
AND SIZE OF CONDUCTORS AND CONDUIT ENTRIES TO SUIT INTENDED APPLICATION.
9. COVERS SHALL BE FULLY ENCLOSED AND SECURED AT ALL CORNERS. 10. GRADE MOUNTED PULL BOXES SHALL BE MADE OF CONCRETE
CONSTRUCTION WITH BOLT DOWN CONCRETE CONCRETE COVERS. PROVIDE A MINIMUM 4" CONCRETE COLLAR AROUND PULLBOX.
11. FLOOR BOXES SHALL BE GALVANIZED CAST IRON TYPE WITH BRASS COVERS AND FLANGES SUITABLE FOR CONDUIT AND DEVICES INDICATED. FLOOR BOXES SHALL BE MANUFACTURED BY STEEL CITY OR APPROVED EQUAL.
D. WIRE AND CABLE1. CONDUCTORS #10 AWG AND SMALLER SHALL BE SOLID. CONDUCTORS
LARGER THAN #10 AWG SHALL BE STRANDED.2. ALL CONDUCTORS SHALL BE MINIMUM 75 DEGREES C COPPER UNLESS
NOTED OTHERWISE.3. POWER AND LIGHTING CONDUCTOR SIZE SHALL BE MINIMUM #12 AWG
UNLESS NOTED OTHERWISE.4. CONDUCTOR INSULATION TYPE SHALL BE THHN/THWN UNLESS NOTED
OTHERWISE.5. ALL TERMINATIONS AND DEVICES SHALL BE LISTED FOR 75 DEGREES C
UNLESS NOTED OTHERWISE.
6. ALL WIRING SHALL BE IDENTIFIED WITH MARKERS TO REFLECT CIRCUIT DESIGNATIONS AT ALL POINTS WHERE WIRING IS ACCESSIBLE.
7. ALUMINUM CONDUCTORS SHALL NOT BE USED UNLESS SPECIFICALLY INDICATED IN THE DRAWINGS.
8. THE FOLLOWING CONDUCTOR SIZES SHALL BE PROVIDED FOR 20A, 1Φ BRANCH CIRCUITS (HOT, NEUTRAL, & GROUND) BASED ON ACTUAL CIRCUIT LENGTH, UPSIZE RACEWAYS ACCORDINGLY.
CONDUCTOR SIZE 120V 208V 277V 480V#12 AWG 0-70FT. 0-135FT. 0-160FT. 0-310FT.#10 AWG 71-120FT. 136-220FT. 161-250FT. 311-500FT.#8 AWG 121-180FT. 221-325FT. 251-375FT. 501.-760FT.#6 AWG 181-315FT. - 376-585FT. -
9. CONDUCTORS SHALL THE FOLLOWING COLOR UNLESS OTHERWISE REQUIRED PER LOCAL ORDINANCES OR REQUIREMENTS
VOLTAGE SYSTEM PHASE A PHASE B PHASE C NEUTRAL GROUND120/240V, 3ϕ, 4W BLACK RED ORANGE WHITE GREEN
(HIGH LEG)208/120V, 3ϕ, 4W BLACK RED BLUE WHITE GREEN
480V, 3ϕ, 4W BROWN ORANGE YELLOW GREEN
480/270V, 3ϕ, 4W BROWN ORANGE YELLOW GRAY GREEN
E. DEVICESWIRING DEVICES SHALL BE COMMERCIAL SPECIFICATION GRADE AS
FOLLOWS:1. WALL SWITCHES: 20A RATED, 120/277V, SINGLE POSE, SILENT TYPE2. DIMMER SWITCHES: LUTRON NOVAT SERIES RATED FOR LOAD SERVED3. RECEPTACLES: 20A RATED ,125V DUPLEX GROUNDED TYPE4. GFI TYPE: 20A RATED GROUND FAULT CIRCUIT INTERRUPTER DUPLEX
RECEPTACLE5. SPECIAL PURPOSE RECEPTACLES SHALL TYPE AND RATING PER PLANS
AND VERIFIED WITH EQUIPMENR SUPPLIER.6. DEVICES AND COLOR PLATES SHALL BE WHITE UNLESS OTHERWISE
OTED OR INSTRUCTED BY THE ARCHITECT OR THE INTERIOR DESIGNER.
7. MOUNTING HEIGHTS SHALL BE INDICATED ON THE DRAWINGS OR AS REQUIRED BY ADA OR AUTHORITY HAVING JURISDICTION.
F. FUSES AND CIRCUIT BREAKERS1. FUSES PROTECTING MOTORS SHALL BE BUSSMAN DUAL ELEMENT TIME
DELAY CLASS RK-52. CIRCUIT BREAKERS SHALL BE OF THE SAME MANUFACTURER AS THE
SWITCHBOARD, DISTRIBUTION PANELOR PANELBOARDS WITH THE RATING AND NUMBER OF POLES AS INDICATED OR SCHEDULES.
3. CIRCUIT BREAKERS SERVING HVAC TYPE EQUIPMENT SHALL BE HACR TYPE AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER.
4. CIRCUIT BREAKERS USED FOR SWITCHING SHALL BE SWD TYPE RATEDFOR SWITCHING USE.
5. SERIES RATED CIRCUIT BREAKERS AND EQUIPMENT ARE NOT ACCEPTABLE.
G. MOTOR STARTERS AND DISCONNECTS 1. MOTOR CONTROLLERS: 600V AC HEAVY DUTY RATED, SINGLE OR MULTI-
POLE TO SUIT APPLICATION AND MOUNTED IN SUITABLE NEMA ENCLOSURE.
2. ALL MOTOR CONTROLLERS SHALL BE HORSEPOWER RATED TO SUIT MOTOR BEING CONTROLLED.
3. PROVIDE H-O-A OR START/STOP OPERATION AS NEEDED FOR APPLICATION, VERIFY WITH EQUIPMENT SUPPLIER PRIOR TO ROUGH-IN.
4. PROVIDE MINIMUM TWO (2) NORMALLY OPEN AND TWO (2) NORMALLY CLOSED AUXILIARY CONTACTS FOR MOTOR CONTROLLERS.
5. DISCONNECTS: 600V AC HEAVY DUTY RATED, FUSED OR NON-FUSED AS INDICATED, SINGLE OR MULTI-POLE TO SUIT APPLICATION AND MOUTNED IN SUITABLE NEMA ENCLOSURE.
