RFP 40313 Addendum #1 CLARIFICATION:
1. The pre-bid meeting is scheduled for 9:00 am Wednesday, November 6, 2013. 2. The below documents are to be replace Sections A, B, C, and D respectively.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 1 of 34
Received and Incorporated
00300A.1 Not Used
00300A.2 General Quotation Parameters
Bidder's Quotation Date
00300A.2.1 Bidder's Contact InformationBidder's Quotation Number
00300A - Quotation Fill-In Information for Steam Turbine Generator - 416.7 MW Net Plant Output
Corporate InformationCompany Name
Technical Contact NameTitle
Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code
Taxpayer ID Number (or EIN)Technical Contact
Phone NumberFax Number
Address/Number, StreetAddress/City
Address/State, Zip CodeEmail Address
00300A.2.2 AddendaNumber Date Description
00300A.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days
00300A.2.5.4 Not Used00300A.2.6.1 All Exceptions are declared on Form 00300A.2.6.1 - Yes/No00300A.2.6.2 All Clarifications are declared on Form 00300A.2.6.2 - Yes/No
00300A.2.4 Quotation includes/excludes taxes - Included/Excluded00300A.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300A.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300A.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 2 of 34
00300A.2.6.1.2 Technical Exceptions
Count Reference Stated Technical Exception123456789
10
00300A.2.6.1.1 Not Used
Form 00300A.2.6.1 Declared Exceptions to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 3 of 34
00300A.2.6.2.2 Technical Clarifications
Count Reference Stated Technical Clarification123456789
10
00300A.2.6.2.1 Not Used
Form 00300A.2.6.2 Declared Clarifications to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 4 of 34
$ -
$ - $ - $ - $ - $ - $ -
$ -
$ - $ - $ - $ - $ - $ -
$ -
00300A.3.2.2 NOT USED
00300A.3.2.5 Shipping/Transportation (from Table 3.2.5)
00300A.3 Quotation Pricing
Total Base Quotation Pricing - DDP/CIP Jobsite Location
00300A.3.1 Product Pricing (FCA-Factory Location)Price Breakdown
00300A.3.2.4.1 Field Service Representative (from Table 3.2.4.1)
Sum of Subtotals (Should Equal Base Quotation Price Above)
Subtotal 00300A.3.2 Supplemental Product Pricing00300A.3.2.6 Instruction Manuals (from Table 3.2.6)
00300A.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)
00300A.3.2.4.2 Training Service (from Table 3.2.4.2)
00300A.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300A.3.2 Supplemental Product Pricing
Subtotal 00300A.3.1 Product Pricing (FCA-Factory Location)
00300A.3.1.1 Steam Turbine Generator(Supplier to provide breakdown as required)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 5 of 34
Extended Price $ - $ - $ - $ -
Extended Price $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
Extended Price $ -
$ -
$ -
00300A.3.2.3 Special Tools and Lift Fixtures
Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1
Unit of MeasureQuantity Included
in POItem Description
Yes/No
Subtotal: Table 00300A.3.2.4.1 Field Service Pricing
Bidder has included Training time in base quotation per RFP requirements
Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses
Unit of Measure
00300A.3.2.4.2 Training Service Bidder Response Column
STG Round trips included in the firm fixed lump sum price
All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:
Round trips included in the firm fixed lump sum price Trips $ - 2
Training weeks included in the firm fixed lump sum price Week $ - 5
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2
All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:
Unit of Measure Unit Price
Subtotal: Table 00300A.3.2.3 Special Tools and Lift Fixtures Pricing $ -
$ - $ -
If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.
$ -
Bidder Response Column
If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP
00300A.3.2.2 NOT USED
Yes/NoAre startup spare or commissioining spare parts required?
Manufacturer's Part Identification
Subtotal: Table 00300A.3.2.1 Startup Spare Parts Pricing
$ -
If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No
00300A.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.
Table 3.2.1: Startup and Commissioning Spare Parts
00300A.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column
Unit Price
If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.
Unit of Measure Unit Price
Are special tools and/or lift fixtures required? Yes/No
Quantity Included in PO
Table 3.2.3: Special Tools and Lift Fixtures
Item Description Manufacturer's Part Identification
Yes/No
Unit Price
Trips $ - 40
Week
Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses
Quantity Included in PO
Table 3.2.4: Technical ServicesBidder Response Column
Quantity Included in PO
$ - STG Field service weeks included in the firm fixed lump sum price 120
00300A.3.2.4.1 Field Service Representative
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 6 of 34
00300A.3.2 Supplemental Product Pricing Tables
$ -
Extended Price $ - $ - $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
00300A.3.2.5 Shipping/Transportation
Subtotal: Table 00300A.3.2.5 Transportation Pricing
Bidder has included transportation in base quotation per RFP requirements
Bidder Response Column
$ - 1
Subtotal: Table 00300A.3.2.6 Instruction Manuals Pricing
Final Copy of Instruction Manuals Electronic EA
1
Table 3.2.6: Instruction ManualsUnit of
Measure Unit PriceQuantity Included
in POItem Description MediaProof Copy of Instruction Manuals Electronic
If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.
$ - EA
Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501
00300A.3.2.6 Instruction Manuals
Steam Turbine Generator(Supplier to provide breakdown as required)
Point of OriginItem Description
1 LotCarrier Type
Quantity Included in PO
Subtotal: Table 00300A.3.2.4.1 Training Pricing
If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.
All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Yes/No
Bidder Response Column
Table 3.2.5: Shipping/Transportation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 7 of 34
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit of Measure Unit Price
$/Day $ - $/Day $ - $/Day $ -
$/h $ - $/h $ - $/h $ -
$/rt $ -
Adjustment Rate Sunday / Holiday (beyond 8 hours)
Per diem Rate
All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:
Per diem Rate Monday through Friday (up to 8 hours)
Adjustment Rate Monday through Friday beyond 8 hours)
Table 4.4: Special Tools and Lift Fixtures
Item Number Unit of Measure
Table 4.3: NOT USED
Table 4.1: Equipment Pricing
Table 4.2: Startup and Commissioning Spare Parts
Item Description
Item Description Unit of Measure
Item Number Item Description Unit of Measure
00300A.4 Unit Adjustment Pricing Tables
Item Number
All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Round Trip Rate
Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance
Per diem Rate Sunday / Holiday (up to 8 hours)
All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:
Adjustment Rate Saturday (beyond 8 hours)
Saturday (up to 8 hours)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 8 of 34
Bidder Response Column
$ -
$ -
Bidder Response Column
Bidder Response Column
Origin CountryStateCity
If yes, list of other locations included with the quotation Yes/No
cu ft
Total Weight per Shipmentcu ft
Total Weight of Largest Single Component
lbTotal Volume per Shipment
Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No
00300A.8 Subcontracting
Number of Shipments CountTotal Number of Pieces per Shipment Count
Total Volume of Largest Single Component
Bidder's product included in the quotation has special storage requirements Yes/No
lb
00300A.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No
If Yes, special storage requirements are included with the quotation Yes/No
00300A.5 Option Pricing
00300A.6 Not Used
00300A.5.1 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, STG Scope Matrix Item 99
00300A.5.2 Recommended STG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))
00300A.7 Logistics00300A.7.1 Jobsite Storage Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 9 of 34
LD*
LD
Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.
Yes/No
00300A.9.2 Schedule of Submittals and Applicable Liquidated Damages
* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.
** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.
Steam Turbine Generator
Yes/No00300A.9.1.1 Bidder will make single consolidated shipment.
00300A.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No
18-Jan-16
00300A.9 Delivery and Schedule
Bidder Response ColumnRequired Delivery
00300A.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**
120 Days Maximum Prior to Required Delivery
(Supplier to provide breakdown as required)
00300A.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No
Yes/No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 10 of 34
TBD TBD
Calendar Event Due Date301 Engineering/Procurement/
Production/Testing and Inspection/Shipping Schedule and Status Report
30 After Effective Date with Monthly Updates
No
302 Preshipment Inspection Notice 30 Before Shipment of Equipment No
303 Electronic Material List 30 Before Shipment of Equipment No304 Shipping Notice 2 Full Work Days Notice No305 Detailed Final Packing List of
Shipment of Equipment, corresponding with Electronic Material List data
Upon each Shipment and With Electronic Materials List
No
306 Hazardous materials documentation
With Each Shipment No
701 Proof Copy of Instruction Manuals
90 Before Shipment of Equipment No
702 Final Copy of Instruction Manuals
15 Before Shipment of Equipment No
703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)
90 After Effective Date No
704 Startup and Commissioning Spare Parts List, Priced
90 Before Shipment of Equipment No
15561 Steam Turbine .0601 15561 Final heat balances for load
conditions specified in Article 15561.1.3
30 After Effective Date No
0602 15561 Expansion lines for the heat balances furnished for load conditions specified in Article 15561.1.3
30 After Effective Date No
0603 15561 HP turbine end points versus throttle flow
30 After Effective Date No
0604 15561 Expansion line end points versus reheater flow (throttle flow for nonreheat units) curves for exhaust pressures for 1 inch (25 mm) Hg absolute to the turbine maximum allowable continuous operating exhaust pressure
30 After Effective Date No
0605 15561 Leakage flow and leakage enthalpy versus throttle flow curves
30 After Effective Date No
0606 15561 Turbine section efficiency versus inlet volumetric flow
30 After Effective Date No
Project Delivery Date: January 18, 2016
00300.9.2 Schedule of Submittals and Applicable Penalty
Effective Date:
Bid
der C
ompl
ies
Yes
/No
Penaltyapply?
The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.
Reference Document
Submittal DatesSubmittals Item
Estimated First Shipment Date:
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 11 of 34
0607 15561 Combined efficiency of IP and LP turbines as a function of reheat temperature and intercept valve pressure
30 After Effective Date No
0608 15561 Turbine exhaust loss curve 30 After Effective Date No0609 15561 Turbine exhaust pressure
correction30 After Effective Date No
0610 15561 First-stage pressure versus flow to the following stage curve
30 After Effective Date No
0611 15561 Reheat bowl pressure versus flow to the following stage curve
30 After Effective Date No
0612 15561 Correction curves for kilowatts and heat rate for the following
After Effective Date No
0613 15561 Throttle pressure rated +5 percent, -50 percent
30 After Effective Date No
0614 15561 Throttle temperature rated +57.2° F to -18.4° F (+14° C to -28° C)
30 After Effective Date No
0615 15561 Reheat temperature rated +57.2° F to -18.4° F (+14° C to -28° C)
30 After Effective Date No
0616 15561 Reheater pressure drop 5 percent to 15 percent of HP turbine exhaust pressure
30 After Effective Date No
0617 15561 Exhaust pressure from 1 inch (25 mm) Hg abs to the turbine maximum allowable continuous operating exhaust pressure
30 After Effective Date No
0618 15561 All other correction curves for ASME PTC 6.2 Acceptance Test
30 After Effective Date No
0619 15561 Valve loop correction to heat rate curve
30 After Effective Date No
0620 15561 Turbine heat rate versus gross turbine output for governing control and hybrid mode of operation
30 After Effective Date No
0621 15561 The following variable pressure performance curves
After Effective Date No
0622 15561 HP turbine exhaust pressure versus percent maximum expected throttle flow
30 After Effective Date No
0623 15561 Main turbine throttle pressure versus percent maximum expected throttle flow
30 After Effective Date No
0624 15561 HP turbine exhaust temperature versus percent maximum expected throttle flow
30 After Effective Date No
0625 15561 IP turbine exhaust pressure versus percent maximum expected throttle flow
30 After Effective Date No
0626 15561 All curves in the Supplier's standard thermal kits
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 12 of 34
0627 15561 Final list of motors including voltage, full load current, locked-rotor current, phase, horsepower, enclosure type for each motor, and space heater watts and volts
90 After Effective Date No
0628 15561 Final list of closed cycle cooling water requirements including flow and pressure drop and flow diagram
45 After Effective Date No
0629 15561 Final list of all instrument/service air users and consumption
90 After Effective Date No
0501 15561 Steam seal system diagram indicating flows, pressures, and temperatures (steam seal system P&ID)
60 After Effective Date No
0630 15561 Lube oil system data including volumetric and flow back
60 After Effective Date No
0502 15561 Lube oil diagrams (lube oil system P&ID)
60 After Effective Date No
0503 15561 Drawings and procedure for cleaning of lube oil system showing all temporary pipe and equipment required
After Effective Date No
0631 15561 Preliminary air consumption 40 After Effective Date No
0504 15561 DEHC fluid diagrams (control and protection P&ID)
60 After Effective Date No
0505 15561 Drawings indicating the location of all turbine generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into accessory
90 After Effective Date No
0506 15561 Detailed schematic and wiring drawings of all electrical control wiring
120 After Effective Date No
0507 15561 Drawings indicating the size and location of all turbine generator ground pads
90 After Effective Date No
0508 15561 All drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings
120 After Effective Date No
0509 15561 Arrangement drawings of all piping and accessories furnished, as required for the Purchaser's check of the layout of these items
150 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 13 of 34
0510 15561 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items
60 Before Shipment of Equipment No
0632 15561 Lateral and torsional analysis report and critical speeds of turbine generator rotor
60 After Effective Date No
0511 15561 A block diagram with significant transfer functions representing the generator, excitation, and regulator satisfactory for computer studies
30 After Effective Date No
0633 15561 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
150 After Effective Date No
0634 15561 Listing of accessory equipment to be shipped loose to jobsite
30 Before Shipment of Equipment No
0512 15561 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items. This includes outline drawings of the supervisory instruments and accessory electrical equipment.
120 After Effective Date No
0201 15561 Supplier to participate in design conference
15 After Effective Date No
0635 15561 Equipment startup schedule duration requirements
90 After Effective Date No
0636 15561 Specification data pages updated and resubmitted
60 After Effective Date No
0637 15561 Preservative coating data 60 After Effective Date No
0638 15561 Detailed drawing submittal schedule list and submittal schedule
30 After Effective Date No
0639 15561 Detailed data to describe the capability of the unit to operate at speeds above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off normal speed operation
60 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 14 of 34
0640 15561 Detailed information as to the capability of the turbine generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
60 After Effective Date No
0641 15561 All control devices and/or process set points, ranges, and flow quantities
60 After Effective Date No
0642 15561 Complete I/O list for signals to/from Subsupplier's systems from/to Supplier's DCS
120 After Effective Date No
0643 15561 I/O counts 120 After Effective Date No
0513 15561 Detailed logic diagrams, operations procedures, and operator interface screens to implement control of Supplier's equipment via Purchaser's DCS
120 After Effective Date No
0644 15561 Electrical load list including MOVs
60 After Effective Date No
0514 15561 Turbine generator general arrangement drawings. These drawings shall indicate all major equipment locations, access doors, maintenance or equipment removal space, and provide sufficient detail to allow for plan layout.
30 After Effective Date No
0515 15561 All main steam, reheat steam, and large bore piping connection drawings including type, allowable movements, and loads
60 After Effective Date No
0516 15561 All main steam, reheat steam, and large bore piping connection drawings end prep details
60 After Effective Date No
0517 15561 Details of temporary steam blow connections
60 After Effective Date No
0518 15561 Condenser interface details including loading flange connections and loading conditions
60 After Effective Date No
0519 15561 Drawings to assist Supplier in bus duct design/layout interface with generator ("bus duct" includes isophase bus duct and bus duct from generator neutral enclosure to the generator NGR enclosure)
60 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 15 of 34
0645 15561 Flow charts detailing on-line monitoring programs for startup and on-line monitoring of critical parameters
120 After Effective Date No
0520 15561 Preliminary drawings and detailed assembly instructions for erection bid solicitation
120 After Effective Date No
0521 15561 Final erection drawings and detailed assembly instructions
360 After Effective Date No
0646 15561 Detailed drawing submittal list and submittal schedule
60 After Effective Date No
15565 Lube Oil Conditioner .
0538 15565 Drawings of layout and overall dimensions of the lube oil conditioner skid package
30 After Effective Date No
0539 15565 Detailed drawings of all electrical/control wiring
30 After Effective Date No
0540 15565 Piping and instrument diagrams 30 After Effective Date No
0541 15565 All drawings required to locate all piping and wiring connections
30 After Effective Date No
16031 Cylindrical Rotor Generators .
0202 16031 Supplier to participate in design conference
15 After Effective Date No
0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0652 16031 Critical speeds of generator 30 After Effective Date No
0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.
30 After Effective Date No
0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 16 of 34
0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation
30 After Effective Date No
0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
30 After Effective Date No
0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)
30 After Effective Date No
0658 16031 Generator "Vee" curves 30 After Effective Date No
0659 16031 Zero and rated power factor current saturation curves
30 After Effective Date No
0660 16031 No load saturation curves 30 After Effective Date No
0661 16031 Generator allowable negative sequence versus time curve
30 After Effective Date No
0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals
30 After Effective Date No
0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.
30 After Effective Date No
0664 16031 Generator current transformer secondary excitation characteristic curve
30 After Effective Date No
0665 16031 Generator current transformer ratio correction factor curve
30 After Effective Date No
0666 16031 Generator current transformer thermal rating
30 After Effective Date No
0667 16031 Generator current transformer mechanical rating
30 After Effective Date No
0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 17 of 34
0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)
30 After Effective Date No
0670 16031 Generator current transformer phase angle correction factor curves
30 After Effective Date No
0671 16031 Generator current transformer correction factor curves
30 After Effective Date No
0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability
30 After Effective Date No
0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies
30 After Effective Date No
0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No
0544 16031 Stator cooling water diagrams 90 After Effective Date No
0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
90 After Effective Date No
0674 16031 List of all control devices and/or process set points, ranges, and flow quantities
90 After Effective Date No
0675 16031 Listing of accessory equipment to be shipped loose to jobsite
120 After Effective Date No
0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams
90 After Effective Date No
0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items
60 After Effective Date No
0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment
90 After Effective Date No
0548 16031 Drawings indicating the size and location of all generator ground pads
90 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 18 of 34
0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers
90 After Effective Date No
0550 16031 Detailed schematic drawings of all electrical control wiring
90 After Effective Date No
0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.
90 After Effective Date No
0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items
90 After Effective Date No
0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.
180 After Effective Date No
0676 16031 Generator terminal enclosure outline and loading data
90 After Effective Date No
0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies
30 After Effective Date No
16051 Electrical Design and Equipment
.
0677 16051 Certified design data and performance curves
70 Before Shipment Yes
0555 16051 Arrangement and fabrication/ erection drawings
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 19 of 34
0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials
60 After Effective Date Yes
0557 16051 Final set of above drawings in addition to interconnection wiring diagrams
21 After Purchaser comments on initial drawings
Yes
0558 16051 Final submittal of as-built drawings
30 After Shipment Yes
0559 16051 Relay instruction and service manual including relay curve information
90 After Effective Date Yes
0678 16051 Current transformer ratio correction factor and excitation curves
90 After Effective Date Yes
0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used
30 After Effective Date Yes
0560 16051 I/O database and I/O wiring diagrams
Upon Shipment Yes
16142 Generator Neutral Grounding .
0680 16142 Bill of Material, Including Quantity, Description, and Part Number
Upon Effective Date Yes
0681 16142 Certified design calculations 30 After Effective Date Yes
0561 16142 Preliminary outline drawings 15 After Effective Date Yes
0562 16142 Final drawings 60 After Effective Date Yes
0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes
16201 Protective Relaying Panels .
0564 16201 Outline drawings showing dimensions, weight, and mounting requirements
15 After Effective Date Yes
0565 16201 Schematic diagrams 30 After Effective Date Yes
0566 16201 Connection and wiring diagrams 30 After Effective Date Yes
0567 16201 Erection drawing 30 After Shipment Yes
0568 16201 Relay installation and wiring information
30 After Effective Date Yes
0569 16201 Nameplate drawings 45 After Effective Date Yes
E645 Electric Actuators .
0570 E645 Actuator outline diagrams 30 After Effective Date No
0571 E645 Wiring diagrams 30 After Effective Date No
K100 Instrumentation .
0572 K100 Instrument Location Plan Drawings
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 20 of 34
0573 K100 Instrument factory calibration sheets
Upon Shipment of Instruments Yes
0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow
120 After Effective Date Yes
0575 K100 ISA-format datasheets for all Instruments
120 After Effective Date Yes
0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.
120 After Effective Date Yes
M200 Piping .
0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.
Q002 General Quality System Requirements
.
0401 Q002 Quality Manual, controlled copy 30 After Effective Date
0402 Q002 Certification Letter or Certificate of Authorization (copy), if certified by a registered agency, e.g., ASME Certificate of Authorization, ISO Certificate
30 After Effective Date
0403 Q002 Subsupplier listing 5 Before Issue of Subsupplier Purchase Order
0404 Q002 Inspection and test plan 30 After Effective Date
0405 Q002 Notification of inspection/test (for B&V hold/witness points)
14 Before Test/Inspection
Q100 General Welding Requirements
.
0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.
0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion
0407 Q100 Radiographs 14 After Fabrication Completion
Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials
.
0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records
21 Before Shipment
Q301 Manufacturer's Standard Coating
.
0683 Q301 Shop drawings that identify shop-applied coating systems
30 Before Start of Fabrication No
0684 Q301 Manufacturer's product data sheets
30 After Release to Proceed No
Q400 General Equipment Requirements
.
RFP 40313
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 21 of 34
0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.
30 After Effective Date No
Q502 Electrical Data
0576 Q502 Completed motor information sheets
60 After Effective Date Yes
0577 Q502 Completed electric actuator information sheet
60 After Effective Date Yes
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 22 of 34
Bidder Response Column
Reference Document Submittal Item Yes/No
15561 Steam Turbine .15561 Heat balance diagrams for each load condition.15561 Exhaust pressure correction curves for heat rate and output.15561 Startup curves for hot, warm, and cold startups indicating flow, temperature,
time, and other parameters for normal startups and loading rate curve.
15561 Lube oil pump characteristic curves.15561 Turbine overall length, width, height, and shaft center line to floor line
dimension.15561 Valve restraint forces imposed on turbine foundation and any other
information that should be incorporated in the turbine foundation design.15561 Bearing spans.15561 Turbine control panels and control cabinets overall length, width, and height.
15561 EHC insert panels and/or CRT overall length, width, and height.15561 Table of weights and dimensions indicating assembled weights and
dimensions of major components, weights to be handled during erection, and weights to be handled during overhaul.
15561 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item including a discussion or designation of particular items required for erection and/or maintenance.
15561 Complete list of recommended spare parts.15561 Description of required sectional shipments if equipment cannot be
completely factory assembled.15561 Information describing coating systems for equipment.15561 Complete information on the EHC system including a list of major
components, description of the principles of operation, and available options.
