Short description of your project
The Mornington Railway would like to apply for funding to complete the Rail
infrastructure component of the Moorooduc to Baxter Heritage Railway, this will
help lead a Tourism based post Covid19 economic recovery.
Would you like to make a simple or detailed budget submission?
Detailed Submission
Budget Amount (if known)
$1.86 - 2.4mill depending on options analysis
Are you making the submission as an individual or club / group /
organisation?
Club / group / organisation
Name of Club, Group or Organisation
Mornington Railway Preservation Society Inc
Does your group, club or organisation have an ABN?
Yes
Does your group, club or organisation have insurance?
Yes
Site Location (if applicable)
Moorooduc to Baxter Railway Corridor
How will this project make a difference to the community?
Will synergise with the Baxter to Brairs Rail and Trail, open connectivity options
between communities in the Mornington Peninsula.
Keystone Project of the Mornington Railway Strategic Plan, will result in the
Mornington Railway contribution to the local economy to significantly increase and
Submission No. 54
3
drive tourism growth. Will become an iconic tourist attraction on the Mornington
Peninsula.
Will facilitate semi-regular tourist trains from Melbourne into Mornington for special
events, festivals, race days.
Do you plan to seek additional funding sources, i.e. grants, donations, etc.
Yes, As a major project the Mornington Railway will be seeking matched funding
from State and Federal levels of government, a commitment from the shire first will
highlight to state and federal that this is a project shovel ready and will attract
funds.
Do you currently have money (partial or otherwise) to fund this project?
MRPS has secured 45% of the sleepers required through material disposal projects
from the LXRA and Victrack, this reduces the cost significantly and hopes to
acquire more. Lets discuss this further.
Are there other community members, organisations, businesses, etc. that
you are, or might, work with to help deliver this project?
This project is a community priority and we have a long list of strategic partners
from the Rail Industry, Local area, Local Business' and our volunteer support
network. We would love the opportunity to present this further.
Are there key stages, timelines of dates for this project?
Estimated 3-4 years depending on a number of items, this is ofcourse dependent
on options assessment, we would love the opportunity to present this further.
Has funding previously been sought for this project?
Yes
Will this project require ongoing maintenance or continued financial support
from the Shire? (if known)
No
Submission No. 54
4
Do you want to be heard at the Forward Planning Meeting?
Yes
Additional submission details
The Mornington Railway has received lots of positive feedback from Shire
Councilors and Officers, the Local Community, State and Federal Government,
This project is a shire and state priority, will link our communities together and open
up large tourism opportunities up for the Mornington Peninsula and its traders. We
would love to have the opportunity to discuss the complexities, options and
eventual completion of this project with you further.
Submission attachment/s
The_Mornington_Railway_Strategy_and_Business_Plan_February_2019.pdf
Baxter_to_Briars_Community_Rail_and_Trail.pdf
MRPS_Strategic_Plan_Summary.pdf
I understand that all or any part of this submission will be made public and I
have read the confidentiality statements
Yes
To view all of this form's submissions, visit
https://shape.mornpen.vic.gov.au/index.php/dashboard/reports/forms_new/data/8
This is not SPAM. You are receiving this message because you have submitted feedback or signed up to Shape
our Future.
Submission No. 54
MRPS Strategy and Business Plan 2018 V2 1
MORNINGTON RAILWAY STRATEGY AND BUSINESS PLAN
October 2018
Submission No. 54
MRPS Strategy and Business Plan 2018 2
Vision and Mission Statement MRPS’s Vision and Mission are shown below.
Vision – How we want to be known. Mornington Railway will be valued by the community, business, Government and others as a hallmark visitor
attraction on the Mornington Peninsula.
Mission – How we will get there. MRPS will operate the Mornington Railway as a financially and operationally sustainable tourist experience that
contributes significantly to the economy and employment in Victoria.
Submission No. 54
MRPS Strategy and Business Plan 2018 3
MORNINGTON RAILWAY STRATEGY AND BUSINESS PLAN
Vision and Mission CONTENTS 1. Background 6 2. Introduction 12 2.1 Purpose of the Strategy and Business Plan 12 2.2 How the Plan was Developed 14 2.3 Critical Industry Characteristics 15 3. Key Planning Considerations 19 3.1 Maintaining Viability 19 3.2 Effective Asset Maintenance – Viability 21 3.3 MRPS Current input to the Regional Economy and Employment 22
3.4 Volunteers – Managing Generational Change 26
Linqage International
Unit 1, 17th Floor, 15 Collins Street, Melbourne, 3000, Australia
Telephone: 61 (0)3 9654 1410 Mobile: 61 (0)418 568 199 Email: [email protected]
Lanegold Pty Ltd trading as Linqage International ABN Number: 54 050 949 445
www.linqageinternational.com.au
Submission No. 54
MRPS Strategy and Business Plan 2018 4
3.5 Current Marketing 30 3.6 Market Analysis Driving Future Marketing 37
3.7 Future Marketing 42 3.8 Meeting Future Marketing Requirements – The Fleet 44 3.9 Meeting Future Marketing Requirements – Support Facilities 48 3.10 Meeting Future Marketing Requirements – Volunteers 48 3.11 Meeting Future Marketing Requirements – Moorooduc Master Plan 49 3.12 Meeting Future Marketing Requirements – Extension to Baxter 50 3.13 Availability of Sleepers 52 3.14 Archival Information 54
4. Supports and Strengths 55 5. Weaknesses and Impediments 58 6. Opportunities 62 7. Threats and Risks 64 8. Strategy Development 68 8.1 Core Strategy 68 8.2 Vision and Mission 73 8.3 Key Factors for Success 74 9. Implementation 77
Submission No. 54
MRPS Strategy and Business Plan 2018 5
9.1 Balancing Growth and Infrastructure Development Investment with Cash Generating Initiatives 77 10. MRPS Finances Following Successful Implementation of the Strategy 87 10.1 Services, Patronage and Impact on Revenue and Expenses 87 11. Goals and Objectives 96 Attachment 1 - ATHRA - Mornington Railway Economic and Employment Input to the Regional Economy Attachment 2 - Revenue and Expense Budget Attachment 3 - Suggested Organisational Structure Attachment 4 – Master Plan Costs
Submission No. 54
MRPS Strategy and Business Plan 2018 6
1. Background The Mornington Railway, operated by the Mornington Railway Preservation Society (MRPS), is a tourist and
heritage railway operating on 5.6 kilometres of line between Moorooduc and Mornington on the Mornington
Peninsula. The Mornington Peninsula is renowned as Melbourne’s playground and is less than an hour’s drive
from Melbourne.
Figure 1 – A Vintage Train at the Original Mornington Station
Submission No. 54
MRPS Strategy and Business Plan 2018 7
The railway operates on part of the former Victorian Railways branch line, built in 1888, which ran from Baxter to
Mornington. The Mornington railway line was a rural railway branching off from the Stony Point railway line at
Baxter. The line operated for 92 years before closing. In 1991, ten years after closing, the line was reopened as
a tourist and heritage railway. The final section of the line between Rail Motor Stopping Place (RMSP) 16 and
the former Mornington terminus was considered to have significant commercial value and was sold by the State
Government to private investors.
Figure 2 – Moorooduc Station Today
Submission No. 54
MRPS Strategy and Business Plan 2018 8
The railway now runs between Moorooduc station and the completely new Mornington station, which is sited at
Yuilles Road in Mornington, 100m from the site of RMSP 16. A runaround loop has been installed. There is an
intermediate stop at Tanti Park station, formerly Mornington Racecourse Station.
Figure 3 – Map of Mornington Railway
Submission No. 54
MRPS Strategy and Business Plan 2018 9
MRPS has cleared the remaining section of line between Moorooduc station and Baxter station to assist in its
restoration endeavours. A future extension to Baxter will significantly add to the Mornington Railway visitor
experience and boost patronage. Connection to the soon to be electrified METRO rail network at Baxter will give
Mornington Railway patrons an ability to travel to the railway by the metropolitan rail network. The newly
constructed Peninsula Link freeway crosses the line; an overpass over the line has been constructed to enable
continued operation and may even assist future operations to Baxter by removing significant traffic from the
Moorooduc Highway level crossing.
The railway currently carries in excess of 10,000 patrons and operates 63 days annually, with steam and diesel
hauled trains running between Moorooduc and Mornington railway stations. It operates:
a recently increased service from one Sunday to now every Sunday a month.
Wednesdays during Victorian school holidays.
for Special Event trains such as Driver Experience as required.
The railway is accredited with the Office of the National Rail Safety Regulator as a Rolling Stock Operator (RSO)
and a Rail Infrastructure Manager (RIM).
MRPS has 250 members of whom 70 are active volunteers. The railway is operated solely by MRPS volunteers.
Submission No. 54
MRPS Strategy and Business Plan 2018 10
The railway has a ten member Committee of Management / Board and the Members are shown below: President Andrew Swaine
Vice President Ken Rees
Secretary Robert Reed
Treasurer Andrew Fairweather
Committee Member Aiden Parlby
Committee Member John Lornie
Committee Member Rodney Reed
Committee Member Joe-Davis Westland
Committee Member Marg French
Committee Member Jim Moody
The Board has a very good mix of business, accounting, financial and engineering skills.
Supporting the Board are the Mechanical Engineering Manager, the Way and Works Manager, and the Traffic
Department Manager. Other key positions include the Marketing Manager and the Training and Education
Manager. The functional organisational structure is shown below. Over time, MRPS will migrate to a more
developed management structure as suggested at Attachment 3. The migration process will include the risk
management assessment and other elements related to management of change, as detailed in the MRPS
Safety Management System.
Submission No. 54
MRPS Strategy and Business Plan 2018 12
2. Introduction 2.1 Purpose of the Strategy and Business Plan This plan details how MRPS will position itself as a hallmark attraction on the Mornington Peninsula by:
consolidating its current position;
growing its volunteer base;
growing patronage; and
progressing measured and achievable expansion by restoring the service to Baxter.
Figure 5 – Baxter offers Significant Benefits to MRPS
Submission No. 54
MRPS Strategy and Business Plan 2018 13
The plan:
outlines the sound commercial and marketing elements considered by MRPS.
highlights the very strong alignment with Local, State and Federal strategic priorities for the broader region.
describes the job creation, tourism, economic and community benefits.
The plan demonstrates that MRPS’s planned extension to Baxter is “shovel ready” and documents how the
extension will be delivered.
Figure 6 – Peninsula Link Freeway Overpass Showing the Bridge and the Cleared Line
Submission No. 54
MRPS Strategy and Business Plan 2018 14
2.2 How the Plan was Developed The Strategy and Business Plan was developed in June 2018 following extensive consultation with MRPS Board
members, Society members, key external stakeholders, Local Government and key State and Federal
Government representatives.
A comprehensive Planning Workshop, attended by the Board and key stakeholders, was undertaken as part of
the planning process. The level of consultation was critical as it will ensure that the plan is owned by the MRPS
Board, Society members, and other key stakeholders.
The key elements of the plan were endorsed by the Board at the Planning Workshop.
The plan will be reviewed annually each June.
Submission No. 54
MRPS Strategy and Business Plan 2018 15
2.3 Critical Industry Characteristics The tourist and heritage rail sector in Australia and internationally is asset and labour intensive. Many railways
that were previously operated as state owned enterprises were closed as the cost of maintenance and staffing
made then non-viable. Most successful tourist and heritage rail operators in Australia are those that lower asset
maintenance and staffing costs through the use of volunteer labour and other cost cutting endeavours such as
re-purposing previously used sleepers.
Successful tourist and heritage operations are generally close to large markets for easy access by both patrons
and volunteers, and ideally, close to other attractions so that patrons can access a suite of attractions.