H. SWITCHBOARDS, DISTRIBUTION PANELS AND PANELBOARDS 1. ACCPETABLE EQUIPMENT MANUFACTURERS SHALL BE GENERAL
ELECTRIC SQUARE D, CUTLER-HAMMER OR APPROVED EQUAL.2. SWITCHBOARDS, DISTRIBUTION PANELS AND PANELBOARDS SHALL MEET
THE SEISMIC QUALIFICATIONS OF THE ADOPTED BUILDING CODE.3. GROUNDING CONNECTIONS SHALL BE MADE WIT APPROVED
CONNECTORS AND METHODS ACCEPTABLE TO AUTHORITY HAVING JURISDICTION.
4. ALL PANELBOARDS SHALL BE BOLT-ON CIRCUIT BREAKER TYPE, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
5. WIRE TERMINATIONS SHALL BE U.I. LISTED FOR 75°C.6. FLUSH MOUNTED PANELBOARDS SHALL HAVE A MINIMUM OF TWO (2) 1"
AND FOUR (4) 3/4" EMPTY CONDUITS STUBBED UP FROM PANEL TO ABOVE ACCESIBLE CEILING SPACE FOR FUTURE BRANCH CIRCUIT WIRING.
7. ALL SWITCHBOARDS, DISTRIBUTION PANELS AND PANELBOARDS SHALL HAVE A SEPARATE GROUND BUS ISOLATED FROM THE NEUTRAL BUS.
8. ALL SWITCHBOARDS SHALL BE FRONT AND REAR ALIGNED.9. ALL SWITCHBOARDS DISTRIBUTION PANELS AND PANELBOARDS SHALL
HAVE A SEPARATE GROUND BUS ISOLATED FROM THE NEUTRAL BIAS.10. METERING CTS AND PTS SHALL BE INSTALLED IN THE MAIN
SWITCHBOARD OR AT A REMOTE LOCATION AS INDICATED ON THE DRAWINGS.
11. METER DEVICE SHALL BE INSTALLED IN THE MAIN SWITCHBOARD OR AT A REMOTE LOCATION AS INDICATED ON THE DRAWINGS. METER DEVICE AND REQUIREMENTS SHALL BE VERIFIED BY THE CONTRACTOR WITH THE SERVING UTILITY COMPANY PRIOR TO COMMENCEMENT OF CONSTRUCTION.
12. CONTRACTOR IS RESPONSIBLE TO CNFIRM SUBMITTED EQUIPMENT WILL FIT WITHIN ALOTTED SPACE SHOWN AND COMPLY WITH ALL NEC CLEARANCE REQUIREMENTS.
I. TRANSFORMERS1. ACCEPTABLE EQUIPMENT MANUFACTURERS SHALL BE GENERAL
ELECTRIC SQUARE D, CUTLER-HAMMER OR APPROVED EQUAL.2. TRANSFORMERS SHALL MEET THE SEISMIC QUALIFICATIONS OF THE
ADOPTED BUILDING CODE.3. TRANSFORMERS SHALL BE 80°C RISE, UNLESS NOTED OTHERWISE.4. TRANSFORMERS SHALL BE UL LISTED AND MEET ANSI OVERLOAD LISTED.5. TRANSFORMERS SHALL MEET NEMA ST-20 SOUND LEVEL
REQUIREMENTS.6. TRANSFORMERS SHALL HAVE COPPER WINDINGS.7. TRANSFORMERS SHALL HAVE APPROPRIATE NEMA RATING FOR
LOCATIONS BEING INSTALLED.8. TRANSFORMERS SHALL HAVE K-FACTOR RATING AS INDICATED ON THE
DRAWINGS.9. TRANSFORMERS SHALL HAVE CLASS 155 INSULATION, UNLESS NOTED
OTHERWISE.
J. LIGHTING FIXTURES1. ALL LIGHTING FIXTURES SHALL BE UL LISTED.2. ALL FLOURESCENT FIXTURES SHALL BE PROVIDED WITH ENERGY SAVING
LAMPS AND ELECTRONIC BALLASTS. PROVIDE ZERO DEGREE BALLASTS FOR EXTERIOR LIGHTING FIXTURES.
3. ALL LAMPS SHALLBE BY THE SAME MANUFACTURER AND FURNISHED BY THE CONTRACTOR UNLESS NOTED OTHERWISE ON THE DRAWINGS. ALL BALLASTS SHALL BE LOW HARMONIC TYPE, THD<10%.
K. FIRE ALARM/LIFE SAFETY SYSTEM1. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND INSTALLATION
OF A COMPLETE AND OPERABLE FIRE ALARM SYSTEM FULLY APPROVED FOR USE BY AUTHORITY HAVING JURISDICTION. CONTRACTOR SHALL PROVIDE COMPLETE SYSTEM WIRING DIAGRAMS INCLUDING BUILDING FLOOR PLANS, SYSTEM COMPONENT SPECIFICATIONS, DEVICE LOCATIONS, ETC. FOR REVIEW AND APPROVAL BY AUTHORITY HAVING JURISDICTION.
2. FIRE ALARM DRAWINGS AND SPECIFICATIONS ARE SHOWN FOR DESIGN INTENT ONLY AND ESTABLISH A PERFRMANCE SPECIFICATION.
3. CONTRACTOR SHALL ENGAGE THE SERVICES OF A NEVADA LICENSED FIRE ALARM CONTRACTOR AND/OR MANUFACTURER TO PROVIDE A COMPLETE AND OPERABLE FIRE ALARM SYSTEM APPROVED BY THE AUTHORITY HAVING JURISDICTION UNDER THE BASE BID. CONTRACTOR SHALL BE RESPONSIBLE FOR AND INCLUDE IN BID ALL PLAN REVIEW AND PERMIT FEES, WHICH MAY BE APPLICABLE.
4. ALL DEVICES REQUIRED BUT NOT SHOWN ON THE DRAWINGS TO OBTAIN APPROVAL FROM AUTHORITY HAVING JURISDICTION SHALL BE INCLUDED IN THE BASE BID.