15561 Complete information on the TSI system including a list of major components, description of the principles of operation, and available options.
15561 Description of instrumentation furnished.15561 Power consumption of EHC and supervisory system in kVA, normal and
peak, inverter power.15561 Complete description of cable requirements, including the cable
constructions, for all equipment furnished and applicable flame tests.15561 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
15561 Complete description of any separate cooling air requirements for logic and control cabinets.
15561 Description and indication of the number of grounding pads or devices for each casing and shaft.
15561 Description of any special equipment grounding requirements that would not allow the equipment to be grounded (connected) to the station ground grid.
Document submitted with Quotation Package
00300A.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 23 of 34
Reference Document Submittal Item Yes/No
15561 Complete description of provisions made in pressure parts and other equipment to permit the proposed turbine generator unit to withstand numerous cold, warm, and hot starts per year over the design life of the unit without fatigue failure.
15561 Complete description of provisions in the equipment design to ensure meeting the stated loading time from minimum load to maximum load.
15561 Complete description of manufacturer's lagging design.15561 Complete description of the lube oil piping arrangement.15561 Complete data on steam purity requirements.15561 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, turbines under construction or in operation.15561 Listing of suppliers and their manufacturing locations.15561 Bidder's preliminary engineering schedule.15561 Bidder's preliminary procurement/production/shipping schedule.15561 Description of data link provided to Purchaser's DCS.15561 Detailed description of automation equipment for automatic run-up of turbine.
15561 Description of turbine rotor stress monitoring system.15561 Description of turning gear.15561 Description of field assembly work required and estimated manpower
requirements for erection of equipment.15561 Description of shaft couplings.15561 Description of startup of the unit.15565 Lube Oil Conditioner .15565 Dimensional drawings of proposed components.16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power
factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.
16031 Generator drawing with excitation cubicle's overall length, width, and height.
16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.
16031 Generator drawing with supervisory cabinet's overall length, width, and height.
16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.
16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.
16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.
16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 24 of 34
Reference Document Submittal Item Yes/No
16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,
including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for
connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable
constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator
temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field
winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.
16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of
cooling air.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 25 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Steam Turbine .15561 Bidder's name15561 Turbine name15561 Identification number15561 Turbine manufacturer15561 Component Weights15561 Weights, ton (long)
15561Assembled turbine complete without external accessories
15561Assembled weight of turbine oil reservoir including coolers, pumps, and piping
15561 Dry15561 Operating
15561Assembled weight of EHC system fluid reservoir including coolers, pumps, and piping
15561 Dry15561 Operating15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Performance15561 Guarantee Load Condition: 15561 Guaranteed/Predicted15561 Throttle Flow, lb/h (kg/h)15561 Net Turbine Output, kW15561 Net Turbine Heat Rate, Btu/kWh15561 Steam Turbine Operational Data
15561Approximate minimum load at which unit can operate satisfactorily for continuous period, percent
15561 Expected no-load throttle flow, lb/h (kg/h)
15561Maximum exhaust temperature at no-load throttle flow, °F (°C)
15561Minimum time required for pickup from minimum load to maximum load, minutes
15561Allowable rate of load change, 25 percent load to rated load (submit as plotted data, if necessary)
15561Supplementary steam requirements for sealing turbine at low load operation during startup and shutdown
15561 Flow, lb/h (kg/h)15561 Temperature, °F (°C)15561 Pressure, psi (kPa)15561 Steam Turbine Physical Data15561 Length of last stage blading, in. (mm)
00300A.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 26 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Diameter of last stage wheel, in. (mm)15561 Velocity at tip of longest row of blades, ft/s (m/s)
15561Exhaust annulus area, per each last stage wheel, ft2 (m2)
15561Maximum allowable turbine back pressure for stable operation, in. (mm) Hg
15561Steam loading on last row of blades for maximum exhaust flow, lb/h/ft2 (kg/h/m2)
15561 Total turbine generator moment of inertia, WK2 (MR2)15561 Pitch diameter of governor stage, in. (mm)15561 Length of governor stage blades, in. (mm)15561 Governor stage efficiency at VWO-NP, percent
15561 First-stage bowl pressure at VWO-NP, psi(a) (kPa[a])
15561 First-stage exit pressure at VWO-NP, psi(a) (kPa[a])15561 Number of governor controlled inlet valves15561 Throttle flow ratio at each admission, 1st, 2nd, etc.15561 Governor stage efficiency at first admission, percent
15561First-stage bowl pressure at first admission, psi(a) (kPa[a])
15561First-stage exit pressure at first admission, psi(a) (kPa[a])
15561 Bearing data15561 Thrust bearing15561 Type15561 Design capacity, lb (kg)15561 Maximum force at worst operating condition, lbf15561 Main bearings15561 Number15561 Type15561 Design load, ton (long)
15561 Maximum allowable bearing temperature, °F (°C)
15561Maximum allowable vibration for each bearing for continued operation, peak-to-peak, mils
15561 Steam Turbine Blade Data15561 Number and type of stages (Quantity/Type)15561 HP turbine /15561 IP turbine /15561 LP turbine /15561 Allowable frequency variation15561 Limited time, ±Hz/total time15561 Continually, ±Hz15561 Method of fastening shrouding and lashing15561 Stage blading fitted with Stellite shields15561 Number15561 Location15561 Shaft Coupling Data15561 Number15561 Type
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 27 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Location15561 Lubricating Oil System15561 Quantity of oil to completely fill system, gal (L)
15561Quantity of oil flow back on shutting down machine, gal (L)
15561 Capacity of reservoir, gal (L)15561 Quantity of cooling water required to each cooler at
design inlet temperature, gpm (L/min)15561 Maximum cooling water temperature for unrestricted
operation with design water flow to both coolers (simultaneous operation), °F (°C)
15561 Supply piping material15561 Drain piping material15561 Guard piping material15561 Oil Coolers15561 Heat duty at maximum load, MBtu/h15561 Cooling surface, each cooler, ft2 (m2)15561 Waterside pressure loss, psi at gpm (kPa at L/min)15561 Design pressure, waterside, psig (kPag)15561 Design pressure, oil side, psig (kPag)15561 Cleanliness factor15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Gland Condenser15561 Manufacturer15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Cooling surface, ft2 (m2)15561 Maximum water flow, gpm (L/min)15561 Friction loss at maximum water flow, psi (kPa)15561 Tube side design conditions15561 Pressure, psig (kPag)15561 Temperature, °F (°C)
15561Minimum condensate flow at low load conditions, gpm (L/min)
15561 Heat duty at maximum load, MBtu/h15561 EHC Data15561 Reservoir capacity, gal (L)15561 EHC coolers15561 Number/type of coolers15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Are double tubesheets provided? Yes or No15561 Heat duty at maximum load, MBtu/h15561 Cooling water required by each cooler, at design inlet
temperature, maximum gpm (L/min)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 28 of 34
Reference Document Submittal Item Tech Fill-In Data
15561Pressure drop through the coolers, psi at gpm (kPa at L/min)
15561 Number of pumps15561 Capacity of pumps, gpm (L/min)15561 Motors Data15561 Emergency lube oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Emergency hydrogen seal oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Miscellaneous Equipment (Manufacturer/Type)15561 Annunciators /15561 Valve motor operators /15561 Prefabricated cables /15561 Limit switches /15561 Pressure switches /15561 Pressure transmitters /15561 Temperature switches /15561 Level switches /15561 Solenoid valves /15561 Thermocouples /15561 Temperature detectors /15561 Control relays /15561 Control switches /15561 Push buttons /15561 Selector switches /15561 Indicating lights /15561 Dc motor starters /15561 Light fixtures /15561 Convenience outlets /15561 Valves /15561 Turbine Auxiliary Power15561
Guaranteed total electric load during normal operation for auxiliaries furnished with turbine, ac load, kW
15561 Total electric load during peak operation for auxiliaries furnished with turbine, ac load, kW
15561Emergency dc electric load for auxiliaries furnished with turbine, kW
15561 Estimated Construction Power Requirements15561 Peak demand, kW15561 Average demand, kW
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 29 of 34
Reference Document Submittal Item Tech Fill-In Data
15561Supplier Furnished Materials and Associated Installation Quantities
15561 Hydraulic System Tubing, lf15561 Large Bore Pipe (>=2 ½” in Diameter), lf15561 Large Bore Pipe Spools, each15561 Large Bore Field Welds, each
15561Large Bore Field Welds (average dia), inches (Note 1)
15561 Small Bore Pipe, lf15561 Small Bore Pipe Spools, each15561 Small Bore Field Welds, each
15561Large Bore Pipe Requiring Purchaser-Provided Heat Trace, lf
15561Small Bore Pipe Requiring Purchaser-Provided Heat Trace, lf
15561 Turbine Generator Enclosure, pieces15561 Turbine Generator Enclosure, sf15561 Off Base Skids & Misc. Equipment, each15561 Power Cable, lf15561 Control Cable, lf15561 Thermocouple Cable, lf15561 Power Conductor Terminations, each (Note 2)15561 Control Conductor Terminations, each (Note 2)
15561Thermocouple Conductor Terminations, each (Note 2)
15561 Conduit, lf15561 Instruments, each15561 Pipe Insulation, lf15561 Insulation Blankets, sf15561 Technical Assistance Time, hours15561 Notes
15561
1. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore weld divided by the total number of large bore welds.
15561
2. Conductor is the number of wires contained in a cable that must be terminated, count both ends.
15565 Lube Oil Conditioner .15565 Bidder's name15565 Equipment name15565 Equipment identification number15565 Manufacturer15565 Model No.15565 Centrifuge capacity, actual15565 At 100 SSU, gpm (L/min)15565 At 1,000 SSU, gpm (L/min)
15565Maximum particle size that will pass through the system, micron(s)
15565Maximum total water contaminant level maintained with influent water level of 5,000 gpm (___ L/min), ppm
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 30 of 34
Reference Document Submittal Item Tech Fill-In Data
15565 Skid assembly15565 Connections15565 Inlet / Outlet15565 Size, in. (mm)
15565 TypeFlanged or Threaded or Welded / Flanged or Threaded or Welded
15565 Overall dimensions (W x L x H), in. (mm)15565 Weight, empty, lb (kg)15565 Weight, full, lb (kg)15565 Power required15565 Power, kW15565 Voltage, volts15565 Phase 3-phase or Single-phase15565 Current at rated voltage, amperes16031 Cylindrical Rotor Generators .16031 Bidder's Name16031 Auxiliary Power16031
Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)
16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)
16031Weight of generator stator winding water cooling unit (if required), lb (kg)
16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if
applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA
16031 Nominal rpm16031 Nominal frequency, hertz
16031Voltages at continuous operation and nominal frequency
16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)
16031
Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv
16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 31 of 34
Reference Document Submittal Item Tech Fill-In Data
16031Short-circuit ratio at rated voltage and rated stator current
16031Continuous current unbalance expressed in terms of I2, percent
16031Generator winding capacitance to ground, all phases tied together, mfd
16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No
16031 Generator field voltage at maximum kVA output, volts
16031Generator field current at maximum excitation, amperes
16031Maximum temperature rise above 104° F (40° C) gas temperature
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the
insulation temperature rise, °F (°C)
16031Maximum temperature rise above ambient air temperature of 104° F (40° C)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 32 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data
16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency
16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW
16031Total generator loss excluding bearings and excitation system, kW
16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent
16031Generator friction loss in bearings, seals, and collector rings, kW
16031 Heat Exchanger Data
16031Complete the following for each type of cooler required by the design
16031 Heat exchanger16031 Cooler description16031 Number of coolers
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 33 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Number of sections per cooler
16031Generator kVA capability with one cooler section out of service, percent
16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler
16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)
16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen
pressure after purging, ft3 (m3)
16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)
16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031
Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?
1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section ASteam Turbine GeneratorQuotation Fill-In Information Page 34 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 1 of 44
Received and Incorporated
00300B.1 Not Used
00300B.2 General Quotation Parameters
Bidder's Quotation Date
00300B.2.1 Bidder's Contact InformationBidder's Quotation Number
00300B - Quotation Fill-In Information for Combustion Turbine Generator - 416.7 MW Net Plant Output
Corporate InformationCompany Name
Technical Contact NameTitle
Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code
Taxpayer ID Number (or EIN)Technical Contact
Phone NumberFax Number
Address/Number, StreetAddress/City
Address/State, Zip CodeEmail Address
00300B.2.2 AddendaNumber Date Description
00300B.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days
00300B.2.5.4 Alternate Scope Pricing firm through Quotation Validity Period - 00300B.2.6.1 All Exceptions are declared on Form 00300B.2.6.1 - Yes/No00300B.2.6.2 All Clarifications are declared on Form 00300B.2.6.2 - Yes/No
00300B.2.4 Quotation includes/excludes taxes - Included/Excluded00300B.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300B.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300B.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 2 of 44
00300B.2.6.1.2 Technical Exceptions
Count Reference Stated Technical Exception123456789
10
00300B.2.6.1.1 Not Used
Form 00300B.2.6.1 Declared Exceptions to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 3 of 44
00300B.2.6.2.2 Technical Clarifications
Count Reference Stated Technical Clarification123456789
10
00300B.2.6.2.1 Not Used
Form 00300B.2.6.2 Declared Clarifications to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 4 of 44
$ -
$ - $ - $ - $ - $ - $ -
$ -
$ - $ - $ - $ - $ - $ -
$ -
00300B.3.2.2 NOT USED
00300B.3.2.5 Shipping/Transportation (from Table 3.2.5)
00300B.3 Quotation Pricing
Total Base Quotation Pricing - DDP/CIP Jobsite Location
00300B.3.1 Product Pricing (FCA-Factory Location)Price Breakdown
00300B.3.2.4.1 Field Service Representative (from Table 3.2.4.1)
Sum of Subtotals (Should Equal Base Quotation Price Above)
Subtotal 00300B.3.2 Supplemental Product Pricing00300B.3.2.6 Instruction Manuals (from Table 3.2.6)
00300B.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)
00300B.3.2.4.2 Training Service (from Table 3.2.4.2)
00300B.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300B.3.2 Supplemental Product Pricing
Subtotal 00300B.3.1 Product Pricing (FCA-Factory Location)
00300B.3.1.1 Combustion Turbine Generator(Supplier to provide breakdown as required)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 5 of 44
Extended Price $ - $ - $ - $ -
Extended Price $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
Extended Price $ -
$ -
$ -
00300B.3.2.3 Special Tools and Lift Fixtures
Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1
Unit of MeasureQuantity Included
in POItem Description
Yes/No
Subtotal: Table 00300B.3.2.4.1 Field Service Pricing
Bidder has included Training time in base quotation per RFP requirements
Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses
Unit of Measure
00300B.3.2.4.2 Training Service Bidder Response Column
CTG Round trips included in the firm fixed lump sum price
All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:
Round trips included in the firm fixed lump sum price Trips $ - 2
Training weeks included in the firm fixed lump sum price Week $ - 5
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2
All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:
Unit of Measure Unit Price
Subtotal: Table 00300B.3.2.3 Special Tools and Lift Fixtures Pricing $ -
$ - $ -
If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.
$ -
Bidder Response Column
If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP
00300B.3.2.2 NOT USED
Yes/NoAre startup spare or commissioining spare parts required?
Manufacturer's Part Identification
Subtotal: Table 00300B.3.2.1 Startup Spare Parts Pricing
$ -
If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No
00300B.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.
Table 3.2.1: Startup and Commissioning Spare Parts
00300B.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column
Unit Price
If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.
Unit of Measure Unit Price
Are special tools and/or lift fixtures required? Yes/No
Quantity Included in PO
Table 3.2.3: Special Tools and Lift Fixtures
Item Description Manufacturer's Part Identification
Yes/No
Unit Price
Trips $ - 60
Week
Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses
Quantity Included in PO
Table 3.2.4: Technical ServicesBidder Response Column
Quantity Included in PO
$ - CTG Field service weeks included in the firm fixed lump sum price 180
00300B.3.2.4.1 Field Service Representative
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 6 of 44
00300B.3.2 Supplemental Product Pricing Tables
$ -
Extended Price $ - $ - $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
00300B.3.2.5 Shipping/Transportation
Subtotal: Table 00300B.3.2.5 Transportation Pricing
Bidder has included transportation in base quotation per RFP requirements
Bidder Response Column
$ - 1
Subtotal: Table 00300B.3.2.6 Instruction Manuals Pricing
Final Copy of Instruction Manuals Electronic EA
1
Table 3.2.6: Instruction ManualsUnit of
Measure Unit PriceQuantity Included
in POItem Description MediaProof Copy of Instruction Manuals Electronic
If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.
$ - EA
Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501
00300B.3.2.6 Instruction Manuals
Combustion Turbine Generator(Supplier to provide breakdown as required)
Point of OriginItem Description
1 LotCarrier Type
Quantity Included in PO
Subtotal: Table 00300B.3.2.4.1 Training Pricing
If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.
All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Yes/No
Bidder Response Column
Table 3.2.5: Shipping/Transportation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 7 of 44
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit of Measure Unit Price
$/Day $ - $/Day $ - $/Day $ -
$/h $ - $/h $ - $/h $ -
$/rt $ -
Per diem Rate Sunday / Holiday (up to 8 hours)
All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:
Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)
Adjustment Rate Monday through Friday beyond 8 hours)
Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance
Saturday (up to 8 hours)Per diem Rate
All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:
Per diem Rate Monday through Friday (up to 8 hours)
Table 4.3: NOT USED
Table 4.4: Special Tools and Lift Fixtures
Item Number Item Description Unit of Measure
Item Number Item Description Unit of Measure
00300B.4 Unit Adjustment Pricing Tables
Item Number Item Description Unit of Measure
Table 4.1: Equipment Pricing
All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Round Trip Rate
Table 4.2: Startup and Commissioning Spare Parts
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 8 of 44
Bidder Response Column
$ -
$ -
$ -
$ -
$ -
Bidder Response Column
$ - $ -
Bidder Response Column
Bidder Response Column
Origin CountryStateCity
If yes, list of other locations included with the quotation Yes/No
cu ft
Total Weight per Shipmentcu ft
Total Weight of Largest Single Component
lbTotal Volume per Shipment
Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No
00300B.8 Subcontracting
Number of Shipments CountTotal Number of Pieces per Shipment Count
Total Volume of Largest Single Component
Bidder's product included in the quotation has special storage requirements Yes/No
lb
00300B.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No
If Yes, special storage requirements are included with the quotation Yes/No
Price Addition to price for alternative scope proposed
00300B.6.1 Alternative Scope 1Single-Shaft Train (Non-Mandatory Alternative)
Price Deduction from base price for scope removed from base scope
00300B.7 Logistics00300B.7.1 Jobsite Storage Requirements
00300B.5.2 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, CTG Scope Matrix Item 99
00300B.5 Option Pricing
00300B.6 Alternative Scope Pricing
00300B.5.1 Pulse Air Compressor Skid per Article 01500.1, CTG Scope Matrix Item 15
00300B.5.3 Recommended CTG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))
00300B.5.4 LTSA Pricing per Sections 01500.1.6 and 19000 (include Supplier pricing breakdown table separately as required)
00300B.5.5 Clean agent fire protection system (FM-200 or Water Mist), REQUIRED if Supplier offers CO2 system in base offering in exception to RFP clean agent system requirements.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 9 of 44
LD*
LD
Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.
Yes/No
00300B.9.2 Schedule of Submittals and Applicable Liquidated Damages
* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.
** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.
Combustion Turbine Generator
Yes/No00300B.9.1.1 Bidder will make single consolidated shipment.
00300B.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No
7-Mar-16
00300B.9 Delivery and Schedule
Bidder Response ColumnRequired Delivery
00300B.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**
120 Days Maximum Prior to Required Delivery
(Supplier to provide breakdown as required)
00300B.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No
Yes/No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 10 of 44
TBD TBD
Calendar Event Due Date301 Engineering/Procurement/
Production/Testing and Inspection/Shipping Schedule and Status Report
30 After Effective Date with Monthly Updates
No
302 Preshipment Inspection Notice 30 Before Shipment of Equipment No
303 Electronic Material List 30 Before Shipment of Equipment No
304 Shipping Notice 2 Full Work Days Notice No
305 Detailed Final Packing List of Shipment of Equipment, corresponding with Electronic Material List data
Upon each Shipment and With Electronic Materials List
No
306 Hazardous materials documentation
With Each Shipment No
701 Proof Copy of Instruction Manuals
90 Before Shipment of Equipment No
702 Final Copy of Instruction Manuals
15 Before Shipment of Equipment No
703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)
90 After Effective Date No
704 Startup and Commissioning Spare Parts List, Priced
90 Before Shipment of Equipment No
05135 Steel Stack Designed by Supplier (Optional Scope)
.
0409 05135 Structural Steel Material Certification
Upon request
0410 05135 High Strength Bolts Material Certification
Upon request
0411 05135 Direct Tension Indicators Material Certification
Upon request
0694 05135 Grating Copies of Certified Test and Inspection Reports
14 After Test/Inspection
0583 05135 Arrangement drawings 30 After Effective Date
0695 05135 Foundation design i t
30 After Effective Date
0696 05135 Design calculations 30 After Effective Date
0584 05135 Fabrication and erection detail drawings
30 After Effective Date
0697 05135 Stack, liner, insulation, and lagging materials specifications
30 After Effective Date
0698 05135 Shop and/or field coatings data 30 After Effective Date
00300.9.2 Schedule of Submittals and Applicable Liquidated Damages
Bid
der C
ompl
ies
Yes
/No
Effective Date: Estimated First Shipment Date:Project Delivery Date: March 7, 2016
The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.
Reference Document
Submittals Item Submittal Dates LDsapply?
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 11 of 44
11506 Selective Catalytic Reduction System (Optional Scope)
.
0585 11506 Arrangement drawings 30 After Effective Date No0699 11506 Certified loads for design of
structures and foundations40 After Effective Date No
0586 11506 Arrangement drawings 15 After Effective Date No0587 11506 Piping and instrument diagrams 30 After Effective Date No
0588 11506 Detail drawings required to indicate miscellaneous piping and wiring connections
45 After Effective Date No
0589 11506 Drawings and data on accessory equipment including valves, fittings, and other components
45 After Effective Date No
0590 11506 Control system functional loop and logic diagrams
60 After Effective Date No
6100 11506 Control system instrumentation and I/O lists
30 After Effective Date No
6101 11506 Instrument data sheets (ISA type or equal) and installation details for control system
60 After Effective Date No
0591 11506 Pipe layout drawings 30 After Effective Date No0592 11506 Recommended location for all
pipe supports, recommended type of pipe supports at each location, and loads on each pipe support
30 After Effective Date No
6102 11506 Pipeline list 30 After Effective Date No11507 Catalyst for Selective
Catalytic Reduction (Optional Scope)
.
