Kapasitas Unit = Kapasitas x % (Perkiraan)

Harga Satuan (Rp) = A + ( B/7) + (18 x 12500) + (0,07 x 75500 x 0,5)

Jumlah HM = π‘‰π‘‚πΏπ‘ˆπ‘€πΈ

𝐾𝐴𝑃𝐴𝑆𝐼𝑇𝐴𝑆 π‘ˆπ‘πΌπ‘‡ atau total Harga = Harga Satuan x Waktu Efektif

Total Harga = Jumlah HM x Harga Satuan (Rp)

Volume Kubikasi = P x L x D

Volume Solar = ( Vol/HM) x HM x 30

Batang Kelapa = 1/20 M

Oli 10 = 50 Liter x 1,1

Oli 30 = 40 Liter x 1,15

Grease = 18 Kg X 2 (Kaleng)

Buchem Berulit WR 400 @ 20 gr = ( 18/6) x 120%

Volume/ HM Satuan

Oli 10 = 0,40 Liter

Oli 30 = 0,19 Liter

Grease = 0,20 Kg

Solar = 19,00 Liter

Volume per HM = π‘‰π‘œπ‘™π‘’π‘šπ‘’ π‘π‘’π‘Ÿ π‘π‘’π‘™π‘Žπ‘›

𝐻𝑀 π‘₯ 30 π‘•π‘Žπ‘Ÿπ‘– ( π‘‘π‘’π‘Ÿπ‘”π‘Žπ‘›π‘‘π‘’π‘›π‘” π‘˜π‘Žπ‘™π‘’π‘›π‘‘π‘’π‘Ÿ π‘‘π‘Žπ‘™π‘Žπ‘š 1 π‘π‘’π‘™π‘Žπ‘› )

Volume/ bulan untuk solar = 18 x HM x 30 Hari

π‘ƒπ‘’π‘šπ‘Žπ‘˜π‘Žπ‘–π‘Žπ‘› π‘‘π‘œπ‘‘π‘Žπ‘™ π‘ π‘œπ‘™π‘Ž π‘Ÿ

π‘‘π‘œπ‘‘π‘Žπ‘™ 𝐻𝑀 = Konsumsi BBM/ Jam

Total HM = (π‘‰π‘œπ‘™π‘’π‘šπ‘’ / π‘˜π‘Žπ‘π‘Žπ‘ π‘–π‘‘π‘Žπ‘  /𝐻𝑀(π‘š3)

π‘ƒπ‘’π‘Ÿπ‘“π‘œπ‘Ÿπ‘šπ‘Žπ‘›π‘π‘’ π‘Žπ‘™π‘Žπ‘‘ π‘π‘’π‘Ÿπ‘Žπ‘‘

Waktu efektif (hari) = Waktu (Hari)/ Performance alat berat + Rolling alat

Waktu hari = π‘‰π‘œπ‘™π‘’π‘šπ‘’

πΎπ‘Žπ‘π‘Žπ‘ π‘–π‘‘π‘Žπ‘  /(π‘˜π‘Žπ‘π‘Žπ‘ π‘–π‘‘π‘Žπ‘  /𝐻𝑀π‘₯7)

HM= Tergantung HM Yang

Ditentukan

Dalam Keadaan Normal/ Optimal