5. CONTRACTOR SHALL INCLUDE IN BASE BID ALL FACTORY START UP AND TESTING OF THE FIRE ALARM SYSTEM.
6. PRELIMINARY SYSTEM TESTING SHALL BE PERFORMED BY THE CONTRACTOR PRIOR TO FINAL TESTING WITH INSPECTION AUTHORITIES.
7. FIRE ALARM SYSTEM SHALL INCLUDE ALL NECESSARY COMPONENTS, DEVICES, RACEWAYS, WIRING, ETC. TO MAKE A COMPLETE AND APPROVED FIRE ALARM SYSTME UNDER THE BASE BID.
L. TV, TELEPHONE AND DATA SYSTEMS1. PROVIDDE A COMPLETE CONDUIT SYSTEM FOR TV, TELEPHONE, DATA AND
COMBINATION OUTLETS SHOWN.2. TV, TELEPHONE, DATA AND COMBINATION OUTLETS INDICATED SHALL
TERMINATE AT THE TERMINAL BOARD OR CABINET INDICATED ON THE DRAWINGS, UNLESS OTHERWISE NOTED.
3. TERMINAL BOARD SHALL BE A 4'X8'X3/4" FIRE RATED SHEET OF PLYWOOD, UNLESS OTHERWISE NOTED.
4. TERMINAL CABINETS SHALL BE SIZED AS INDICATED ON THE DRAWINGS OR SUITABLE FOR INSTALLATION IF NOT INDICATED WITH NEMA ENCLOSURE RATED FOR APPLICATION.
5. TELEPHONE SERVICE AND CABLE TV SERVICE DEMARK CONDUITS AND REQUIREMENTS SHALL BE COORDINATED AND VERIFIED WITH THE SERVINGUTILITIES AND OWNER PRIOR TO BID.
GENERAL EXECUTION
A. THOROUGHLY CLEAN ALL ITEMS BEFORE INSTALLATION.B. ALL WORK SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE IN
AN APPROVED MANNER.C. ALL EQUIPMENT SHALL BE FASTENED TO BUILDING CONSTRUCTIONWITH
APPROVED SUPPORTS.D. COORDINATE ELECTRICAL WORK WITH OTHER TRADES PRIOR TO SUBMITTING
BID.E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ELECTRICAL
DEVICES, INCLUDING RECEPTACLES, SWITCHES, DATA AND TELEPHONE OUTLETS IF LOCATIONS ARE NOT DEPICTED ON ARCHITECTURAL DRAWINGS, OBTAIN APPROVAL OF ARCHITECT PRIOR TO ROUGH-IN.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, PATCHING AND COMPLETE REPAIR OF EXISTING BUILDING WALLS, CEILINGS, ETC. AS REQUIRED FOR INSTALLATION OF ELECTRICAL SYSTEMS.
G. PROVIDE ENGRAVED NAME PLATES WITH SHEET METAL SCREWS FOR EACH PIECE OF EQUIPMENT, INCLUDING PANELBOARDS, TRANSFORMERS, DISTRIBUTION PANELS, SWITCHBOARDS, DISCONNECTS, MOTOR STARTERS, ETC. LABELED PER AS-BUILT DRAWINGS.
H. ALL ELECTRICAL DISTRIBUTION EQUIPMENT SHALL BE OF THE SAME MANUFACTURER, INCLUDING: PANELBOARDS, TRANSFORMERS, DISTRIBUTION PANELS, SWITCHBOARDS, DISCONNECTS, MOTOR STARTES, ETC.
INSTALLATION
A. RACEWAYS1. RACEWAYS SHALL BE INSTALLED CONCEALED, UNLESS OTHERWISE NOTES.2. ALL RACEWAYS REQUIRED TO BE EXPOSED SHALL BE PAINTED TO MATCH
THE ADJACENT BUILDING SURFACE.3. SUPPORT RACEWAYS WITH TOGGLE BOLTS ON HOLLOW MASONRY, MACHINE
SCREWS ON METAL SURFACES, BEAM CLAMPS ON FRAMEWORK, WOOD SCREWS ON WOOD.
4. RACEWAYS SHOULD BE INSTALLED PARALLEL AND PERPENDICULAR TO BUILDING SURFACES AND AT RIGHT ANGLES.
5. PROVIDE 200LB PULL STRING IN ALL EMPTY RACEWAYS.6. RACEWAYS PASSING THROUGH FIRE RATED CONSTRUCTION SHALL BE
SEALED WITH UL LISTED FIRE RATED SEALANT. WHERE ELECTRICAL RACEWAYS ARE INSTALLED THROUGH RATED FLORS OR WALLS, THE CONTRACTOR SHALL PROVIDE APPROPRIATE FITTINGS SPPROVED BY ALL REQUIRED LOCAL AUTHORITIES FOR THE INTENDED APPLICATION.
7. OBTAIN FINAL APPROVAL FROM THE ARCHITECT PRIOR TO THE INSTALLATION OF RACEWAYS THROUGH RATED WALLS OR FLOORS.
8. DO NOT COMBINE HOMERUNS UNLESS OTHERWISE NOTED.9. INSTALL ALL RACEWAY SYSTEMS PER THE NEC. DEVIATIONS FROM THE
WIRING METHODS INDICATED SHALL NOT BE ALLOWED WITHOUT SPECIFIC WRITTEN APPROVAL PRIOR TO PLACING BID AND INSTALLATION.
10. INCLUDE ALL COSTS FOR RACEWAY SYSTEMS AS SPECIFIED UNLESS WRITTEN APPROVAL FOR AN ALTERNATE WIRING METHOD IS OBTAINED FROM THE ARCHITECT, ENGINEER, AND OWNER PRIOR TO SUBMITTING BID.
11. PROVIDE EQUIPMENT GROUNDING CONDUCTOR PER NEC 250 IN ALL RACEWAYS.
12. PROVIDE SEPARATE RACEWAYS FOR EMERGENCY SYSTEM WIRING AND NORMAL SYSTEM WIRING.
13. ALL RACEWAYS AND CONDUCTOR SIZES SHOWN ARE TO BE INSTALLED WITHIN THE BUILDING STRUCTURE NOT EXPOSED TO AMBIENT CONDITIONS. IF RACEWAYS AND CONDUCTORS ARE ROUTED EXPOSED TO AMBIENT CONDITIONS, CONTRACTOR SHALL DERATE CONDUCTORS AND UPSIZE RACEWAYS ACCORDINGLY.