The viability of tourist and heritage railway organisations is generally dependent on:
the Board having a record of sound governance.
utilising the assets as intensively as possible to generate a return that enables recurrent expenses to be
covered, and importantly, funds to be generated for ongoing asset maintenance. Being near a large market
means a better return, as railways can operate services at closer to maximum capacity.
the organisation having sufficient facilities to allow for essential maintenance of rolling stock, track and other
assets.
Submission No. 54
MRPS Strategy and Business Plan 2018 16
having a market focus and an experience that meets the needs of large diverse markets, through product
offerings that include both an excursion family oriented product and a premium product.
offering visitor experiences that vary in length, short, medium and long.
the development and maintenance of an engaging and supportive culture for volunteers and staff, if paid
staff are employed.
having enough volunteers with the right skills to maintain operations – proximity to a large population base
increases the recruiting pool for volunteers.
successful management of inter-generational change issues which result in a culture that is engaging and
welcoming for new volunteers, especially younger volunteers.
having the moveable assets, trains, stored undercover overnight as close as possible to the large market to
minimise “dead running”, ie. operating trains with few passengers as they transit to the large market. It
significantly reduces recurrent expenses. Undercover storage increases passenger comfort, especially in
winter, and significantly decreases maintenance costs.
linking in with other attractions, so that one attraction is on the way to another.
Submission No. 54
MRPS Strategy and Business Plan 2018 17
The Puffing Billy Railway in Victoria is an example of an organisation that is viable through meeting the above
characteristics.
The Lifecycle of the Tourist and Heritage Rail Sector diagram below illustrates how not addressing the basic
industry requirements detailed above leads to a non-viable outcome.
Critical Industry Characteristics ‐ The Puffing Billy Example
The Puffing Billy Railway (PBR), which attracts over 500,000 patrons annually, exemplifies the key industry characteristics:
PBR is one hour from Melbourne, a major population base and market, creating easy access for tourists.
PBR offers an intensive service all year round of up to 6 trains daily.
PBR offers excursion and premium products.
The Melbourne population base supports over 1,000 active volunteers.
PBR’s operational base, Belgrave, is co-located with a suburban railway station and is the terminus where the majority of passengers
board.
PBR links with other attractions, such as the penguins at Phillip Island or the Yarra Valley, and can be visited on the outbound or
return trips.
Figure 7 – Industry Characteristics – Puffing Billy
Submission No. 54
MRPS Strategy and Business Plan 2018 18
Figure 8 – Lifecycle of the Tourist and Heritage Rail Sector
Submission No. 54
MRPS Strategy and Business Plan 2018 19
3. Key Planning Considerations
During the extensive consultation process and the Planning Workshop, the following key planning considerations
and issues to be addressed were identified.
3.1 Maintaining Viability MRPS has developed its operations to the point where the ongoing financial viability of the organisation can be
maintained with the current concept of operations, patronage and volunteer base, however, funds for investment
in critical additional infrastructure are not available.
Analysis of the very conservative financial budget at Attachment 2 and presented graphically in the passenger,
revenue and expense budget below confirms MRPS’s financial viability.
The graph uses MRPS’s current accounts as the base year and utilises a conservative 3% growth rate.
The graph confirms MRPS’s ongoing financial viability, however, funds for investment in critical additional
infrastructure are not available.
Submission No. 54
MRPS Strategy and Business Plan 2018 20
Figure 9 – MRPS Passengers, Revenue and Expense Budget Estimates Based on Current Concept of Operations
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Mornington Railway Passengers, Revenue and ExpensesBudget Based on Current Concept of Operations
Total Passengers Total Revenue Total Expenses
Submission No. 54
MRPS Strategy and Business Plan 2018 21
3.2 Effective Asset Maintenance – Viability
As detailed in Section 2.3 Critical Industry Characteristics, the MRPS Board appreciates that effective asset
maintenance is critical for viability, as the tourist and heritage rail sector is asset intensive, and longevity is
dependent on ongoing resourcing of asset maintenance, especially maintenance of track.
MRPS successfully maintains 5.6 kilometres of track between Moorooduc and Mornington. MRPS has no
bridges on its line.
All track and other infrastructure maintenance is progressed in accordance with the Asset Management Policy
and Plan in the MRPS Safety Management System (SMS). As detailed earlier, the SMS, including the Asset
Management Policy and Plan is audited internally and also externally by the Office of the National Rail Safety
Regulator.
Since 2015, a concerted effort to clear a backlog of sleepers requiring replacement has been successfully
progressed. 1,300 sleepers have been replaced, with planned work to clear the remaining backlog of 500
sleepers to be completed within 12 months. A full tamp will be undertaken on completion of that work. Re-
ballasting is not required.
Submission No. 54
MRPS Strategy and Business Plan 2018 22
Routine embankment maintenance, weed spraying, vegetation clearance, and drain maintenance is progressed
in an annual cycle.
In anticipation of works to reopen the line from Moorooduc to Baxter, over the last 2 years, extensive works have
seen that portion of the line cleared of undergrowth and sprayed with weedkiller regularly.
As funds become available, MRPS will progress completion of the track re-laying between Moorooduc and
Baxter.
3.3 MRPS Current Input to the Regional Economy and Employment MRPS is a significant contributor to the local, regional and state economy. The Board identified the need to
ensure that business, the community and all levels of Government appreciate the contribution made by the
organisation.
Annually, the Association of Tourist and Heritage Rail Australia undertakes a detailed analysis to quantify the
economic and employment input of the tourist and heritage railway sector to the Australian economy.
The current analysis is based on the Resources and State Tourism Satellite Accounts 2016 – 17, produced by
Tourism Research Australia in April 2018 and the Economic Contribution of Tourism in Victoria 2016 – 17,
Submission No. 54
MRPS Strategy and Business Plan 2018 23
produced by the Department of Economic Development Jobs Transport and Resources. Attachment 1 provides
full details.
Annual visitation to the heritage rail sector in Australia of 799,809 patron day trips / visits contributes significantly
to the regional and Australian economy. Detailed analysis shows that each year the people who visited heritage
rail sector venues in Australia directly and indirectly contributed $371.128 million annually to the Australian
economy. The Mornington Railway directly and indirectly contributed $2.64 million annually to the Victorian
economy.
That amount reflects the contribution to the Australian economy resulting from money spent by visitors to the heritage rail sector in Australia and the amount spent on the Mornington Peninsula.
Using the above data, the heritage rail sector in Australia provided a significant contribution to employment. The
direct and indirect full-time equivalent jobs generated by the Mornington Railway are 22.6. The segmentation
that relates to the above data is detailed below.
Submission No. 54
MRPS Strategy and Business Plan 2018 24
Figure 10 – Segmentation Based on Visitor Days
International, 33.60%
Domestic Overnight,
42.69%
Domestic Day, 23.71%
Segmentation Based on Visitor Days
International Domestic Overnight Domestic Day
Submission No. 54
MRPS Strategy and Business Plan 2018 25
The chart below in Figure 11 details the sectors showing the percentage spend of each tourist dollar.
Figure 11 – Sector Spending Percentage Spend of Each Tourist Dollar
Retail trade9%
Accommodation and food services
46%Transport, postal
and warehousing
14%
Information media and
telecommunications1%
Rental, hiring and real estate services
(b)2%
Administrative and support
services4%
Public administration and
safety0%
Education and training
5%
Health care and social
assistance1%
Arts and recreation services
14%
Other services1% Ownership of dwellings
3%
Tourism Spend by Sector ‐ Percentage of each Dollar Spent
Submission No. 54
MRPS Strategy and Business Plan 2018 26
3.4 Volunteers – Managing Generational Change
MRPS has 250 members of whom 70 are active volunteers. The railway is operated solely by MRPS volunteers.
Figure 12 – Mornington Railway is Operated by Volunteers
Submission No. 54
MRPS Strategy and Business Plan 2018 27
Those numbers provide MRPS with sufficient volunteers and the required skills to support all year round Sunday
operations, school holiday operations, the operation of special trains when required, and to progress essential
track and rolling stock maintenance.
The MRPS Board realises that volunteer capacity and capability is a significant constraint on any increase in
future operational tempo. The MRPS Board appreciates that to retain existing volunteers and to grow volunteer
numbers, generational change issues, as detailed in Figure 8, Lifecycle of the Tourist and Heritage Rail Sector,
must be successfully managed.
Poor management of generational change in tourist and heritage rail organisations can result in them becoming
non-viable, as volunteer contribution decreases, and operations and essential maintenance cannot be sustained.
MRPS is successfully facing the generational change challenge. The issue is exacerbated by existing
volunteering arrangements, that see many volunteers either volunteering during the week (about 45% - generally
retired), or volunteering over the weekend (about 55% - generally in employment or engaged in academic
pursuits), depending on their employment and family situation. In the past, it has resulted in fragmentation as
two separate non-complementary cultures developed. To successfully manage the challenge, MRPS has
progressed the following:
Submission No. 54
MRPS Strategy and Business Plan 2018 28
A recruitment and induction programme that prepares volunteers for any issues that may arise from
generational change.
A mentoring programme utilising experienced volunteers that support new volunteers in the early stages of
their engagement with the railway.
Regular updating of all volunteers on issues associated with volunteer retention and the importance of
ongoing volunteer engagement and ownership of issues that impact on volunteers and the railway.
Migrating the management of projects on the railway from a functional focus where a specific work group
progresses all tasks associated with a particular discipline, for example rolling stock maintenance, to a
management system where work groups tailored for specific projects are formed and they progress
designated projects. The approach ensures that teams with the appropriate skills and capacity are available
and there is less fragmentation.
Developing a comprehensive training programme for volunteers, and in partnership with Registered Training
Organisations, developing the railway as a training centre.
Facilities and equipment to support volunteers in the track maintenance area are good with old but serviceable
equipment being available. Facilities and equipment for mechanical maintenance are limited with plans to
improve locomotive and rolling stock maintenance facilities when funds are available. Operationally, the facilities
available for volunteers are satisfactory.
Submission No. 54
MRPS Strategy and Business Plan 2018 29
Figure 13 – An Engaged and Motivated Pool of Volunteers, Especially in Areas Such as Track Maintenance, is Critical to Maintain MRPS’s Viability
Submission No. 54
MRPS Strategy and Business Plan 2018 30
3.5 Current Marketing 3.5.1 The Product MRPS offers a unique experience. Patrons can experience travel in Edwardian splendour in restored carriages
hauled by a heritage steam locomotive on a picturesque country branch line.
Figure 14 – MRPS Offers a Unique Heritage Travel Experience Through Picturesque Rural Scenery
Submission No. 54
MRPS Strategy and Business Plan 2018 31
During 2016 / 2017, MRPS carried 11,360 passengers with 2,937 of those being on special trains. Annually,
up to 16 special trains operate including:
Anniversary specials related to locomotives and rolling stock.
Santa and Easter Specials.
Ale Trains.
Birthday Parties / Trundles.
Super Heroes.
Little Train of Horrors.
Grand Final Eve specials.
Australia Day. Special trains are operated as required. All patrons travel in Excursion class. The special train patrons receive
an add on related to the occasion, or in some cases, supporting augmented products such as beer, wine and
canapes.
Patronage figures are severely impacted when diesel locomotives replace the steam locomotive. As a matter
of priority, MRPS will restore another K Class steam locomotive to service. Weather and seasonality do not
disproportionately impact on patronage. Over 98% of all visitors on site travel on MRPS services.
Submission No. 54
MRPS Strategy and Business Plan 2018 32
Figure 15 – Santa Special on the Mornington Railway
Submission No. 54
MRPS Strategy and Business Plan 2018 33
The presentation and cleanliness of Mornington Railway’s trains are very good.
The station precinct is rudimentary but adequate. In the medium term, the station facilities require updating to
meet growing visitor expectations, which includes developing the picnic area adjacent to the station at
Moorooduc. Over time, Moorooduc should be developed as an attractive visitor destination.
Over 90% of visitors travel to the railway by car and the current unsealed access road requires sealing.
