OUT OF PIT CRUSHING AND CONVEYING
(OPCC) SYSTEMS
PT ADARO INDONESIA, Tbk
Menara Karya, 23rd Floor
Jalan H.R. Rasuna Said Block X-5, Kav. 1-2
Jakarta 12950, Indonesia
Phone: +6221-521-1265
PROJECT
OWNER
FLSmidth Indonesia
Gedung BRI II, 21st floor, Suite # 2101
Jalan Jendral Sudirman Kav. 44-46
Jakarta 10210, Indonesia
Tel +62 21 251 27 38/2739
Fax +62 21 251 27 40
PT WIJAYA KARYA (Persero), Tbk
Jl. DI Panjaitan Kav 9 Jakarta 13340
Phone : (62-21) 819 2808, 850 8640, 850 8650
Fax : (62-21) 856 4463, 819 1235
DRAWING NUMBER :
CONTRACTOR
RIGGING PLAN
CHASSIS OF APRON FEEDER
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
START
DATA MATERIAL
1. DIMENSION
2. WEIGHT
RIGGING DEPARTMENT
ANALYZE AND PLANED ACTIVITY FOR
LIFTING AND ERECTION WORK
REFERENCE
1. RIGGING BOOK
2. EQUIPMENT MANUAL
3. ASME B30.5-2004 Mobil & Locomotive cranes
4. ASME B30.6-2003 Derrick
5. ASME B30.10-1999 Hook
6. ASME B30.21-2005 manually lever operated hoist
7. ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling
8. ASME B30.26-2004 Rigging Hardware
9. BS EN 5973 Scaffolding
10. Australian Standard, AS 3569--1989, Wire ropes
11. Australian Standard, AS 2759--1985, Wire ropes
NEED DUO CRANE
Yes
No
MONO CRANE
TAILING DESIGN
JOB SAFETY ANALISYS
Safe
Risk
FINISH
Final Inspection by
WIKA
Prepare Final Report for ApprovaL
Handover
No
Yes
RIGGING PLAN
ACTION
CONTROL
OPCC-90-RIG-0002
1:1
00
: / 11
: CHASSIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
01
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
RIGGING PROCEDURE
01. OBJECTIVE
Rigging Study of install Chassis of Apron Feeder.
02. SCOPE OF APPLICATION
Rigging study is describe the guidelines and operating step of lifting Chassis of Apron Feeder.
03. REFERENCE
1. PT WIJAYA KARYA RIGGING DEPARTMENT REFERENCE
04. EQUIPMENT
No Equipment Qty Capacities Remark
01 CRAWLER CRANE 1 unit 250 ton New
02 Low Boy 1 unit 60 ton New
05. RIGGING TOOLS
No Equipment Qty Capacities Remark
01 Wire Sling 2.5 inch x 8.500m 4 pcs 47.7 ton
02 Omega Type Shackle 4 pcs 20 ton
03 Chain BLock 2 pcs 20 ton
06. SAFETY REQUIREMENTS
No Equipment Qty
01 Safety Barricade Red White 77 mtr
02 Safety Cone 7 pcs
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:1
00
: / 11
: CHASSIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
02
START
Chassis of Apron Feeder INSTALLATION
Move Chassis of Apron Feeder by Trailer to Site
Moving Preparation by Rigger Crew
LA
Y D
OW
N A
CT
IV
IT
Y
Inspection Quality
by QC & Safety
No
Yes
Connected all Sling
for Lifting
PR
EP
AR
IN
G A
CT
IV
IT
Y IN
S
IT
E
Lifting Chassis of Apron Feederby Crawler Crane
to Target Elevation
From ELev. 0.000
Connected Chassis of Apron Feeder to Foundation
FINISH
Cleaning Chassis of Apron Feeder
ER
EC
TIO
N A
CT
IV
IT
Y
Control Position of Chassis of Apron Feeder
to be Lifted by Rigging Supervisor
Object on Target Position
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:1
00
: / 11
: CHASSIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 1
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 2
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 3
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 4
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 5
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 6
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 7
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON
REMARK:
-. All dimension in millimeters
Gunawan H
SUKMA ARI
HaGun
Hg
12 11
A
B
C
D
E
10 9 8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
12 11
F
G
10 9 8 7 65
4 3
H
2 1
DWG NO :
A4
SIZE REV.
SCALE
REV. DATE DESCRIPTION
APRDCHKDDRAWN BP APRD
DATE DATE DATE DATE
REVISIONS
REFERENCE
DRAWINGS
For Information For Review For Approval For Release For As-Built
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his
responsibilities and liability under the Contract
C: ACCEPTED WITHOUT COMMENTS
B: ACCEPTED WITH COMMENTS
A: DOCUMENT TO BE REVISED AND REISSUED
CORE
LIFECYCLE CODE : A OR B
RESULT CODE : C, B, A
NEXT STATUS : FA, FR, RE, AB
RESUBMISSION DATE :
NEXT SUBMISSION DATE:
ISSUE PURPOSE :
EQUIP ITEM NO :
NON
REVIEW DATE :
RESPONSIBLE DEPT. / PERSON :
ENGINEER
APPROVED
CHECKED
DRAWN
SIGN.INITIALSDATE
FILE NAME:
PAGE
TYPE
DETAIL
AREA
NOTES:
OWNER
DWG NO. TITLE
CONTRACTOR
OPCC-90-RIG-0002
1:200
00
: / 14
: CHASIS OF APRON FEEDER
: RIGGING PLAN
: OUT OF PIT CRUSHING AND CONVEYING
03
STEP 8
RIGGING TOOLS:
1. CRAWLER CRANE 250 TON
2. BOOM 36.6 METER
3. R max 18 M LIFT CAPACITIES 50.8 TON
4. R min 9 M LIFT CAPACITIES 114.4 TON
5. MAXIMUM WEIGHT 40 TON