Dam Site 1,182.40 1183.6
S.No Invoice Rate
In years
1 2.00 3.00 4
0.02
1Dozer
8,000,000.00 ### 8
2ROC
18,665,000.00 ### 8
32 Boom Drill Jumbo
28,000,000.00 ### 10
4600 KVA Diesel Generator
3,089,049.60 ### 15
5Excavator
4,612,746.00 ### 12
6Hyva
1,605,116.58 ### 10
7Loader
7,843,137.00 ### 10
8Welding Machine
19,588.40 19,588.40 10
9Batching Plant
3,262,674.00 ### 18
10JCB 3DX
1,745,000.69 ### 10
11Concrete Pump
1,836,000.00 ### 5
12Transit Mixer
938,829.00 938,829.00 10
13Grout Pump
2,920,243.53 ### 10
14Wet Shotcrete Machine
29,054,171.48 ### 10
15Dewatering 10 HP
84,637.00 84,637.00 12
16Dewatering 20 HP
220,850.00 220,850.00 12
Claim
Equipment Description
Landed cost
Scheduled Life
17Dewatering 35 HP
234,375.00 234,375.00 12
18Ventilation Fan
922,549.00 922,549.00 12
19Atlas Copco XAH 210
968,827.68 968,827.68 10
20Hydra
863,516.00 863,516.00 10
21Water Tanker
550,000.00 550,000.00 10
22Compressor XA175
759,321.00 759,321.00 10
23Compressor XAH210
968,827.68 968,827.68 10
24Jack Hammer
60,500.00 60,500.00 10
25Tata 909
1,592,634.00 ### 10
25Tipper
1,592,634.00 ### 10
26Spider Excavator
15,000,000.00 ### 10
1 2 3 4
Ventilation Duct calculation
-
Chainage of Claim 0
Adit 2 445.00
Adit 3 236.00
Adit 4 400.00
Adit 5 196.00
Length of Adit Total Length
#N/A 1,183.00 #N/A
Length of HRT
Cadre Rate
Unskilled 145
508.20
Semi Skilled 165
578.30
Skilled 190
665.92
Highly Skilled 219
766.82
Engineer 30,000.00 2,139
Manager 60,000.00 6,025
Sr. manager 80,000.00 8,324
Explosive 52.94 58.23 ED 13.51 14.86 NED 74.02 81.42 Rockbolt 143.01 157.32
Cement 345.00 379.50 Sand 1,129.00 1,241.90 Aggregate 2,470.00 2,717.00 Accelerator 34.98 38.48 Micro Silica 26.15 28.77 AEA 30.50 33.55 WRA 30.50 33.55
Unit rate paid
Superplasticizer 30.50 33.55 Reinforcement 35,350.00 38,885.00 Structural Steel 45,105.00 49,615.50 Polyfibre 261.98 288.18 Diesel 42.19 46.41 Boulder
Ownership Cost
In hours Life in Hrs
5
9000 200% 1200 918,000.00 979,200.00
8000 80% 2200 ### ###
15000 120% 1200 ### ###
30000 120% 2000 185,342.98 185,342.98
15000 150% 2000 345,955.95 553,529.52
12000 175% 2000 144,460.49 240,767.49
15000 200% 2000 705,882.33 941,176.44
12000 80% 2000 1,762.96 2,938.26
30000 75% 2000 163,133.70 195,760.44
15000 200% 2000 157,050.06 209,400.08
8000 100% 2000 330,480.00 413,100.00
10000 120% 2000 84,494.61 168,989.22
10000 100% 2000 262,821.92 525,643.84
15000 100% 2000 ### ###
20000 70% 2000 6,347.78 7,617.33
20000 70% 2000 16,563.75 19,876.50
Time Period
Repair Provision
Annual Operation
hrs Life in years
20000 70% 2000 17,578.13 21,093.75
24000 80% 2000 69,191.18 69,191.18
12000 100% 2000 87,194.49 145,324.15
12000 150% 2000 77,716.44 129,527.40
16000 120% 2000 49,500.00 61,875.00