Figure 16 – The Moorooduc Station Precinct Showing Basic Station Facilities, Picnic Area, and Unsealed Access Road
Picnic Area
Access Road
Station Facilities
Submission No. 54
MRPS Strategy and Business Plan 2018 34
Timetable The MRPS Timetable and running days, extracted from the website, are detailed below.
See
http://morningtonrailway.org.au/excursion-trains/
Figure 17 – Mornington Railway Timetable
Submission No. 54
MRPS Strategy and Business Plan 2018 35
Figure 18 – Mornington Railway Running Days
Submission No. 54
MRPS Strategy and Business Plan 2018 36
Fares The MRPS fares, extracted from the website, are detailed below.
See
http://morningtonrailway.org.au/excursion-trains/
The average fare per passenger is $9.87. Retail recovery is $0.338 per passenger.
Figure 19 – Mornington Railway Fares
Submission No. 54
MRPS Strategy and Business Plan 2018 37
3.6 Market Analysis Driving Future Marketing 3.6.1 Visitation Data Analysis of the Mornington Peninsula Regional Tourism Summary Year Ending December 2017, from the
Victorian Department of Economic Development Jobs Transport and Resources, shows that after the Puffing
Billy Railway, Mornington Railway has the largest market catchment of any tourist and heritage railway in
Australia. Annually, the Mornington Peninsula has 6.863 million visitors, which is more than the Dandenong
Ranges where the Puffing Billy Railway is located. That region attracts 5.3 million visitors annually. Figure 20
provides specific details. Most patrons are day trippers followed by domestic overnight visitors.
Domestic Overnight, 1,600,000,
23%
Domestic Day Trips, 5,200,000,
76%
International Overnight, 63,000, 1%
Mornington Peninsula Tourism Visits Segmentation 2017
Domestic Overnight Domestic Day Trips International OvernightFigure 20 – Mornington Peninsula Tourism Visits Showing Segmentation
Submission No. 54
MRPS Strategy and Business Plan 2018 38
Figure 21 provides specific details of the growth in the segments. Growth in visitor numbers in all segments is
strong, especially Domestic Overnight and Domestic Day Trips.
Figure 21 – Visitation Growth
18.2%
13.6%10.8%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%
18.0%
20.0%
Domestic Overnight Domestic Day Trips International Overnight
Mornington Peninsula Tourism Visitation Growth 2017
Domestic Overnight
Domestic Day Trips
International Overnight
Submission No. 54
MRPS Strategy and Business Plan 2018 39
Figure 22 provides specific details of the value of the segments. Total value of the tourism spend is $1.045
billion. The segment with the largest value is Domestic Overnight.
Domestic Overnight,
$514,000,000, 49%
Domestic Day Trips, $444,000,000, 43%
International Overnight, $87,000,000, 8%
Mornington Peninsula Tourism Value of Segments
Domestic Overnight Domestic Day Trips International Overnight
Figure 22 – Value of the Segments
Submission No. 54
MRPS Strategy and Business Plan 2018 40
Figure 23 provides specific details of the growth in value of the segments. There is very good growth potential in
all segments.
Figure 23 – Growth in Value of Each Segment
15.5%
24.4%
56.8%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Domestic Overnight Domestic Day Trips International Overnight
Mornington Peninsula Tourism Growth in Spend 2017
Domestic Overnight
Domestic Day Trips
International Overnight
Submission No. 54
MRPS Strategy and Business Plan 2018 41
3.6.2 Analysis of the Visitation Data Analysis of the data detailed above shows that:
• The market MRPS serves is very large, one of the largest in Australia, and large by international
standards.
• The Domestic Day Market, the largest market and the railway’s current market, is strong and growing
significantly and should remain a priority. The railway’s current Excursion product caters for 80% of that
segment, however, relative to other tourist and heritage operators in Australia, 20% of the Domestic Day
market that seeks a Premium product does not currently have its needs met at Mornington Railway.
• The Domestic Overnight Market, the next largest market, is substantial, valuable and should be the next
priority. As detailed above, a Premium product is required.
• Internationals – the numbers are small but they spend a lot of money. It is also a large market, not as
substantial as the Domestic market, but it is of significant value.
• There is sufficient demand to justify a migration, as capacity becomes available, with Saturday operations
to complement Sunday operations, and eventually daily weekday running.
Noting the patronage of the Puffing Billy Railway, which operates up to six services daily, is over 500,000
patrons annually, and similarly located tourist and heritage railways overseas, conservatively, the Mornington
Railway could grow patronage to over 300,000 annually within a decade.
Submission No. 54
MRPS Strategy and Business Plan 2018 42
3.7 Future Marketing As identified in Section 3.6 above and Section 2.3, Critical Industry Characteristics, future product development
must focus on:
Developing a Premium “First Class” product based around a parlour car service capable of serving patrons
drinks and canapes and an open style van suitable as a dance venue to support special events.
As volunteer capacity develops, operating trains on Saturday as well as Sunday each weekend, with
services eventually operating throughout the week.
As resources become available, restoring a second steam locomotive to ensure the availability of one
steam locomotive at all times. It will eliminate the drops in patronage experienced when heritage diesel
locomotives are operated because a steam locomotive is in maintenance.
As resources become available, improve the visitor experience by paving the entry road, enhancing the
station precinct, improving picnic facilities, and upgrading the station building and signal box.
As resources become available, extending the line from Moorooduc to Baxter. It will facilitate offering a
visitor experience that can vary in length from short to medium to long, and will offer patrons the
opportunity to dwell at Baxter, Moorooduc or Mornington.
Developing Moorooduc as a destination with a Discovery Centre that displays exhibitions telling the story
of railways on the Mornington Peninsula and their importance to the community. It should be further
Submission No. 54
MRPS Strategy and Business Plan 2018 43
developed to include displays of main line steam locomotives and other rail related equipment that will be
able to access the railway through the connection to the suburban network at Baxter.
Over time, in partnership with training organisations, develop a Trade Training Facility that utilises the high
level of metal, wood and other trades required to restore and maintain heritage rolling stock, in order to
train and develop youth to a “job ready” status. Viewing opportunities at the facility could be included as
part of the visitor experience.
The Workshops Rail Museum at Ipswich in Queensland has identified in customer surveys the popularity of
visitors being able to witness “behind the scenes” trade work required to support heritage operations.
Figure 24 – Ipswich Railway Museum Conducts Popular “Behind the Scenes” Tours at Queensland Rail’s Ipswich Workshops
Submission No. 54
MRPS Strategy and Business Plan 2018 44
3.8 Meeting Future Marketing Requirements – The Fleet 3.8.1 Passenger Cars The current operational passenger carriage fleet adequately supports MRPS’s current operations. The carriage
fleet consists of:
57BE - The carriage is currently undergoing a re-paint and replacement of guttering on both sides of the
vehicle. It is hoped it will be back in service by September 2018.
27BU - The carriage is the next to have a re-paint in oil based gloss enamel and completion of minor
repairs.
24AW - It was the second last carriage to be restored. No further work is planned except for a wash down
and clean and a possible re-paint in oil based gloss enamel.
45BE - It was the last carriage to be restored and re-painted in oil based gloss enamel. Apart from an
annual wash down, no further work is planned in the near future.
65AW - It is the emergency carriage in case it is required to replace any of the other 4 carriages while they
are in for repairs. It will require a full external restoration in the next 2-3 years.
5CV - The vehicle takes any overflow of passengers and is utilised for the Ale Trains. It requires roof
repairs.
7CV - Restoration of the van, an additional support vehicle for the Ale Trains, is proceeding as resources
are available.
Submission No. 54
MRPS Strategy and Business Plan 2018 45
86BPL - It is in the early stages of a full restoration.
State Car 2 (Parlour Car) Melville - It is to be restored for First Class Premium services. The programme of full carriage restoration over the past 4 years, as contrasted to previous “patch and paint”
methods, was achieved with four well-presented and restored passenger carriages going forward that support
MRPS.
3.8.2 Current – Locomotives MRPS has one steam locomotive and three diesel locomotives available for service:
K 163 - Planned maintenance has been satisfactorily progressed, with heavy maintenance to the cylinders,
valve gear and boiler nearing completion.
T 343 and T 411 - diesel electric locomotives are both serviceable.
W 241 - diesel hydraulic locomotive is serviceable.
3.8.3 Future Fleet Works In summary, as funds become available, MRPS will focus on:
Progressing restoration of the State Car 2, first class carriage, Melville, to facilitate introduction of a
Premium service – cost $70,000.
Site clearing, track laying and construction of covered carriage storage that will see all operational
Submission No. 54
MRPS Strategy and Business Plan 2018 46
carriages stored under cover. It will significantly improve the customer experience, especially in
winter, will reduce carriage maintenance costs, and will reduce volunteer workloads – Cost $150,000.
Completion of K 177 steam locomotive restoration. The recent unavailability of K163 shows the
decrease in patronage that results when diesel locomotives are substituted for steam locomotives. A
second standby locomotive is required. K177 has had investment of $120,000 to date, and $180,000
is required to complete the works to return the locomotive to service. Volunteer capacity is available
to undertake the work.
Progressing restoration of the guards van 7CV to improve the facilities available for special trains,
such as the Ale Train. Cost - $10,000.
MRPS has a small but adequate fleet of support vehicles and rail tractors.
All maintenance of rolling stock is in accordance with the Asset Management Policy and Plan in the MRPS
Safety Management System (SMS). The SMS, including the Asset Management Policy and Plan, is audited
internally and also externally by the Office of the National Rail Safety Regulator.
Submission No. 54
MRPS Strategy and Business Plan 2018 47
The MRPS current fleet, augmented by an additional van, Premium class carriage, and a steam locomotive, is
adequate and will meet current and future needs.
Figure 25 – When Not in Use, MRPS’s Wooden Carriages are Stabled Outside in the Weather
Additional Covered Storage Sidings are Required
Submission No. 54
MRPS Strategy and Business Plan 2018 48
3.9 Meeting Future Marketing Requirements – Support Facilities As funds become available, critical support infrastructure that will facilitate maintenance and enable the
introduction of new products will be constructed or upgraded. Those facilities include:
Site clearing, track laying and construction of covered carriage storage that will see all operational
carriages stored under cover. It will greatly improve the customer experience, especially in winter,
will reduce carriage maintenance costs, and will reduce volunteer workloads – Cost $180,000.
Progressing the installation of a hard stand, overhead lifting gantry and pit for locomotive
maintenance – Cost $178,000.
3.10 Meeting Future Marketing Requirements – Volunteers
As detailed earlier, MRPS has 250 members and 70 active volunteers. Those numbers provide MRPS with
sufficient volunteers possessing the required skills to support all year round Sunday operations, school holiday
operation, and the operation of special trains when required. Changing the MRPS concept of operations to
include Saturday running, to provide for full weekend operations, will require membership to increase to 500
members and an increase to 140 active volunteers. The increase is achievable given the size and population of
the catchment area of the volunteer pool.
That increase would be sufficient to support operations that utilise the Moorooduc to Baxter section of line.
Submission No. 54
MRPS Strategy and Business Plan 2018 49
3.11 Meeting Future Marketing Requirements – Moorooduc Master Plan Linked to the development of new products and the provision of critical infrastructure is progression of the
Moorooduc Master Plan. Implementation of that plan will support MRPS product development and will see
Moorooduc developed as a suitable operating base and a visitor destination – Cost $2.68 Million. Details are at
Attachment 4.
Figure 26 – MRPS Moorooduc Master Plan
Submission No. 54
MRPS Strategy and Business Plan 2018 50
3.12 Meeting Future Marketing Requirements – Extension to Baxter The MRPS Board has identified the significant opportunity that the extension to Baxter will provide the railway in
terms of improving the visitor experience.
