8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
1/13
Thatta Cement Company Limited
Main Burner Unitherm M.A.S.Alignment27 – June - 20!
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
2/13
Thatta Cement Company Limited
≈200 mm.
≈ 2 0 0 m m .
Main Burner Unitherm M.A.S.
inserted ≈ 200 mm.
To avoid flame distortion from secondary air
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
3/13
Thatta Cement Company Limited
Main burner end tip with a hole a
the middle of oil channel
aser device placed at the bac!
of the main burner "centred#
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
4/13
Thatta Cement Company Limited
aser ray passin$ the hole "oil
channel#
%iln A&is
'st
(eference at '2 meter
aser beam out of the centre at
initial ali$nment
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
5/13
Thatta Cement Company Limited
T)) *ersonnel started movin$
burner for ali$nment
aser beam startin$ ali$nment to
!iln a&is *hoto '
'st (eference at '2 meter
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
6/13
Thatta Cement Company Limited
%iln A&is
Burner ali$nment in process
*hoto 2
'st (eference at '2 meter
%iln A&is
Burner ali$nment in process
*hoto +
'st (eference at '2 meter
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
7/13
Thatta Cement Company Limited
%iln A&is
Burner ali$nment in process
*hoto ,
'st (eference at '2 meter
%iln A&is
Burner ali$nment in process
*hoto -
'st (eference at '2 meter
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
8/13
Thatta Cement Company Limited
%iln A&is
Burner ali$ned down - mm. ".-
cm# from %iln A&is at '2 meters
%iln A&is
Burner ali$nment final step
"ma&imum reached in the trolley#
*hoto
'st (eference at '2 meter
- mm.
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
9/13
Thatta Cement Company Limited
The first reference was removed to identify the leaser beam at the
middle of the !iln len$th "+0 meter#
%iln A&is
aser beam final set
2nd reference at +0 meters'0 mm.
'00 mm. )oal mill side
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
10/13
Thatta Cement Company Limited
aser beam is now
/touchin$ the !iln shelf
After the 2nd reference was measured1 we loo! at the end of the !iln to
/see the laser ray where was placed
Measurments at !iln feed shelf was made by T)) *rocess 3n$ineers
'040 mm.
' 4 + 0 m m .
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
11/13
Thatta Cement Company Limited
T)) *rocess 3n$ineer performed a measurement in the 0.0
meter of !iln "!iln dischar$e to )ross Bar )ooler#
'5'0 mm.
' 5 ' 0 m m .
' 4 5 0 m m .
'450 mm.)oal mill side.))( Side
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
12/13
Thatta Cement Company Limited
T)) 6 7S *erformed measurements at 0.0 m. "point 0#1 '2.0 m. "point '# 6 +0.0 m. "point 2#
0 ' 2
8/18/2019 TCCL 27.06.2015 Burner Unitherm Alignment
13/13
Thatta Cement Company Limited
T"A#$ %&U