Transcript

SPECTRACLICKRESILIENTVINYLPLANKINSTALLATIONGUIDELINESAboutyourNewSpectraLuxuryVinyl:

• Spectrafeaturesnewclick/locktechnology,resultinginafloatingfloorsystemthatonlyrequiresminimalhandtools.Aquiet,fastandcleaninstallationprocess.

• Spectraisintendedforinteriorinstallationsonly,suitableforbelow-grade,on-gradeandabove-gradeinstallations,butshouldnotbeinstalledwheretheapplicationssubstrateisexposedtoweatherelements.

• Asafloatingfloor,itshouldbeallowedtoexpandandcontractfreely.PermanentfixturesmustbeinstalledpriortoinstallationofSpectra.

• Aminimum8mmexpansionspaceisrequiredinallareas,atallverticalsurfaces.• Areaslargerthan9mx9mrequireatransitionstrip,asdodoorwaysnarrower1minwidth.• Spectramustbeacclimatedforaminimumof48hours,aconsistentroomtemperatureof18-

21°Cshouldideallybemaintainedbefore,duringandafterallinstallations.• Directexposuretosunlightmaycausefadingandorjointseparation.• Spectraisnotrecommendedforinstallationinsunrooms.• Spectraiswaterresistant,however,constant/prolongedexposuretoexcessive

moisture/humiditymayaffecttheproduct.Moisture/humidityissuesmustbeaddressedandcorrectedpriortocommencinginstallation.

Spectraundergoastrictqualitycontrolprocedurethatguaranteeshigh-qualitystandards.If,contrarytoallexpectations,materialproblemsshouldbeidentifiedonsite,thesearetobenotifiedbeforecuttingtosizeandlaying.Claimsforobviousdefects(e.g.colourvariations,differencesinthicknesses,surfacedefects,insufficientaccuracyoffitetc.)cannotbeacceptedafterinstallation.Ifanumberofpackagesofdesignflooringarebeingusedthecontentsshouldbecheckedforbatch-to-batchvariationbeforecuttingandlaying.Whenorderingitisimperativethatreferencebemadetotheneedforadeliveryfromonedyelottoinsurecolourconsistency.

PRE-INSTALLATIONPROCEDURESPleaserefertotheBritishStandardBS8203:2001+A1:2009,codeofpracticeforinstallationofresilientfloorcoverings.JobsiteEvaluation

ü Thebuildingshouldbeclosedinwithalloutsidedoorsandwindowsinplace.ü Allconcrete,masonry,framingmembers,drywall,paintandother“wet”workshouldbe

thoroughlydry.ü Basementsandcrawlspacesmustbedryandwellventilated.(Crawlspacemustbeaminimum

of24”(600mm)fromthegroundtoundersideofjoists.Agroundcoverof6-8milblackpolyethylenefilmsisessentialasavaporbarrierwithjointslappedsixinchesandtaped.Thecrawlspaceshouldhaveperimeterventingtoaminimumof1.5%ofthecrawlspacesquarefootage.Theseventsshouldbeproperlylocatedtofostercrossventilation).

ü Permanentairconditioningandheatingsystemsshouldbeinplaceandoperational

ü Theinstallationsiteshouldhaveaconsistentroomtemperatureof15-21°Cfor14daysprior,duringandafterinstallationforaforproperlivingenvironment.

ü HVACsystemsshouldbeinplaceandworking10daysbeforeinstallationü Substratesmustbecheckedformoisturecontentusingtheappropriatetestingmethods.