Linked to extension of the electrified suburban rail network to Baxter, the connection will mean that patrons can
cross the Baxter platform to board Mornington Railway trains. The link will also facilitate charter trains operating
to Mornington and the cross transfer of locomotives and rolling stock.
The Board has adopted an incremental growth strategy, with track in the section being re-laid progressively as
sleepers are made available. The first aspect of the incremental growth strategy is to secure approval for PTV
works to install boom gates at Moorooduc Road.
In anticipation of works to re-open the line from Moorooduc to Baxter, over the last 2 years, extensive efforts
have seen that portion of the line cleared of undergrowth and sprayed with weedkiller regularly. As funds
become available, MRPS will progress completion of the track re-laying between Moorooduc and Baxter.
Submission No. 54
MRPS Strategy and Business Plan 2018 51
A cost breakdown for that work is shown below: Baxter Extension Base Data Kilometres Sleepers per kilometre Total Sleepers Days Labour Ballast Tonnes Assumes VicTrack pays for main line connection and 5 1,600 8,000 40 3,000.00 signalling and PTV funds crossings Unit cost Total Cost Ex. Sleepers and Labour Sleeper cost $140.00 $1,120,000.00 Track Screws / Pandrol Clips $2.00 $64,000.00 $64,000.00 Track Crew 4+Foremen @ $5,000 / day $5,000.00 $200,000.00 Point Timbers $40,000.00 $40,000.00 $40,000.00 Ballast $50.00 $150,000.00 $150,000.00 Petrol Driven Specialist Tools $60,000.00 $60,000.00 $60,000.00 Hire of Equipment - Tamper $10,000.00 $10,000.00 $10,000.00 Drainage Rehabilitation $25,000.00 $25,000.00 $25,000.00 Bank Stabilisation $30,000.00 $30,000.00 $30,000.00 Other including fuel $3,000.00 $3,000.00 $3,000.00 Station Works Frankston / Flinders Rd. $34,000.00 $34,000.00 $34,000.00 Parking Baxter and Frank./Flinders Rd. $40,000.00 $40,000.00 $40,000.00 Contingency $30,000.00 $30,000.00 $30,000.00 Total $1,806,000.00 $486,000.00
External funding to progress the Baxter Extension and other infrastructure upgrades is being sought.
Figure 27 – Costs Associated with the Baxter Extension
Submission No. 54
MRPS Strategy and Business Plan 2018 52
3.13 Availability of Sleepers The MRPS aggressive sleeper replacement programme, proposed works to increase undercover storage
facilities for rolling stock, and extension of the railway from Moorooduc to Baxter, will see the requirement for
8,000 new or second hand sleepers.
Figure 28 – Peninsula Link Freeway Overpass Showing the Bridge and the Cleared Line on the Baxter Moorooduc Section
Submission No. 54
MRPS Strategy and Business Plan 2018 53
In Victoria, the sector relies on the flow down of sleepers, and other material such as ballast and rail, from major
rail projects where old infrastructure is replaced. Suitable second hand sleepers are made available to the sector
through the endeavours of the Tourist and Heritage Railway Registrar.
In recent times, the unavailability of suitable second hand sleepers has severely impacted on the sector.
MRPS identified the need to liaise closely with the Tourist and Heritage Railway Registrar and also to approach key influencers in Government to facilitate improved second hand sleeper availability, especially for concrete
sleepers.
Figure 29 – a Reliable Supply of Suitable Second Hand Railway Sleepers is Critical to the Sector
Submission No. 54
MRPS Strategy and Business Plan 2018 54
3.14 Archival Information MRPS is unusual for a tourist and heritage railway as it has extensive archival records and an active archivist
group. Those records tell the story of development of railways on the Mornington Peninsula and reflect the
impact the railway had on the community.
The records will form the basis of future displays for visitors
MRPS has a comprehensive Archival Business Plan that requires resourcing.
Submission No. 54
MRPS Strategy and Business Plan 2018 55
4. Supports and Strengths
The major supports and strengths to be considered in implementation of this Strategy and Business Plan were
identified as:
• Location Mornington Railway’s location on the V/Line network and relative proximity to the very large
Melbourne market is a major strength.
• Viability The Mornington Railway is financially and operationally viable as demonstrated by its near three
decades of operation.
• Significant Spare Capacity
With the shift from one Sunday a month to operating regularly every Sunday, Mornington Railway has
effectively increased its passenger lift capacity by 62%. Given that the increase in capacity has taken
place with existing volunteer capacity and with little increase in recurrent costs, it is a major support.
Submission No. 54
MRPS Strategy and Business Plan 2018 56
• Good Rail Infrastructure The condition of Mornington Railway’s track is relatively good having been constructed with heavy rail
and good ballast. It is a major strength.
• Product – a Good Experience Mornington Railway’s Excursion class offers patrons a unique experience. Patrons can experience
travel in Edwardian splendour in restored carriages hauled by a heritage steam locomotive on a
picturesque country branch line. It is a major strength.
• Input to the Local Economy and Jobs
Mornington Railway directly and indirectly contributes $2.64 million annually to the Victorian
economy and generates 22.6 direct and indirect full-time equivalent jobs.
Submission No. 54
MRPS Strategy and Business Plan 2018 57
Figure 30 – Mornington Railway – a Unique Visitor Experience
Submission No. 54
MRPS Strategy and Business Plan 2018 58
5. Weaknesses and Impediments
The major weaknesses and impediments to be considered in implementation of this Strategy and Business Plan
were identified as:
• Limited Capital in a Capital Intensive Industry The tourist and heritage rail sector is a capital intensive sector. Mornington Railway has limited capital to
invest in new infrastructure. It is a weakness. The sector overcomes the weakness by growing revenue and
surpluses, utilising existing infrastructure and recycled materials, and through the use of volunteers.
• People Intensive Industry / Limited Volunteer Capacity The tourist and heritage sector is a people intensive industry. Currently, Mornington Railway’s volunteer
capability is at full capacity. It is a weakness. Future migration to more intensive services will require an
increase in membership and volunteer numbers. Addressing generational change issues will assist in
securing additional volunteers for the railway, together with electrification of the line to Baxter as more
volunteers can travel from Melbourne, undertake their duties on the railway, and then return to Melbourne
all in a day using METRO services.
Submission No. 54
MRPS Strategy and Business Plan 2018 59
• Declining Availability of Second Hand Materials The declining availability of low cost, second hand sleepers, rail, ballast and other materials is a significant
weakness, that will impose a substantial financial burden on the Mornington Railway and the sector.
• Steam Locomotive Availability
Mornington Railway only has one operational steam locomotive. Unavailability of the locomotive
when it is being serviced results in a significant decrease in patronage. It is a weakness that will be
overcome once a second steam locomotive is available.
• Lack of a Premium Product. Mornington Railway is unable to meet the needs of an estimated 20% of the market, as it is does not
offer a Premium Product. It is a weakness. Introduction of a Premium Product, consisting of travel
in a First Class carriage with wine and canapes being served, will address the issue and see fare
revenue increase substantially.
• Timetabling Industry experience shows that a simple and easy to remember timetable assists patrons in planning their
visit. Mornington Railway’s timetable is difficult for patrons to remember. It is a weakness that will be easily
addressed through simple adjustment of the operating timetable.
Submission No. 54
MRPS Strategy and Business Plan 2018 60
• Short, Medium and Long Travel Options Industry experience also shows that patrons like to choose from a short, medium or long experience.
Currently, Mornington Railway does not offer that choice. It is a weakness. Completion of the extension to
Baxter will address the weakness.
• Limited Undercover Storage Limited undercover storage results in Mornington Railway stabling its operational rolling stock outside in the
weather. The additional maintenance load is the equivalent of one full time painter. The passenger
experience is also impacted, as in winter, passengers travel in cold and damp vehicles. The limited
undercover storage is a weakness. Additional planned undercover storage will address the weakness.
• Limited Government Support Mornington Railway’s location, as an organisation within an “Interface Council” (outside the designated
Regional Development Victoria boundaries) means that it cannot secure funding through Regional
Development Victoria. It is a weakness. The weakness will be addressed through direct lobbying of local
State Government members and through the progression of grant applications to the Federal Government
or philanthropic organisations.
Submission No. 54
MRPS Strategy and Business Plan 2018 61
• Bureaucracy Mornington Railway’s operational and growth endeavours take place in a highly bureaucratic environment
that requires significant time and volunteer capability, capacity and patience. It is a weakness. Where
possible, some issues are being addressed through the industry body, ATHRA.
Submission No. 54
MRPS Strategy and Business Plan 2018 62
6. Opportunities
The major opportunities considered in implementation of this Strategy and Business Plan were identified as:
• Rail Discovery Centre / Trade Training at Moorooduc Establishment of a Rail Discovery Centre at Moorooduc, based around displays that tell the story of
railways and the community on the Mornington Peninsula, and a Trade Training Facility, afford the
Mornington Railway an opportunity to significantly improve the visitor experience and provide a social and
employment dividend to the community.
• Develop More Meaningful Alliances Linked to the opportunity detailed above, the Mornington Railway has the opportunity to establish and
benefit from alliances with organisations such as Steamrail Victoria and other operators, to facilitate the
effective migration of rail operations and maintenance from Newport to suitable areas around the State.
Moorooduc, with a main line connection at Baxter, offers a suitable venue for additional storage, display
and maintenance facilities, and as a base for main line operations.
Submission No. 54
MRPS Strategy and Business Plan 2018 63
Figure 31 – Alliances Have Benefits
Figure 20 – Volunteers – Their Capability and Capacity is Critical for Operations
Submission No. 54
MRPS Strategy and Business Plan 2018 64
7. Threats and Risks
The threats and risks considered in implementation of this Strategy and Business Plan were identified as:
Loss of Board Effectiveness / Failure of Governance
The loss of Board effectiveness or a failure in governance are threats that would impact on the success of
Mornington Railway’s operations.
Likelihood of occurring: LOW
Likely impact should it occur: HIGH
The threat will be effectively managed by rigorous Board processes, including audits, and a Board
Succession Plan.
Unexpected Change in the Economy Mornington Railway’s revenue is driven by patronage. There is a risk that a downturn which impacts on the
disposable income of patrons would impact on the railway.
Likelihood of occurring: LOW
Submission No. 54
MRPS Strategy and Business Plan 2018 65
Likely impact should it occur: HIGH
The threat will be managed by effective marketing that highlights the low cost of travel to and on the railway.
Inability to Secure Resources / Funding to Progress Infrastructure Projects Mornington Railway has identified critical infrastructure that requires resourcing and funding. There is a risk
that securing resources / funding will be delayed or will not be achieved.
Likelihood of occurring: LOW
Likely impact should it occur: HIGH
The threat will be effectively managed by engaging key funding organisations to ensure that the economic,
employment and social benefits resulting from Mornington Railway’s infrastructure initiatives are understood
and justify the investment.
Project Mismanagement Significant resources and funds will be expended as Mornington Railway implements its plans. In the event
that there was a failure in project management, delays and poor planning would be costly and would impact
on Mornington Railway’s expense base and viability.
Submission No. 54
MRPS Strategy and Business Plan 2018 66
Likelihood of occurring: LOW
Likely impact should it occur: HIGH
The risk will be managed by utilisation of experienced managers with a record of achievement in the area.
Loss of Key Personnel and Loss of Volunteers Key personnel and volunteers are critical to effectively operate the Mornington Railway. A loss of key
personnel or a reduced pool of volunteers will significantly impact on operations.
Likelihood of occurring: LOW
Likely impact should it occur: HIGH
The threat will be managed through an effective Recruitment and Training Plan and a Succession Plan,
complemented by support mechanisms that will reduce the possibility of key personnel and volunteer burn
out.
Major Level Crossing Incident / Catastrophic Equipment Failure A major level crossing incident or a catastrophic equipment failure is a significant threat.