14. RACEWAYS PENETRATING THROUGH ROOF SHALL HAVEROOF FLASHING WITH CAULK AND SLEEVE. INSTALLATION SHALL BE WATERTIGHT.
15. ALL UNDERGROUND SERVICE CONDUITS SHALL BE SEALED PER NEC ARTICLE 230.8.
16. ALL EMERGENCY FEEDERS SHALL BE ROUTED IN COMPLIANCE WITH NEC 700.9 AND SNECA.
17. ALL UNDERGROUND OR BELOW GRADE RACEWAYS SHALL BE INSTALLED IN COMPLIANCE WITH NEC TABLE 300.5.
B. FITTINGS AND ACCESSORIES1. PROVIDE EXPANSION AND DEFLECTION FITTINGS FOR CONDUITS CROSSING
EXPANSION JOINTS. PROVIDE BONDING JUMPERS FOR ALL EXPANSION FITTINGS.
2. FITTINGS SHALL BE SUITABLE FOR CONDITIONS OF INSTALLATION. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
C. OUTLET, JUNCTION AND PULL BOXES1. OUTLET BOXES SHALL BE METALLIC WITH GROUND CONNECTION AND
EQUIPMENT GROUNDING CONDUCTOR CONNECTION.2. PROVIDE INSULATED SUPPORTS FOR CABLES.3. PROVIDE SEPARATE BOXES FOR DIFFERENT VOLTAGE SYSTEMS.4. PROVIDE SEPARATE BOXES FOR EMERGENCY SYSTEM WIRING AND FOR
NORMAL SYSTEM WIRING.5. COORDINATE FLOOR BOX LOCATIONS WITH ARCHITECT, STRUCTURAL
ENGINEER, FURNITURE CONSULTANT AND INTERIOR DESIGNER PRIOR TO ROUGH-IN. SEE THOSE DRAWINGS FOR ADDITIONAL INFORMATION.
6. PROVIDE FIRE BARRIER PUTTY PADS TO ALL NEW AND MODIFIED ELECTRICAL BOX (IE OUTLET, JUNCTION BOX, PULL BOXES, ETC.) LOCATED IN THE DEMISING WALLS. FIRE BARRIER PUTTY PADS SHALL BE 3M TYPE "MPP+" OR APPROVED EQUAL.
D. WIRE AND CABLE1. DO NOT COMBINE HOMERUNS, UNLESS NOTED OTHERWISE.2. PROVIDE INSULATION TESTING DOCUMENTATION OF ALL FEEDER AND
DISTRIBUTION WIRING. REMOVE AND REPLACE WIRING NOT MEETING MANUFACTURER'S RECOMMENDED INSULATION RESISTANCE.
3. PROVIDE TESTING DOCUMENTATION SHOWING GROUNDING SYSTEM FOR THIS PROJECT WITH RESISTANCE OF LESS THAN 5 OHMS.
E. DEVICES1. INSTALL SWITCHES @48" AFF TO CENTER OF SWITCH, UNLESS OTHERWISE
NOTED.2. INSTALL RECEPTACLES @18" AFF TO CENTER IF DEVICE, UNLESS OTHERWISE
NOTED.3. RECEPTACLES LOCATED FOR COUNTERTOP USE SHALL BE 6" TO THE
QCENTER OF DEVICE ABOVE THE COUNTERTOP, UNLESS OTHERWISE NOTED.
F. FUSES AND CIRCUIT BREAKERS1. PROVIDE ALL FUSES FOR DEVICES SHOWN.2. PROVIDE OWNER TWO (2) SPARE SETS OF FUSES OF EACH TYPE AND RATING
INSTALLED.
3. PROVIDE FUSE PULLER FOR EACH TYPE OF FUSE.4. PROVIDE SPARE FUSE CABINET WHERE INDICATED ON THE DRAWINGS.5. VERIFY FUSES WITH MANUFACTURER OF EQUIPMENT PRIOR TO
INSTALLATION.6. WHERE NEW OVERCURRENT DEVICES ARE ADDED TO EXISTING
SWITCHBOARD DISTRIBUTION PANELS AMD PANELBOARDS, UTILIZE SPARES AND/OR PROVIDE ADDITIONAL BREAKERS OR SWITCHES AS REQUIRED TO EXISTING SPACES OR PROVIDE A NEW PANELBOARD OR SECTION SUBFED FROM THE EXISTING SYSTEM. SHORT CIRCUITING INTERRUPTING RATING OF NEW OVERCURRENT DEVICES SHALL MATCH THE RATING OF THE EXISTING EQUIPMENT.
G. MOTOR STARTERS AND DISCONNECTS 1. INSTALL MOTOR STARTERS AND DISCONNECTS AS RQUIRED PER THE NEC.2. WALL MOUNTED MOTOR STARTERS AND DISCONNECTS SHALL BE INSTALLED
@54" TO BOTTOM OF DEVICE, UNLESS OTHERWISE NOTED.
H. SWITCHBOARDS, DISTRIBUTION PANELS AND PANEL BOARDS 1. CONTRACTOR SHALL BALANCE THE LOADS IN ALL PANELBOARDS TO LESS
THAN 10% IMBALANCE BETWEEN THE PHASES.2. PROVIDE TYPEWRITTEN PANELBOARD SCHEDULES IN PANELBOARD DOORS
DEPICTING THE FINAL AS-BUILT CONDITIONS AT PROJECT COMPLETION.3. ALL ELECTRICAL SYSTEMS, EQUIPMENT, AND COMPONENTS SHALL BE
GROUNDED IN ACCORDANCE WITH NEC 250.4. ALL FLOOR MOUNTED SWITCHBOARDS AND DISTRIBUTION PANELS SHALL
HAVE A 4" HIGH HOUSEKEEPING PAD EXTENDING 4" OUTSIDE THE EQUIPMENT FOOTPRINT IN ALL DIRECTIONS.
