Transcript

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 10 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05010 3.0

As Shown

/ /2212 11 CO MP CL

For Coordination

2.0

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5010.d

gn

Approved

Approved

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

80

80

80

80

80

80

80

80

80

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

57+000

58+000

59+000

60+000

61+000

62+00063+000

64+000

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

Chainage

57+600

57+700

57+800

57+900

58+000

58+100

58+200

58+300

58+400

58+500

58+600

58+700

58+800

58+900

59+000

59+100

59+200

59+300

59+400

59+500

59+600

59+700

59+800

59+900

60+000

60+100

60+200

60+300

60+400

60+500

60+600

60+700

60+800

60+900

61+000

61+100

61+200

61+300

61+400

61+500

61+600

61+700

61+800

61+900

62+000

62+100

62+200

62+300

62+400

62+500

62+600

62+700

62+800

62+900

63+000

63+100

63+200

63+300

63+400

63+500

63+600

63+700

63+800

63+900

64+000

Horizontal Alignment L=2826.5

L=375.0R=8220.0

L=2804.7L=375.0L=467.9

L=350.0R=8220.0

L=533.4

L=350.0

Vertical Alignment L=1825.2

G=-0.42%

L=401.5

R=56000.0L=50

5.1

G=-1.14%

L=746.6

R=-56000.0

L=649.5G=0.19%

L=261.4

R=56000.0

L=3806.6

G=-0.27%

Existing Level 98.7

98.9

98.9

98.8

98.5

98.2

97.8

97.9

97.5

96.8

96.1

95.1

94.5

94.4

94.2

93.9

93.4

92.7

92.4

92.1

91.5

91.0

89.8

88.5

87.6

86.8

86.0

85.4

84.9

84.0

83.0

82.5

82.3

81.9

81.5

81.2

79.9

78.5

78.1

78.3

79.1

80.4

83.1

84.6

85.7

86.7

87.4

86.2

82.8

78.8

77.0

76.9

76.6

75.7

75.7

75.8

76.6

78.1

80.5

82.8

83.6

83.0

82.8

81.7

81.2

Proposed Level 99.7

99.3

98.9

98.5

98.0

97.6

97.2

96.8

96.3

95.9

95.3

94.5

93.5

92.4

91.2

90.1

88.9

87.8

86.7

85.7

85.0

84.4

83.9

83.7

83.6

83.7

83.9

84.1

84.3

84.5

84.7

84.9

85.1

85.1

84.9

84.6

84.4

84.1

83.8

83.5

83.3

83.0

82.7

82.4

82.2

81.9

81.6

81.3

81.1

80.8

80.5

80.2

80.0

79.7

79.4

79.2

78.9

78.6

78.3

78.1

77.8

77.5

77.2

77.0

76.7

+1.0

+0.4

+0.5

+1.7

+2.4

+2.8

+3.2

+3.4

+3.4

+4.5

+5.6

+5.7

+5.2

+4.2

+2.6

+2.0

+3.5

+3.3

+3.4

+4.0

+3.7

+3.4

+2.3

+0.5

Cut and Fill -0.3

-0.5

-0.6

-0.6

-1.1

-1.2

-0.9

-0.8

-0.6

-1.0

-2.0

-3.0

-3.8

-4.5

-4.9

-5.7

-6.4

-6.5

-6.6

-5.9

-4.8

-4.0

-3.1

-2.1

-1.3

-0.6

-0.4

-2.2

-3.5

-4.8

-5.8

-4.9

-1.7

-2.2

-4.7

-5.8

-5.5

-5.6

-4.7

-4.5

Design Speed 400km/h

Ch.5

8440.8

06

TP.9

6.1

65

Ch.5

8842.3

33

TP.9

3.0

27

Ch.5

9347.4

32

TP.8

7.2

68

Ch.6

0094.0

09

TP.8

3.7

34

Ch.6

0743.5

01

TP.8

4.9

89

Ch.6

1004.8

83

TP.8

4.8

84

New HS2 Viaduct

over Flood Plain

New HS2 Viaduct over Flood Plain 200m

New HS2 Viaduct over Flood Plain 220m

New Possible Permanent

A418 Diversion over HS2

New Possible Permanent

A418 Diversion over HS2

STONE

New Possible Permament

Marsh Lane Diversion

over HS2

New Possible Permanent

Risborough Road Diversion

over HS2

New Possible Permanent Realignment

of the Princes Risborough to Aylesbury

Railway Line over HS2

New HS2 Viaduct

over Flood Plain

New Possible Permanent Realignment

of the Princes Risborough to Aylesbury

Railway Line over HS2

New Possible Permament

Marsh Lane Diversion

over HS2

New Possible Permanent

Risborough Road Diversion

over HS2

Possible Road Closure

AYLESBURY

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5011

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5009

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting

Recommended