Submission No. 54
MRPS Strategy and Business Plan 2018 67
Likelihood of occurring: LOW
Likely impact should it occur: HIGH
The threat will be managed through effective risk analysis and rigorous risk mitigation regimes.
Figure 32 – Catastrophic Equipment Failure – a Risk
Submission No. 54
MRPS Strategy and Business Plan 2018 68
8. Strategy Development Having completed a comprehensive analysis of the issues impacting on Mornington Railway, together with an
assessment of its strengths / supports, weaknesses / impediments, opportunities, threats / risks, it was possible
to develop a core strategy, key factors for success, and goals and objectives.
8.1 Core Strategy
Mornington Railway will be valued by the community, business, Government and others as a hallmark visitor
attraction on the Mornington Peninsula. To realise its vision, MRPS will operate the Mornington Railway as a
financially and operationally sustainable tourist experience that contributes significantly to the economy and
employment in Victoria.
Specifically, the Mornington Railway will incrementally and sustainably grow patronage to achieve 20,000 patrons
per annum within two years. Mornington Railway will develop a strong First Class offering with in excess of 20%
of patrons travelling First Class. That product will further support Special Trains such as the Ale Train and the
Driver Experience offering. Initially, MRPS will use social media and publicity to promote its new every Sunday
running timetable. The threefold increase in Sunday services and capacity will see patronage double over two
years. Surplus funds generated will be utilised to develop a Premium Product capability and improve undercover
storage for rolling stock. A recruitment programme linked to the increase in patronage will see volunteer numbers
double within two years. Additional volunteers will enable migration to a Saturday and Sunday service every
Submission No. 54
MRPS Strategy and Business Plan 2018 69
Figure 33 – Utilise Spare Capacity to Grow Patronage
Submission No. 54
MRPS Strategy and Business Plan 2018 70
weekend. Surplus funds generated will be utilised to restore an additional steam locomotive, improve locomotive
maintenance facilities, and enhance the station precinct.
Incrementally, MRPS will progress the extension to Baxter, with an initial goal of securing boom gates for the
Moorooduc Road crossing; input to the future development of Baxter Station and the surrounding precinct; and a
reliable supply of sleepers. On an opportunity basis, MRPS will seek external funding. The Baxter extension will
provide very substantial benefits to the Mornington Railway, as it will significantly improve the visitor experience,
and enable the railway to capitalise on the benefits of a cross platform connection with the suburban network
operator METRO, and facilitate main line operations and rolling stock transfers.
Linked to this initiative is progressing the establishment of a Discovery Centre and Trade Training Facility at
Moorooduc. It is a major project, however, the social, economic and employment benefits, coupled with the
significant benefit to the railway through improvement in the visitor experience, will make the project attractive to
Government and other funding sources.
The Mornington Railway Board will continue to provide leadership, sound governance, policy direction and
oversee a rigorous risk management regime. Board effectiveness will be further improved through a review of
the Board’s Succession Plan.
Submission No. 54
MRPS Strategy and Business Plan 2018 71
The Mornington Railway will successfully maintain its effective engagement of the community, businesses and
key influencers in Government to secure support and funding. Within the industry, Mornington Railway will continue
to engage industry participants through ATHRA and other organisations, in order to ensure policy and other
outcomes that are optimal for the organisation.
Staffing will continue to be provided by volunteers. Mornington Railway’s Training Plan and Succession Plan will
be reviewed to ensure that the organisation has adequate numbers of trained, skilled volunteers and that their
workloads avoid “volunteer burn out”.
Within five years, Mornington Railway will have annual patronage of 40,000 and will contribute $23.55 million
annually to the Victorian regional economy and generate 122 full time equivalent positions.
Within ten years of completing the extension to Baxter, the railway will have annual patronage of 300,000.
Submission No. 54
MRPS Strategy and Business Plan 2018 72
Figure 34 – MRPS Locomotive T411 Stabled at Baxter 1993
Submission No. 54
MRPS Strategy and Business Plan 2018 73
8.2 Vision and Mission Having considered the core strategy, the Board developed Mornington Railway’s Vision and Mission.
Vision – How we want to be known. Mornington Railway will be valued by the community, business, Government and others as a hallmark visitor
attraction on the Mornington Peninsula.
Mission – How we will get there. MRPS will operate the Mornington Railway as a financially and operationally sustainable tourist experience that
contributes significantly to the economy and employment in Victoria.
Figure 35 – MRPS – A Hallmark Visitor Attraction
Submission No. 54
MRPS Strategy and Business Plan 2018 74
8.3 Key Factors for Success
The following key factors for success were identified:
Funding Mornington Railway must effectively engage funding organisations to resource critical infrastructure projects
in a timely manner.
Priorities
Mornington Railway must continue to focus on its prioritised project activities as follows:
Progressing restoration of the State Car 2, first class carriage, Melville, to facilitate the introduction of
a Premium Product – cost $70,000.
Site clearing, track laying and construction of covered carriage storage that will see all operational
carriages stored under cover. It will significantly improve the customer experience, especially in winter,
will reduce carriage maintenance costs, and will reduce volunteer workloads – Cost $150,000.
Incrementally progressing the installation of a hard stand, overhead lifting gantry and pit for locomotive
inspections to expedite completion of K 177 steam locomotive restoration. The recent unavailability of
K163 shows the decrease in patronage that results when diesel locomotives are substituted for steam
locomotives. A second standby locomotive is required. K177 has had investment of $120,000 to date,
and $180,000 is required to complete the works to return the locomotive to service. Volunteer capacity
is available to undertake the work.
Submission No. 54
MRPS Strategy and Business Plan 2018 75
Progressing restoration of the guards van 7CV to improve the facilities available for Special Trains
such as the Ale Train. Cost - $10,000.
Site clearing, track laying and construction of covered carriage storage that will see all operational
carriages stored under cover. It will greatly improve the customer experience, especially in winter, will
reduce carriage maintenance costs, and will reduce volunteer workloads – Cost $180,000.
Progressing the installation of a hard stand, overhead lifting gantry and pit for locomotive maintenance
– Cost $178,000.
Progressing incrementally the extension to Baxter – Cost $1.806 Million.
Progressing the Master Plan Development including the Rail Discovery Centre and the Training
Centre of Excellence – Cost $2.68 Million.
Engagement Mornington Railway must successfully maintain its effective engagement of the community, businesses and
key influencers in Government.
Governance
Leadership, sound governance, policy direction and risk management must continue to be provided
by the Board.
Project Management Mornington Railway must effectively manage the risks associated with projects.
Submission No. 54
MRPS Strategy and Business Plan 2018 76
Volunteers Mornington Railway must effectively manage generational change issues to ensure that volunteer capability
and capacity is maintained. Marketing The conservative marketing targets must be achieved and promotional tools based around social media and
publicity must effectively support the railway.
Submission No. 54
MRPS Strategy and Business Plan 2018 77
9. Implementation 9.1 Balancing Growth and Infrastructure Development Investment with Cash Generating Initiatives
MRPS must balance its investment in essential infrastructure with achievable cash generating initiatives.
9.1.1 Short Term Needs. MRPS, having achieved commercial viability, has a need to focus on immediate short
term cash generating activities to fund essential capital items. The most effective means of progressing that is
to:
Expeditiously return to service the railway’s K class steam locomotive, K163.
Progress short term social media and publicity based marketing initiatives to increase patronage that
utilises existing capacity on planned scheduled services. It can be progressed without any additional
operational expenses or any additional demand on volunteers.
Seek funding through successfully securing small project related State and Federal funding.
Currently, patronage is 11,360 (16% capacity utilisation). Doubling patronage over a 24 month period will see
annual surpluses rise to in excess of $100,000, as detailed in the financial budget at Attachment 2.
The surplus funds will be utilised as follows:
Submission No. 54
MRPS Strategy and Business Plan 2018 78
Progressing restoration of the State Car 2, first class carriage, Melville, to facilitate the introduction of a
Premium Product – cost $70,000.
Site clearing, track laying and construction of covered carriage storage that will see all operational
carriages stored under cover. It will significantly improve the customer experience, especially in winter,
will reduce carriage maintenance costs, and will reduce volunteer workloads – Cost $150,000.
Short Term Input to the Regional Economy and Employment Attachment 1 - ATHRA - Mornington Railway Economic and Employment Input to the Regional Economy and
Attachment 2 show the current MRPS Input to the Regional Economy and Employment as being: $2.64 million
annually with a direct and indirect employment contribution of 22.6 jobs.
An increase to 20,000 patrons will see that contribution rise to $3.6 million annually with the employment
contribution increasing to 32.2 jobs. That is an increase in economic input of $1 million annually and the
employment contribution increases by 10 positions.
Submission No. 54
MRPS Strategy and Business Plan 2018 79
Figure 36 – Mornington Railway Patrons Spend Substantial Amounts in the Region and in Mornington
Submission No. 54
MRPS Strategy and Business Plan 2018 80
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Mornington Railway Passengers, Revenue and ExpensesBudget Based on Current Concept of Operations and 50%
Increase in Capacity Utilisation
Tourist Passengers Total Revenue Total Expenses
Figure 37 – MRPS Passengers, Revenue and Expense Budget Estimates – 50% Increase in Capacity Utilisation Year 2
Submission No. 54
MRPS Strategy and Business Plan 2018 81
9.1.2 Medium Term Needs. MRPS, having progressed short term cash generation activities and doubled its
membership and volunteer capacity, will increase its scheduled services to include Saturday operations every
week. The most effective means of successfully implementing change is:
Increase membership from 250 to 500 members with the volunteer pool increasing from 70 to 140.
Progress short term social media and publicity based marketing initiatives to promote the change in
timetabled services.
Continue to seek funding through successfully securing small project related State and Federal funding.
Patronage will rise to 37,000 in Year 3 and annual surplus will rise to in excess of $150,000, as detailed in the
financial budget at Attachment 2.
The surplus funds will be utilised as follows:
Incrementally progressing the installation of a hard stand, overhead lifting gantry and pit for locomotive
inspections to expedite completion of K 177 steam locomotive restoration. The recent unavailability of
K163 shows the decrease in patronage that results when diesel locomotives are substituted for steam
locomotives. A second standby locomotive is required. K177 has had investment of $120,000 to date, and
$180,000 is required to complete the works to return the locomotive to service. Volunteer capacity is
available to undertake the work.
Submission No. 54
MRPS Strategy and Business Plan 2018 82
Progressing restoration of the guards van 7CV to improve the facilities available for Special Trains such
as the Ale Train. Cost - $10,000.
Successfully negotiate with Public Transport Victoria to achieve reinstatement of the Moorooduc Road
level crossing with boom gates.
Incremental and achievable progress on the Moorooduc to Baxter extension by undertaking incremental
re-sleepering on the extension whilst pursuing major funding of $1.86 Million for the extension.
Seeking major funding for the Master Plan implementation, the Rail Discovery Centre and Training Centre
of Excellence, $2.68 Million.
In the next 12 months, the annual surplus will rise to in excess of $360,000, as detailed in the financial budget at
Attachment 2.
Medium Term Input to the Regional Economy and Employment An increase to 46,000 patrons will see the contribution rise from $3.6 million to $10.7 million annually, with the
employment contribution increasing to 91.6 jobs. That is an increase in economic input of $7 million annually and
the employment contribution increases by 60 positions.
Submission No. 54
MRPS Strategy and Business Plan 2018 83
Figure 38 – MRPS Passengers, Revenue and Expense Budget Estimates – Weekend Running and School Holidays
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
1 2 3 4 5 6 7 8 9 10 11
Mornington Railway Passengers, Revenue and Expenses
Budget Based on Weekend Running and School Holidays
Total Pax Total Revenue Total Expenses
Submission No. 54
MRPS Strategy and Business Plan 2018 84
9.1.3 Long Term Needs. Long term, as MRPS patronage increases, the railway will incrementally develop its
services, initially offering services on Monday and Friday. As the incremental change consolidates, the railway
will offer services on Tuesday, Wednesday and Thursday. Ideally, that should take place prior to completion of
the extension to Baxter, estimated to be in Year 8. The most effective means of progressing that is to:
Increase membership to 2,000 members by year 8, with volunteer numbers increasing to 670.