SUITABLESURFACESLightlytexturedorporoussurfaces,well-bondedsheetvinyl,vinylorceramictile,embossedsurfacesorgroutlinesmaytelegraphthru,sothesemustbefilledwithanappropriatePortlandbasedlevellingcompound.Allstructurallysoundsolidwoodfloors,plywoodsubstratesetc.shouldbetestedformoistureusingamoisturemeterandlevelsmustnotexceed14%MC.Dry,clean,wellsetconcrete,curedforatleast90daysprior,shouldalsobemoisturetestedandmustnotexceed4%MC.Ifitisfoundtoexceedthislevel,asuitableliquiddampproofmembraneisrecommended.SpectraResilientvinylmaybeinstalledoverradiantheatedfloors(Surfacetemperaturemustneverexceedorsustain27°Candnevercomeintodirectcontactwiththeheatsource)Spectraresilientvinylmaybeinstalledonallgradelevelsincludingbasements.AlthoughSpectraiswaterresistant,moistureissuesmustbeidentifiedandcorrectedpriortoanyinstallationtoavoidmoldorodourInadditionanytracesofglueorresiduefromthepreviousflooringmustberemovedorasuitablelevellingcompoundusedtoactasamembranebetweentheSpectravinylandtheresidue.UNSUITABLESURFACESRough,heavytexturedorunevensurfacesmaytelegraphthroughthevinylanddistortthefinishedsurface.Thisproductisnotsuitableinroomsthatcouldpotentiallyhavedampconcrete,suchassaunasandwetrooms.Donotinstallthisproductinareas,whichareexposedtolong-termdirectsunlightand/orextremetemperaturechanges.Donotuseanunderlaywiththisproductunlessithasbeenapprovedbytheflooringmanufacturer.INSTALLATIONIMPLIESACCEPTANCEPREPARATION

• Thevinylplanksshouldbeallowedtoacclimatiseatroomtemperatureapprox.18-21°Cfor48hourspriortoinstallation(Excessivecoldorheatcanaffectthesizeofindividualplanks).

• Itmustbestoredhorizontally,flat.• CheckthatallBatchnumberanditemnumbersarethesameandthatyouhavepurchases

sufficientmaterialtocompletethejob.• Carefullycheckplanksforanydefectsbeforeinstallation.

Allnewconcretefloorsneedtodryoutforatleast90dayspriortoinstallation.Woodplankfloorsrequireasuitablethicknessplywoodsurfaceandallnailheadsorfastenersmustbeadjustedbelowthesubfloorsurface(bewareofpipesunderthesubfloor).Securelyfastenallloosesubfloorstoremovesqueaksanddeflection.Ifthesub-floorisuneven3mm+/-withinaspanof1.2m,plane,sand,orfillunevenboards,holesorcracksusingfloor-levelingcompound.Ifinstallingoverexistingtiles,useafloor-levelingcompoundtoskimcoatgroutlines.Makesurethefloorissmooth,cleanandfreeofwax,grease,oilordustandsealedasnecessarybeforelayingplanks.TOOLSREQUIERED

Utilityknife,spacers,pencil,tapemeasure,setsquare,handsaw,kneepadsandsafetygoggles.GETTINGSTARTEDDeterminethedirectionthattheflooringwillbeinstalled.Installationparalleltothelongestwallisrecommendedforbestvisualeffects.Undercutalldoorjamsbyturningaplankupsidedownandusingahandsawtocutawaythenecessaryheightsothatplanksslideeasilyundertheframes.Removeanyexistingbase,quarterround,shoemoldinganddoorthresholds.Sweepingandvacuumingtoremoveanydebrisasyougo.Floorshouldbeinstalledfromalternatecartonsatthesametimetoinsureagoodcolorandshadebalance.Beforestartingdeterminethewidthofthelastrowofplanks,iflessthan50mm,trimthewidthofyourstartingrowofplankstocentertheboardsintheroom.Beattentivetostaggeringtheendsofthevinylplanksaminimumof400mmforamorefavorableoverallappearanceofthefloor.INSTALLATION

Fig1.Firstplank,firstrow.Placeadistance8mmthicknesstotheleftandpositiontheplankagainstthewall.Later,after3rows,youcaneasilypositiontheflooringagainstthefrontwallwithdistances8mm.Priortoinstallation,measurethewidthoftheroomtocheckifthefirstrowshouldpreferablybecutlengthwisetogetmoreequalwidthofthefirstandlastrowsplanks.Seealsofig12.Fig2.Secondplank,firstrowPresstheshortendofthenextfloorboardatanangletothefirstone,andthenlaydown.Completethefirstrowinthesameway.

Fig3.Attheendofthefirstrow,putadistance8mm,tothewallandmeasurethelengthofthelastplanktofit.Cutthelastpaneltocorrectlength,recommendedminlengthistwotimesthewidthoftheplank

Fig4.Secondrow.Positiontheremainingpartofthefirstrow’slastplankasfirstplankofsecondrow.Keepagaintwotimesthewidthasminlength.Putadistanceagainstthewall.