6103 11507 Catalyst preproduction test results report
90 After Effective Date and prior to catalyst production
No
11508 Ammonia System (Optional Scope)
.
0593 11508 Detailed drawings indicating pipe connection points
30 After Effective Date No
6104 11508 Fan performance curve - final 30 Before Shipment No
6105 11508 Flowmeter certification report 30 Before Shipment No
13125 Pre-Manufactured Metal Equipment Building
.
0685 13125 Bill of Material, Including Quantity, Description, and Part Number
Effective Date No
0578 13125 Plan view outline - General arrangement, center of gravity weight, floor opening size and locations, mounting details, and cable entry area and door swing requirements
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 12 of 44
0579 13125 Elevation outline - General arrangement in elevation, recommended pier and tie-down locations, and wall opening sizes and locations
30 After Effective Date No
0580 13125 Legend/design criteria outline - Design criteria and drawing legend
30 After Effective Date No
0581 13125 Electrical interconnection diagram
30 After Effective Date No
0686 13125 Certified design calculations 30 After Effective Date No0687 13125 Certified Air conditioning,
Heating, Pressurization design load calculations with considerations of transmission and solar gain, people, lighting, mechanical and electrical equipment, motors, electronic equipment, computers, miscellaneous appliances, infi
30 After Effective Date No
0688 13125 For HVAC Equipment: Fan curves, motor data, coating data, dimensional data including piping connection sizes and location, weight, performance data, wiring diagrams and sound level data.
60 After Effective Date No
0689 13125 For Filters: filter efficiency, airflow resistance, dust holding capacity, media material, thickness, density and dimensional data.
60 After Effective Date No
0690 13125 For Dampers: AMCA certified pressure drop and leakage data.
60 After Effective Date No
0691 13125 For Terminal Devices: Flow versus pressure drop and flow versus throw.
60 After Effective Date No
0692 13125 For Temperature Controls: Wiring diagrams, control and electrical components data sheets, sequence of operations, control system architecture, and temperature control panel layout drawings.
60 After Effective Date No
0693 13125 Bill of Material, Including Quantity, Description, and Part Number
No
0582 13125 Submit drawings indicating the layout of building
No
15562 Combustion Turbine .0647 15562 Certified design data and
performance curves40 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 13 of 44
0522 15562 Arrangement Drawings required for plant layout indicating physical arrangement and dimensions of equipment furnished
30 After Effective Date No
0523 15562 Arrangement Drawings for all auxiliary equipment indicating physical arrangement and dimensions of equipment furnished
45 After Effective Date No
0524 15562 Foundation interface Drawings for all furnished equipment indicating loads, dimensions, anchor bolt locations, embedded conduit, and other necessary details
45 After Effective Date No
0525 15562 Base combustion turbine generator unit arrangement and outline drawing
30 After Effective Date No
0526 15562 CTG auxiliary enclosures and equipment arrangement and outline drawing
45 After Effective Date No
0527 15562 Duct outline Drawings including movements and clearances for insulation, lagging, stiffeners, and expansion joints
60 After Effective Date No
0528 15562 Detail Drawings indicating all Purchaser's piping and wiring connections including locations, sizes, types, materials, cable type, etc.
60 After Effective Date No
0529 15562 Piping and Instrument Diagrams 60 After Effective Date No
0530 15562 Control panel and operator Work station outline and layout Drawings
90 After Effective Date No
0531 15562 Drawings and data on accessory equipment including valves, fittings, and other components
90 After Effective Date No
0532 15562 Electrical one-line diagrams indicating electrical scope
60 After Effective Date No
0533 15562 Electrical elementaries, schematic, wiring, block and tubing diagrams, cable block diagrams, raceway layout, and cable entry into equipment
120 After Effective Date No
0534 15562 Control system functional loop and logic diagrams
90 After Effective Date No
0535 15562 Control operator CRT graphic display pages with descriptions of operator control actions linked to the graphics
120 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 14 of 44
0536 15562 Control system and instrumentation input/output tabulations with descriptions and interface functions
90 After Effective Date No
0648 15562 Instrument data sheets (ISA type or equal) and installation details for all control system input and output devices such as transmitters and control drives
120 After Effective Date No
0649 15562 Recommended detailed erection sequence and procedure
120 Before Shipment No
0701 15562 Two draft copies of Commissioning Manual
90 Before Start of commissioning No
0702 15562 Four final copies of Commissioning Manual
30 Before Start of commissioning No
0537 15562 As-built Drawings 60 Before Completion of commissioning
No
16031 Cylindrical Rotor Generators .
0202 16031 Supplier to participate in design conference
15 After Effective Date No
0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0652 16031 Critical speeds of generator 30 After Effective Date No
0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.
30 After Effective Date No
0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures
30 After Effective Date No
0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 15 of 44
0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
30 After Effective Date No
0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)
30 After Effective Date No
0658 16031 Generator "Vee" curves 30 After Effective Date No
0659 16031 Zero and rated power factor current saturation curves
30 After Effective Date No
0660 16031 No load saturation curves 30 After Effective Date No
0661 16031 Generator allowable negative sequence versus time curve
30 After Effective Date No
0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals
30 After Effective Date No
0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.
30 After Effective Date No
0664 16031 Generator current transformer secondary excitation characteristic curve
30 After Effective Date No
0665 16031 Generator current transformer ratio correction factor curve
30 After Effective Date No
0666 16031 Generator current transformer thermal rating
30 After Effective Date No
0667 16031 Generator current transformer mechanical rating
30 After Effective Date No
0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class
30 After Effective Date No
0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)
30 After Effective Date No
0670 16031 Generator current transformer phase angle correction factor curves
30 After Effective Date No
0671 16031 Generator current transformer correction factor curves
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 16 of 44
0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 17 of 44
0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies
30 After Effective Date No
0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No0544 16031 Stator cooling water diagrams 90 After Effective Date No
0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
90 After Effective Date No
0674 16031 List of all control devices and/or process set points, ranges, and flow quantities
90 After Effective Date No
0675 16031 Listing of accessory equipment to be shipped loose to jobsite
120 After Effective Date No
0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams
90 After Effective Date No
0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items
60 After Effective Date No
0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment
90 After Effective Date No
0548 16031 Drawings indicating the size and location of all generator ground pads
90 After Effective Date No
0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers
90 After Effective Date No
0550 16031 Detailed schematic drawings of all electrical control wiring
90 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 18 of 44
0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.
90 After Effective Date No
0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items
90 After Effective Date No
0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.
180 After Effective Date No
0676 16031 Generator terminal enclosure outline and loading data
90 After Effective Date No
0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies
30 After Effective Date No
16051 Electrical Design and Equipment
.
0677 16051 Certified design data and performance curves
70 Before Shipment Yes
0555 16051 Arrangement and fabrication/ erection drawings
90 After Effective Date Yes
0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials
60 After Effective Date Yes
0557 16051 Final set of above drawings in addition to interconnection wiring diagrams
21 After Purchaser comments on initial drawings
Yes
0558 16051 Final submittal of as-built drawings
30 After Shipment Yes
0559 16051 Relay instruction and service manual including relay curve information
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 19 of 44
0678 16051 Current transformer ratio correction factor and excitation curves
90 After Effective Date Yes
0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used
30 After Effective Date Yes
0560 16051 I/O database and I/O wiring diagrams
Upon Shipment Yes
16142 Generator Neutral Grounding .
0680 16142 Bill of Material, Including Quantity, Description, and Part Number
Upon Effective Date Yes
0681 16142 Certified design calculations 30 After Effective Date Yes0561 16142 Preliminary outline drawings 15 After Effective Date Yes0562 16142 Final drawings 60 After Effective Date Yes0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes
16201 Protective Relaying Panels .
0564 16201 Outline drawings showing dimensions, weight, and mounting requirements
15 After Effective Date Yes
0565 16201 Schematic diagrams 30 After Effective Date Yes0566 16201 Connection and wiring diagrams 30 After Effective Date Yes
0567 16201 Erection drawing 30 After Shipment Yes0568 16201 Relay installation and wiring
information30 After Effective Date Yes
0569 16201 Nameplate drawings 45 After Effective Date YesE645 Electric Actuators .
0570 E645 Actuator outline diagrams 30 After Effective Date No0571 E645 Wiring diagrams 30 After Effective Date No
K100 Instrumentation .0572 K100 Instrument Location Plan
Drawings90 After Effective Date Yes
0573 K100 Instrument factory calibration sheets
Upon Shipment of Instruments Yes
0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow
120 After Effective Date Yes
0575 K100 ISA-format datasheets for all Instruments
120 After Effective Date Yes
0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.
120 After Effective Date Yes
M200 Piping .
0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.
RFP 40313
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 20 of 44
Q100 General Welding Requirements
.
0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.
0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion
0407 Q100 Radiographs 14 After Fabrication Completion
Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials
.
0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records
21 Before Shipment
Q301 Manufacturer's Standard Coating
.
0683 Q301 Shop drawings that identify shop-applied coating systems
30 Before Start of Fabrication No
0684 Q301 Manufacturer's product data sheets
30 After Release to Proceed No
Q400 General Equipment Requirements
.
0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.
30 After Effective Date No
Q502 Electrical Data
0576 Q502 Completed motor information sheets
60 After Effective Date Yes
0577 Q502 Completed electric actuator information sheet
60 After Effective Date Yes
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 21 of 44
Bidder Response Column
Reference Document Submittal Item Yes/No
13125 Pre-Manufactured Metal Equipment Building .13125 HVAC Design Engineer13125 HVAC Equipment Vendors15562 Combustion Turbine .15562 Combustion turbine generator performance curves15562 Combustion turbine heat rate, exhaust flow, and exhaust temperature curves
versus load, showing the effect of inlet guide vane (IGV) control15562 Compressor inlet temperature correction curves for heat rate, capacity,
exhaust temperature, and mass flow15562 NOx injection water (or steam) correction curves for effects on heat rate,
capacity, exhaust temperature, mass flow, and emissions for varying amounts of water (or steam) injection for NOx control.
15562 NOx control water (or steam) injection requirement versus combustion turbine load curve for all specified fuels at various compressor inlet temperatures.
15562 Curves indicating the effect of inlet anti-icing on output and heat rate.15562 NOx and CO emission level versus load for all specified fuels.15562 CO, UHC, and VOC emission levels versus water (or steam) injection rate
curve.15562 Inlet pressure drop correction data.15562 Exhaust pressure drop correction data.15562 Humidity correction data.15562 Atmospheric pressure (or altitude) correction curves.15562 Estimated output, heat rate, exhaust flow, and exhaust temperature
degradation versus fired hours curves from initial startup through second major overhaul for firing each specified fuel.
15562 Curves showing recovery effects of compressor washing for output, heat rate, exhaust flow, and exhaust temperature.
15562 Detailed description of starting system.15562 List of Drawings to be provided during project execution and schedule of
drawing submittals.15562 Preliminary/typical general arrangement Drawings showing the combustion
turbine generator unit(s), inlet filter(s), exhaust stack(s), all associated compartments/enclosures/skids, starter unit, transformers, and radiators. A vertical section shall be included showing the complete installed unit including crane minimum hook height and capacity.
15562 Control system configuration drawing identifying all microprocessors, operator interface devices, and interconnecting data highways.
15562 Preliminary/typical one-line diagrams of generator electrical system, including ac and dc auxiliary electric system. One-line diagrams shall include all auxiliary load data and proposed metering and protective relaying.
15562 A complete description of all equipment proposed, together with supportive data.
15562 Preliminary Engineering Schedule.15562 Preliminary Procurement/Production/Shipping Schedule.
Document submitted with Quotation Package
00300B.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 22 of 44
Reference Document Submittal Item Yes/No
15562 Shipping methods and erection criteria and requirements.15562 Description of manufacturer's performance estimating procedure, including
correction procedures for differing altitudes, ambient temperatures, part loads, NOx emissions, water (or steam) injection rates, and IGV control.
15562 Information on technical assistance provided during erection and commissioning.
15562 Description of proposed classroom instruction for operations and maintenance training.
15562 Description and drawing of lay-down space requirements with area defined.
15562 Description and drawing of additional maintenance area required in addition to the lay-down space defined.
15562 Priced lists of recommended spare parts.15562 List of Startup And Commissioning Spare Parts furnished with the
equipment.15562 List of all maintenance tools/special tools furnished with the equipment.15562 Discussion of emission level changes with increasing operating hours.15562 Provide estimated hours to erect proposed combustion turbine generator
unit, broken down by craft.15562 Description of all field assembly/erection required. Any item not described
will be assumed to be fully factory finished.15562 Description of factory testing program for furnished equipment.15562 Description of the extent of nondestructive testing of unit components,
including the casing, rotor forgings, shafts, machine journals, and other major components.
15562 Description of compressor and turbine blade coatings.15562 Description of compressor and turbine blade material and method for
securing to rotor and casing.15562 Description of burners, ignitors, and combustion system for the proposed
combustion system including cross-section Drawings.15562 Description of flame safety and combustion control systems.15562 List of borescope port locations.15562 Description of methods and equipment required for field balancing.15562 Description of gaseous fuel systems and balance-of-plant support/interface
requirements.15562 Gaseous fuel requirements (temperature, pressure, minimum required fuel
superheat, purity, viscosity, minimum heating value, etc.).15562 Description of combustion turbine generator lubricating system, including
lubrication schedules, types, quantities, filters, maintenance intervals, etc.
15562 Description of backup or redundancy features provided in lube oil system and seal oil system.
15562 Description of the combustion turbine generator lube oil cooling system.15562 Description of turning gear system, including statement of effect of long-term
operation of turning gear.15562 Description of manual system for rotating the turbine and generator shafts.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 23 of 44
Reference Document Submittal Item Yes/No
15562 Descriptive information on the combustion turbine control system, including a description of all local and remote control functions and local and remote operator interface functions, redundancy, and a list of sensors furnished (transducers, vibration detectors, thermocouples, RTDs, etc.).
15562 Description of emergency trip system, including fuel shutoff control.15562 Description of combustion turbine automatic generation control (AGC)
system and capabilities.15562 Description of fire protection and detection equipment with a discussion on
compliance with NFPA requirements.15562 Description of unit enclosures and noise attenuation features.15562 Description of procedure for enclosure disassembly in large sections to
accommodate major maintenance.15562 Description and arrangement Drawings of the acoustical barrier system for
noise attenuation, if required.15562 Description of compressor water wash equipment and cleaning chemical
requirements.15562 Description of inlet air filtration system.15562 Description of inlet anti-icing system, including conditions under which it is
required for operation.15562 Description of starting system with associated detailed drawings.15562 Description of water (or steam) injection/NOx reduction control system,
including the combustion turbine manufacturer's operating experience with water (or steam) injection for the combustion turbine model proposed, pressure, temperature, and purity requirements for injection for NOx control.
15562 Water quality and blowdown information for the evaporative cooler system.
15562 Description of proposed insulation and lagging systems.15562 Description of enclosure/compartment HVAC system, including design
temperatures.15562 Description of overspeed protection system.15562 Detailed description of unit startup event sequence, including times, auxiliary
power requirements, amperage versus time curve, etc. (separately address "normal" and "fast" starts).
15562 Description of proposed shutdown corrosion protection system15562 Description of planned future upgrades (capacity increases) to the unit(s)
proposed and effects these upgrades will have on the electrical equipment specified.
15562 Complete current experience listings for the combustion turbine generator model proposed indicating the following information as a minimum:
15562 Recommended maintenance practices and procedures, including frequency of routine inspection intervals and required parts. Include man-hours required to complete the combustion inspection, hot gas path inspection, and the first major overhaul.
15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's DCS.
15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's SCADA system.
15562 Description of any special control system grounding requirements.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 24 of 44
Reference Document Submittal Item Yes/No
15562 Complete description of the proposed Turbine Generator Supervisory System including equipment provided, list of sensors furnished, and operator interface functions.
15562 Complete description of the proposed Vibration Monitoring System including equipment provided, list of sensors furnished, and operator interface functions.
15562 Water quality and blowdown information for the evaporative cooler system.
15562 List of codes and standards used in design of all equipment including version or issue date.
16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power
factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.
16031 Generator drawing with excitation cubicle's overall length, width, and height.
16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.
16031 Generator drawing with supervisory cabinet's overall length, width, and height.
16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.
16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.
16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.
16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,
including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for
connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable
constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 25 of 44
Reference Document Submittal Item Yes/No
16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator
temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field
winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.
16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of
cooling air.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 26 of 44
Reference Document Submittal Item Tech Fill-In Data
13125 Pre-Manufactured Metal Equipment Building .13125 Bidder's Name13125 Electrical/Control Building13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Design permissible loading, lb/ft2 (kg/m2)13125 Floor13125 Roof13125 Wind13125 Dimensions, inches (mm)13125 Height13125 Depth13125 Length13125 Total weight, lb (kg)13125 Lighting13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Lighting fixture type13125 Switch type13125 Receptacle type13125 Contactor type
Combined Cycle Configuration .Configuration (Single or Multi-Shaft)Single Shaft Configuration
Configuration (CGS or CSG)Clutch
ManufacturerMW Rating
Cooling steam requirements, lb/hr (startup/transient)15562 Combustion Turbine .15562 Bidder's Name15562 Performance Data at Specified Conditions15562 Note: Items marked with an asterisk (*) shall be
guaranteed for all load and ambient conditions designated."Guaranteed," in accordance with Section 15562.
00300B.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 27 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Parameter 115562 Guaranteed15562 Gross generator output Btu/h15562 CTG auxiliary power Btu/h15562 CTG heat consumption, LHV Btu/h15562 Net CTG output* Btu/h15562 Net CTG heat rate, LHV* Btu/kwh15562 Fuel flow 15562 Turbine inlet temperature °F (°C)15562 Water or steam injection flow* lb/h15562 Inlet airflow °F (°C)15562 Inlet air pressure drop PSI15562 Exhaust pressure drop PSI15562 Exhaust gas flow lb/h15562 Exhaust gas temperature* °F (°C)15562 Exhaust gas heat* Btu/h15562 Exhaust gas heat reference temperature °F (°C)15562 Auxiliary Power Requirements15562 Fuel
15562Included in Net Output Btu/h / Total Connected Power Btu/h
15562 Turbine cooling air compressor /15562 Control air compressor /15562 Lube oil pumps (ac) /15562 Lube oil pumps (dc) /15562 Space heaters /15562 Lube oil cooler fans /15562 Cooling water pumps /15562 Evaporative cooling system /15562 Generator cooling system /15562 Rotor turning motor /15562 Hydrogen system seal oil pump /15562 Mist eliminator /15562 Control system /15562 Air conditioners /15562 Ventilation fans/blowers /15562 Fin-fan cooler fans /15562 Total at continuous baseload /15562 Total standby power /15562 Note: Auxiliary power data shall be for steady-state
operation at the guaranteed load condition on the indicated fuel.
15562 Startup and Shutdown Performance15562 Primary Fuel
15562Guaranteed normal cycle starting time from cold standby to continuous baseload, min
15562 Guaranteed rate of load change, kW/min15562 Total gross generation per start15562 Normal start, Btu15562 Total auxiliary power required per start15562 Normal start, Btu15562 Peak auxiliary power required per start
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 28 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Fuel consumed per start (LHV)15562 Normal start, Btu15562 Noise Emissions15562 Guaranteed average near field noise levels at 3 feet
(0.914 meter) from the combustion turbine generator and any associated auxiliary equipment, oper-ating at full load, dBA to a reference of 20 micropascals
15562 Guaranteed far field noise levels at 400 feet (122 meters) from the combustion turbine enclosure boundary, operating at full load, dBA / dBC /
15562 Reference band levels, dBA15562 Octave band center frequency, hertz15562 3115562 6315562 12515562 25015562 50015562 1,00015562 2,00015562 4,00015562 8,00015562 Operational Performance
15562 Maintenance intervalsEquivalent operating hours (EOH) or
Fired hours or Starts15562 Combustion inspection15562 Hot gas path15562 Major overhaul15562 Equivalent operating hours data EOH15562 Each hour at baseload, gas fuel15562 Each hour at peak load, gas fuel15562 Each normal start15562 Each trip from full load15562 Each normal stop15562 Expected degradation data
15562Nonrecoverable degradation in baseload output, percent
15562 1,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 4,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 8,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 29 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 16,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 24,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 Miscellaneous15562 Bidder's definition of baseload15562 Bidder's definition of peak load15562 Has a factory fired operation test been completed for
the size and type of the unit proposed? Yes or No15562 If yes, provide details15562 General Data15562 Manufacturer15562 Location assembled15562 Combustion turbine model number15562 Number of units furnished15562 Gas delivery conditions15562 Minimum required, PSI / °F15562 Maximum allowed, PSI / °F15562 General Design Information15562 Type of combustion turbine15562 Shaft speed, rpm15562 Overspeed trip15562 Electronic, rpm15562 Mechanical bolt, rpm15562 Critical speeds15562 First critical, rpm / mode15562 Second critical, rpm / mode15562 Third critical, rpm / mode15562 Fourth critical, rpm / mode15562 Vibration Amplitude15562 Turbine15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Generator15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Unit Weights and Dimensions15562 Turbine engine weight, lbf15562 Generator stator weight, lbf15562 Generator rotor weight, lbf15562 Auxiliary Skid15562 Name
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 30 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Length, in.15562 Width, in.15562 Height, in.15562 Weight, lb.15562 Shipping weight, entire unit, lbf15562 Heaviest piece handled during erection15562 Weight, lbf15562 Heaviest piece handled during major overhaul15562 Weight, lbf15562 Overall dimensions, including housing, in15562 Length15562 Width15562 Height15562 Component Descriptions15562 Inlet guide vanes15562 Type15562 Material15562 Description of operating limitations15562 Turbine15562 Number of stages: 015562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating15562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating
15562Describe how blades are secured to rotor and how nozzle is secured to casing.