5. ALL SWITCHBOARDS, DISTRIBUTION PANELS AND PANELBOARDS SHALL BE INSTALLED TO MEET THE NEC 110-26 CLEARANCE AND REQUIREMENTS.
6. ALL UTILITY METERING DEVICES SHALL BE INSTALLED PER THE SERVING UTILITY COMPANY'S REQUIREMENTS.
7. ANY CUSTOMER OWNED METERING DEVICES SHALL BE INSTALLED AS INDICATED ON THE DRAWINGS.
8. PROVIDE ALL REQUIRED DEVICES AND EQUIPMENT FOR A COMPLETE AND OPERABLE METER INSTALLATION.
I. TRANSFORMERS1. INSPECT TRANSFORMERS FOR PHYSICAL DAMAGE, MECHANICAL AND
ELECTRICAL CONNECTIONS.2. PROVIDE GROUNDING CONNECTION TO GROUNDING ELECTRODE SYSTEM
PER NEC AND LOCAL CODE REQUIREMENTS FOR ALL SEPARATELY DERIVED SYSTEMS.
3. ALL FLOOR MOUNTED TRANSFORMERS SHALL HAVE A 4" HIGH HOUSEKEEPING PAD EXTENDING 4" OUTSIDE THE EQUIPMENT FOOTPRINT IN ALL DIRECTIONS.
4. VERIFY WITH PROJECT STRUCTURAL ENGINEER OR RETAIN THE SERVICS OF LICENSED STRUCTURAL ENGINEER TO PROVIDE ANY MOUNTING DIAGRAMS OR CALCULATIONS REQUIRED FOR MOUNTING OF ANY WALL OR TRAPIEZE MOUNTED TRANSFORMERSPRIOR TO ROUGH-IN. ALL COSTS TO BE INCLUDED IN BASE BID.
5. PROVIDE ISOLATION VIBRATION SPRINGS TYPE AS RECOMMENDED BY MANUFACTURER.
J. LIFE SAFETY SYSTEM1. PROVIDE ALL NECESSARY SUPPORTS FOR LIGHTING FIXTURES REQUIRED.2. WHERE FIXTURES ARE INSTALLED ON OR IN SUSPENDED CEILING SYSTEMS,
SECURES FIXTURES TO CEILING FRAME SYSTEM AND PROVIDE FIXTURE SUPPORTS INDEPENDENT OF CEILING SUSPENSION SYSTEM AS REQUIRED PER APPLICABLE CODE.
3. INCLUDE IN BASE BID ALL LABOR AND MATERIAL TO INSTALL FIXTURES, INCLUDING THOSE PROVIDED BY THE OWNER.
4. PROVIDE CEILING MOUNTED PENDANT FIXTURE WITH APPROVED SUPPORT FOR WEIGHT TO BE SUPPORTED AND FOR SEISMIC COMPLIANCE.
5. RECESSED FIXTURES IN FIRE RATED CEILINGS AND RETURN AIR PLENUMS SHALL BE APPROVED FOR THE FIRE RATING OF THE CEILING OR SHALL BE FULLY ENCLOSED IN A FIRE RATED HOUSING ACCEPTABLE TO AUTHORITY HAVING JURISDICTION.
6. SEAL ALL OPENINGS AS REQUIRED TO ELIMINATE AIR LEAKS.7. VERIFY TYPE OF MOUNTING REQUIRED FOR ALL LIGHTING FIXTURES AND
PROVIDE ALL MOUNTING HARDWARE REQUIRED FOR A COMPLETE INSTALLATION.
8. ALL ADJUSTABLE FIXTURES SHALL BE LOCATED AND PROPERLY AIMED AS DIRECTED BY THE ARCHITECT OR LIGHTING DESIGNER. ALL AIMING OF BUILDING FACADE LIGHTING SHALL BE PERFORMED BY CONTRACTOR AT NIGHT.
K. LIFE SAFETY SYSTEM1. DESIGN AND INSTALLATION SHALL BE PERFORMED BY A STATE LICENSED
FIRE ALARM CONTRACTOR. INSTALLATION SHALL BE PERFORMED BY LICENSED AND EXPERIENCED INSTALLERS.
2. MINIMUM RACEWAY IS 3/4", UNLESS OTHERWISE NOTED.3. PROVIDE ALL DEVICES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.4. ALL WIRING SHALL BE INSTALLED IN CONDUIT. ALL CONDUCTORS SHALL BE
LABELED AT EACH JUNCTION BOX AND AT EACH DEVICE.5. ALL OUTLET, PULL AND JUNCTION BOXES SHALL BE PAINTED RED ON THE
EXTERIOR AND MARKED FOR FIRE ALARM.6. INSTALL END OF LINE RESISTORS WHERE REQUIRED IN A JUNCTION BOX
ADJACENT TO THE LAST DEVICE SERVED.
L. TV, TELEPHONE AND DATA SYSTEM1. MINIMUM RACEWAY SIZE IS 3/4", UNLESS OTHERWISE NOTED.2. PROVIDE #6 AWG GROUND WIRE FROM SERVICE ENTRANCE GROUNDING
ELECTRODE TO TELEPHONE SYSTEM LOCATION AND ALL TELEPHONE TERMINAL BOARDS UNLESS OTHERWISE NOTED.