Continue social media and publicity based marketing initiatives to promote the change in timetabled
services.
Continue to seek funding through successfully securing small project related State and Federal funding.
By Year 7, the surplus will be in excess of $1 million annually, as detailed in the financial budget at Attachment
2.
Those funds will be utilised to complete the extension to Baxter and to progress the Discovery Centre and Trade
Training Facility initiative and on improvements to the station precincts.
Submission No. 54
MRPS Strategy and Business Plan 2018 85
Figure 39 – MRPS Passengers, Revenue and Expense Budget Estimates – Running Every Day and Extension to Baxter in Year 8
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Mornington Railway Passengers, Revenue and ExpensesBudget Based on Incremental Increase to Every Day Running and
Baxter Extension in Year 8
Total Pax Total Revenue Total Expenses
Submission No. 54
MRPS Strategy and Business Plan 2018 86
Long Term Input to the Regional Economy and Employment The increase to 150,000 patrons annually in Year 8 will see the contribution rise from $10.7 million annually to
$39 million annually, with the employment contribution increasing from 91.6 jobs to over 340 jobs. That is an
increase in economic input of over $28 million annually and the employment contribution increases by over 240
positions.
Submission No. 54
MRPS Strategy and Business Plan 2018 87
10. MRPS FINANCES FOLLOWING SUCCESSFUL IMPLEMENTATION OF THE STRATEGY 10.1 Services, Patronage and Impact on Revenue and Expenses The financial analysis is based on the following:
Initially trains will operate on the existing Sunday, Public Holidays and School Holiday timetable.
A premium product will be available after year 2.
After 2 years the railway will commence operating on Saturday in addition to the days currently
operated.
After 5 years the railway will migrate to services every day of the week.
By Year 8 the railway will complete Baxter Extension.
Special event trains such as “Santa Specials” and “The Ales Train” will be regularly operated as required.
The SRP effectively provides VGR with double the passenger carrying capacity with minimal additional cost
and minimal additional volunteer input.
Attachment 2, the Revenue and Expense Budget, reflects the market analysis detailed in Section 3.5 and
3.6. It shows that MRPS patronage growth is conservative with 38,000 passengers being carried in Year 3,
63,000 passengers in Year 5 and 150,000 passengers in Year 8.
Submission No. 54
MRPS Strategy and Business Plan 2018 88
The budget at Attachment 2 is for 10 years, as the sector is capital and maintenance intensive and requires
positive cash flows over a long period to ensure sustainability. Accrued surpluses are required for major
capital works such as bridge replacement and boiler refurbishment or replacement.
Figure 40 below is an extract from the 10 year MRPS Passenger Numbers, and Revenue and Expense
Budget, showing the financial state of the railway that justifies the capital investment identified in the plan.
Submission No. 54
MRPS Strategy and Business Plan 2018 89
11,360 16,617 26,977 37,896 47,178 63,690 84,433 112,345 149,926 159,955 170,948 183,088$204,979 $273,898$478,390 $578,501 $706,272
$926,484$1,196,183
$1,566,284
$3,825,505$4,165,961
$4,537,349
$4,942,499
$155,963$169,369 $230,891 $297,391 $317,385 $376,392 $392,441 $433,927 $519,015 $540,777 $563,760 $588,053
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Passengers, Revenue and ExpensesYear 0 to Year 11
Passengers Revenue Expenses
Year 5
40,645 Passengers
Figure 40 – MRPS Passengers, Revenue and Expenses
Submission No. 54
MRPS Strategy and Business Plan 2018 90
Passenger Numbers Passenger JourneysYear 0 11,360 22,720
Year 1 16,617 33,234
Year 2 26,977 53,954
Year 3 37,896 75,792
Year 4 47,178 94,355
Year 5 63,690 127,379
Year 6 84,433 168,867
Year 7 112,345 224,689
Year 8 149,926 299,852
Year 9 159,955 319,910
Year 10 170,948 341,895
Year 11 183,088 366,175
Column1
Column2
11,360 22,72016,617 33,23426,97753,95437,896
75,79247,178
94,35563,690
127,37984,433
168,867
112,345
224,689
149,926
299,852
159,955
319,910
170,948
341,895
183,088
366,175
050,000
100,000150,000200,000250,000300,000350,000400,000
MRPS Passenger Growth
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Column1 Column2
Figure 41 – MRPS Passenger Growth and Passenger Journey Growth
Submission No. 54
MRPS Strategy and Business Plan 2018 91
Figure 42 shows the increase in revenue without a commensurate increase in expenses as the marginal expenses per passenger over such a relatively short journey is minimal.
Revenue Expenses
Year 0 $204,979 $155,963
Year 1 $273,898 $169,369
Year 2 $478,390 $230,891
Year 3 $578,501 $297,391
Year 4 $706,272 $317,385
Year 5 $926,484 $376,392
Year 6 $1,196,183 $392,441
Year 7 $1,566,284 $433,927
Year 8 $3,825,505 $519,015
Year 9 $4,165,961 $540,777
Year 10 $4,537,349 $563,760
Year 11 $4,942,499 $588,053
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
MRPS Revenue and Expenses Year 8
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Figure 42 –MRPS Revenue and Expenses
Submission No. 54
MRPS Strategy and Business Plan 2018 92
Figure 43 shows MRPSs revenue, expenses and surplus. The surpluses will be accumulated to form a reserve
to provide for capital works, such as major earthworks, boiler replacements and improved facilities.
Figure 43 – MRPS Revenue, Expenses and Surplus
Revenue Expenses SurplusYear 0 $204,979 $155,963 $49,016
Year 1 $273,898 $169,369 $104,529
Year 2 $478,390 $230,891 $247,499
Year 3 $578,501 $297,391 $281,110
Year 4 $706,272 $317,385 $388,887
Year 5 $926,484 $376,392 $550,092
Year 6 $1,196,183 $392,441 $803,742
Year 7 $1,566,284 $433,927 $1,132,357
Year 8 $3,825,505 $519,015 $3,306,489
Year 9 $4,165,961 $540,777 $3,625,184
Year 10 $4,537,349 $563,760 $3,973,589
Year 11 $4,942,499 $588,053 $4,354,446
MRPS Revenue, Expenses and Surplus
Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Submission No. 54
MRPS Strategy and Business Plan 2018 93
Figure 44 shows MRPS revenue for year 8. Compared with other tourist and heritage rail organisations, it
highlights the importance of First Class.
Figure 44 – MRPS Revenue Year 8
Excursion, $3,500,167
First Class, $151,791
MRPS Revenue Year 5
Submission No. 54
MRPS Strategy and Business Plan 2018 94
Figure 45 shows MRPS expenses for year8. The administration expenses are low relative to other tourist and
heritage rail organisations.
Figure 45 – MRPS Expenses Year 8
Marketing, $25,504 Fund Raising, $13,787
Insurance, $25,768Admin., $25,504
Utilities, $12,233
Running Expenses, $37,097
Loco. Expenses, $190,000
Vehicles , $23,185 , $0
Way and Works, $27,546
Other Expenses, $38,210
First Class Food and Alcohol, $100,182
MRPS Expenses Year 8
Submission No. 54
MRPS Strategy and Business Plan 2018 95
The diagrams and information detailed above reflect the financial sustainability of MRPS and the clear
benefits of being close to a very large market. The financial data justifies the capital investment identified in
the Strategy and Business Plan. It clearly consolidates MRPS’s position both in terms of patronage and
sustainability.
Of significance, when compared with other tourist and heritage railways, MRPS is differentiated by the
revenue gained from First Class patronage, and the subsequent surpluses that will substantially lower the
organisation’s financial risk and provide for the funding of earthworks, boiler replacements and other major
capital improvements.
Submission No. 54
MRPS Strategy and Business Plan 2018 96
9. GOALS AND OBJECTIVES
The Goals for the venture are:
Goal 1 Core Product MRPS will be a hallmark tourist attraction on the Mornington Peninsula.
Goal 2 People MRPS will be operated by professional, customer focused volunteers working in a co-operative environment.
Goal 3 Marketing MRPS will ensure its ongoing viability through effective promotion and marketing.
Goal 4 Finance MRPS will be financially viable.
Goal 5 Infrastructure MRPS infrastructure maintained in a manner that ensures ongoing operational sustainability.
Goal 6 Governance MRPS Board will provide sound policy direction, governance and leadership.
Submission No. 54
MRPS Strategy and Business Plan 2018 97
Goal 1 Core Product MRPS will be a hallmark tourist attraction on the Mornington Peninsula. Objectives:
1.1 By February 2019, submit funding applications for Federal and State grants.
1.2 By June 2019, develop the accreditation update required for the Baxter Extension.
1.3 As required, monitor developments in electrification of the line to Baxter to optimise benefits to MRPS.
1.4 By June 2019, finalise MRPS booking system requirements and purchase the necessary licences.
1.5 Annually each June, having reviewed the booking system data, implement changes to MRPS’s marketing
and operations, which address any trends identified.
1.6 By 2026, incrementally migrate MRPS scheduled services to daily running.
Submission No. 54
MRPS Strategy and Business Plan 2018 98
1.7 By 2016, MRPS will operate services to Baxter.
Submission No. 54
MRPS Strategy and Business Plan 2018 99
Goal 2 People MRPS will be operated by professional, customer focused volunteers working in a co-operative environment.
Objectives:
2.1 By June 2019, develop a recruitment and induction programme that prepares volunteers for any
issues that may arise from generational change.
2.3 By June 2019, develop a mentoring programme utilising experienced volunteers that support new
volunteers in the early stages of their engagement with the railway.
2.4 Annually each February, update all volunteers on issues associated with volunteer retention and the
importance of ongoing volunteer engagement and ownership of issues that impact on volunteers and the
railway.
2.5 By June 2019, complete the migration of the management of projects on the railway from a functional focus
where a specific work group progresses all tasks associated with a particular discipline, for example rolling
Submission No. 54
MRPS Strategy and Business Plan 2018 100
stock maintenance, to a management system where work groups tailored for specific projects are formed
and they progress designated projects. The approach ensures that teams with the appropriate skills and
capacity are available and there is less fragmentation.
2.6 By October 2019, develop a comprehensive training programme for volunteers and, in partnership with
Registered Training Organisations, developing the railway as a training centre
2.7 By 2020, double the number of members and active volunteers.
2.8 By 2023 have 1,000 members and 350 active volunteers.
2.9 Annually each August, conduct a volunteer satisfaction survey.
2.10 Annually each November, having reviewed MRPS’s operational and other requirements to identify any
volunteer and staffing issues, implement actions to address those issues.
2.11Annually each November, conduct a volunteer function that includes the presentation of certificates of
appreciation for volunteers.
Submission No. 54
MRPS Strategy and Business Plan 2018 101
Goal 3 Marketing The MRPS will ensure its viability through effective marketing. Objectives:
3.1 Annually each July, review MRPS’s marketing and publicity arrangements to ensure optimal outcomes for
the railway.
3.2 Annually each July, review the placement of road signs at strategic locations, detailing the experience
offered at the railway.
3.3 Annually each August, having reviewed relationships with major tourism stakeholders and operators in the
region, amend MRPS’s marketing to ensure optimal outcomes for the railway.
3.4 By 2020, MRPS will double its patronage through a relaunch of services supported by the use of social
media and low cost publicity
Submission No. 54
MRPS Strategy and Business Plan 2018 102
3.5 By 2024, MRPS will operate daily services and have patronage of 64,000 passengers and 128,000
passenger journeys annually.