15562 Cooling methods15562 Blades15562 Nozzles15562 Disks15562 Shaft15562 Accessory gear15562 Manufacturer15562 Type or model15562 Driven equipment15562 AGMA quality factor15562 Service factor15562 Maximum power rating, Btu/h15562 Compressor15562 Type15562 Number of stages15562 Blade material15562 Nozzle material15562 Coating material
15562Describe how blades are secured to rotor and how nozzle is secured to casing.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 31 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Turbine bearings15562 Type15562 Radial15562 Thrust15562 Quantity15562 Radial15562 Thrust15562 Temperature detectors15562 Manufacturer15562 Type/model15562 Description of internal lubrication system15562 Combustors15562 Type15562 Number of cans/silos15562 Expected life min15562 Liners15562 Nozzles15562 Spark plugs15562 Hot gas casing15562 Burner tiles15562 Transition pieces15562 Crossfire tubes15562 Materials15562 Combustor casing15562 Combustor liner15562 Combustor tiles15562 Transition pieces15562 Crossfire tubes15562 Type of ignitors15562 Number of ignitors15562 Type of flame detectors15562 Number of flame detectors15562 Description of nozzle15562 Starting system15562 General description15562 Maximum number of starts allowed in a 1 hour period
at maximum design temperature15562 Time required between start attempts, min
15562Minimum time between controlled shutdown and subsequent start, min
15562Minimum time between unit trip and subsequent start attempt, min
15562 Static start system15562 Manufacturer15562 Description15562 Drive capacity, kVA15562 Transformer size, kVA / Volts / Phase / /
15562Maximum load during combustion turbine starting, kW / kVA /
15562 Lubricating oil system15562 Lube oil type15562 Recommended manufacturer
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 32 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 System fill requirement, gal15562 Quantity of oil flowback on shutdown, gal15562 Retention time at Site load, min15562 Lube oil circulation, gpm15562 Lube oil filters15562 Number15562 Capacity, gpm15562 Mesh size, in15562 Mist eliminators15562 Type15562 Number15562 Lube oil pumps15562 Gear driven15562 Manufacturer15562 Type15562 Number15562 Ac motor driven15562 Manufacturer15562 Type15562 Number15562 Dc motor driven15562 Manufacturer15562 Type15562 Number15562 Lube oil coolers15562 Manufacturer15562 Number15562 Capacity, percent15562 Type (shell and tube or fin-fan)15562 Media (oil-to-water or oil-to-air)15562 Tube material15562 Tube surface area, in215562 Fan diameter, in15562 Fan speed, rpm15562 Radiator materials15562 Mechanical Accessory Equipment15562 Compressor wash system15562 On-Line / Off-Line15562 Flow to combustion turbine, gpm /15562 Water quality required /15562 Type of detergent Not applicable /15562 Quantity of detergent Not applicable /15562 Duration of wash, min /15562 Is resulting discharge a hazardous material? Not applicable / Yes or No15562 Tank capacity, gal /
15562Recommended cleaning frequency, operating hours on primary fuel /
15562 Fire detection and protection15562 Fire protection system15562 Type CO2 or FM200 or Water Mist15562 Detectors15562 Locations
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 33 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Number15562 Nozzles15562 Locations15562 Number15562 Type15562 Number of releases allowed before recharge15562 Gas protection system15562 Type15562 Detectors15562 Locations15562 Number15562 Limits of detection15562 Inlet air filtration equipment15562 Manufacturer15562 Type15562 Filter media material15562 Efficiency15562 Means of filter support
15562Typical number of hours of operation before replacement of filter
15562 Number of filter modules15562 Number of filters15562 Pressure drop for15562 Clean conditions15562 End of media life15562 Inlet duct15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Material15562 Coating15562 Inlet silencer15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Internal materials15562 Evaporative cooler15562 Manufacturer15562 Type15562 Cooler media15562 Differential pressure drop, PSI15562 Fuel gas filter/separator15562 Type15562 Manufacturer15562 Filter mesh size, in15562 Shell material15562 Turbine blade cooling air booster air compressor15562 Type
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 34 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Manufacturer15562 Number of stages15562 Speed, rpm15562 Turbine blade cooling air heat exchanger15562 Type15562 Manufacturer15562 Media, air-to-15562 Heat exchange material15562 Number of fans15562 Fan capacity, percent15562 Air temperature in, °F15562 Air temperature out, °F15562 Airflow, lbm/h15562 Combustion Turbine Generator Control System 15562 Local / Remote15562 Microprocessor15562 Manufacturer15562 Model No.15562 Number of processors15562 Quantity of spare I/O digital15562 Quantity of spare I/O analog15562 Quantity of spare alarm points15562 Quantity of spare message capacity15562 Cabinets15562 Number15562 Size15562 LCD monitor15562 Number of monitors15562 Manufacturer15562 Model No.15562 Size (diagonal) in15562 Data logging rate, points/time / /15562 Printer15562 Number of printers15562 Manufacturer15562 Model No.15562 Type15562 Power consumption (kVA)15562 120 volts ac15562 125 volts dc15562 Electrical generator control panels15562 Number15562 Size15562 Standard vibration detectors15562 Manufacturer15562 Model No.15562 Type15562 Quantity15562 Location
15562Supplier Furnished Materials and Associated Installation Quantities
15562 Inlet Filter, tons (Note 1)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 35 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Inlet Filter, pieces15562 Inlet Filter Field Seal Welding, lf15562 Exhaust Diffuser, tons15562 Exhaust Diffuser, pieces15562 Exhaust Diffuser, lf15562 Large Bore Pipe (>= 2 ½” in diameter, lf15562 Large Bore Pipe Spools, each15562 Large Bore Field Welds, each
15562Large Bore Field Welds (average dia), inches (Note 3)
15562 Small Bore Pipe, lf15562 Small Bore Pipe Spools, each15562 Small Bore Field Welds, each15562 Turbine Generator Enclosure, pieces15562 Turbine Generator Enclosure, sf15562 Platform and Stairs, tons15562 Platform and Stairs,pieces15562 Off Base Skids & Misc. Equipment, each15562 Pipe Insulation, lf15562 Insulation Blankets, sf15562 Power Cable, lf15562 Control Cable, lf15562 Thermocouple Cable, lf15562 Power Conductor Terminations, each (Note 4)15562 Control Conductor Terminations, each (Note 4)
15562Thermocouple Conductor Terminations, each (Note 4)
15562 Conduit, lf15562 Instruments, each15562 Technical Assistance Time, hours15562 Notes
15562
1. Inlet Filter includes all pieces of structural steel, ductwork, & expansion joints, but not fasteners, shims, gussets, etc.
15562
2. Exhaust Diffuser includes all pieces of structural steel, ductwork, & expansion joint, but not fasteners, shims, gussets, etc.
15562
3. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore welds divided by the total number of large bore welds.
15562
4. Conductor is the number of wires contained in a cable that must be terminated, count both ends.
15562
Seal welding is defined as the number of lineal feet of weld placed multiplied by the number of sides from which the weld must be placed. Thus, a seal weld that must be placed from both the inside and outside is equal to the length of the weld multiplied by two (2).
16031 Cylindrical Rotor Generators .16031 Bidder's Name
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 36 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Auxiliary Power16031
Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)
16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)
16031Weight of generator stator winding water cooling unit (if required), lb (kg)
16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if
applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA
16031 Nominal rpm16031 Nominal frequency, hertz
16031Voltages at continuous operation and nominal frequency
16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)
16031
Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv
16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t
16031Short-circuit ratio at rated voltage and rated stator current
16031Continuous current unbalance expressed in terms of I2, percent
16031Generator winding capacitance to ground, all phases tied together, mfd
16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 37 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No
16031 Generator field voltage at maximum kVA output, volts
16031Generator field current at maximum excitation, amperes
16031Maximum temperature rise above 104° F (40° C) gas temperature
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the
insulation temperature rise, °F (°C)
16031Maximum temperature rise above ambient air temperature of 104° F (40° C)
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 38 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data
16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency
16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW
16031Total generator loss excluding bearings and excitation system, kW
16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent
16031Generator friction loss in bearings, seals, and collector rings, kW
16031 Heat Exchanger Data
16031Complete the following for each type of cooler required by the design
16031 Heat exchanger16031 Cooler description16031 Number of coolers16031 Number of sections per cooler
16031Generator kVA capability with one cooler section out of service, percent
16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler
16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)
16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 39 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen
pressure after purging, ft3 (m3)
16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)
16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031
Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?
1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 40 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Combustion Turbine Long Term Services Specification
19000 General19000 Annual Operating Profile19000 Fired Hours per unit per year 600019000 Number of Starts per unit per year 15019000 Contract Term19000 Commencement COD under the EPC Contract19000 Expiration No sooner than at completion of
2nd Major Inspection for each unit
19000 Sunset Clause Not specified19000 Definitions19000 Calculation of FFH/EOH/AOH, etc. By Supplier19000 Planned Maintenance19000 Annual Borescope Inspection All Parts and Services1
19000 Combustion Inspections and Overhauls All Parts and Services1
19000 Combustion Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Hot Gas Path Inspections and Overhauls All Parts and Services1
19000 Hot Gas Path Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Major Inspections and Overhauls All Parts and Services1
19000 Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Minor Inspections All Parts and Services1
19000 Generator Minor Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Major Inspections All Parts and Services1
19000 Generator Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Technical Advisories affecting Planned Mainte All Parts and Services1
19000 Corrective actions required to maintain/restore expected performance, reliability or safety of any component/part
All Parts and Services1 (excludes Limited Scope Components)
19000 Parts and Services required to maintain emiss All Parts and Services1
19000 Limited Scope Components19000 Inspection Inspection, including removal or
access for inspection, cleaning and inspection services
19000 Replacement Not required19000 Items classified as Limited Scope ComponentsBy Supplier19000 Full Scope Components By Supplier19000 Onsite controls engineer to assist during startu Provided by Supplier
00300B.12 LTSA Technical Fill-In Data Required with Quotation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 41 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Disassembly, removal, cleaning and reassembly of enclosures, lagging, equipment and systems supplied under Equipment Purchase Specification necessary to access CTG to perform Planned Maintenance
Service provided by Supplier
19000 Unplanned Maintenance19000 Performance of Unplanned Maintenance Service provided by Supplier19000 All costs and expenses with respect to
Unplanned MaintenanceBy Purchaser, unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Provision for Major Maintenance Parts necessary for Unplanned Maintenance
Provided by Supplier, Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Provision to perform Unplanned Maintenance on high-priority, 24/7 basis as required to remedy a condition resulting in a Forced Outage
Service provided by Supplier
19000 Major Maintenance Parts for Unplanned Maintenance
New and unused unless Purchaser elects to negotiate for refurbished parts
19000 Spare Parts; Tools/Tooling; TA19000 Initial Spare Parts19000 Costs incurred for procurement and shipping
to siteAll costs incurred borne by Supplier
19000 Parts condition, initial delivery of Spare Parts Inventory
New and unused
19000 Costs, replacement of Spare Parts used for Planned Maintenance
All costs incurred borne by Supplier
19000 Costs, replacement of Spare Parts used for Unplanned Maintenance
Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Parts condition, replacement of Spare Parts used for Unplanned Maintenance
New and unused, or refurbished consistent with Prudent Operating Practices and in accordance with Purchaser Approved Appendix 3 submittal
19000 Parts condition, replacement of Spare Parts used for Planned Maintenance
New and unused, or refurbished consistent with Prudent Operating Practices
19000 Time frame to replace used Spare Parts <2 months after removal19000 Parts condition, parts used for maintenance
of Limited Scope ComponentsNew and unused
19000 Data provided for refurbished parts proposed for use at Plant
Life history, including serial #'s, drawing or model #'s, factored hours/starts, trips and conditions, date(s) and type of repairs performed
19000 Procurement of all Major Maintenance Parts All costs incurred borne by Supplier, including shipping and inspection
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 42 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Equivalent parts (to replace obsolete parts) Supplier provides same level or upgrade parts at no more than same cost as original parts
19000 Title to Replaced Parts Supplier19000 Tooling and equipment for all Major
MaintenanceProvided by Supplier at Supplier's sole cost
19000 Tool change scenario with price and part # Proposed by Supplier19000 Personnel19000 Services Director Serves as main Client - Supplier
interface19000 Guarantees19000 Planned Maintenance Components installed
or inspected during a Planned Maintenance event
Planned Maintenance Components shall provide reliable service until the next scheduled outage. All costs associated with a pre-mature failure or "Fall-out" of a Planned Maintenance Component shall be responsibility of Supplier
19000 Delivery time of all replacement parts (within scope) required for Planned Maintenance
At Site not less than 30 days prior to Planned Maintenance
19000 Plant Availability19000 Unplanned Outage, maximum aggregate
days for each CTG, 1st and 2nd years of operation
Proposed by Supplier
19000 Unplanned Outage, maximum aggregate days for each CTG, each year from 3rd year of operation to end of contract term
Proposed by Supplier
19000 Scheduled Outage Durations, Planned Maintenance
19000 Annual Borescope Inspections, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Combustion Inspection and Overhaul, each unit
Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Hot Gas Path Inspection and Overhaul, each unit
Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Major Inspection and Overhaul, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Generator Minor Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Generator Major Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 43 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Performance degradation of Gross Electrical Output at 100% of CTG base load in each period of maintenance cycles
Proposed by Supplier
19000 Performance degradation of Gross Heat Rate at 100% of CTG base load in each period of maintenance cycles
Proposed by Supplier
19000 Performance Testing19000 Formulation for obtaining Gross Electrical
Output and Gross Heat Rate figures of "New and Clean" condition
Proposed by Supplier for Purchaser consideration/ acceptance
19000 Testing procedure for obtaining all guaranteed figures including the estimated uncertainty
Proposed by Supplier for Purchaser consideration/ acceptance
19000 Performance tests after each maintenance work
Performed by Purchaser
19000 Specification Appendices19000 LTSA Spec Appendix 1: Combustion Turbine I Mandatory, By Supplier19000 LTSA Spec Appendix 2: Spare Parts Price List Mandatory, By Supplier19000 LTSA Spec Appendix 3: Replacement Scenari Mandatory, By Supplier19000 LTSA Spec Appendix 4: Division of Work comp Mandatory, By Supplier19000 LTSA Spec Appendix 5: Manpower completed Mandatory, By Supplier19000 LTSA Spec Appendix 6: Field Service Rate com Mandatory, By Supplier19000 Remote Monitoring and Diagnostics 19000 All associated hardware, software and
telecom facilities for online monitoring of CTGs
Included
19000 Windows Compatibility Windows 719000 ERP Compatibility SAP ERP19000 Interface Security High security modem link or VPN
19000 Remote system administration services Required19000 Real-time process information by any Intranet
or Internet web browser on any connected PC (including necessary software licensing)
Required
19000 Remote monitoring parameters19000 Speed Required19000 Load Required19000 Fired Starts Required19000 Fired Hours Required19000 Site Barometric Reading Required19000 Temperatures19000 Inlet Ambient Required19000 Compressor Discharge Required19000 Turbine Exhaust Required19000 Turbine Wheelspace Required19000 Lube Oil Header Required19000 Lube Oil Tank Required19000 Bearing Metal Required19000 Bearing Drains Required19000 Exhaust Spread Required19000 Pressures19000 Compressor Discharge Required19000 Lube Pump(s) Required19000 Bearing Header Required19000 Cooling Water Required
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section BCombustion Turbine Generator
Quotation Fill-In Information Page 44 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Fuel Required19000 Filters (Fuel, Lube, Inlet Air) Required19000 Vibration Data for Power Train Required19000 Generator Required19000 Output Voltage Required19000 Field Voltage Required19000 Phase Current Required19000 Field Current Required19000 VARS Required19000 Stator Temperature Required19000 Load Required19000 Vibration Required19000 Start-Up Time Required19000 Coast-Down Time Required19000 Remote Services19000 Measure Equipment Condition19000 Combustion system performance vibration Required19000 Machine performance Required19000 Starting and shutdown characteristics Required19000 Diagnostics by communication with Plant
CEMRequired
19000 Comparison to baseline, design and fleet experience
Required
19000 Analyze equipment condition19000 Diagnostic and engr. services related to
alarm/error/malfunction that is not an in-service failure
Planned Maintenance
19000 Diagnostic and engr. services related to an in-service failure
Unplanned Maintenance
19000 Archive Plant historical data Required19000 Consultations between Remote Monitoring
Center and Plant O&M staffRequired
19000 Remote combustion tuning system to supervise and give recommendations for CTG tuning events
Provided by Supplier, tuning events warranted as Unplanned Maintenance
19000 Condition reporting Quarterly basis and interim (as required)
19000 RCA assistance Required
Notes1) "All Parts and Services" defined as: all planning, engineering, field repairs, shop repairs, replacement of parts,
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 1 of 34
Received and Incorporated
00300C.2.5.4 Not Used00300C.2.6.1 All Exceptions are declared on Form 00300C.2.6.1 - Yes/No00300C.2.6.2 All Clarifications are declared on Form 00300C.2.6.2 - Yes/No
00300C.2.4 Quotation includes/excludes taxes - Included/Excluded00300C.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300C.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300C.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No
00300C.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days
00300C.2.2 AddendaNumber Date Description
Phone NumberFax Number
Address/Number, StreetAddress/City
Address/State, Zip CodeEmail Address
Corporate InformationCompany Name
Technical Contact NameTitle
Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code
Taxpayer ID Number (or EIN)Technical Contact
00300C.1 Not Used
00300C.2 General Quotation Parameters
Bidder's Quotation Date
00300C.2.1 Bidder's Contact InformationBidder's Quotation Number
00300C - Quotation Fill-In Information for Steam Turbine Generator - 495 MW Net Plant Output
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 2 of 34
00300C.2.6.1.2 Technical Exceptions
Count Reference Stated Technical Exception123456789
10
00300C.2.6.1.1 Not Used
Form 00300C.2.6.1 Declared Exceptions to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 3 of 34
00300C.2.6.2.2 Technical Clarifications
Count Reference Stated Technical Clarification123456789
10
00300C.2.6.2.1 Not Used
Form 00300C.2.6.2 Declared Clarifications to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 4 of 34
$ -
$ - $ - $ - $ - $ - $ -
$ -
$ - $ - $ - $ - $ - $ -
$ -
00300C.3.1.1 Steam Turbine Generator(Supplier to provide breakdown as required)
00300C.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300C.3.2 Supplemental Product Pricing
Subtotal 00300C.3.1 Product Pricing (FCA-Factory Location)
Sum of Subtotals (Should Equal Base Quotation Price Above)
Subtotal 00300C.3.2 Supplemental Product Pricing00300C.3.2.6 Instruction Manuals (from Table 3.2.6)
00300C.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)
00300C.3.2.4.2 Training Service (from Table 3.2.4.2)
00300C.3.2.2 NOT USED
00300C.3.2.5 Shipping/Transportation (from Table 3.2.5)
00300C.3 Quotation Pricing
Total Base Quotation Pricing - DDP/CIP Jobsite Location
00300C.3.1 Product Pricing (FCA-Factory Location)Price Breakdown
00300C.3.2.4.1 Field Service Representative (from Table 3.2.4.1)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 5 of 34
Extended Price $ - $ - $ - $ -
Extended Price $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
Extended Price $ -
$ -
Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses
Quantity Included in PO
Table 3.2.4: Technical ServicesBidder Response Column
Quantity Included in PO
$ - STG Field service weeks included in the firm fixed lump sum price 120
00300C.3.2.4.1 Field Service Representative
Unit Price
Trips $ - 40
Week
Unit of Measure Unit Price
Are special tools and/or lift fixtures required? Yes/No
Quantity Included in PO
Table 3.2.3: Special Tools and Lift Fixtures
Item Description Manufacturer's Part Identification
Yes/No
00300C.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.
Table 3.2.1: Startup and Commissioning Spare Parts
00300C.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column
Unit Price
If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.
00300C.3.2.2 NOT USED
Yes/NoAre startup spare or commissioining spare parts required?
Manufacturer's Part Identification
Subtotal: Table 00300C.3.2.1 Startup Spare Parts Pricing
$ -
If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No
If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.
$ -
Bidder Response Column
If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP
$ - $ -
Subtotal: Table 00300C.3.2.3 Special Tools and Lift Fixtures Pricing $ -
Training weeks included in the firm fixed lump sum price Week $ - 5
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2
All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:
Unit of Measure Unit Price
Round trips included in the firm fixed lump sum price Trips $ - 2
Yes/No
Subtotal: Table 00300C.3.2.4.1 Field Service Pricing
Bidder has included Training time in base quotation per RFP requirements
Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses
Unit of Measure
00300C.3.2.4.2 Training Service Bidder Response Column
STG Round trips included in the firm fixed lump sum price
All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:
Unit of MeasureQuantity Included
in POItem Description
$ -
00300C.3.2.3 Special Tools and Lift Fixtures
Bidder has included field service time in base quotation per RFP requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 6 of 34
00300C.3.2 Supplemental Product Pricing Tables
$ -
Extended Price $ - $ - $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
Table 3.2.5: Shipping/Transportation
Subtotal: Table 00300C.3.2.4.1 Training Pricing
If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.
All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Yes/No
Bidder Response Column
Point of OriginItem Description
1 LotCarrier Type
Quantity Included in PO
00300C.3.2.6 Instruction Manuals
Steam Turbine Generator(Supplier to provide breakdown as required)
If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.
$ - EA
Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501
Unit PriceQuantity Included
in POItem Description MediaProof Copy of Instruction Manuals Electronic
$ - 1
Subtotal: Table 00300C.3.2.6 Instruction Manuals Pricing
Final Copy of Instruction Manuals Electronic EA
1
Table 3.2.6: Instruction ManualsUnit of
Measure
Bidder has included transportation in base quotation per RFP requirements
Bidder Response Column
00300C.3.2.5 Shipping/Transportation
Subtotal: Table 00300C.3.2.5 Transportation Pricing
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 7 of 34
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit of Measure Unit Price
$/Day $ - $/Day $ - $/Day $ -
$/h $ - $/h $ - $/h $ -
$/rt $ -
00300C.4 Unit Adjustment Pricing Tables
Round Trip Rate
Item Number
Item Number Item Description Unit of Measure
Table 4.1: Equipment Pricing
Table 4.2: Startup and Commissioning Spare Parts
Item Description
Item Description Unit of Measure
Table 4.3: NOT USED
Table 4.4: Special Tools and Lift Fixtures
Item Number
Monday through Friday (up to 8 hours)
Unit of Measure
Per diem Rate
Adjustment Rate Monday through Friday beyond 8 hours)
Per diem Rate Sunday / Holiday (up to 8 hours)
Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance
Saturday (up to 8 hours)
All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:
Per diem Rate
All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:
Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)
All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 8 of 34
Bidder Response Column
$ -
$ -
Bidder Response Column
Bidder Response Column
00300C.5 Option Pricing
00300C.6 Not Used
00300C.5.1 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, STG Scope Matrix Item 99
00300C.5.2 Recommended STG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))
00300C.7 Logistics00300C.7.1 Jobsite Storage Requirements
Bidder's product included in the quotation has special storage requirements Yes/No
lb
00300C.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No
If Yes, special storage requirements are included with the quotation Yes/No
Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No
00300C.8 Subcontracting
Number of Shipments CountTotal Number of Pieces per Shipment Count
Total Volume of Largest Single Component cu ft
Total Weight per Shipmentcu ft
Total Weight of Largest Single Component
lbTotal Volume per Shipment
Origin CountryStateCity
If yes, list of other locations included with the quotation Yes/No
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 9 of 34
LD*
LD(Supplier to provide breakdown as required)
00300C.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No
Yes/No18-Jan-16
00300C.9 Delivery and Schedule
Bidder Response ColumnRequired Delivery
00300C.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**
120 Days Maximum Prior to Required Delivery
00300C.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No
Steam Turbine Generator
Yes/No00300C.9.1.1 Bidder will make single consolidated shipment.
* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.
** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.
Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.
Yes/No
00300C.9.2 Schedule of Submittals and Applicable Liquidated Damages
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 10 of 34
TBD TBD
Calendar Event Due Date301 Engineering/Procurement/
Production/Testing and Inspection/Shipping Schedule and Status Report
30 After Effective Date with Monthly Updates
No
302 Preshipment Inspection Notice 30 Before Shipment of Equipment No
303 Electronic Material List 30 Before Shipment of Equipment No304 Shipping Notice 2 Full Work Days Notice No305 Detailed Final Packing List of
Shipment of Equipment, corresponding with Electronic Material List data
Upon each Shipment and With Electronic Materials List
No
306 Hazardous materials documentation
With Each Shipment No
701 Proof Copy of Instruction Manuals
90 Before Shipment of Equipment No
702 Final Copy of Instruction Manuals
15 Before Shipment of Equipment No
703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)
90 After Effective Date No
704 Startup and Commissioning Spare Parts List, Priced
90 Before Shipment of Equipment No
15561 Steam Turbine .0601 15561 Final heat balances for load
conditions specified in Article 15561.1.3
30 After Effective Date No
0602 15561 Expansion lines for the heat balances furnished for load conditions specified in Article 15561.1.3
30 After Effective Date No
0603 15561 HP turbine end points versus throttle flow
30 After Effective Date No
0604 15561 Expansion line end points versus reheater flow (throttle flow for nonreheat units) curves for exhaust pressures for 1 inch (25 mm) Hg absolute to the turbine maximum allowable continuous operating exhaust pressure
30 After Effective Date No
0605 15561 Leakage flow and leakage enthalpy versus throttle flow curves
30 After Effective Date No
0606 15561 Turbine section efficiency versus inlet volumetric flow
30 After Effective Date No
Project Delivery Date: January 18, 2016
00300.9.2 Schedule of Submittals and Applicable Penalty
Effective Date:
Bid
der C
ompl
ies
Yes
/No
Penaltyapply?
The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.
Reference Document
Submittal DatesSubmittals Item
Estimated First Shipment Date:
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 11 of 34
0607 15561 Combined efficiency of IP and LP turbines as a function of reheat temperature and intercept valve pressure
30 After Effective Date No
0608 15561 Turbine exhaust loss curve 30 After Effective Date No0609 15561 Turbine exhaust pressure
correction30 After Effective Date No
0610 15561 First-stage pressure versus flow to the following stage curve
30 After Effective Date No
0611 15561 Reheat bowl pressure versus flow to the following stage curve
30 After Effective Date No
0612 15561 Correction curves for kilowatts and heat rate for the following
After Effective Date No
0613 15561 Throttle pressure rated +5 percent, -50 percent
30 After Effective Date No
0614 15561 Throttle temperature rated +57.2° F to -18.4° F (+14° C to -28° C)
30 After Effective Date No
0615 15561 Reheat temperature rated +57.2° F to -18.4° F (+14° C to -28° C)
30 After Effective Date No
0616 15561 Reheater pressure drop 5 percent to 15 percent of HP turbine exhaust pressure
30 After Effective Date No
0617 15561 Exhaust pressure from 1 inch (25 mm) Hg abs to the turbine maximum allowable continuous operating exhaust pressure
30 After Effective Date No
0618 15561 All other correction curves for ASME PTC 6.2 Acceptance Test
30 After Effective Date No
0619 15561 Valve loop correction to heat rate curve
30 After Effective Date No
0620 15561 Turbine heat rate versus gross turbine output for governing control and hybrid mode of operation
30 After Effective Date No
0621 15561 The following variable pressure performance curves
After Effective Date No
0622 15561 HP turbine exhaust pressure versus percent maximum expected throttle flow
30 After Effective Date No
0623 15561 Main turbine throttle pressure versus percent maximum expected throttle flow
30 After Effective Date No
0624 15561 HP turbine exhaust temperature versus percent maximum expected throttle flow
30 After Effective Date No
0625 15561 IP turbine exhaust pressure versus percent maximum expected throttle flow
30 After Effective Date No
0626 15561 All curves in the Supplier's standard thermal kits
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 12 of 34
0627 15561 Final list of motors including voltage, full load current, locked-rotor current, phase, horsepower, enclosure type for each motor, and space heater watts and volts
90 After Effective Date No
0628 15561 Final list of closed cycle cooling water requirements including flow and pressure drop and flow diagram
45 After Effective Date No
0629 15561 Final list of all instrument/service air users and consumption
90 After Effective Date No
0501 15561 Steam seal system diagram indicating flows, pressures, and temperatures (steam seal system P&ID)
60 After Effective Date No
0630 15561 Lube oil system data including volumetric and flow back
60 After Effective Date No
0502 15561 Lube oil diagrams (lube oil system P&ID)
60 After Effective Date No
0503 15561 Drawings and procedure for cleaning of lube oil system showing all temporary pipe and equipment required
After Effective Date No
0631 15561 Preliminary air consumption 40 After Effective Date No
0504 15561 DEHC fluid diagrams (control and protection P&ID)
60 After Effective Date No
0505 15561 Drawings indicating the location of all turbine generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into accessory
90 After Effective Date No
0506 15561 Detailed schematic and wiring drawings of all electrical control wiring
120 After Effective Date No
0507 15561 Drawings indicating the size and location of all turbine generator ground pads
90 After Effective Date No
0508 15561 All drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings
120 After Effective Date No
0509 15561 Arrangement drawings of all piping and accessories furnished, as required for the Purchaser's check of the layout of these items
150 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 13 of 34
0510 15561 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items
60 Before Shipment of Equipment No
0632 15561 Lateral and torsional analysis report and critical speeds of turbine generator rotor
60 After Effective Date No
0511 15561 A block diagram with significant transfer functions representing the generator, excitation, and regulator satisfactory for computer studies
30 After Effective Date No
0633 15561 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
150 After Effective Date No
0634 15561 Listing of accessory equipment to be shipped loose to jobsite
30 Before Shipment of Equipment No
0512 15561 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items. This includes outline drawings of the supervisory instruments and accessory electrical equipment.
120 After Effective Date No
0201 15561 Supplier to participate in design conference
15 After Effective Date No
0635 15561 Equipment startup schedule duration requirements
90 After Effective Date No
0636 15561 Specification data pages updated and resubmitted
60 After Effective Date No
0637 15561 Preservative coating data 60 After Effective Date No
0638 15561 Detailed drawing submittal schedule list and submittal schedule
30 After Effective Date No
0639 15561 Detailed data to describe the capability of the unit to operate at speeds above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off normal speed operation
60 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 14 of 34
0640 15561 Detailed information as to the capability of the turbine generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
60 After Effective Date No
0641 15561 All control devices and/or process set points, ranges, and flow quantities
60 After Effective Date No
0642 15561 Complete I/O list for signals to/from Subsupplier's systems from/to Supplier's DCS
120 After Effective Date No
0643 15561 I/O counts 120 After Effective Date No
0513 15561 Detailed logic diagrams, operations procedures, and operator interface screens to implement control of Supplier's equipment via Purchaser's DCS
120 After Effective Date No
0644 15561 Electrical load list including MOVs
60 After Effective Date No
0514 15561 Turbine generator general arrangement drawings. These drawings shall indicate all major equipment locations, access doors, maintenance or equipment removal space, and provide sufficient detail to allow for plan layout.
30 After Effective Date No
0515 15561 All main steam, reheat steam, and large bore piping connection drawings including type, allowable movements, and loads
60 After Effective Date No
0516 15561 All main steam, reheat steam, and large bore piping connection drawings end prep details
60 After Effective Date No
0517 15561 Details of temporary steam blow connections
60 After Effective Date No
0518 15561 Condenser interface details including loading flange connections and loading conditions
60 After Effective Date No
0519 15561 Drawings to assist Supplier in bus duct design/layout interface with generator ("bus duct" includes isophase bus duct and bus duct from generator neutral enclosure to the generator NGR enclosure)
60 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 15 of 34
0645 15561 Flow charts detailing on-line monitoring programs for startup and on-line monitoring of critical parameters
120 After Effective Date No
0520 15561 Preliminary drawings and detailed assembly instructions for erection bid solicitation
120 After Effective Date No
0521 15561 Final erection drawings and detailed assembly instructions
360 After Effective Date No
0646 15561 Detailed drawing submittal list and submittal schedule
60 After Effective Date No
15565 Lube Oil Conditioner .
0538 15565 Drawings of layout and overall dimensions of the lube oil conditioner skid package
30 After Effective Date No
0539 15565 Detailed drawings of all electrical/control wiring
30 After Effective Date No
0540 15565 Piping and instrument diagrams 30 After Effective Date No
0541 15565 All drawings required to locate all piping and wiring connections
30 After Effective Date No
16031 Cylindrical Rotor Generators .
0202 16031 Supplier to participate in design conference
15 After Effective Date No
0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0652 16031 Critical speeds of generator 30 After Effective Date No
0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.
30 After Effective Date No
0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 16 of 34
0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation
30 After Effective Date No
0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
30 After Effective Date No
0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)
30 After Effective Date No
0658 16031 Generator "Vee" curves 30 After Effective Date No
0659 16031 Zero and rated power factor current saturation curves
30 After Effective Date No
0660 16031 No load saturation curves 30 After Effective Date No
0661 16031 Generator allowable negative sequence versus time curve
30 After Effective Date No
0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals
30 After Effective Date No
0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.
30 After Effective Date No
0664 16031 Generator current transformer secondary excitation characteristic curve
30 After Effective Date No
0665 16031 Generator current transformer ratio correction factor curve
30 After Effective Date No
0666 16031 Generator current transformer thermal rating
30 After Effective Date No
0667 16031 Generator current transformer mechanical rating
30 After Effective Date No
0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 17 of 34
0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)
30 After Effective Date No
0670 16031 Generator current transformer phase angle correction factor curves
30 After Effective Date No
0671 16031 Generator current transformer correction factor curves
30 After Effective Date No
0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability
30 After Effective Date No
0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies
30 After Effective Date No
0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No
0544 16031 Stator cooling water diagrams 90 After Effective Date No
0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
90 After Effective Date No
0674 16031 List of all control devices and/or process set points, ranges, and flow quantities
90 After Effective Date No
0675 16031 Listing of accessory equipment to be shipped loose to jobsite
120 After Effective Date No
0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams
90 After Effective Date No
0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items
60 After Effective Date No
0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment
90 After Effective Date No
0548 16031 Drawings indicating the size and location of all generator ground pads
90 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 18 of 34
0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers
90 After Effective Date No
0550 16031 Detailed schematic drawings of all electrical control wiring
90 After Effective Date No
0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.
90 After Effective Date No
0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items
90 After Effective Date No
0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.
180 After Effective Date No
0676 16031 Generator terminal enclosure outline and loading data
90 After Effective Date No
0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies
30 After Effective Date No
16051 Electrical Design and Equipment
.
0677 16051 Certified design data and performance curves
70 Before Shipment Yes
0555 16051 Arrangement and fabrication/ erection drawings
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 19 of 34
0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials
60 After Effective Date Yes
0557 16051 Final set of above drawings in addition to interconnection wiring diagrams
21 After Purchaser comments on initial drawings
Yes
0558 16051 Final submittal of as-built drawings
30 After Shipment Yes
0559 16051 Relay instruction and service manual including relay curve information
90 After Effective Date Yes
0678 16051 Current transformer ratio correction factor and excitation curves
90 After Effective Date Yes
0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used
30 After Effective Date Yes
0560 16051 I/O database and I/O wiring diagrams
Upon Shipment Yes
16142 Generator Neutral Grounding .
0680 16142 Bill of Material, Including Quantity, Description, and Part Number
Upon Effective Date Yes
0681 16142 Certified design calculations 30 After Effective Date Yes
0561 16142 Preliminary outline drawings 15 After Effective Date Yes
0562 16142 Final drawings 60 After Effective Date Yes
0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes
16201 Protective Relaying Panels .
0564 16201 Outline drawings showing dimensions, weight, and mounting requirements
15 After Effective Date Yes
0565 16201 Schematic diagrams 30 After Effective Date Yes
0566 16201 Connection and wiring diagrams 30 After Effective Date Yes
0567 16201 Erection drawing 30 After Shipment Yes
0568 16201 Relay installation and wiring information
30 After Effective Date Yes
0569 16201 Nameplate drawings 45 After Effective Date Yes
E645 Electric Actuators .
0570 E645 Actuator outline diagrams 30 After Effective Date No
0571 E645 Wiring diagrams 30 After Effective Date No
K100 Instrumentation .
0572 K100 Instrument Location Plan Drawings
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 20 of 34
0573 K100 Instrument factory calibration sheets
Upon Shipment of Instruments Yes
0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow
120 After Effective Date Yes
0575 K100 ISA-format datasheets for all Instruments
120 After Effective Date Yes
0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.
120 After Effective Date Yes
M200 Piping .
0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.
Q002 General Quality System Requirements
.
0401 Q002 Quality Manual, controlled copy 30 After Effective Date
0402 Q002 Certification Letter or Certificate of Authorization (copy), if certified by a registered agency, e.g., ASME Certificate of Authorization, ISO Certificate
30 After Effective Date
0403 Q002 Subsupplier listing 5 Before Issue of Subsupplier Purchase Order
0404 Q002 Inspection and test plan 30 After Effective Date
0405 Q002 Notification of inspection/test (for B&V hold/witness points)
14 Before Test/Inspection
Q100 General Welding Requirements
.
0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.
0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion
0407 Q100 Radiographs 14 After Fabrication Completion
Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials
.
0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records
21 Before Shipment
Q301 Manufacturer's Standard Coating
.
0683 Q301 Shop drawings that identify shop-applied coating systems
30 Before Start of Fabrication No
0684 Q301 Manufacturer's product data sheets
30 After Release to Proceed No
Q400 General Equipment Requirements
.
RFP 40313
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 21 of 34
0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.
30 After Effective Date No
Q502 Electrical Data
0576 Q502 Completed motor information sheets
60 After Effective Date Yes
0577 Q502 Completed electric actuator information sheet
60 After Effective Date Yes
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 22 of 34
Bidder Response Column
Reference Document Submittal Item Yes/No
15561 Steam Turbine .15561 Heat balance diagrams for each load condition.15561 Exhaust pressure correction curves for heat rate and output.15561 Startup curves for hot, warm, and cold startups indicating flow, temperature,
time, and other parameters for normal startups and loading rate curve.
15561 Lube oil pump characteristic curves.15561 Turbine overall length, width, height, and shaft center line to floor line
dimension.15561 Valve restraint forces imposed on turbine foundation and any other
information that should be incorporated in the turbine foundation design.15561 Bearing spans.15561 Turbine control panels and control cabinets overall length, width, and height.
15561 EHC insert panels and/or CRT overall length, width, and height.15561 Table of weights and dimensions indicating assembled weights and
dimensions of major components, weights to be handled during erection, and weights to be handled during overhaul.
15561 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item including a discussion or designation of particular items required for erection and/or maintenance.
15561 Complete list of recommended spare parts.15561 Description of required sectional shipments if equipment cannot be
completely factory assembled.15561 Information describing coating systems for equipment.15561 Complete information on the EHC system including a list of major
components, description of the principles of operation, and available options.
15561 Complete information on the TSI system including a list of major components, description of the principles of operation, and available options.
15561 Description of instrumentation furnished.15561 Power consumption of EHC and supervisory system in kVA, normal and
peak, inverter power.15561 Complete description of cable requirements, including the cable
constructions, for all equipment furnished and applicable flame tests.15561 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
15561 Complete description of any separate cooling air requirements for logic and control cabinets.
15561 Description and indication of the number of grounding pads or devices for each casing and shaft.
15561 Description of any special equipment grounding requirements that would not allow the equipment to be grounded (connected) to the station ground grid.
Document submitted with Quotation Package
00300C.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 23 of 34
Reference Document Submittal Item Yes/No
15561 Complete description of provisions made in pressure parts and other equipment to permit the proposed turbine generator unit to withstand numerous cold, warm, and hot starts per year over the design life of the unit without fatigue failure.
15561 Complete description of provisions in the equipment design to ensure meeting the stated loading time from minimum load to maximum load.
15561 Complete description of manufacturer's lagging design.15561 Complete description of the lube oil piping arrangement.15561 Complete data on steam purity requirements.15561 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, turbines under construction or in operation.15561 Listing of suppliers and their manufacturing locations.15561 Bidder's preliminary engineering schedule.15561 Bidder's preliminary procurement/production/shipping schedule.15561 Description of data link provided to Purchaser's DCS.15561 Detailed description of automation equipment for automatic run-up of turbine.
15561 Description of turbine rotor stress monitoring system.15561 Description of turning gear.15561 Description of field assembly work required and estimated manpower
requirements for erection of equipment.15561 Description of shaft couplings.15561 Description of startup of the unit.15565 Lube Oil Conditioner .15565 Dimensional drawings of proposed components.16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power
factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.
16031 Generator drawing with excitation cubicle's overall length, width, and height.
16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.
16031 Generator drawing with supervisory cabinet's overall length, width, and height.
16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.
16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.
16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.
16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 24 of 34
Reference Document Submittal Item Yes/No
16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,
including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for
connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable
constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator
temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field
winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.
16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of
cooling air.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 25 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Steam Turbine .15561 Bidder's name15561 Turbine name15561 Identification number15561 Turbine manufacturer15561 Component Weights15561 Weights, ton (long)
15561Assembled turbine complete without external accessories
15561Assembled weight of turbine oil reservoir including coolers, pumps, and piping
15561 Dry15561 Operating
15561Assembled weight of EHC system fluid reservoir including coolers, pumps, and piping
15561 Dry15561 Operating15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Heaviest piece to be handled during erection15561 Name15561 Weight, ton (long)15561 Length, ft (m)15561 Performance15561 Guarantee Load Condition: 15561 Guaranteed/Predicted15561 Throttle Flow, lb/h (kg/h)15561 Net Turbine Output, kW15561 Net Turbine Heat Rate, Btu/kWh15561 Steam Turbine Operational Data
15561Approximate minimum load at which unit can operate satisfactorily for continuous period, percent
15561 Expected no-load throttle flow, lb/h (kg/h)
15561Maximum exhaust temperature at no-load throttle flow, °F (°C)
15561Minimum time required for pickup from minimum load to maximum load, minutes
15561Allowable rate of load change, 25 percent load to rated load (submit as plotted data, if necessary)
15561Supplementary steam requirements for sealing turbine at low load operation during startup and shutdown
15561 Flow, lb/h (kg/h)15561 Temperature, °F (°C)15561 Pressure, psi (kPa)15561 Steam Turbine Physical Data15561 Length of last stage blading, in. (mm)
00300C.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 26 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Diameter of last stage wheel, in. (mm)15561 Velocity at tip of longest row of blades, ft/s (m/s)
15561Exhaust annulus area, per each last stage wheel, ft2 (m2)
15561Maximum allowable turbine back pressure for stable operation, in. (mm) Hg
15561Steam loading on last row of blades for maximum exhaust flow, lb/h/ft2 (kg/h/m2)
15561 Total turbine generator moment of inertia, WK2 (MR2)15561 Pitch diameter of governor stage, in. (mm)15561 Length of governor stage blades, in. (mm)15561 Governor stage efficiency at VWO-NP, percent
15561 First-stage bowl pressure at VWO-NP, psi(a) (kPa[a])
15561 First-stage exit pressure at VWO-NP, psi(a) (kPa[a])15561 Number of governor controlled inlet valves15561 Throttle flow ratio at each admission, 1st, 2nd, etc.15561 Governor stage efficiency at first admission, percent
15561First-stage bowl pressure at first admission, psi(a) (kPa[a])
15561First-stage exit pressure at first admission, psi(a) (kPa[a])
15561 Bearing data15561 Thrust bearing15561 Type15561 Design capacity, lb (kg)15561 Maximum force at worst operating condition, lbf15561 Main bearings15561 Number15561 Type15561 Design load, ton (long)
15561 Maximum allowable bearing temperature, °F (°C)
15561Maximum allowable vibration for each bearing for continued operation, peak-to-peak, mils
15561 Steam Turbine Blade Data15561 Number and type of stages (Quantity/Type)15561 HP turbine /15561 IP turbine /15561 LP turbine /15561 Allowable frequency variation15561 Limited time, ±Hz/total time15561 Continually, ±Hz15561 Method of fastening shrouding and lashing15561 Stage blading fitted with Stellite shields15561 Number15561 Location15561 Shaft Coupling Data15561 Number15561 Type
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 27 of 34
Reference Document Submittal Item Tech Fill-In Data
15561 Location15561 Lubricating Oil System15561 Quantity of oil to completely fill system, gal (L)
15561Quantity of oil flow back on shutting down machine, gal (L)
15561 Capacity of reservoir, gal (L)15561 Quantity of cooling water required to each cooler at
design inlet temperature, gpm (L/min)15561 Maximum cooling water temperature for unrestricted
operation with design water flow to both coolers (simultaneous operation), °F (°C)
15561 Supply piping material15561 Drain piping material15561 Guard piping material15561 Oil Coolers15561 Heat duty at maximum load, MBtu/h15561 Cooling surface, each cooler, ft2 (m2)15561 Waterside pressure loss, psi at gpm (kPa at L/min)15561 Design pressure, waterside, psig (kPag)15561 Design pressure, oil side, psig (kPag)15561 Cleanliness factor15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Gland Condenser15561 Manufacturer15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Cooling surface, ft2 (m2)15561 Maximum water flow, gpm (L/min)15561 Friction loss at maximum water flow, psi (kPa)15561 Tube side design conditions15561 Pressure, psig (kPag)15561 Temperature, °F (°C)
15561Minimum condensate flow at low load conditions, gpm (L/min)
15561 Heat duty at maximum load, MBtu/h15561 EHC Data15561 Reservoir capacity, gal (L)15561 EHC coolers15561 Number/type of coolers15561 Tube size, in. (mm)15561 Tube wall thickness, AWG15561 Tube material15561 Tubesheet material15561 Are double tubesheets provided? Yes or No15561 Heat duty at maximum load, MBtu/h15561 Cooling water required by each cooler, at design inlet
temperature, maximum gpm (L/min)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 28 of 34
Reference Document Submittal Item Tech Fill-In Data
15561Pressure drop through the coolers, psi at gpm (kPa at L/min)
15561 Number of pumps15561 Capacity of pumps, gpm (L/min)15561 Motors Data15561 Emergency lube oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Emergency hydrogen seal oil pump15561 kW15561 Volts15561 Full Load Current, Amps15561 Maximum Current During Starting, Amps15561 Enclosure15561 Quantity15561 Miscellaneous Equipment (Manufacturer/Type)15561 Annunciators /15561 Valve motor operators /15561 Prefabricated cables /15561 Limit switches /15561 Pressure switches /15561 Pressure transmitters /15561 Temperature switches /15561 Level switches /15561 Solenoid valves /15561 Thermocouples /15561 Temperature detectors /15561 Control relays /15561 Control switches /15561 Push buttons /15561 Selector switches /15561 Indicating lights /15561 Dc motor starters /15561 Light fixtures /15561 Convenience outlets /15561 Valves /15561 Turbine Auxiliary Power15561
Guaranteed total electric load during normal operation for auxiliaries furnished with turbine, ac load, kW
15561 Total electric load during peak operation for auxiliaries furnished with turbine, ac load, kW
15561Emergency dc electric load for auxiliaries furnished with turbine, kW
15561 Estimated Construction Power Requirements15561 Peak demand, kW15561 Average demand, kW
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 29 of 34
Reference Document Submittal Item Tech Fill-In Data
15561Supplier Furnished Materials and Associated Installation Quantities
15561 Hydraulic System Tubing, lf15561 Large Bore Pipe (>=2 ½” in Diameter), lf15561 Large Bore Pipe Spools, each15561 Large Bore Field Welds, each
15561Large Bore Field Welds (average dia), inches (Note 1)
15561 Small Bore Pipe, lf15561 Small Bore Pipe Spools, each15561 Small Bore Field Welds, each
15561Large Bore Pipe Requiring Purchaser-Provided Heat Trace, lf
15561Small Bore Pipe Requiring Purchaser-Provided Heat Trace, lf
15561 Turbine Generator Enclosure, pieces15561 Turbine Generator Enclosure, sf15561 Off Base Skids & Misc. Equipment, each15561 Power Cable, lf15561 Control Cable, lf15561 Thermocouple Cable, lf15561 Power Conductor Terminations, each (Note 2)15561 Control Conductor Terminations, each (Note 2)
15561Thermocouple Conductor Terminations, each (Note 2)
15561 Conduit, lf15561 Instruments, each15561 Pipe Insulation, lf15561 Insulation Blankets, sf15561 Technical Assistance Time, hours15561 Notes
15561
1. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore weld divided by the total number of large bore welds.
