Water at thermal power plants
Requirements:Desalinated water for boilers feeding;
River or sea water for condensers cooling;
Soft water for district heating systems;
other technical needs.
Water treatment systems:
Water desalination system;
Water-steam cycle systems (dosing systems, condensate polishers);
Cooling water treatment systems (correlated with water characteristics);
Water softening system for district heating systems.
7/27/2019 Symp-Gotovtsev
3/13
Waste water problems
water purification system that produce ultrapure water for the boilers feeding; this
system also have two types of waste water: water with high mineralization and water
with sludge after coagulation;
cooling systems with wet cooling towers: in this system water cooled in thetowers is used for steam turbines condensers cooling; the difficulties in this systemrelated with blowdown that have from 2 to 5 times higher concentration of impurities
in comparison with water source;
water with oil; there are a lot of oil contained systems at power plants and in some
cases this oil mixtures with water;
rain water from power plant territory also can contain oil and some specific
impurities related with technological processes, for example coal dust in the coalfired power plants;
and many others
7/27/2019 Symp-Gotovtsev
4/13
Water management
Initial steps:
Determination of treated water demand;
Determination of water availability and quality in water
source;
Determination of possibility of water discharges and
requirements of waste water quality;
In case of existing power plant:
Determination of all waste water streams in power plant;
Determination of impurities concentrations in the each wastewater stream;
7/27/2019 Symp-Gotovtsev
5/13
Water management
Chemistry control of all water streams in power plant
Main on-line instrumentation (depending of waste water source):
pH;
Conductivity;
Turbidity;
Oil;
Additional:
Fe and Cu;
Ammonia;
TOC
7/27/2019 Symp-Gotovtsev
6/13
Water intake
Cooling system
Rain and meltwater
Water treatment
(make up)
Sludging
Sludge dump
Steam cycle
Neutralizing site
Waste water treatmentsystem Permanent
discharge
7 Drainagetreatment
Industrial heatingsystem
Oil in
water
3
8
1
10
Discharge
chemicals
9
4
controller users
2 3 4 5 61
2
6
5
9
10
7
8
pHpH
turbidity
turbidity
Oil in
water turbidity
pH
conductivity
conductivitypH conductivity
On-line chemistry control
Example of on-line
chemistry control a
combine cycle poweplant with coolinsystem with coolintowers
7/27/2019 Symp-Gotovtsev
7/13
Water reuse
Previous slide powe
plant. Reuse of rainwater and water with
oil.
This system gives 55
m3/h periodical
additional makeup incooling system.
But its means around170 000 m3/yeareconomy of water
from source and the
same number ofdecreasing of
discharges.
7/27/2019 Symp-Gotovtsev
8/13
Water reuseThe same power plant. Membrane water treatment.
7/27/2019 Symp-Gotovtsev
9/13
Water with high mineralizationTreatment of RO concentrate or water after regeneration of ion-exchange filters is
the main challenge in zero-liquid discharge projects
7/27/2019 Symp-Gotovtsev
10/13
Cooling system with wet cooling
towers blowdown
Main problems:
High concentration of impurities in comparison with water in the water
source;
Corrosion, biocorrosion and scaling;
Volume of blowdown in some cases exceed water requirements ofpower plant.
Using blowdown as a water for water treatment system.+ all or part of blowdown is reusing;- large impurities load on water treatment unit (rising of regeneration
number or impurities concentrations in concentrate in case of ROsystem).
7/27/2019 Symp-Gotovtsev
11/13
Some challenges in zero-liquid
discharge power plants
1) Sediment and sludge problem. Utilization of all sludge and sediment is veryexpensive. There are exist technologies of partial re-use of salts with producingsulfuric acid or NaCl.
2) Mixing problem. We have to mix different types of treated water with waterfrom water source.
In IGCC and combine cycle water consumption is very low, in several regions therain and melt water sometimes will be around 20-50% of water that goes to thetreatment. Those waters have very high differences of concentrations of impuritiesin very short time (during one rain or during snow melting periods).
7/27/2019 Symp-Gotovtsev
12/13
How we cane increase of water reuse
systems efficiency?
Water from flue gases technology this technology can decrease waterconsumption.
New chemicals for example, we use polyacrylamide (PAA) based chemicals forflocculation, is there any new hydrophilic polymer that can improve efficiency ofsedimentation and help with additional treatment of sludge (dewatering and
utilization)?New floaters already have a very good efficiency. However it is possible to expect
some increasing of efficiency due to new technologies of water-air mixing withlow volume of air bubble.
7/27/2019 Symp-Gotovtsev
13/13
Thank you
any questions
?