Submission No. 54
MRPS Strategy and Business Plan 2018 103
Goal 4 Finance
The MRPS will be financially viable. Objectives:
4.1 By December 2019, secure undertakings from State and Federal Government departments for the required
funding for MRPS infrastructure identified in the Strategy and Business Plan. 4.2 Annually each June, review MRPS’s marketing performance to ensure that revenue budgets are achieved. 4.3 Annually each February, prepare a revenue and expense budget for Board approval. 4.4 Annually each February, having identified possible sources of funding for capital works for new MRPS
initiatives, undertake activities to secure the funding.
4.5 Annually each February, review MRPS’s financial risk management to ensure optimal outcomes.
Submission No. 54
MRPS Strategy and Business Plan 2018 104
Goal 5 Infrastructure The MRPS infrastructure maintained in a manner that ensures ongoing operational sustainability. Objectives:
5.1 By June 2019, complete the restoration of the State Car 2, first class carriage, Melville, to facilitate the
introduction of a premium service – cost $70,000.
5.2 By June 2020. Complete site clearing, track laying and construction of covered carriage storage that will
see all operational carriages stored under cover – Cost $150,000.
5.3 By December 2020, incrementally progressing the installation of a hard stand, overhead lifting gantry and
pit for locomotive inspections – Cost $80,000.
5.4 By December 2021, complete restoration of K 177 steam locomotive – Cost $180,000.
5.5 By December 2012, complete restoration of the guards van 7CV to improve the facilities available for
special trains such as the Ale Train. Cost - $10,000.
Submission No. 54
MRPS Strategy and Business Plan 2018 105
5.6 By 2026, complete the works associated with the extension to Baxter.
Submission No. 54
MRPS Strategy and Business Plan 2018 106
Goal 6 Governance
MRPS Board will provide sound policy direction, governance and leadership.
Objectives:
6.1 Annually each May, review the performance of MRPS’s Board. 6.2 Annually each June, review implementation of the Board Development and Succession Plan. 6.3 Bi-annually every June and December, review implementation of the Strategy and Business Plan.
Submission No. 54
MRPS Strategy and Business Plan 2018 107
Attachment 1 - ATHRA - Mornington Railway Economic and Employment Input to the Regional Economy
Submission No. 54
MRPS Strategy and Business Plan 2018 108
Attachment 2 - Revenue and Expense Budget
Submission No. 54
MRPS Strategy and Business Plan 2018 107
Attachment 1 - ATHRA - Mornington Railway Economic and Employment Input to the Regional Economy
Submission No. 54
ASSOCIATION OF TOURIST AND HERITAGE RAIL AUSTRALIA
Mornington Railway (Mornington Railway Preservation Society)
Annual Economic and Employment Input
to the Regional Economy
August 2018 Prepared by
L I N Q A G E I N T E R N A T I O N A L Telephone:+ 61(0)3 9654 1410 Mobile: +61 (0)418568 199 Email: [email protected]
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
2
ATHRA Economic and Employment Analysis
1. Introduction
Railways, once a dominant political and an economic force in developing Australia, have now become an important
element in cultural heritage life. Australian railways enabled the agricultural and industrial development of the country,
the growth of our major cities and provided the birthplace of many country communities by their strategic placement
and the need for services. The evolution of the Australian transport system over the last 80 years has seen rail no
longer an important day to day element in people’s lives.
The heritage rail sector provides significant economic benefits to Australia through employment, tourism and
expenditure and the intangible benefits of volunteering. Today, those organisations are for many people the public
face of the rail industry. Specified below are details of the economic analysis utilised to calculate the economic and
employment benefits of the heritage rail sector in Australia and the Mornington Railway based on Australian tourist
and heritage sector 2016 / 2017 annual patronage data and Economic Contribution of Tourism in Victoria 2016 - 17
Department of Economic Development Jobs Transport and Resources and State Tourism Satellite Accounts 2016 -
17 produced by Tourism Research Australia April 2018.
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
3
2. Economic and Employment Data Analysis of Resources and State Tourism Satellite Accounts 2016 - 17 produced by Tourism Research Australia April
2018 and Economic Contribution of Tourism in Victoria 2016 - 17 Department of Economic Development Jobs
Transport and Resources shows for Australia the following.
For direct employment, one job is created for every $79,000 aggregated tourism spend.
For indirect employment, one job is created for every $154,000 aggregated tourism spend.
The multiplier for direct to indirect economic contribution is conservatively estimated to be 1.99.
187.7 million Domestic day visitors spend $105 per day.
93.7 million Domestic overnight visitors stay 338,000,000 nights and spend $185 per day.
7.9 million International visitors stay 266 million nights and spend $152 per day.
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
4
3. Patronage Data
Analysis of the data provided by the heritage rail sector shows that the aggregate patron day trips / visits for the
sector in Australia is 799,809 patron day trips / visits for the period 2016 / 2017 and is currently 5,680 patron day
trips / visits for the Mornington Railway. In 2022, the Mornington Railway annual patron days will be 30,308.
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
5
4. Contribution to the National Economy
The contribution to the national economy of the 799,809 patron day trips / visits to organisations in the heritage rail
sector in Australia and the Mornington Railway’s contribution are detailed below in Figure 1.
Source: Economic Contribution of Tourism in Victoria 2016 - 17 Department of Economic Development Jobs Transport and Resources and State Tourism Satellite Accounts 2016 - 17 produced
by Tourism Research Australia April 2018
Figure 1 – Annual Contribution by the Heritage Rail Sector to the Australian Economy and Employment and the Mornington Railway Contribution to the Victorian Economy and Employment in 2022
Tourist and Hertage Rail Sector AustraliaPatron Day Trips / Visits 799,809 Daily Spend Direct Contribution Indirect ContribuDirect EmploymIndirect Employment
33.60% 268,725 International $152.6 $41,015,432.11 $81,585,850.49 522.0 529.242.69% 341,462 Domestic Overni $185.2 $63,242,187.36 $125,798,202.71 804.8 816.023.71% 189,623 Domestic Day $105.0 $19,900,888.48 $39,585,854.12 253.3 256.8
100.00% $124,158,507.95 $246,969,907.31 1,580.0 1,601.9
Total Direct and Indirect Economic Contriburion $371,128,415Total Direct and Indirect EmploymentContriburion 3,181.9
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
6
The segmentation that relates to the above is detailed below in Figure 2.
Figure 2 – Segmentation Based on Visitor Days
International, 33.60%
Domestic Overnight,
42.69%
Domestic Day, 23.71%
Segmentation Based on Visitor Days
International Domestic Overnight Domestic Day
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
7
The chart below in Figure 3 details the sectors showing the percentage spend for each tourist dollar.
Figure 3 – Sector Percentage Spend for Each Tourist Dollar
Retail trade9%
Accommodation and food services
46%Transport, postal and
warehousing14%
Information media and
telecommunications
1%
Rental, hiring and real estate services
(b)2%
Administrative and support services
4%
Public administration
and safety0%
Education and training
5%
Health care and social assistance
1%
Arts and recreation services
14%
Other services1%
Ownership of dwellings
3%
Tourism Spend by Sector ‐ Percentage of each Dollar Spent
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
8
5. Summary
Annual visitation to the heritage rail sector in Australia, being 799,809 patron day trips / visits, and the current 5,680
patron day trips / visits for the Mornington Railway contribute significantly to the regional and Australian economy.
Detailed analysis using the data above shows that each year the people who visited heritage rail sector venues in
Australia contributed $371.128 million annually to the Australian economy. By 2022, the Mornington Railway will
directly and indirectly contribute $14.1 million annually to the Victorian economy.
That amount reflects the contribution to the Australian economy resulting from money spent by visitors to the heritage rail sector in Australia and the amount spent in the Mornington Peninsula.
Using the above data, the heritage rail sector in Australia will provide a significant contribution to employment. In
2022, the direct and indirect full-time equivalent jobs to be generated by the Mornington Railway will be 120.6.
The jobs to be created will be in the sectors detailed in Figure 3, many will be part-time positions or part-time positions
that will become full-time positions, and most will be in the hospitality, tourism and retail sectors.
Submission No. 54
ATHRA and Mornington Railway - Economic and Employment Analysis 2018
9
In addition to the above economic benefits, the Australian economy, especially the regional economy, will be
enhanced as there will be an increase in the diversity of recreational pursuits which improves the region’s liveability.
Submission No. 54
MRPS Strategy and Business Plan 2018 108
Attachment 2 - Revenue and Expense Budget
Submission No. 54
Attachment 2. Detailed Revenue and Expense 2018 Changed Concept of OperationsRevenue from Operations Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6Assumptions Double Saturday Monday/FridayAverage fare per Tourist $9.87 $10.16 $10.47 $10.78 $11.11 $11.44 $11.78Annual Adjustment - 3%First Class Fare $20.00 $20.60 $21.22 $21.85 $22.51 $23.19 $23.88
$0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Souvenir Recovery per Passenger $1.97 $2.03 $2.09 $2.16 $2.22 $2.29 $2.36DataTourist Passengers 10,460 14,121 19,769 27,677 38,748 54,247 70,521Total Tourist Ticket Sales $103,229 $143,540 $206,984 $298,471 $430,395 $620,630 $831,023First Class Passengers 0 0 1,900 2,660 3,724 5,325 6,923First Class Sales $0 $0 $40,314 $58,133 $83,828 $123,470 $165,326Special Events Passengers 900 927 955 983 1,013 1,043 1,075Total Fund Raising $22,906 $23,594 $24,301 $25,030 $25,781 $26,555 $27,351Total Running Day Income $20,653 $21,272 $21,910 $22,568 $23,245 $23,942 $24,660Rental Income $30,725 $31,647 $32,596 $33,574 $34,581 $35,619 $36,687
0 0 0 0 0 0 0$0 $0 $0 $0 $0 $0 $0
Total Passengers 11,360 15,048 22,624 31,321 43,485 60,616 78,519Operational Revenue $177,513 $220,052 $326,106 $437,776 $597,830 $830,215 $1,085,049Other IncomeFuel Rebate $2,617 $2,696 $2,776 $2,860 $2,945 $3,034 $3,125Subscriptions $6,559 $6,756 $6,958 $7,167 $7,382 $7,604 $7,832Misc. Income $791 $815 $839 $864 $890 $917 $944Donations $17,499 $18,024 $18,565 $19,122 $19,695 $20,286 $20,895Total Revenue $204,979 $248,342 $355,245 $467,789 $628,744 $862,056 $1,117,845