15561
2. Conductor is the number of wires contained in a cable that must be terminated, count both ends.
15565 Lube Oil Conditioner .15565 Bidder's name15565 Equipment name15565 Equipment identification number15565 Manufacturer15565 Model No.15565 Centrifuge capacity, actual15565 At 100 SSU, gpm (L/min)15565 At 1,000 SSU, gpm (L/min)
15565Maximum particle size that will pass through the system, micron(s)
15565Maximum total water contaminant level maintained with influent water level of 5,000 gpm (___ L/min), ppm
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 30 of 34
Reference Document Submittal Item Tech Fill-In Data
15565 Skid assembly15565 Connections15565 Inlet / Outlet15565 Size, in. (mm)
15565 TypeFlanged or Threaded or Welded / Flanged or Threaded or Welded
15565 Overall dimensions (W x L x H), in. (mm)15565 Weight, empty, lb (kg)15565 Weight, full, lb (kg)15565 Power required15565 Power, kW15565 Voltage, volts15565 Phase 3-phase or Single-phase15565 Current at rated voltage, amperes16031 Cylindrical Rotor Generators .16031 Bidder's Name16031 Auxiliary Power16031
Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)
16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)
16031Weight of generator stator winding water cooling unit (if required), lb (kg)
16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if
applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA
16031 Nominal rpm16031 Nominal frequency, hertz
16031Voltages at continuous operation and nominal frequency
16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)
16031
Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv
16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 31 of 34
Reference Document Submittal Item Tech Fill-In Data
16031Short-circuit ratio at rated voltage and rated stator current
16031Continuous current unbalance expressed in terms of I2, percent
16031Generator winding capacitance to ground, all phases tied together, mfd
16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No
16031 Generator field voltage at maximum kVA output, volts
16031Generator field current at maximum excitation, amperes
16031Maximum temperature rise above 104° F (40° C) gas temperature
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the
insulation temperature rise, °F (°C)
16031Maximum temperature rise above ambient air temperature of 104° F (40° C)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 32 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data
16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency
16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW
16031Total generator loss excluding bearings and excitation system, kW
16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent
16031Generator friction loss in bearings, seals, and collector rings, kW
16031 Heat Exchanger Data
16031Complete the following for each type of cooler required by the design
16031 Heat exchanger16031 Cooler description16031 Number of coolers
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 33 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Number of sections per cooler
16031Generator kVA capability with one cooler section out of service, percent
16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler
16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)
16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen
pressure after purging, ft3 (m3)
16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)
16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031
Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?
1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section CCombustion Turbine Generator
Quotation Fill-In Information Page 34 of 34
Reference Document Submittal Item Tech Fill-In Data
16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 1 of 44
Received and Incorporated
00300D.1 Not Used
00300D.2 General Quotation Parameters
Bidder's Quotation Date
00300D.2.1 Bidder's Contact InformationBidder's Quotation Number
00300D - Quotation Fill-In Information for Combustion Turbine Generator - 495 MW Net Plant Output
Corporate InformationCompany Name
Technical Contact NameTitle
Purchase Order AddresseeAddress/Number, StreetAddress/State, Zip Code
Taxpayer ID Number (or EIN)Technical Contact
Phone NumberFax Number
Address/Number, StreetAddress/City
Address/State, Zip CodeEmail Address
00300D.2.2 AddendaNumber Date Description
00300D.2.3 Quotation Validity Period, through January 31, 2014 per RFQ - Yes/No - If no, advise number of days
00300D.2.5.4 Alternate Scope Pricing firm through Quotation Validity Period - 00300D.2.6.1 All Exceptions are declared on Form 00300D.2.6.1 - Yes/No00300D.2.6.2 All Clarifications are declared on Form 00300D.2.6.2 - Yes/No
00300D.2.4 Quotation includes/excludes taxes - Included/Excluded00300D.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No00300D.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No00300D.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 2 of 44
00300D.2.6.1.2 Technical Exceptions
Count Reference Stated Technical Exception123456789
10
00300D.2.6.1.1 Not Used
Form 00300D.2.6.1 Declared Exceptions to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 3 of 44
00300D.2.6.2.2 Technical Clarifications
Count Reference Stated Technical Clarification123456789
10
00300D.2.6.2.1 Not Used
Form 00300D.2.6.2 Declared Clarifications to the RFQ Requirements
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 4 of 44
$ -
$ - $ - $ - $ - $ - $ -
$ -
$ - $ - $ - $ - $ - $ -
$ -
00300D.3.2.2 NOT USED
00300D.3.2.5 Shipping/Transportation (from Table 3.2.5)
00300D.3 Quotation Pricing
Total Base Quotation Pricing - DDP/CIP Jobsite Location
00300D.3.1 Product Pricing (FCA-Factory Location)Price Breakdown
00300D.3.2.4.1 Field Service Representative (from Table 3.2.4.1)
Sum of Subtotals (Should Equal Base Quotation Price Above)
Subtotal 00300D.3.2 Supplemental Product Pricing00300D.3.2.6 Instruction Manuals (from Table 3.2.6)
00300D.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3)
00300D.3.2.4.2 Training Service (from Table 3.2.4.2)
00300D.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1)00300D.3.2 Supplemental Product Pricing
Subtotal 00300D.3.1 Product Pricing (FCA-Factory Location)
00300D.3.1.1 Combustion Turbine Generator(Supplier to provide breakdown as required)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 5 of 44
Extended Price $ - $ - $ - $ -
Extended Price $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
Extended Price $ -
$ -
$ -
00300D.3.2.3 Special Tools and Lift Fixtures
Bidder has included field service time in base quotation per RFQ requirements Yes/NoIf Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1
Unit of MeasureQuantity Included
in POItem Description
Yes/No
Subtotal: Table 00300D.3.2.4.1 Field Service Pricing
Bidder has included Training time in base quotation per RFP requirements
Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses
Unit of Measure
00300D.3.2.4.2 Training Service Bidder Response Column
CTG Round trips included in the firm fixed lump sum price
All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour onsite workdays, Monday - Saturday:
Round trips included in the firm fixed lump sum price Trips $ - 2
Training weeks included in the firm fixed lump sum price Week $ - 5
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2
All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite workdays, Monday - Friday:
Unit of Measure Unit Price
Subtotal: Table 00300D.3.2.3 Special Tools and Lift Fixtures Pricing $ -
$ - $ -
If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.
$ -
Bidder Response Column
If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP
00300D.3.2.2 NOT USED
Yes/NoAre startup spare or commissioining spare parts required?
Manufacturer's Part Identification
Subtotal: Table 00300D.3.2.1 Startup Spare Parts Pricing
$ -
If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No
00300D.3.2 Supplemental Product Pricing TablesBidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is not included in these tables.
Table 3.2.1: Startup and Commissioning Spare Parts
00300D.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column
Unit Price
If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.
Unit of Measure Unit Price
Are special tools and/or lift fixtures required? Yes/No
Quantity Included in PO
Table 3.2.3: Special Tools and Lift Fixtures
Item Description Manufacturer's Part Identification
Yes/No
Unit Price
Trips $ - 60
Week
Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses
Quantity Included in PO
Table 3.2.4: Technical ServicesBidder Response Column
Quantity Included in PO
$ - CTG Field service weeks included in the firm fixed lump sum price 180
00300D.3.2.4.1 Field Service Representative
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 6 of 44
00300D.3.2 Supplemental Product Pricing Tables
$ -
Extended Price $ - $ - $ - $ - $ - $ -
Extended Price $ -
$ -
$ -
00300D.3.2.5 Shipping/Transportation
Subtotal: Table 00300D.3.2.5 Transportation Pricing
Bidder has included transportation in base quotation per RFP requirements
Bidder Response Column
$ - 1
Subtotal: Table 00300D.3.2.6 Instruction Manuals Pricing
Final Copy of Instruction Manuals Electronic EA
1
Table 3.2.6: Instruction ManualsUnit of
Measure Unit PriceQuantity Included
in POItem Description MediaProof Copy of Instruction Manuals Electronic
If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.
$ - EA
Yes/NoBidder has included pricing for Instruction Manuals in base quotation per Article Q501
00300D.3.2.6 Instruction Manuals
Combustion Turbine Generator(Supplier to provide breakdown as required)
Point of OriginItem Description
1 LotCarrier Type
Quantity Included in PO
Subtotal: Table 00300D.3.2.4.1 Training Pricing
If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.
All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Yes/No
Bidder Response Column
Table 3.2.5: Shipping/Transportation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 7 of 44
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit Price(to Add)
Unit Price (to Delete)
Delivery ARO (WKS)
$ - $ - $ - $ - $ - $ - $ - $ -
Unit of Measure Unit Price
$/Day $ - $/Day $ - $/Day $ -
$/h $ - $/h $ - $/h $ -
$/rt $ -
Per diem Rate Sunday / Holiday (up to 8 hours)
All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:
Adjustment Rate Saturday (beyond 8 hours)Adjustment Rate Sunday / Holiday (beyond 8 hours)
Adjustment Rate Monday through Friday beyond 8 hours)
Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance
Saturday (up to 8 hours)Per diem Rate
All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite workday in which all project construction and management personnel are working normal shifts:
Per diem Rate Monday through Friday (up to 8 hours)
Table 4.3: NOT USED
Table 4.4: Special Tools and Lift Fixtures
Item Number Item Description Unit of Measure
Item Number Item Description Unit of Measure
00300D.4 Unit Adjustment Pricing Tables
Item Number Item Description Unit of Measure
Table 4.1: Equipment Pricing
All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses associated with one round trip.
Round Trip Rate
Table 4.2: Startup and Commissioning Spare Parts
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 8 of 44
Bidder Response Column
$ -
$ -
$ -
$ -
$ -
Bidder Response Column
$ - $ -
Bidder Response Column
Bidder Response Column
Origin CountryStateCity
If yes, list of other locations included with the quotation Yes/No
cu ft
Total Weight per Shipmentcu ft
Total Weight of Largest Single Component
lbTotal Volume per Shipment
Bidder proposes subcontracting any major portions of the Work Yes/NoIf Yes, Sub-supplier List is included with the quotation Yes/No
00300D.8 Subcontracting
Number of Shipments CountTotal Number of Pieces per Shipment Count
Total Volume of Largest Single Component
Bidder's product included in the quotation has special storage requirements Yes/No
lb
00300D.7.2 ShipmentsManufactured in Bidder's own facility? Yes/NoManufactured in facilities of others? If so list. Yes/No
If Yes, special storage requirements are included with the quotation Yes/No
Price Addition to price for alternative scope proposed
00300D.6.1 Alternative Scope 1Single-Shaft Train (Non-Mandatory Alternative)
Price Deduction from base price for scope removed from base scope
00300D.7 Logistics00300D.7.1 Jobsite Storage Requirements
00300D.5.2 Attendance at the Purchaser's DCS Factory Acceptance Test per Article 01500.1, CTG Scope Matrix Item 99
00300D.5 Option Pricing
00300D.6 Alternative Scope Pricing
00300D.5.1 Pulse Air Compressor Skid per Article 01500.1, CTG Scope Matrix Item 15
00300D.5.3 Recommended CTG Scope Spare Parts List per Article 01500.1.9 (Pricing Valid Up To One Year After The Contract Award Date))
00300D.5.4 LTSA Pricing per Sections 01500.1.6 and 19000 (include Supplier pricing breakdown table separately as required)
00300D.5.5 Clean agent fire protection system (FM-200 or Water Mist), REQUIRED if Supplier offers CO2 system in base offering in exception to RFP clean agent system requirements.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 9 of 44
LD*
LD
Bidder confirms ability and commitment to meet all the required submittal dates. Yes/NoIf No, Bidder has for each submittal to which the “No” applies stated the best possible submittal date as an exception.
Yes/No
00300D.9.2 Schedule of Submittals and Applicable Liquidated Damages
* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in accordance with applicable articles of the RFP.
** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date is at the discretion of Supplier.
Combustion Turbine Generator
Yes/No00300D.9.1.1 Bidder will make single consolidated shipment.
00300D.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/NoIf No, Bidder has included a proposed staggered shipping schedule. Yes/No
7-Mar-16
00300D.9 Delivery and Schedule
Bidder Response ColumnRequired Delivery
00300D.9.1 Delivery DAP Jobsite (originating in US), DDP Jobsite (originating outside US) Early Delivery**
120 Days Maximum Prior to Required Delivery
(Supplier to provide breakdown as required)
00300D.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No
Yes/No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 10 of 44
TBD TBD
Calendar Event Due Date301 Engineering/Procurement/
Production/Testing and Inspection/Shipping Schedule and Status Report
30 After Effective Date with Monthly Updates
No
302 Preshipment Inspection Notice 30 Before Shipment of Equipment No
303 Electronic Material List 30 Before Shipment of Equipment No
304 Shipping Notice 2 Full Work Days Notice No
305 Detailed Final Packing List of Shipment of Equipment, corresponding with Electronic Material List data
Upon each Shipment and With Electronic Materials List
No
306 Hazardous materials documentation
With Each Shipment No
701 Proof Copy of Instruction Manuals
90 Before Shipment of Equipment No
702 Final Copy of Instruction Manuals
15 Before Shipment of Equipment No
703 Recommended Spare Parts List, with Unit Prices and Names of Suppliers, Necessary to Cover a Full Maintenance Cycle (3 years)
90 After Effective Date No
704 Startup and Commissioning Spare Parts List, Priced
90 Before Shipment of Equipment No
05135 Steel Stack Designed by Supplier (Optional Scope)
.
0409 05135 Structural Steel Material Certification
Upon request
0410 05135 High Strength Bolts Material Certification
Upon request
0411 05135 Direct Tension Indicators Material Certification
Upon request
0694 05135 Grating Copies of Certified Test and Inspection Reports
14 After Test/Inspection
0583 05135 Arrangement drawings 30 After Effective Date
0695 05135 Foundation design i t
30 After Effective Date
0696 05135 Design calculations 30 After Effective Date
0584 05135 Fabrication and erection detail drawings
30 After Effective Date
0697 05135 Stack, liner, insulation, and lagging materials specifications
30 After Effective Date
0698 05135 Shop and/or field coatings data 30 After Effective Date
Submittal Dates LDsapply?
00300.9.2 Schedule of Submittals and Applicable Liquidated Damages
Bid
der C
ompl
ies
Yes
/No
Effective Date: Estimated First Shipment Date:Project Delivery Date: March 7, 2016
The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to "update," to "inform," etc., or to “submit” should a condition precedent occur. These have not been included in the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or not the submittal is actually included on the following:Item No.
Reference Document
Submittals Item
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 11 of 44
11506 Selective Catalytic Reduction System (Optional Scope)
.
0585 11506 Arrangement drawings 30 After Effective Date No0699 11506 Certified loads for design of
structures and foundations40 After Effective Date No
0586 11506 Arrangement drawings 15 After Effective Date No0587 11506 Piping and instrument diagrams 30 After Effective Date No
0588 11506 Detail drawings required to indicate miscellaneous piping and wiring connections
45 After Effective Date No
0589 11506 Drawings and data on accessory equipment including valves, fittings, and other components
45 After Effective Date No
0590 11506 Control system functional loop and logic diagrams
60 After Effective Date No
6100 11506 Control system instrumentation and I/O lists
30 After Effective Date No
6101 11506 Instrument data sheets (ISA type or equal) and installation details for control system
60 After Effective Date No
0591 11506 Pipe layout drawings 30 After Effective Date No0592 11506 Recommended location for all
pipe supports, recommended type of pipe supports at each location, and loads on each pipe support
30 After Effective Date No
6102 11506 Pipeline list 30 After Effective Date No11507 Catalyst for Selective
Catalytic Reduction (Optional Scope)
.
6103 11507 Catalyst preproduction test results report
90 After Effective Date and prior to catalyst production
No
11508 Ammonia System (Optional Scope)
.
0593 11508 Detailed drawings indicating pipe connection points
30 After Effective Date No
6104 11508 Fan performance curve - final 30 Before Shipment No
6105 11508 Flowmeter certification report 30 Before Shipment No
13125 Pre-Manufactured Metal Equipment Building
.
0685 13125 Bill of Material, Including Quantity, Description, and Part Number
Effective Date No
0578 13125 Plan view outline - General arrangement, center of gravity weight, floor opening size and locations, mounting details, and cable entry area and door swing requirements
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 12 of 44
0579 13125 Elevation outline - General arrangement in elevation, recommended pier and tie-down locations, and wall opening sizes and locations
30 After Effective Date No
0580 13125 Legend/design criteria outline - Design criteria and drawing legend
30 After Effective Date No
0581 13125 Electrical interconnection diagram
30 After Effective Date No
0686 13125 Certified design calculations 30 After Effective Date No0687 13125 Certified Air conditioning,
Heating, Pressurization design load calculations with considerations of transmission and solar gain, people, lighting, mechanical and electrical equipment, motors, electronic equipment, computers, miscellaneous appliances, infi
30 After Effective Date No
0688 13125 For HVAC Equipment: Fan curves, motor data, coating data, dimensional data including piping connection sizes and location, weight, performance data, wiring diagrams and sound level data.
60 After Effective Date No
0689 13125 For Filters: filter efficiency, airflow resistance, dust holding capacity, media material, thickness, density and dimensional data.
60 After Effective Date No
0690 13125 For Dampers: AMCA certified pressure drop and leakage data.
60 After Effective Date No
0691 13125 For Terminal Devices: Flow versus pressure drop and flow versus throw.
60 After Effective Date No
0692 13125 For Temperature Controls: Wiring diagrams, control and electrical components data sheets, sequence of operations, control system architecture, and temperature control panel layout drawings.
60 After Effective Date No
0693 13125 Bill of Material, Including Quantity, Description, and Part Number
No
0582 13125 Submit drawings indicating the layout of building
No
15562 Combustion Turbine .0647 15562 Certified design data and
performance curves40 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 13 of 44
0522 15562 Arrangement Drawings required for plant layout indicating physical arrangement and dimensions of equipment furnished
30 After Effective Date No
0523 15562 Arrangement Drawings for all auxiliary equipment indicating physical arrangement and dimensions of equipment furnished
45 After Effective Date No
0524 15562 Foundation interface Drawings for all furnished equipment indicating loads, dimensions, anchor bolt locations, embedded conduit, and other necessary details
45 After Effective Date No
0525 15562 Base combustion turbine generator unit arrangement and outline drawing
30 After Effective Date No
0526 15562 CTG auxiliary enclosures and equipment arrangement and outline drawing
45 After Effective Date No
0527 15562 Duct outline Drawings including movements and clearances for insulation, lagging, stiffeners, and expansion joints
60 After Effective Date No
0528 15562 Detail Drawings indicating all Purchaser's piping and wiring connections including locations, sizes, types, materials, cable type, etc.
60 After Effective Date No
0529 15562 Piping and Instrument Diagrams 60 After Effective Date No
0530 15562 Control panel and operator Work station outline and layout Drawings
90 After Effective Date No
0531 15562 Drawings and data on accessory equipment including valves, fittings, and other components
90 After Effective Date No
0532 15562 Electrical one-line diagrams indicating electrical scope
60 After Effective Date No
0533 15562 Electrical elementaries, schematic, wiring, block and tubing diagrams, cable block diagrams, raceway layout, and cable entry into equipment
120 After Effective Date No
0534 15562 Control system functional loop and logic diagrams
90 After Effective Date No
0535 15562 Control operator CRT graphic display pages with descriptions of operator control actions linked to the graphics
120 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 14 of 44
0536 15562 Control system and instrumentation input/output tabulations with descriptions and interface functions
90 After Effective Date No
0648 15562 Instrument data sheets (ISA type or equal) and installation details for all control system input and output devices such as transmitters and control drives
120 After Effective Date No
0649 15562 Recommended detailed erection sequence and procedure
120 Before Shipment No
0701 15562 Two draft copies of Commissioning Manual
90 Before Start of commissioning No
0702 15562 Four final copies of Commissioning Manual
30 Before Start of commissioning No
0537 15562 As-built Drawings 60 Before Completion of commissioning
No
16031 Cylindrical Rotor Generators .
0202 16031 Supplier to participate in design conference
15 After Effective Date No
0650 16031 Generator hydrogen pressure correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0651 16031 Generator power factor correction curves for ASME PTC 6.2 acceptance test
Upon Submittal of Proposal No
0652 16031 Critical speeds of generator 30 After Effective Date No
0653 16031 Generator loss curve and excitation power requirement curve including total electrical losses for generation capability at minimum hydrogen pressure and at 1 bar (14.5 psi) including up to the maximum hydrogen pressure for rated and unity power factors. Curve shall include the total mechanical or fixed losses.