Fig5.General.Distancesbetweenshortends.Minimumdistancebetweenshortendsofplanksinparallelrowsshallnotbelessthanabouttwotimesthewidthoftheplank.

Fig6.Placethefloorboardanangleagainstthefloorboardinthepreviousrow,pressforwardandfolddownatthesametime.Leavethepanelinasomewhatupangledpositionwherethepanelsstarttoloc.Tomakethisfurthereasier,awedgewiththesuitableanglecanbeplacedundertheplankneartheshortsidejointassupport.

Fig7.Secondplanksecondrow.Placetheshortendofthefloorboardatanangleagainstthepreviousinstalledfloorboardandfolddownalltheway.

Fig11.After2-3rows.Adjustthedistancetothefrontwallbyplacingdistances8mm.Keepthedistancesinpositionduringtheentiretimeofinstallationandremoveoncetheinstallationiscompleted.

Fig8.Pushtoslidetheplankagainsttherowinfrontsoitalignswiththefirstplank.Putitdownlikewiththefirstplankwhenthefloorboardsarepositionedtightlytogether.Thefirst/previousplankcannowbefoldedcompletelydowntohorizontalpositionandifawedgeisuseditcanbemovedtothenextshortendjoint.

Horizontalinstallation

Fig13. Fig14.Cutoffthelockingelementwithachisel,applyapplicableglueontheadjustedstripandpushtheplankshorizontallytogether.Ifnecessaryplacesomespacersbetweenlastboardandthewallduringthehardeningtimeoftheglue.Themethodcanalsobeappliedtotheshortends.Radiatorpipes–Principlecutout

Fig15. Fig16.

Fig12.Ifthewallisuneven,thefloorboardsmustbeadaptedtoitscontours.Markthefloorboardswiththecontourofthewall.Donotforgettoleaveca8mmspacetothewall.Thisprocedureshallbeusedalsoforthefirstrowifnecessary.

Installationatforexampleradiatorpipes.Markthecentreoftheholesanddrilltheholewithadiameterabout16mmbiggerthanthepipediameter(=8mmgaparound),cutasshownwithasaworwithasharputilityknife.Installthefloorplank.Ifnecessary,putglueonthecutpieceandreplace.Completingthejob:Removeallspacers,installbaseboardsorquarterround/scotia,tocoverexpansionjoint.Installdoortransitionmoldings,(donotfixanymoldingortransitionsthrutheresilientvinylflooring).Sweeporvacupanyremainingdebris.Cleanasnecessarywithaqualityresilientvinylfloorcleaner.Topreventsurfacedamageavoidrollingheavyappliancesandfurnituredirectlyonthefloor,useplywoodorhardboardifnecessary.CAREANDMAINTENANCESweep,dustmopandvacuumregularlytoremovesurfacegritanddust.Useadampclothormopwithaqualityresilientvinylfloorcleanertocleanupdirtandfootprints,(becarefultoavoidusingexcessivemoisture).CAUTION:Planksareslipperywhenwet.Allspillsshouldbecleanedupimmediately.

• Donotusewetspraymicrofibermops.• Neverusewax,polish,vinegar,abrasivecleanersorscouringagentsastheymaydullordistort

thefinish.• Highheelscandamagefloors.• Useprotectivepadsunderallfurniture.• Useexteriordoormatsatallentrancewaystokeepdirtandmoisturefrombeingtrackedin.

Avoidtheuseofinteriorrubber,foamorplasticbackmatsastheymaydiscolorthefloor.Topreventslippageorarearugsuseanapprovedrugunderlayfromareputablemanufacturer.

• Donotallowpetswithunclippedmailstoscratchordamagethefloor.Note:Steamcleanersarenotrecommended.Avoidexposuretodirectsunlightforprolongedperiodsoftime.Usedrapesorblindstominimizedirectsunlightduringpeaksunlighthours.TIP:Itisagoodideatosaveafewplanksincaseofaccidentaldamage.Plankscaneasilybereplacedorrepairedbyaqualifiedprofessional.Address:UKFlooringDirectLtdZone1aBaytonRoadIndEstExhallCoventryWestMidlandsCV79EL-UK


Recommended