M. IDENTIFICATION1. CONDUIT IDENTIFICATION: USE ADHESIVE MARKING TAPE LABELS TO
IDENTIFY ALL CONDUITS LOCATED ABOVE NON-ACCESSIBLE CEILING OR ON FLOORS AND WALLS SHALL BE LABELED WITHIN 3 FEET OF BECOMING ACCESSIBLE. LABELS FOR MULTIPLE CONDUITS SHALL BE ALIGNED AND READ THE SAME DIRECTION; USE THE FOLLOWING COLORS:ABOVE 250 VOLTS: BLACK LETTERS ON ORANGE BACKGROUND INDICATING SOURCE EQUIPMENT DESIGNATION, CIRCUIT NUMBER (IF APPLICABLE), AND VOLTAGE.250V AND BELOW NORMAL: WHITE LETTERS ON BLACK BACKGROUND INDICATING SOURCE EQUIPMENT DESIGNATION, CIRCUIT NUMBER(S), AND VOLTAGE.600 VOLT AND BELOW EMERGENCY: BLACK LETTERS ON RED BACKGROUND INDICATING SOURCE EQUIPMENT DESIGNATION, CIRCUIT NUMBER(S) AND VOLTAGE.FIRE ALARM: RED LETTERS ON WHITE BACKGROUND INDICATING 'FIRE ALARM'.TEMPERATURE CONTROL: BLACK LETTERS ON BLUE BACKGROUND INDICATING 'TEMP CONTROL'.LIGHTING CONTROL AND DMX: BLACK LETTERS ON GREEN BACKGROUND INDICATING 'GROUND' AND EQUIPMENT DESIGNATION.SECURITY AND CARD ACCESS: BLACK LETTERS ON YELLOW BACKGROUND INDICATING 'SECURITY'.NETWORK FIBER AND DATA: BLACK LETTERS ON WHITE BACKGROUND INDICATING 'NETWORK FIBER DATA'.GROUND: BLACK LETTERSON GREEN BACKGROUND INDICATING 'GROUND' AND EQUIPMENT DESIGNATION.WHERE CONDUITS ENTER OR EXIT A PANELBOARD, PULL OR JUNCTION BOX, SWITCHBOARD, OR OTHERDISTRIBUTION EQUIPMENT, CONDUIT LABELS SHALL INCLUDE CIRCUIT NUMBER IN ADDITION TO FEEDER IDENTIFICATION AND VOLTAGE (SEE SAMPLE BELOW):
PANEL L2A LEVEL 2 ELECTRICAL ROOM225A 480Y/277V 3 PHASE
FED FROM DBL1A LEVEL 1 ELECTRICAL ROOM
2. IDENTIFY JUNCTION, PULL AND CONNECTION BOXES: IDENTIFICATION OF SYSTEMS AND CURCUITS SHALL INDICATE SYSTEM VOLTAGE AND IDENTITY OF CONTAINED CIRCUITS ON OUTSIDE OF BOX COVER. COLOR CODE SHALL BE SMAE AS CONDUITS FOR PRESSURE SENSITIVE LABELS. USE SELF ADHESIVE BRADY MARKING LABELS AT EXPOSED LOCATIONS. ALL FIRE ALARM BOXES SHALL HAVE COVERS PAINTED RED. ALL TEMPERATURE CONTROL BOXES SHALL HAVE COLORS PAINTED BLUE.
3. PROVIDE BLACK LETTERS ON CLEAR BACKGROUND TAPE LABELS FOR IDENTIFICATION OF INDIVIDUAL RECEPTACLE AND LIGHT SWITCH WALLPLATES. LOCATE TAPE ON FRONT OF PLATE AND IDENTIFY BRANCH CIRCUIT SERVING THE RECEPTACLE. PROVIDE TAPE LABELS FOR IDENTIFICATION OF INDIVIDUAL SWITCHES OR THERMAL OVERLOAD SWITCHES SERVING AS EQUIPMENT DISCONNECTS. LOCATE THE TAPE ON THE FRONT OF THE COVERPLATE AND IDENTIFY THE BRANCH CIRCUIT SERVING THE EQUIPMENT.
PROVIDE FOR THE FOLLOWING:- POWER CONNECTIONS TO TWO (2) NEW PRIMARY PUMPS.- POWER CONNECTIONS TO TWO (2) NEW WATER HEATERS FOR DOMESTIC HOT WATER- POWER CONNECTION TO ONE (1) TEMPERATURE CONTROL PANEL.
SCOPE OF WORK
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 2:16:18 PM
E0.03
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017JB
SP
SP
UNLV
ELE
CT
RIC
AL
SP
EC
IFIC
AT
ION
S
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
K
J
H
G
F
4 5 6 74.5 5.5
EXISTING MOTOR CONTROL CENTER "MCCA"
EXISTING SWITCHBOARD "MS"
EXISTING MAIN SWITCHBOARD "MSA"
5
(E)HWP
6
(E)HWP
7
HHWPP
8
HHWPP
1 2 3 5
1 2 3 5
MINI POWER CENTER 'MPCB'
MPCB - 1,3,5
MPCB - 7,9,11
4 5
4 5
2 7
2 7
MPCB - 7,9,11VIA MOTOR STARTER
MPCB - 1,3,5VIA MOTOR STARTER
VFD
VFD3
WOMEN108
EXIST.MECH104B
EXIST. MECH104A
EXIST.MECH
104
EXIST. DATA106
EXIST. TELE104C
SUPPORT104E
ELEV. MECH100E
VEST.104D
MPCB-88 J
6
6
2 4 91
WH
2
WH2 4 9
MPCB-2 MPCB-4
N
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
SHEET NOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
As indicated
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 2:16:19 PM
E2.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017JB
SP
SP
UNLV
FIR
ST
LE
VE
L E
LEC
TR
ICA
L P
OW
ER
PLA
N
0 2' 4' 8' 1/4" = 1'-0"1
FIRST LEVEL ELECTRICAL POWER PLAN
REMOVE EXISTING STARTER IN MOTOR CONTROL "MCCA" AND PROVIDE FEEDER TO NEW VFD. EXTEND CONDUIT AND PROVIDE NEW CONDUCTORS AS REQUIRED.
REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION, ADDITIONAL INFORMATION, AND REQUIREMENTS.
REFER TO SINGLE LINE DIAGRAM FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
REFER TO PANEL SCHEDULE FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
PROVIDE FINAL CONNECTION AS REQUIRED TO MOTOR FROM MOTOR STARTER OR VFD.
VFD TO BE FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR.
PROVIDE NEMA SIZE 0 COMBINATION MOTOR STARTER-FUSED DISCONNECT SWITCH. PROVIDE TWO (2) N.O. AND TWO (2) N.C. AUXILLARY CONTACTS WITH HAND-OFF-AUTO (HOA) CONTROLS AS INDICATED ON MECHANICAL DRAWINGS.
