STRUCTURAL ENGINEERS ASSOCIATION OF WASHINGTONSeptember 26, 2017
1
Image courtesy of One Reel
6
7
WATERFRONT SEATTLE A NEW DESTINATION PARK
8
WATERFRONT SEATTLE PROGRAM
9
CONSTRUCTION SCHEDULE
7
SEAWALL
7
7
13
15
PROMENADE
16
17
PROMENADE
TIDELAND TERRACES
18
• The new Alaskan Way/Elliott Way surface street is a hard-working street that provides critical mobility for people and goods not provided by the SR99 tunnel
• Unlike the Viaduct, the SR99 Tunnel does not provide access to Downtown Seattle or to northwest Seattle via Elliott and Western Avenues. The new surface Alaskan Way is critical to the SR99 Tunnel – it serves those missing functions. The new street is particularly important for freight, transit and ferry traffic, as well as providing local access to waterfront businesses and properties.
WHY IS THE NEW ALASKAN WAY/ELLIOTT WAY IMPORTANT?
Existing SR 99 Traffic
Patterns
3 times current traffic volume
2 times current traffic volume
STREET DESIGN TRAFFIC CONSIDERATIONS2030 AVERAGE DAILY TRAFFIC
TRANSIT: SW TRANSIT PATHWAY
VEHICLES, PARKING AND LOADING
NORTH/SOUTH BICYCLE AND PEDESTRIAN MOVEMENT
FERRIES: LOADING AND UNLOADING
STREET DESIGNFUNCTIONS OF THE STREET
23
ALASKAN WAYS KING ST – YESLER ST
ALASKAN WAY INTERSECTION
24
ALASKAN WAY INTERSECTION AND PERGOLA RESTORATION
25
PIONEER SQUARE
COLMAN DOCK / TRANSIT HUB & MARION ST PROJECT AREA
27
INTERSECTIONS
28
29
TERRACES
30
MARION STREET BRIDGE CONCEPT
31
ALASKAN WAY PIKE – PINE ST
MARKETFRONT
Source: Barbie Hull, courtesy of Pike Place Market PDA32
33
OVERLOOK WALK UPDATE
34
OVERLOOK WALK
35
OVERLOOK WALK
36
PINE ST CONNECTION
37
ELLIOTT WAY BRIDGE
ELLIOTT WAY AND WESTERN AVE
38
39
PIER 62/63 REBUILDPRESENT
40
PIER 62/63 REBUILD
41
PIER 62/63 REBUILDFUTURE
42
PIER 62/63 REBUILDFUTURE
Public
• City Departments
– Office of the Waterfront
– SDOT
– Parks
– SPU/City Light
• WSDOT
• Port of Seattle
• King County Metro
• Tribes
Private/Non-Profit
• Central Waterfront Committee• Friends of Waterfront Seattle• Seattle Aquarium• Pike Place Market• Historic Pier Owners • Downtown Seattle Association• Building Owners and Managers
Association (BOMA)• Chamber of Commerce• Seattle Parks Foundation• Development Community• Alliance for Pioneer Square• Neighborhood Orgs
43
KEY PLAYERS
44
BUDGET
45
FUNDING
• Bertha emerges (April)
• Concept design for Pike and Pine Streets (May)
• ‘MarketFront’ opens (June)
• Council action on funding and LID (September)
• Council action to advance management partnership with Friends of Waterfront Seattle (September)
• 90% design complete for Main Corridor – Alaskan and Elliott Ways, Columbia and Seneca Streets, Lenora Street Bridge (October)
• Pier 62 rebuild starts (November)
• Washington St Boat Landing reinstall complete (December)
46
2017 MILESTONES
47
QUESTIONS?
48
VISIT WATERFRONTSEATTLE.ORG OR CONTACT US WITH QUESTIONS!