Submission No. 54
Operating ExpensesMarketing $14,960 $22,960 $23,649 $35,204 $36,260 $59,371 $61,153
$0 $0 $0 $0 $0 $0 $0Fund Raising $10,884 $11,210 $11,547 $11,893 $12,250 $12,617 $12,996
$0 $0 $0 $0 $0 $0 $0Insurance $20,341 $20,952 $21,580 $22,227 $22,894 $23,581 $24,289
$0 $0 $0 $0 $0 $0 $0Admin. $12,584 $12,962 $13,351 $13,751 $14,164 $14,589 $15,026
$0 $0 $0 $0 $0 $0 $0Utilities $9,657 $9,946 $10,245 $10,552 $10,869 $11,195 $11,531
$0 $0 $0 $0 $0 $0 $0Running Expenses $3,177 $5,177 $5,332 $8,221 $8,468 $14,246 $14,673
$0 $0 $0 $0 $0 $0 $0Loco. Expenses $28,829 $62,162 $64,027 $112,175 $115,541 $211,837 $218,192
$0 $0 $0 $0 $0 $0 $0Vehicles $6,832 $12,165 $12,530 $20,234 $20,841 $36,248 $37,336
$0 $0 $0 $0 $0 $0 $0Way and Works $21,745 $22,397 $23,069 $23,761 $24,474 $25,208 $25,965
$0 $0 $0 $0 $0 $0 $0Other Expenses $26,954 $27,763 $28,595 $29,453 $30,337 $31,247 $32,184
$0 $0 $0 $0 $0 $0 $0First Class Expenses $0 $0 $20,157 $29,067 $41,914 $61,735 $82,663
$0 $0 $0 $0 $0 $0 $0Wages Mgr., Fitter and Apprentice $0 $0 $0 $0 $0 $180,000 $185,400
Total Expenses $155,963 $207,694 $234,082 $316,539 $338,011 $681,874 $721,407
Total Expenses $155,963 $207,694 $234,082 $316,539 $338,011 $681,874 $721,407Surplus / Shortfall $49,016 $40,648 $121,163 $151,250 $290,732 $180,182 $396,438Accumulated Surplus / Shortfall $49,016 $89,664 $210,827 $362,076 $652,809 $832,990 $1,229,428
Capex $70,000 $75,000 $75,000 $190,000Melville (Undercover Storage) K177 & 7CV
(Site Clearing, Track Laying)
Submission No. 54
Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 137 Days Baxter$12.14 $12.50 $23.00 $23.69 $24.40 $25.13 $25.89
$24.60 $25.34 $50.00 $51.50 $53.05 $54.64 $56.28$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$2.43 $2.50 $2.58 $2.65 $2.73 $2.82 $2.90
91,678 94,428 97,261 100,179 103,184 106,280 109,468$1,112,740 $1,180,506 $2,237,003 $2,373,237 $2,517,767 $2,671,099 $2,833,769
9,000 9,270 9,548 9,834 10,129 10,433 10,746$221,372 $234,854 $477,394 $506,467 $537,311 $570,033 $604,748
1,107 1,140 1,174 1,210 1,246 1,283 1,322$28,172 $29,017 $29,888 $30,784 $31,708 $32,659 $33,639$25,400 $26,162 $26,947 $27,755 $28,588 $29,446 $30,329$37,788 $38,922 $40,089 $41,292 $42,531 $43,807 $45,121
0 0 0 0 0 0 0$0 $0 $0 $0 $0 $0 $0
101,785 104,838 107,983 111,223 114,559 117,996 121,536$1,425,472 $1,509,460 $2,811,321 $2,979,535 $3,157,904 $3,347,043 $3,547,605
$3,219 $3,315 $3,415 $3,517 $3,623 $3,731 $3,843$8,067 $8,309 $8,558 $8,815 $9,079 $9,352 $9,632
$973 $1,002 $1,032 $1,063 $1,095 $1,128 $1,162$21,522 $22,167 $22,832 $23,517 $24,223 $24,949 $25,698
$1,459,252 $1,544,254 $2,847,158 $3,016,447 $3,195,924 $3,386,203 $3,587,940
Submission No. 54
$93,597 $96,405 $99,297 $102,276 $105,344 $108,505 $111,760$0 $0 $0 $0 $0 $0 $0
$13,386 $13,787 $14,201 $14,627 $15,066 $15,518 $15,983$0 $0 $0 $0 $0 $0 $0
$25,017 $25,768 $26,541 $27,337 $28,157 $29,002 $29,872$0 $0 $0 $0 $0 $0 $0
$15,477 $15,941 $16,420 $16,912 $17,420 $17,942 $18,480$0 $0 $0 $0 $0 $0 $0
$11,876 $12,233 $12,600 $12,978 $13,367 $13,768 $14,181$0 $0 $0 $0 $0 $0 $0
$22,784 $23,468 $24,172 $24,897 $25,644 $26,413 $27,205$0 $0 $0 $0 $0 $0 $0
$353,377 $363,979 $655,161 $674,816 $695,061 $715,912 $737,390$0 $0 $0 $0 $0 $0 $0
$58,965 $60,734 $62,556 $64,433 $66,366 $68,357 $70,408$0 $0 $0 $0 $0 $0 $0
$26,744 $27,546 $28,372 $29,223 $30,100 $31,003 $31,933$0 $0 $0 $0 $0 $0 $0
$33,150 $34,145 $35,169 $36,224 $37,311 $38,430 $39,583$0 $0 $0 $0 $0 $0 $0
$110,686 $117,427 $238,697 $253,234 $268,656 $285,017 $302,374$0 $0 $0 $0 $0 $0 $0
$190,962 $196,691 $202,592 $208,669 $214,929 $221,377 $228,019
$956,022 $988,123 $1,415,777 $1,465,626 $1,517,420 $1,571,244 $1,627,188
$956,022 $988,123 $1,415,777 $1,465,626 $1,517,420 $1,571,244 $1,627,188$503,230 $556,131 $1,431,381 $1,550,821 $1,678,504 $1,814,959 $1,960,752
$1,732,658 $2,288,789 $3,720,170 $5,270,991 $6,949,495 $8,764,455 $10,725,207
$1,202,800Baxter
Submission No. 54
Attachment 3Mornington Railway Preservation Society
Suggested Organisational Management Structure
ManagementCommittee
Human Resources Committee
Membership Officer
Training and Education Manager
Roster Officer for Safeworking
Roster Officer for Steam
Roster Officer for Diesel
Roster Officer for Station Staff
Driver Experience Co‐Ordinator
Catering Manager
Rail and General Safety
Committee
Document Controller
Safety Officer
Key Registrar
Marketing Committee
Facebook Page Manager
Publications Manager
Way and Works Manager
Signals and Telegraph Manager
Mechanical Engineering Manager
Fitter in Charge Steam
Fitter in Charge Diesel
UndergearSpecialist
Light Engineering Manager
Project Manager K177
ICT Manager Carriage Manager
Painting Manager
Infrastructure Manager
BoardBoard
7 Members
Assistant Way and Works Manager
Event Manager
Mid‐Week Track Gang Leader
Party Co‐Ordinator
Submission No. 54
Attachment 4 - Master Plan - Rail Discovery Centre & Rail Skills Training Centre of Excellence Details
Design & permits $45,000
Manufacture & supply $180,000 Steel work
Brickwork $40,000 Pit and Perimeter wall with windows
Erect $120,000 Foundations, cranes, labour
Fit out $30,000 Water, electricity
$415,000
Track Track $48,000
Turnouts $65,000
Floor $135,000
$248,000
Facilities Jacking $105,000 Special jacks for lifting locomotives
Amenities $72,000 Staff & visitor toilets & wash area
$177,000
Intepretation Walkways etc $41,000 Discrete pathways & elevated viewing area
Display & interactive $46,000
Signage, foyer & entry $23,000
$110,000
$950,000Project cost
Shed structure
Roundhouse and Skills Training building
Sub total
Sub total
Sub total
Sub total
Submission No. 54
Design & permits $45,000 Brick front and Station Master's vestibule
Manufacture & supply $400,000 Steel work with skylights
Brickwork $240,000 Brick arched front 2 track entry
Erect $130,000 Foundations, crane and labour
Fit out $95,000
$910,000
Track Track $65,000
Turnouts $70,000
paving $20,000
$155,000
Toilets Visitor toilets $65,000 Including disabled toilets
Staff amenities $30,000 Including wash area
$95,000
Intepretation On platform cameos $100,000 Construct Edwardian and Art Deco cameos
Display & interactive $400,000 Sound and light
Signage $70,000
$570,000
$1,730,000
Roundhouse and Station Train Display Pavillion $2,680,000
Sub total
Project cost
Display Pavilion Pavilion structure
Brick arch metal shed
Sub total
Sub total
Sub total
Submission No. 54
The Vision is to create anengaging tourism corridor,including the restoration of theheritage railway from Baxter toMornington, constructing theMornington Community Safelinkfrom the end of the PeninsulaLink Trail to Mornington anddeveloping the centrally locatedMt Eliza Regional Park, whereMoorooduc station will form avisitation hub for the community.
S A F E L I N K A N D M O R N I N G T O N R A I L W A Y
The Gateway to theMornington Peninsula Beginyour journey here by connectingfrom public transportation andthe trail connection toWesternport.
The restored railwaywill follow the
Peninsula Link Trail from Baxter to Mt
Eliza Regional Park.
BAXTER STATION
EXISITINGPENINSULA LINK
MT ELIZAREGIONALPARKHistoric Railway located in theMt Eliza Regional Park. ThePark is ideal for Broad BasedCommunity Activities that willallow the community to enjoywalking, Picnic and BBQsfacilities, trains and wetlands.Adjacent to the HistoricMoorooduc Cool Stores.
SAFELINKTRAIL
Construction of Safelink trail will
connect thecommunities of Mt Eliza,Mornington, Mt Martha
and Baxter. Its part ofthe Bay Trail!
HARRAP CREEK TRAIL
Safelink joins theHarrap Creek trail
which culminates atThe Briars park
completing the entireBaxter to Briars Rail
and Trail.
INTERPRETATION
Creation of Interpretivesignage along the corridorfocusing on native vegetation,railway, local and indigenousheritage.
The Mission
Restore the heritagerailway line from Baxter toMoorooduc. Developbroad based communityactivities at Mt ElizaRegional Park. Createinterpretive signage alongthe corridor focusing onnative vegetation, railway,local and indigenousheritage.
The Cost The Economic Benefit The Mornington CommunitySafelink Trail will cost $6m.
The Safelink Trail willcontribute $4.45m and 10 FTEin year 1, Total $9.3m and 25FTE's to the local economy.
GETAWAY TO PORTPHILLIP BAYExtend your journey inthe Mornington Township Toenjoy its vibrant culinary, coffeeand social culture basedexperience.
The Moorooduc to BaxterRailway will cost $1.86m or$2.4m with recycled compositeplastic sleepers.
The Moorooduc to Baxter RailwayStrategic Plan will contributedirect and indirect $14m and120.6 FTE's to the local economy. Plastic Sleeper Options saves 64tonnes/km (320 Tonnes total)from landfill.
The Community Benefit
Creates a year round visitor destinationthat connects local communities on theNorthern Peninsula for Residents on thePeninsula and South East Melbourne.
Run tourist trains direct fromMelbourne to Mornington forlocal events and races.Safely operate running festivalsand Fun Run with K163.
The Baxter to Moorooduc Railway Restoration including the Moorooduc Highway Crossing andthe Mornington Community Safelink Project are ready for immediate government investment.
Submission No. 54
"Restoring our Railway Heritage for all Generations"
Summary of Mornington Railway Strategic Plan
Introduction
The Mornington Railway Preservation Society Inc, abbreviated to MRPS. The MRPS was founded in
1984 and has brought joy to thousands of visitors around Victoria with Heritage Steam and Diesel
Locomotive excursions and events.
Vision – How we want to be known.
Mornington Railway will be valued by the community, business, Government and others as a
hallmark visitor attraction on the Mornington Peninsula.
Mission – How we will get there.
MRPS will operate the Mornington Railway as a financially and operationally sustainable tourist
experience that contributes significantly to the economy and employment in Victoria.
Economic benefit
Currently the MRPS contributes $2.64 Million and 22.6 Full Time Equivalent Jobs annually to the
economy as of 2018.
Forecasted to contribute $14million and 120.6 Full Time Equivalent Jobs annually to the economy
by 2022 as a result of the implementation of the MRPS strategic plan.
Key Capital Projects / Priorities outlined by the strategic plan
Melville carriage restored to facilitate a first class service and events carriage, this offers a strong
payback to assist MRPS fund future capital expenses.
Infrastructure Improvements to Moorooduc; to facilitate heavy maintenance, undercover storage
of wooden bodied carriages, Rail Discovery Centre to show the story of Victorian Railways and a
trade training centre, to develop victoria’s next railway workers.
Restoration / Acquisition of 2nd Steam locomotive the MRPS fundraising ability drops significantly
when our single steam locomotive is out for maintenance, a second steam locomotive will ensure
the sustainability of the Mornington Railway’s core business.
Back to Baxter is the ultimate objective to return heritage steam and diesel operations to Baxter and
link with the Victorian public railway network, this offers huge potential to expand our services and
ensure continued sustainability.
Submission No. 54