30 After Effective Date No
0654 16031 Water requirements for the air or hydrogen coolers indicated as a curve for varying load conditions, hydrogen pressures, and cooling water temperatures
30 After Effective Date No
0655 16031 Detailed data describing capability of the unit to operate above and below rated speed, including minimum and maximum allowable speed versus cumulative time duration of off-normal speed operation
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 15 of 44
0656 16031 Detailed information on the capability of the generator to respond to a system upset situation, where a large portion of the system load is applied to the unit and load shedding is required
30 After Effective Date No
0657 16031 Reactive power capability versus real power capability curve at minimum and maximum hydrogen pressure(s)
30 After Effective Date No
0658 16031 Generator "Vee" curves 30 After Effective Date No
0659 16031 Zero and rated power factor current saturation curves
30 After Effective Date No
0660 16031 No load saturation curves 30 After Effective Date No
0661 16031 Generator allowable negative sequence versus time curve
30 After Effective Date No
0662 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at the generator terminals
30 After Effective Date No
0663 16031 Generator current decrement curves for 3-phase, line-to-line, and line-to-neutral short-circuit conditions at terminals of transformers connected to generator terminals. Electrical system parameters will be furnished by the Purchaser.
30 After Effective Date No
0664 16031 Generator current transformer secondary excitation characteristic curve
30 After Effective Date No
0665 16031 Generator current transformer ratio correction factor curve
30 After Effective Date No
0666 16031 Generator current transformer thermal rating
30 After Effective Date No
0667 16031 Generator current transformer mechanical rating
30 After Effective Date No
0668 16031 Generator current transformer IEC or ANSI metering and relaying accuracy class
30 After Effective Date No
0669 16031 Generator current transformer secondary resistance at 77.0° F (25° C)
30 After Effective Date No
0670 16031 Generator current transformer phase angle correction factor curves
30 After Effective Date No
0671 16031 Generator current transformer correction factor curves
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 16 of 44
0672 16031 All generator, exciter, and regulator data required to complete a mathematical model study of system stability
30 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 17 of 44
0542 16031 A block diagram with significant transfer functions representing the generator, exciter, and regulator satisfactory for computer studies
30 After Effective Date No
0543 16031 Hydrogen seal oil diagrams 90 After Effective Date No0544 16031 Stator cooling water diagrams 90 After Effective Date No
0673 16031 Complete listing of all accessory equipment with instrument ranges and recommended contact set points
90 After Effective Date No
0674 16031 List of all control devices and/or process set points, ranges, and flow quantities
90 After Effective Date No
0675 16031 Listing of accessory equipment to be shipped loose to jobsite
120 After Effective Date No
0545 16031 Air-to-water cooling diagrams or hydrogen-to-water cooling diagrams
90 After Effective Date No
0546 16031 Drawings of all separately mounted equipment indicating information required for setting, piping, and wiring the items
60 After Effective Date No
0547 16031 Drawings indicating location of all generator junction boxes and electrical accessories requiring embedded conduit in the turbine generator pedestal, including recommended quantities and sizes of conduits into each junction box or piece of equipment
90 After Effective Date No
0548 16031 Drawings indicating the size and location of all generator ground pads
90 After Effective Date No
0549 16031 Drawings indicating electrical connection details to the generator terminals, generator neutral enclosure, and generator current transformers
90 After Effective Date No
0550 16031 Detailed schematic drawings of all electrical control wiring
90 After Effective Date No
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 18 of 44
0551 16031 All certified drawings required to indicate miscellaneous piping and wiring connections and any other piping and wiring connections not indicated on previous drawings. This shall include piping diagrams as required to indicate manufacturer's requirements for the Purchaser's piping systems.
90 After Effective Date No
0552 16031 Arrangement drawings of all piping and accessories furnished, as required for the Engineer's check of the layout of these items
90 After Effective Date No
0553 16031 Drawings as required to indicate the details of construction and internal wiring of all equipment and equipment components furnished. Detail drawings of standard gauges, instruments, valves, and similar miscellaneous items.
180 After Effective Date No
0676 16031 Generator terminal enclosure outline and loading data
90 After Effective Date No
0554 16031 Provide a block diagram and parameter values for the significant transfer functions (representing the generator, excitation and governor) satisfactory for transient and dynamic computer studies
30 After Effective Date No
16051 Electrical Design and Equipment
.
0677 16051 Certified design data and performance curves
70 Before Shipment Yes
0555 16051 Arrangement and fabrication/ erection drawings
90 After Effective Date Yes
0556 16051 Detailed set of drawings to include arrangement drawings, one-line and three-line diagrams, metering and relaying diagrams, schematics, instrument door details, nameplate schedule, and bill of materials
60 After Effective Date Yes
0557 16051 Final set of above drawings in addition to interconnection wiring diagrams
21 After Purchaser comments on initial drawings
Yes
0558 16051 Final submittal of as-built drawings
30 After Shipment Yes
0559 16051 Relay instruction and service manual including relay curve information
90 After Effective Date Yes
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 19 of 44
0678 16051 Current transformer ratio correction factor and excitation curves
90 After Effective Date Yes
0679 16051 Time overcurrent curves for each overload, molded case circuit breaker, and solid-state protective device used
30 After Effective Date Yes
0560 16051 I/O database and I/O wiring diagrams
Upon Shipment Yes
16142 Generator Neutral Grounding .
0680 16142 Bill of Material, Including Quantity, Description, and Part Number
Upon Effective Date Yes
0681 16142 Certified design calculations 30 After Effective Date Yes0561 16142 Preliminary outline drawings 15 After Effective Date Yes0562 16142 Final drawings 60 After Effective Date Yes0563 16142 Schematic and wiring diagrams 60 After Effective Date Yes
16201 Protective Relaying Panels .
0564 16201 Outline drawings showing dimensions, weight, and mounting requirements
15 After Effective Date Yes
0565 16201 Schematic diagrams 30 After Effective Date Yes0566 16201 Connection and wiring diagrams 30 After Effective Date Yes
0567 16201 Erection drawing 30 After Shipment Yes0568 16201 Relay installation and wiring
information30 After Effective Date Yes
0569 16201 Nameplate drawings 45 After Effective Date YesE645 Electric Actuators .
0570 E645 Actuator outline diagrams 30 After Effective Date No0571 E645 Wiring diagrams 30 After Effective Date No
K100 Instrumentation .0572 K100 Instrument Location Plan
Drawings90 After Effective Date Yes
0573 K100 Instrument factory calibration sheets
Upon Shipment of Instruments Yes
0574 K100 Flow element calculation data sheets showing beta ratio, dP, flow
120 After Effective Date Yes
0575 K100 ISA-format datasheets for all Instruments
120 After Effective Date Yes
0682 K100 PTC 19.3 calculations for steam line TW's vib failure analysis confirming thermowells will not fail in service or during steam blow conditions.
120 After Effective Date Yes
M200 Piping .
0683 M200 Calculations to verify suitability of integrally reinforced fittings for dissimilar branch/header materials.
RFP 40313
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 20 of 44
Q100 General Welding Requirements
.
0406 Q100 Nonconformance reports 5 After Discovery of Nonconf.
0407 Q100 ASME/NBIC Data Reports 60 After Fabrication Completion
0407 Q100 Radiographs 14 After Fabrication Completion
Q110 Welding of 9Cr-1Mo-V (Grade 91) Materials
.
0408 Q110 ASME B31.1 shop fabricated piping spools P91 documentation records
21 Before Shipment
Q301 Manufacturer's Standard Coating
.
0683 Q301 Shop drawings that identify shop-applied coating systems
30 Before Start of Fabrication No
0684 Q301 Manufacturer's product data sheets
30 After Release to Proceed No
Q400 General Equipment Requirements
.
0301 Q400 Shipment Plan providing details of field assembly work required as described in the Supplier's proposal.
30 After Effective Date No
Q502 Electrical Data
0576 Q502 Completed motor information sheets
60 After Effective Date Yes
0577 Q502 Completed electric actuator information sheet
60 After Effective Date Yes
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 21 of 44
Bidder Response Column
Reference Document Submittal Item Yes/No
13125 Pre-Manufactured Metal Equipment Building .13125 HVAC Design Engineer13125 HVAC Equipment Vendors15562 Combustion Turbine .15562 Combustion turbine generator performance curves15562 Combustion turbine heat rate, exhaust flow, and exhaust temperature curves
versus load, showing the effect of inlet guide vane (IGV) control15562 Compressor inlet temperature correction curves for heat rate, capacity,
exhaust temperature, and mass flow15562 NOx injection water (or steam) correction curves for effects on heat rate,
capacity, exhaust temperature, mass flow, and emissions for varying amounts of water (or steam) injection for NOx control.
15562 NOx control water (or steam) injection requirement versus combustion turbine load curve for all specified fuels at various compressor inlet temperatures.
15562 Curves indicating the effect of inlet anti-icing on output and heat rate.15562 NOx and CO emission level versus load for all specified fuels.15562 CO, UHC, and VOC emission levels versus water (or steam) injection rate
curve.15562 Inlet pressure drop correction data.15562 Exhaust pressure drop correction data.15562 Humidity correction data.15562 Atmospheric pressure (or altitude) correction curves.15562 Estimated output, heat rate, exhaust flow, and exhaust temperature
degradation versus fired hours curves from initial startup through second major overhaul for firing each specified fuel.
15562 Curves showing recovery effects of compressor washing for output, heat rate, exhaust flow, and exhaust temperature.
15562 Detailed description of starting system.15562 List of Drawings to be provided during project execution and schedule of
drawing submittals.15562 Preliminary/typical general arrangement Drawings showing the combustion
turbine generator unit(s), inlet filter(s), exhaust stack(s), all associated compartments/enclosures/skids, starter unit, transformers, and radiators. A vertical section shall be included showing the complete installed unit including crane minimum hook height and capacity.
15562 Control system configuration drawing identifying all microprocessors, operator interface devices, and interconnecting data highways.
15562 Preliminary/typical one-line diagrams of generator electrical system, including ac and dc auxiliary electric system. One-line diagrams shall include all auxiliary load data and proposed metering and protective relaying.
15562 A complete description of all equipment proposed, together with supportive data.
15562 Preliminary Engineering Schedule.15562 Preliminary Procurement/Production/Shipping Schedule.
Document submitted with Quotation Package
00300D.10 Technical Documents Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 22 of 44
Reference Document Submittal Item Yes/No
15562 Shipping methods and erection criteria and requirements.15562 Description of manufacturer's performance estimating procedure, including
correction procedures for differing altitudes, ambient temperatures, part loads, NOx emissions, water (or steam) injection rates, and IGV control.
15562 Information on technical assistance provided during erection and commissioning.
15562 Description of proposed classroom instruction for operations and maintenance training.
15562 Description and drawing of lay-down space requirements with area defined.
15562 Description and drawing of additional maintenance area required in addition to the lay-down space defined.
15562 Priced lists of recommended spare parts.15562 List of Startup And Commissioning Spare Parts furnished with the
equipment.15562 List of all maintenance tools/special tools furnished with the equipment.15562 Discussion of emission level changes with increasing operating hours.15562 Provide estimated hours to erect proposed combustion turbine generator
unit, broken down by craft.15562 Description of all field assembly/erection required. Any item not described
will be assumed to be fully factory finished.15562 Description of factory testing program for furnished equipment.15562 Description of the extent of nondestructive testing of unit components,
including the casing, rotor forgings, shafts, machine journals, and other major components.
15562 Description of compressor and turbine blade coatings.15562 Description of compressor and turbine blade material and method for
securing to rotor and casing.15562 Description of burners, ignitors, and combustion system for the proposed
combustion system including cross-section Drawings.15562 Description of flame safety and combustion control systems.15562 List of borescope port locations.15562 Description of methods and equipment required for field balancing.15562 Description of gaseous fuel systems and balance-of-plant support/interface
requirements.15562 Gaseous fuel requirements (temperature, pressure, minimum required fuel
superheat, purity, viscosity, minimum heating value, etc.).15562 Description of combustion turbine generator lubricating system, including
lubrication schedules, types, quantities, filters, maintenance intervals, etc.
15562 Description of backup or redundancy features provided in lube oil system and seal oil system.
15562 Description of the combustion turbine generator lube oil cooling system.15562 Description of turning gear system, including statement of effect of long-term
operation of turning gear.15562 Description of manual system for rotating the turbine and generator shafts.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 23 of 44
Reference Document Submittal Item Yes/No
15562 Descriptive information on the combustion turbine control system, including a description of all local and remote control functions and local and remote operator interface functions, redundancy, and a list of sensors furnished (transducers, vibration detectors, thermocouples, RTDs, etc.).
15562 Description of emergency trip system, including fuel shutoff control.15562 Description of combustion turbine automatic generation control (AGC)
system and capabilities.15562 Description of fire protection and detection equipment with a discussion on
compliance with NFPA requirements.15562 Description of unit enclosures and noise attenuation features.15562 Description of procedure for enclosure disassembly in large sections to
accommodate major maintenance.15562 Description and arrangement Drawings of the acoustical barrier system for
noise attenuation, if required.15562 Description of compressor water wash equipment and cleaning chemical
requirements.15562 Description of inlet air filtration system.15562 Description of inlet anti-icing system, including conditions under which it is
required for operation.15562 Description of starting system with associated detailed drawings.15562 Description of water (or steam) injection/NOx reduction control system,
including the combustion turbine manufacturer's operating experience with water (or steam) injection for the combustion turbine model proposed, pressure, temperature, and purity requirements for injection for NOx control.
15562 Water quality and blowdown information for the evaporative cooler system.
15562 Description of proposed insulation and lagging systems.15562 Description of enclosure/compartment HVAC system, including design
temperatures.15562 Description of overspeed protection system.15562 Detailed description of unit startup event sequence, including times, auxiliary
power requirements, amperage versus time curve, etc. (separately address "normal" and "fast" starts).
15562 Description of proposed shutdown corrosion protection system15562 Description of planned future upgrades (capacity increases) to the unit(s)
proposed and effects these upgrades will have on the electrical equipment specified.
15562 Complete current experience listings for the combustion turbine generator model proposed indicating the following information as a minimum:
15562 Recommended maintenance practices and procedures, including frequency of routine inspection intervals and required parts. Include man-hours required to complete the combustion inspection, hot gas path inspection, and the first major overhaul.
15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's DCS.
15562 Complete description of the data link hardware, software, and communications protocol for the interface to the Purchaser's SCADA system.
15562 Description of any special control system grounding requirements.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 24 of 44
Reference Document Submittal Item Yes/No
15562 Complete description of the proposed Turbine Generator Supervisory System including equipment provided, list of sensors furnished, and operator interface functions.
15562 Complete description of the proposed Vibration Monitoring System including equipment provided, list of sensors furnished, and operator interface functions.
15562 Water quality and blowdown information for the evaporative cooler system.
15562 List of codes and standards used in design of all equipment including version or issue date.
16031 Cylindrical Rotor Generators .16031 Reactive capability curve to indicate generator capability at various power
factors.16031 Generator saturation curve.16031 Generator "Vee" curves.16031 Drawings of recommended method of stator erection.16031 Generator drawing with overall length, width, and height.16031 Generator drawing with exciter or collector's overall length, width, and height.
16031 Generator drawing with excitation cubicle's overall length, width, and height.
16031 Generator drawing with rotor removal clearance (straight and askew).16031 Generator drawing with control cabinet's overall length, width, and height.
16031 Generator drawing with supervisory cabinet's overall length, width, and height.
16031 Complete list of required maintenance tools. The listing shall include a complete description and quantity of each item.
16031 Equipment storage requirements, including inside or outside requirements, requirements for controlled temperature or humidity, etc.
16031 Complete list of necessary special tools. The listing shall provide a complete description and quantity of each item, including a discussion or designation of particular items required for erection and/or maintenance.
16031 Complete list of recommended spare parts.16031 Description and listing of major generator assemblies for shipment.16031 Information describing coating systems for equipment.16031 One uncontrolled copy of bidder's Quality Assurance Program.16031 Complete information on the generator supervisory instrumentation system,
including a bill of material.16031 Detailed listing of alarm contacts available and recommended alarms for
connection to DCS, including unit prices for additions or deductions.16031 Detailed listing of instrumentation furnished.16031 Complete description of cable requirements, including the cable
constructions, for all equipment furnished.16031 Complete description of any voltage level separation requirements for
raceway or special cable shielding requirements for all equipment furnished.
16031 Complete description of the lube oil piping arrangement.16031 Complete list of other plants where the manufacturer has duplicate, or near
duplicate, generators under construction or in operation.16031 Listing of Work subcontracted to other Suppliers.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 25 of 44
Reference Document Submittal Item Yes/No
16031 Listing of Subsuppliers and Suppliers used.16031 Bidder's preliminary engineering schedule.16031 Bidder's procurement/production/shipping schedule.16031 Complete description of excitation system.16031 Complete description of generator core monitor system (if specified).16031 Generator maximum allowable temperature of cold coolant generator
temperature rise of gas and liquid.16031 Generator maximum allowable temperature for armature winding, field
winding, core, and mechanical parts in contact with or adjacent to armature winding insulation; and collector rings, brushes, and brush holders.
16031 Detailed description of the brushless exciter (if specified).16031 Maximum allowable temperature of cooling air and temperature rise of
cooling air.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 26 of 44
Reference Document Submittal Item Tech Fill-In Data
13125 Pre-Manufactured Metal Equipment Building .13125 Bidder's Name13125 Electrical/Control Building13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Design permissible loading, lb/ft2 (kg/m2)13125 Floor13125 Roof13125 Wind13125 Dimensions, inches (mm)13125 Height13125 Depth13125 Length13125 Total weight, lb (kg)13125 Lighting13125 Item13125 Description13125 Manufacturer13125 Location of manufacturer13125 City13125 State13125 Country13125 Standard for manufacturing and testing13125 Lighting fixture type13125 Switch type13125 Receptacle type13125 Contactor type
Combined Cycle Configuration .Configuration (Single or Multi-Shaft)Single Shaft Configuration
Configuration (CGS or CSG)Clutch
ManufacturerMW Rating
Cooling steam requirements, lb/hr (startup/transient)15562 Combustion Turbine .15562 Bidder's Name15562 Performance Data at Specified Conditions15562 Note: Items marked with an asterisk (*) shall be
guaranteed for all load and ambient conditions designated."Guaranteed," in accordance with Section 15562.
00300D.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base Scope and Elective Option [if proposed])
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 27 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Parameter 115562 Guaranteed15562 Gross generator output Btu/h15562 CTG auxiliary power Btu/h15562 CTG heat consumption, LHV Btu/h15562 Net CTG output* Btu/h15562 Net CTG heat rate, LHV* Btu/kwh15562 Fuel flow 15562 Turbine inlet temperature °F (°C)15562 Water or steam injection flow* lb/h15562 Inlet airflow °F (°C)15562 Inlet air pressure drop PSI15562 Exhaust pressure drop PSI15562 Exhaust gas flow lb/h15562 Exhaust gas temperature* °F (°C)15562 Exhaust gas heat* Btu/h15562 Exhaust gas heat reference temperature °F (°C)15562 Auxiliary Power Requirements15562 Fuel
15562Included in Net Output Btu/h / Total Connected Power Btu/h
15562 Turbine cooling air compressor /15562 Control air compressor /15562 Lube oil pumps (ac) /15562 Lube oil pumps (dc) /15562 Space heaters /15562 Lube oil cooler fans /15562 Cooling water pumps /15562 Evaporative cooling system /15562 Generator cooling system /15562 Rotor turning motor /15562 Hydrogen system seal oil pump /15562 Mist eliminator /15562 Control system /15562 Air conditioners /15562 Ventilation fans/blowers /15562 Fin-fan cooler fans /15562 Total at continuous baseload /15562 Total standby power /15562 Note: Auxiliary power data shall be for steady-state
operation at the guaranteed load condition on the indicated fuel.
15562 Startup and Shutdown Performance15562 Primary Fuel
15562Guaranteed normal cycle starting time from cold standby to continuous baseload, min
15562 Guaranteed rate of load change, kW/min15562 Total gross generation per start15562 Normal start, Btu15562 Total auxiliary power required per start15562 Normal start, Btu15562 Peak auxiliary power required per start
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 28 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Fuel consumed per start (LHV)15562 Normal start, Btu15562 Noise Emissions15562 Guaranteed average near field noise levels at 3 feet
(0.914 meter) from the combustion turbine generator and any associated auxiliary equipment, oper-ating at full load, dBA to a reference of 20 micropascals
15562 Guaranteed far field noise levels at 400 feet (122 meters) from the combustion turbine enclosure boundary, operating at full load, dBA / dBC /
15562 Reference band levels, dBA15562 Octave band center frequency, hertz15562 3115562 6315562 12515562 25015562 50015562 1,00015562 2,00015562 4,00015562 8,00015562 Operational Performance
15562 Maintenance intervalsEquivalent operating hours (EOH) or
Fired hours or Starts15562 Combustion inspection15562 Hot gas path15562 Major overhaul15562 Equivalent operating hours data EOH15562 Each hour at baseload, gas fuel15562 Each hour at peak load, gas fuel15562 Each normal start15562 Each trip from full load15562 Each normal stop15562 Expected degradation data
15562Nonrecoverable degradation in baseload output, percent
15562 1,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 4,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 8,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 29 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 16,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 24,000 Hours (fixed hours of operation)15562 Gas Fuel Operation
15562Nonrecoverable degradation in baseload heat rate, percent
15562 Gas fuel operation15562 Miscellaneous15562 Bidder's definition of baseload15562 Bidder's definition of peak load15562 Has a factory fired operation test been completed for
the size and type of the unit proposed? Yes or No15562 If yes, provide details15562 General Data15562 Manufacturer15562 Location assembled15562 Combustion turbine model number15562 Number of units furnished15562 Gas delivery conditions15562 Minimum required, PSI / °F15562 Maximum allowed, PSI / °F15562 General Design Information15562 Type of combustion turbine15562 Shaft speed, rpm15562 Overspeed trip15562 Electronic, rpm15562 Mechanical bolt, rpm15562 Critical speeds15562 First critical, rpm / mode15562 Second critical, rpm / mode15562 Third critical, rpm / mode15562 Fourth critical, rpm / mode15562 Vibration Amplitude15562 Turbine15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Generator15562 Nominal / Startup15562 Typical /15562 Alarm /15562 Trip /15562 Unit Weights and Dimensions15562 Turbine engine weight, lbf15562 Generator stator weight, lbf15562 Generator rotor weight, lbf15562 Auxiliary Skid15562 Name
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 30 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Length, in.15562 Width, in.15562 Height, in.15562 Weight, lb.15562 Shipping weight, entire unit, lbf15562 Heaviest piece handled during erection15562 Weight, lbf15562 Heaviest piece handled during major overhaul15562 Weight, lbf15562 Overall dimensions, including housing, in15562 Length15562 Width15562 Height15562 Component Descriptions15562 Inlet guide vanes15562 Type15562 Material15562 Description of operating limitations15562 Turbine15562 Number of stages: 015562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating15562 Stage Identification15562 Blade Material15562 Nozzle Material15562 Blade Coating15562 Nozzle Coating
15562Describe how blades are secured to rotor and how nozzle is secured to casing.