PROVIDE COMPLETE ELECTRICAL CONNECTION TO TEMPERATURE CONTROL PANEL, 120V, 500 WATT MAX. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
PROVIDE COMPLETE ELECTRICAL CONNECTION TO GAS WATER HEATER, 120V, 500W MAX. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
A. REFER TO ELECTRICAL SPECIFICATIONS ON SHEET E0.03 FOR CONDUIT AND WIRE SIZES REQUIRED FOR VOLTAGE DROP.
B. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR EXACT LOCATIONS AND ADDITIONAL REQUIREMENTS.
C. COORDINATE AND OBTAIN APPROVAL FROM STRUCTURAL ENGINEER FOR ROUTING OF ANY CONDUIT OR RACEWAY IN SLAB PRIOR TO ROUGH-IN.
D. COORDINATE ROUTING OF RACEWAYS WITH OTHER TRADES PRIOR TO ROUGH-IN.
E. SEE SINGLE LINE DIAGRAM FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
F. EXISTING INFORMATION INDICATED WAS OBTAINED FROM AVAILABLE AS-BUILT INFORMATION PROVIDED BY OWNER, CONTRACTOR IS RESPONSIBLE TO VERIFY ALL EXISTING INFORMATION INDICATED AND NOTIFY ENGINEER IN WRITING IF FIELD CONDITIONS DIFFER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION; INCLUDE ALL COSTS IN BASE BID FOR VERIFICATION OF EXISTING CONDITIONS.
1
2
3
4
5
6
7
8
9
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE
VFD VFD
5 5
5
(E)HWP
6
(E)HWP
2 2
EXISTING MOTOR CONTROL CENTER "MCCA" 480V, 3-PHASE, 3-WIRE, 800A BUSNEMA 1 ENCLOSUREAIC = EXISTING
EXISTING MAIN SWITCHBOARD "MSA"480Y/277V, 2000A BUSNEMA 1 ENCLOSUREAIC = EXISTING
TO EXISTING NEVADA ENERGY TRANSFORMER
471.0 KVA (464 KVA) 4
MINI POWER CENTER "MPCB"
F1
3
TO EXISTING SWITCHBOARD "MS"
1,479.0 KVA (1,472 KVA) 4
30A
25A
30A
25A
30A
25A
3 1
40
(E)1200A
(E)1200A
(E)800A
(E)800A
X
1 1
ALL ELECTRICAL EQUIPMENT AND DEVICES SHALL BE FULLY RATED TO WITHSTAND THE AVAILABLE FAULT CURRENT.
PROVIDE 4" HIGH HOUSEKEEPING PAD UNDER ALL FLOOR MOUNTED ELECTRICAL EQUIPMENT.
MATERIALS AND INSTALLATION SHALL COMPLY WITH THE LATEST CODES, LAWS AND ORDINANACES OF THE AUTHORITY HAVING JURISDICTION INCLUDING THE LOCALLY ADOPTED AMENDMENTS.
PROVIDE SHOP DRAWINGS SHOWING ELECTRICAL EQUIPMENT ROOM LAYOUTS IN COMPLIANCE WITH NEC ART 110 REQUIREMENTS BASED ON SUBMITTED EQUIPMENT.
PROVIDE OVERSIZED LUGS, ADAPTERS, GUTTERS, WIREWAYS AND ENCLOSURES AS REQUIRED WHERE CONDUCTORS HAVE BEEN INCREASED FOR VOLTAGE DROP.
ALL ELECTRICAL EQUIPMENT AND DEVICES LOCATED OUTDOORS SHALL BE NEMA 3R WEATHERPROOF TYPE.
PROVIDE A MINIMUM OF 20% FULLY RATED BUSSED SPACE IN ALL SWITCHBOARDS, DISTRIBUTION BOARDS AND DISTRIBUTION PANELS IN ADDITION TO THE DEVICES.
EXISTING INFORMATION INDICATED WAS OBTAINED FROM AVAILABLE AS-BUILT INFORMATION PROVIDED BY OWNER, CONTRACTOR IS RESPONSIBLE TO VERIFY ALL EXISTING INFORMATION INDICATED AND NOTIFY ENGINEER IN WRITING IF FIELD CONDITIONS DIFFER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION; INCLUDE ALL COSTS IN BASE BID FOR VERIFICATION OF EXISTING CONDITIONS.
EXISTING LOAD SHOWN IN PARENTHESIS AND NEW DEMAND LOAD SHOWN ADJACENT.
A.
B.
C.
D.
E.
F.
G.
H.
I.
ELECTRICAL FEEDER SCHEDULECOPPER CONDUCTORS, 600V THHN/THWN INSULATION, UON
AMPRERERATING
# OF CONDUCTORS
VERSION CONDUCTORS CONDUIT
40 3 1 3#8, #10G, 1"C EMT
G=GROUND, BJ = BONDING JUMPER
FEEDER SCHEDULE NOTES:
1. PROVIDE INCREASED SIZED EQUIPMENT GROUNDING CONDUCTORS LARGER THAN THOSE SHOWN
WHERE UNGROUNDED CONDUCTORS HAVE BEEN INCREASED FOR VOLTAGE DROP PER
NEC 250.122(B).
2. PROVIDE INCREASED SIZED EQUIPMENT GROUNDING CONDUCTORS LARGER THAN THOSE SHOWN
FOR MOTOR CIRCUITS PER NEC 250.122 AND 430 BASED ON MOTOR CIRCUIT OVERCURRENT
PROTECTIVE DEVICE RATING.