15562 Cooling methods15562 Blades15562 Nozzles15562 Disks15562 Shaft15562 Accessory gear15562 Manufacturer15562 Type or model15562 Driven equipment15562 AGMA quality factor15562 Service factor15562 Maximum power rating, Btu/h15562 Compressor15562 Type15562 Number of stages15562 Blade material15562 Nozzle material15562 Coating material
15562Describe how blades are secured to rotor and how nozzle is secured to casing.
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 31 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Turbine bearings15562 Type15562 Radial15562 Thrust15562 Quantity15562 Radial15562 Thrust15562 Temperature detectors15562 Manufacturer15562 Type/model15562 Description of internal lubrication system15562 Combustors15562 Type15562 Number of cans/silos15562 Expected life min15562 Liners15562 Nozzles15562 Spark plugs15562 Hot gas casing15562 Burner tiles15562 Transition pieces15562 Crossfire tubes15562 Materials15562 Combustor casing15562 Combustor liner15562 Combustor tiles15562 Transition pieces15562 Crossfire tubes15562 Type of ignitors15562 Number of ignitors15562 Type of flame detectors15562 Number of flame detectors15562 Description of nozzle15562 Starting system15562 General description15562 Maximum number of starts allowed in a 1 hour period
at maximum design temperature15562 Time required between start attempts, min
15562Minimum time between controlled shutdown and subsequent start, min
15562Minimum time between unit trip and subsequent start attempt, min
15562 Static start system15562 Manufacturer15562 Description15562 Drive capacity, kVA15562 Transformer size, kVA / Volts / Phase / /
15562Maximum load during combustion turbine starting, kW / kVA /
15562 Lubricating oil system15562 Lube oil type15562 Recommended manufacturer
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 32 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 System fill requirement, gal15562 Quantity of oil flowback on shutdown, gal15562 Retention time at Site load, min15562 Lube oil circulation, gpm15562 Lube oil filters15562 Number15562 Capacity, gpm15562 Mesh size, in15562 Mist eliminators15562 Type15562 Number15562 Lube oil pumps15562 Gear driven15562 Manufacturer15562 Type15562 Number15562 Ac motor driven15562 Manufacturer15562 Type15562 Number15562 Dc motor driven15562 Manufacturer15562 Type15562 Number15562 Lube oil coolers15562 Manufacturer15562 Number15562 Capacity, percent15562 Type (shell and tube or fin-fan)15562 Media (oil-to-water or oil-to-air)15562 Tube material15562 Tube surface area, in215562 Fan diameter, in15562 Fan speed, rpm15562 Radiator materials15562 Mechanical Accessory Equipment15562 Compressor wash system15562 On-Line / Off-Line15562 Flow to combustion turbine, gpm /15562 Water quality required /15562 Type of detergent Not applicable /15562 Quantity of detergent Not applicable /15562 Duration of wash, min /15562 Is resulting discharge a hazardous material? Not applicable / Yes or No15562 Tank capacity, gal /
15562Recommended cleaning frequency, operating hours on primary fuel /
15562 Fire detection and protection15562 Fire protection system15562 Type CO2 or FM200 or Water Mist15562 Detectors15562 Locations
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 33 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Number15562 Nozzles15562 Locations15562 Number15562 Type15562 Number of releases allowed before recharge15562 Gas protection system15562 Type15562 Detectors15562 Locations15562 Number15562 Limits of detection15562 Inlet air filtration equipment15562 Manufacturer15562 Type15562 Filter media material15562 Efficiency15562 Means of filter support
15562Typical number of hours of operation before replacement of filter
15562 Number of filter modules15562 Number of filters15562 Pressure drop for15562 Clean conditions15562 End of media life15562 Inlet duct15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Material15562 Coating15562 Inlet silencer15562 Manufacturer15562 Dimensions15562 Length, in.15562 Width, in.15562 Height, in.15562 Internal materials15562 Evaporative cooler15562 Manufacturer15562 Type15562 Cooler media15562 Differential pressure drop, PSI15562 Fuel gas filter/separator15562 Type15562 Manufacturer15562 Filter mesh size, in15562 Shell material15562 Turbine blade cooling air booster air compressor15562 Type
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 34 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Manufacturer15562 Number of stages15562 Speed, rpm15562 Turbine blade cooling air heat exchanger15562 Type15562 Manufacturer15562 Media, air-to-15562 Heat exchange material15562 Number of fans15562 Fan capacity, percent15562 Air temperature in, °F15562 Air temperature out, °F15562 Airflow, lbm/h15562 Combustion Turbine Generator Control System 15562 Local / Remote15562 Microprocessor15562 Manufacturer15562 Model No.15562 Number of processors15562 Quantity of spare I/O digital15562 Quantity of spare I/O analog15562 Quantity of spare alarm points15562 Quantity of spare message capacity15562 Cabinets15562 Number15562 Size15562 LCD monitor15562 Number of monitors15562 Manufacturer15562 Model No.15562 Size (diagonal) in15562 Data logging rate, points/time / /15562 Printer15562 Number of printers15562 Manufacturer15562 Model No.15562 Type15562 Power consumption (kVA)15562 120 volts ac15562 125 volts dc15562 Electrical generator control panels15562 Number15562 Size15562 Standard vibration detectors15562 Manufacturer15562 Model No.15562 Type15562 Quantity15562 Location
15562Supplier Furnished Materials and Associated Installation Quantities
15562 Inlet Filter, tons (Note 1)
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 35 of 44
Reference Document Submittal Item Tech Fill-In Data
15562 Inlet Filter, pieces15562 Inlet Filter Field Seal Welding, lf15562 Exhaust Diffuser, tons15562 Exhaust Diffuser, pieces15562 Exhaust Diffuser, lf15562 Large Bore Pipe (>= 2 ½” in diameter, lf15562 Large Bore Pipe Spools, each15562 Large Bore Field Welds, each
15562Large Bore Field Welds (average dia), inches (Note 3)
15562 Small Bore Pipe, lf15562 Small Bore Pipe Spools, each15562 Small Bore Field Welds, each15562 Turbine Generator Enclosure, pieces15562 Turbine Generator Enclosure, sf15562 Platform and Stairs, tons15562 Platform and Stairs,pieces15562 Off Base Skids & Misc. Equipment, each15562 Pipe Insulation, lf15562 Insulation Blankets, sf15562 Power Cable, lf15562 Control Cable, lf15562 Thermocouple Cable, lf15562 Power Conductor Terminations, each (Note 4)15562 Control Conductor Terminations, each (Note 4)
15562Thermocouple Conductor Terminations, each (Note 4)
15562 Conduit, lf15562 Instruments, each15562 Technical Assistance Time, hours15562 Notes
15562
1. Inlet Filter includes all pieces of structural steel, ductwork, & expansion joints, but not fasteners, shims, gussets, etc.
15562
2. Exhaust Diffuser includes all pieces of structural steel, ductwork, & expansion joint, but not fasteners, shims, gussets, etc.
15562
3. Average Diameter for large bore pipe welds is the sum of the diameters for each individual large bore welds divided by the total number of large bore welds.
15562
4. Conductor is the number of wires contained in a cable that must be terminated, count both ends.
15562
Seal welding is defined as the number of lineal feet of weld placed multiplied by the number of sides from which the weld must be placed. Thus, a seal weld that must be placed from both the inside and outside is equal to the length of the weld multiplied by two (2).
16031 Cylindrical Rotor Generators .16031 Bidder's Name
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 36 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Auxiliary Power16031
Guaranteed total electric load during normal operation for auxiliaries furnished with generator, ac load (kW)
16031 Total electric load during peak operation, ac load (kW)16031 Emergency dc electric load (kW)16031 Technical Data16031 Weight of generator stator, lb (kg)16031 Excitation system weight, lb (kg)16031 Shipping weight of generator, lb (kg)
16031Weight of generator stator winding water cooling unit (if required), lb (kg)
16031 Weight of generator rotor, lb (kg)16031 Continuous rating at maximum hydrogen pressure (if
applicable), rated power factor, and specified cooling water temperature, based on maximum shaft power developed by the prime mover, MVA
16031 Nominal rpm16031 Nominal frequency, hertz
16031Voltages at continuous operation and nominal frequency
16031 Nominal voltage, kV16031 Maximum voltage, kV16031 Minimum voltage, kV16031 Generator rated power factor (leading/lagging)
16031
Generator direct axis subtransient reactance in per unit value based on generator continuous kVA rating and nominal frequency (saturated at rated voltage) X"dv
16031 Estimated16031 Percent tolerance16031 Plus16031 Minus16031 Short-time capability expressed in terms of I22t
16031Short-circuit ratio at rated voltage and rated stator current
16031Continuous current unbalance expressed in terms of I2, percent
16031Generator winding capacitance to ground, all phases tied together, mfd
16031 Current transformers16031 Application16031 Relaying16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Metering16031 ANSI C57.13 Accuracy Class16031 IEC 185 Accuracy Class16031 Location16031 Line side16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 37 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Line side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Relaying16031 Laboratory calibration required16031 Yes or No16031 Neutral side16031 Quantity16031 Secondary current rating16031 Application Metering16031 Laboratory calibration required16031 Yes or No
16031 Generator field voltage at maximum kVA output, volts
16031Generator field current at maximum excitation, amperes
16031Maximum temperature rise above 104° F (40° C) gas temperature
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Generator core and mechanical parts adjacent to the
insulation temperature rise, °F (°C)
16031Maximum temperature rise above ambient air temperature of 104° F (40° C)
16031 Generator armature winding temperature rise, °F (°C)16031 Generator field winding temperature rise, °F (°C)16031 Collector rings temperature rise, °F (°C)16031 Telephone influence factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced16031 Residual16031 Wave form deviation factor (IEEE Std. 115)16031 Calculated16031 Balanced16031 Residual16031 Guaranteed16031 Balanced
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 38 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Residual16031 Temperature detectors16031 Armature16031 Number16031 Type16031 Rotating exciter16031 Number16031 Type16031 Generator cold gas16031 Number16031 Type16031 Generator hot gas16031 Number16031 Type16031 Generator Loss Data
16031Generator calculated losses at continuous nameplate MVA, voltage, and frequency
16031 Total iron loss, kW16031 Generator stator I2R loss, kW16031 Generator rotor I2R loss, kW16031 Generator stray load loss, kW16031 Generator windage loss, kW
16031Total generator loss excluding bearings and excitation system, kW
16031 Static exciter losses, kW16031 Excitation transformer losses, kW16031 Generator efficiency, percent
16031Generator friction loss in bearings, seals, and collector rings, kW
16031 Heat Exchanger Data
16031Complete the following for each type of cooler required by the design
16031 Heat exchanger16031 Cooler description16031 Number of coolers16031 Number of sections per cooler
16031Generator kVA capability with one cooler section out of service, percent
16031 Cooling water required by each cooler16031 Inlet temperature, °F (°C)16031 Maximum flow, gpm (L/min)16031 Cleanliness factor16031 Heat duty at maximum load, each cooler
16031Tube side (waterside) pressure loss at maximum flow, gpm (L/min)
16031 Tube side (waterside) design conditions16031 Pressure, psi (kPa)16031 Temperature, °F (°C)16031 Tube size, in. (mm)16031 Tube wall thickness, in. (mm)16031 Tube material16031 Tubesheet material
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Bid Issue25Oct2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 39 of 44
Reference Document Submittal Item Tech Fill-In Data
16031 Hydrogen Cooling System Data16031 Complete for hydrogen cooled generators16031 Hydrogen required to purge carbon dioxide, ft3 (m3)16031 Hydrogen required to fill system to maximum hydrogen
pressure after purging, ft3 (m3)
16031Guaranteed hydrogen consumption in 24 hours, ft3 (m3)
16031 Hydrogen seal oil flow, gpm (L/min)16031 Hydrogen seal oil pressure, psi (kPa)16031 Stator Winding Cooling Water System16031 Number of circulating pumps16031 Full- or half-capacity pumps16031 Stator cooling water demineralizer description16031 Excitation System16031 Excitation system description16031 Excitation system control system16031 Make and type of excitation system16031 Make and type of voltage regulator16031 Communication method to operator interface16031 Description of operator interface equipment16031 Rated output of excitation system, kW16031 Rated voltage, volts dc16031 Rated current, amperes dc16031 Excitation system response ratio, per unit16031 Ceiling voltage, percent minimum16031
Does the excitation system meet the definition of high initial response as defined in IEEE Standard 421.1?
1603116031 Yes or No16031 Protective Relaying16031 Generator protection relay type/model16031 Out-of-step (78) relay type/model16031 Dc Motors16031 Motors16031 Airside seal oil backup pump (dc)16031 kW16031 Volts16031 Enclosure16031 Quantity16031 Other dc motors16031 (Name of motor)16031 kW16031 Volts16031 Enclosure16031 Quantity
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 40 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Combustion Turbine Long Term Services Specification
19000 General19000 Annual Operating Profile19000 Fired Hours per unit per year 600019000 Number of Starts per unit per year 15019000 Contract Term19000 Commencement COD under the EPC Contract19000 Expiration No sooner than at completion of
2nd Major Inspection for each unit
19000 Sunset Clause Not specified19000 Definitions19000 Calculation of FFH/EOH/AOH, etc. By Supplier19000 Planned Maintenance19000 Annual Borescope Inspection All Parts and Services1
19000 Combustion Inspections and Overhauls All Parts and Services1
19000 Combustion Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Hot Gas Path Inspections and Overhauls All Parts and Services1
19000 Hot Gas Path Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Major Inspections and Overhauls All Parts and Services1
19000 Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Minor Inspections All Parts and Services1
19000 Generator Minor Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Generator Major Inspections All Parts and Services1
19000 Generator Major Inspection Interval19000 Hours (FFH, EOH, etc.) By Supplier19000 Starts (FS, ES, etc.) By Supplier19000 Technical Advisories affecting Planned Mainte All Parts and Services1
19000 Corrective actions required to maintain/restore expected performance, reliability or safety of any component/part
All Parts and Services1 (excludes Limited Scope Components)
19000 Parts and Services required to maintain emiss All Parts and Services1
19000 Limited Scope Components19000 Inspection Inspection, including removal or
access for inspection, cleaning and inspection services
19000 Replacement Not required19000 Items classified as Limited Scope ComponentsBy Supplier19000 Full Scope Components By Supplier19000 Onsite controls engineer to assist during startu Provided by Supplier
00300D.12 LTSA Technical Fill-In Data Required with Quotation
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 41 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Disassembly, removal, cleaning and reassembly of enclosures, lagging, equipment and systems supplied under Equipment Purchase Specification necessary to access CTG to perform Planned Maintenance
Service provided by Supplier
19000 Unplanned Maintenance19000 Performance of Unplanned Maintenance Service provided by Supplier19000 All costs and expenses with respect to
Unplanned MaintenanceBy Purchaser, unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Provision for Major Maintenance Parts necessary for Unplanned Maintenance
Provided by Supplier, Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Provision to perform Unplanned Maintenance on high-priority, 24/7 basis as required to remedy a condition resulting in a Forced Outage
Service provided by Supplier
19000 Major Maintenance Parts for Unplanned Maintenance
New and unused unless Purchaser elects to negotiate for refurbished parts
19000 Spare Parts; Tools/Tooling; TA19000 Initial Spare Parts19000 Costs incurred for procurement and shipping
to siteAll costs incurred borne by Supplier
19000 Parts condition, initial delivery of Spare Parts Inventory
New and unused
19000 Costs, replacement of Spare Parts used for Planned Maintenance
All costs incurred borne by Supplier
19000 Costs, replacement of Spare Parts used for Unplanned Maintenance
Purchaser cost unless Unplanned Maintenance is caused by fault of Supplier scope of work
19000 Parts condition, replacement of Spare Parts used for Unplanned Maintenance
New and unused, or refurbished consistent with Prudent Operating Practices and in accordance with Purchaser Approved Appendix 3 submittal
19000 Parts condition, replacement of Spare Parts used for Planned Maintenance
New and unused, or refurbished consistent with Prudent Operating Practices
19000 Time frame to replace used Spare Parts <2 months after removal19000 Parts condition, parts used for maintenance
of Limited Scope ComponentsNew and unused
19000 Data provided for refurbished parts proposed for use at Plant
Life history, including serial #'s, drawing or model #'s, factored hours/starts, trips and conditions, date(s) and type of repairs performed
19000 Procurement of all Major Maintenance Parts All costs incurred borne by Supplier, including shipping and inspection
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 42 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Equivalent parts (to replace obsolete parts) Supplier provides same level or upgrade parts at no more than same cost as original parts
19000 Title to Replaced Parts Supplier19000 Tooling and equipment for all Major
MaintenanceProvided by Supplier at Supplier's sole cost
19000 Tool change scenario with price and part # Proposed by Supplier19000 Personnel19000 Services Director Serves as main Client - Supplier
interface19000 Guarantees19000 Planned Maintenance Components installed
or inspected during a Planned Maintenance event
Planned Maintenance Components shall provide reliable service until the next scheduled outage. All costs associated with a pre-mature failure or "Fall-out" of a Planned Maintenance Component shall be responsibility of Supplier
19000 Delivery time of all replacement parts (within scope) required for Planned Maintenance
At Site not less than 30 days prior to Planned Maintenance
19000 Plant Availability19000 Unplanned Outage, maximum aggregate
days for each CTG, 1st and 2nd years of operation
Proposed by Supplier
19000 Unplanned Outage, maximum aggregate days for each CTG, each year from 3rd year of operation to end of contract term
Proposed by Supplier
19000 Scheduled Outage Durations, Planned Maintenance
19000 Annual Borescope Inspections, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Combustion Inspection and Overhaul, each unit
Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Hot Gas Path Inspection and Overhaul, each unit
Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Major Inspection and Overhaul, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Generator Minor Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
19000 Generator Major Inspection, each unit Outage duration proposed by Supplier, breaker to breaker or turning gear to turning gear basis
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 43 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Performance degradation of Gross Electrical Output at 100% of CTG base load in each period of maintenance cycles
Proposed by Supplier
19000 Performance degradation of Gross Heat Rate at 100% of CTG base load in each period of maintenance cycles
Proposed by Supplier
19000 Performance Testing19000 Formulation for obtaining Gross Electrical
Output and Gross Heat Rate figures of "New and Clean" condition
Proposed by Supplier for Purchaser consideration/ acceptance
19000 Testing procedure for obtaining all guaranteed figures including the estimated uncertainty
Proposed by Supplier for Purchaser consideration/ acceptance
19000 Performance tests after each maintenance work
Performed by Purchaser
19000 Specification Appendices19000 LTSA Spec Appendix 1: Combustion Turbine I Mandatory, By Supplier19000 LTSA Spec Appendix 2: Spare Parts Price List Mandatory, By Supplier19000 LTSA Spec Appendix 3: Replacement Scenari Mandatory, By Supplier19000 LTSA Spec Appendix 4: Division of Work comp Mandatory, By Supplier19000 LTSA Spec Appendix 5: Manpower completed Mandatory, By Supplier19000 LTSA Spec Appendix 6: Field Service Rate com Mandatory, By Supplier19000 Remote Monitoring and Diagnostics 19000 All associated hardware, software and
telecom facilities for online monitoring of CTGs
Included
19000 Windows Compatibility Windows 719000 ERP Compatibility SAP ERP19000 Interface Security High security modem link or VPN
19000 Remote system administration services Required19000 Real-time process information by any Intranet
or Internet web browser on any connected PC (including necessary software licensing)
Required
19000 Remote monitoring parameters19000 Speed Required19000 Load Required19000 Fired Starts Required19000 Fired Hours Required19000 Site Barometric Reading Required19000 Temperatures19000 Inlet Ambient Required19000 Compressor Discharge Required19000 Turbine Exhaust Required19000 Turbine Wheelspace Required19000 Lube Oil Header Required19000 Lube Oil Tank Required19000 Bearing Metal Required19000 Bearing Drains Required19000 Exhaust Spread Required19000 Pressures19000 Compressor Discharge Required19000 Lube Pump(s) Required19000 Bearing Header Required19000 Cooling Water Required
GRDA Unit 3 Combined Cycle Project178592.67.9120
Combustion Turbine Generator/Steam Turbine Generator
Owner Review Issue08Aug2013
Source: 00300, 2009, v1.2
Section DCombustion Turbine Generator
Quotation Fill-In Information Page 44 of 44
Reference Document
Submittal Item Specification Tech Fill-In Data
19000 Fuel Required19000 Filters (Fuel, Lube, Inlet Air) Required19000 Vibration Data for Power Train Required19000 Generator Required19000 Output Voltage Required19000 Field Voltage Required19000 Phase Current Required19000 Field Current Required19000 VARS Required19000 Stator Temperature Required19000 Load Required19000 Vibration Required19000 Start-Up Time Required19000 Coast-Down Time Required19000 Remote Services19000 Measure Equipment Condition19000 Combustion system performance vibration Required19000 Machine performance Required19000 Starting and shutdown characteristics Required19000 Diagnostics by communication with Plant
CEMRequired
19000 Comparison to baseline, design and fleet experience
Required
19000 Analyze equipment condition19000 Diagnostic and engr. services related to
alarm/error/malfunction that is not an in-service failure
Planned Maintenance
19000 Diagnostic and engr. services related to an in-service failure
Unplanned Maintenance
19000 Archive Plant historical data Required19000 Consultations between Remote Monitoring
Center and Plant O&M staffRequired
19000 Remote combustion tuning system to supervise and give recommendations for CTG tuning events
Provided by Supplier, tuning events warranted as Unplanned Maintenance
19000 Condition reporting Quarterly basis and interim (as required)
19000 RCA assistance Required
Notes1) "All Parts and Services" defined as: all planning, engineering, field repairs, shop repairs, replacement of parts,