FAULT AND VOLTAGE DROP CALCULATIONSFAULT LOCATION DESIGNATION ISC (A) VOLTAGE DROP (%)
F1 MINI POWER CENTER MPCB 2,743 0.01
PANEL DESIGNATION:
MINI POWER CENTER MPCB (15kVA 480V-208Y/120V)LOCATION: CENTRAL PLANT VOLTAGE: 208 / 120 A.I.C. RATING: 25,000A
SUPPLY FROM: MCCA PHASE: 3 BUS RATING: 100A
MOUNTING: SURFACE WIRE: 4 MAIN TYPE: MCB, TOP ENTRY
ENCLOSURE: NEMA 1 NEUTRAL: 100% MCB RATING: 50A
CKT DESCRIPTION BKR TRIP
POLE WIRE AND CONDUIT LOAD TYPE
CONN.VA
Ø CONN.VA
LOAD TYPE
WIRE AND CONDUIT POLE BKR TRIP
DESCRIPTION CKT
1 HHWPP-7 (2 HP) 20 3 3#10, #10G, 3/4"C M 820 A 500 Q 2#12, #12G, 3/4"C 20 1 WH-1 2
3 - 20 3 3#10, #10G, 3/4"C M 820 B 500 Q 2#12, #12G, 3/4"C 20 1 WH-2 4
5 - 20 3 3#10, #10G, 3/4"C M 820 C 20 1 SPARE 6
7 HHWPP-8 (2 HP) 20 3 3#10, #10G, 3/4"C M 820 A 500 Q 2#12, #12G, 3/4"C 20 1 CONTROLS 8
9 - 20 3 3#10, #10G, 3/4"C M 820 B 20 1 SPARE 10
11 - 20 3 3#10, #10G, 3/4"C M 820 C 20 1 SPARE 12
13 SPARE 15 3 A SPACE 14
15 - 15 3 B SPACE 16
17 - 15 3 C SPACE 18
19 SPARE 20 3 A SPACE 20
21 - 20 3 B SPACE 22
23 - 20 3 C SPACE 24
1. CONNECTED LOAD COLUMN INCLUDES SUBFED PANELS.
EQUIPMENT DEMAND CALCULATION PER NEC ARTICLE 220 TOTAL CONN.
LOAD
% TOTAL DEMAND
LOAD
LOAD CALCULATION SUMMARY
LIGHTING (L) 0.0 1.25 0.0
FIRST 10 KW RECEPTACLES (R) PER NEC 220.44 0.0 1.00 0.0
>10KW RECEPTACLES 0.0 0.50 0.0 TOTAL CONNECTED LOAD: 6.4 KVA
HEATING (H) 0.0 1.25 0.0 18 A
AIR COND. MOTORS (AC) 0.0 1.00 0.0 TOTAL DEMAND LOAD: 7.0 KVA
MOTORS (M) 2.4 1.00 2.4 20 A
LARGEST MOTOR 2.5 1.25 3.1
KITCHEN EQUIPMENT (K) 0.0 1.00 0.0 OVERCURRENT
ELEVATORS (E) 0.0 1.00 0.0 PROTECTION: 50 A
EQUIPMENT (Q) 1.5 1.00 1.5
OTHER (O) 0.0 1.00 0.0
DRAWING NO.
JOB TITLE
DRAWN BY
DESIGNED BY
CHECKED BY
DATE
SCALE
JOB NO.
4765 CAMERON STREETLAS VEGAS NEVADA
89103702.736.4041
www.southlandind.com
IF THIS DRAWING IS NOT 42x30 IT HAS BEEN SCALED
ALL
DR
AW
ING
S P
RE
PA
RE
D B
Y S
OU
TH
LAN
D IN
DU
ST
RIE
S A
RE
TH
E E
XC
LUS
IVE
PR
OP
ER
TY O
F S
OU
TH
LAN
D IN
DU
ST
RIE
S A
ND
, UN
LES
S O
TH
ER
WIS
E A
GR
EE
D IN
WR
ITIN
G,
SO
UTH
LAN
D IN
DU
STR
IES
SH
ALL
BE
DE
EM
ED
TH
E A
UT
HO
R O
F T
HE
M A
ND
SH
ALL
RE
TAIN
ALL
CO
MM
ON
LA
W, S
TA
TU
TO
RY
AN
D O
TH
ER
RE
SE
RV
ED
RIG
HTS
, IN
AD
DIT
ION
TO
TH
E C
OP
YR
IGH
T. A
NY
US
E T
HE
RE
OF
WIT
HO
UT
TH
E E
XP
RE
SS
WR
ITTE
N C
ON
SE
NT
OF
SO
UT
HLA
ND
IND
US
TR
IES
IS P
RO
HIB
ITE
D.
AN
Y U
NA
UT
HO
RIZ
ED
US
E O
F T
HE
DR
AW
ING
S S
HA
LL B
E A
T T
HE
US
ER
'S S
OLE
RIS
K A
ND
WIT
HO
UT
AN
Y L
IAB
ILIT
Y T
O S
OU
TH
LAN
D IN
DU
STR
IES
.
KEY PLAN
NTS
KEYNOTES
SHEET NOTES
DR
AW
ING
TIT
LE:
ISSUE FOR PERMIT
UN
LV P
RO
JEC
T N
UM
BE
R: S
LC-1
706/
PC
-900
8
C:\Users\JBenavente\My Documents\Autodesk\My Projects\Revit\2017\UNLV Shadow Lane Heating Hot Water [email protected]/15/2017 2:16:20 PM
E5.01
UNLV SHADOW LANE HEATINGHOT WATER REPIPE
1001 SHADOW LANE, LAS VEGAS, NV 89106
5221687
08/15/2017JB
SP
SP
UNLV
ELE
CT
RIC
AL
SIN
GLE
LIN
ED
IAG
RA
M A
ND
SC
HE
DU
LES
NTS1
PARTIAL SINGLE LINE DIAGRAM
REMOVE EXISTING STARTER WITHIN MCC AND PROVIDE FEEDER ONLY TO NEW VFD.
VERIFY EXISTING FUSE SIZES AND WIRE SIZES WITH NEW VFD EQUIPMENT SUPPLIER AND PROVIDE NEW FUSES AND WIRING AS REQUIRED.
REMOVE EXISTING STARTER AND PROVIDE NEW FUSES IN EXISTING DISCONNECT AS REQUIRED FOR NEW FEED TO MINIPOWER CENTER "MPCB".
EXISTING LOAD INFORMATION WAS OBTAINED FROM LSW ENGINEERS DRAWINGS DATED 01/17/2003. CONTRACTOR IS RESPONSIBLE TO VERIFY EXISTING LOADS IN COMPLIANCE WITH SPECIFICATIONS ON SHEET E0.03 PRIOR TO THE CONNECTION OF ANY NEW LOADS.
VFD TO BE FURNISHED BY MECHANICAL CONTRACTOR INSTALLED BY ELECTRICAL CONTRACTOR.
1
2
3
4
5
NO
.R
EV
ISIO
N D
ES
CR
IPT
I ON
BY
DA
TE