12000 100% 2000 68,338.89 113,898.15
12000 100% 2000 87,194.49 145,324.15
8000 80% 2000 5,445.00 13,612.50
12000 175% 2000 146,203.80 243,673.00
12000 175% 2000 146,203.80 243,673.00
12000 100% 2000 ### ###
5 6 7 8 9
RD
From To
0 0
1,182.40 1183.6
Cadre
CadreUnskilled work
508.20
12,064 Helper, BeldarHelper
508.20
13,728 Beldar
508.20
15,808 Watchman
578.30
18,203 SupervisorCableman
578.30
48,750 Driver
665.92
140,833 Mechanic
665.92
195,000 Electrician 665.92 Supervisor 766.82 Driller 766.82 Operator 766.82 Foreman 766.82 Engineer 2,138.80 Manager 6,024.92 Sr. Manager 8,324.44 Semi Skilled 578.30 Skilled 665.92 Highly Skilled 766.82 Blaster 766.82
kgNoNoRM Dia
bag 12 44.25 39.83 cum 16 44.25 39.83 cum 25 44.25 39.83 kg 32 44.25 39.83 kgkgkg
Rate/manday
Monthly rate
Watchman, Cable Man
Driver,Mechanic, Electrician,
SupervisorOperator , Foreman,
Reinforcement NEC rates
deduct salvage value@10%
kgMTMTkgl
Ownership Cost
Regular
Average Foreman
18,203.15 ### ###
948,600.00 790.50 1,813.33 0.25 1.00 0.25
### 1,557.68 1,903.83 0.25 2.00 0.25
### 1,890.00 2,240.00 0.125 1.00 0.25
185,342.98 92.67 123.56 0.125 1.00 0.50
449,742.74 224.87 461.27 0.25 1.00 0.25
192,613.99 96.31 234.08 0.25 - 0.25
823,529.39 411.76 1,045.75 0.13 1.00 0.250
2,350.61 1.18 1.31 0.25
179,447.07 89.72 81.57 0.50 2.00 0.50
183,225.07 91.61 232.67 0.13 1.00 0.50
371,790.00 185.90 229.50 0.13 1.00 0.17
126,741.92 63.37 112.66 0.25 1.00 0.50
394,232.88 197.12 292.02 0.25 1.00 0.17
### 1,525.34 1,936.94 0.13 1.00 0.50
6,982.55 3.49 2.96 1.00 0.17
18,220.13 9.11 7.73 1.00 0.17
Repair Cost
Operation Cost
Hourly Ownership
Cost
Operator
Mechani
c
19,335.94 9.67 8.20 1.00 0.17
69,191.18 34.60 30.75 0.75 0.75
116,259.32 58.13 80.74 0.13 1.00 0.25
103,621.92 51.81 107.94 0.50 1.00 0.25
55,687.50 27.84 41.25 0.25
91,118.52 45.56 63.28 0.13 1.00 0.25
116,259.32 58.13 80.74 0.13 1.00 0.25
9,528.75 4.76 6.05 1.00 0.13
194,938.40 97.47 236.90 0.25 - 0.25
194,938.40 97.47 236.90 0.25 - 0.25
### 918.00 1,275.00 0.25 1.00 0.25
10 11 12 13 14 15
Regular Total Casual
Welder Driver Regular Helper
### ### ### ### ### ###
### 1.00 0.25
### 2.00 0.50
### 4.00 0.25
### 1.00 0.17
### 1.00 0.25
8,502.79 1.00 0.25
### 1.00 0.17
1.00 0.17 ### 1.00
###
### 1.00 0.17
### 1.00 0.17
### 1.00 0.25
### 1.00 0.17
### 1.00 0.25
0.17 ### 1.00
0.17 ### 1.00
Electricia
n
Supervis
or
Watchma
n
0.17 ### 1.00
### 1.50 0.17
0.50 ### 1.00 0.25
0.25 ### 2.00 0.25
2.00 ### 1.00
0.50 ### 1.00 0.25
0.50 ### 1.00 0.25
0.20 ### 0.50 0.13
8,502.79 1.00 0.25
8,502.79 1.00 0.25
### 1.00 0.25
16 17 18 19 20 21 22
Casual Total Indirect Cost
Beldar Casual Regular Casual
### ### 80.00% 55.00%
### 21,364.75 8,522.80 29,887.55
### 35,927.26 ### 52,972.86
### - - -
### - - -
### 21,364.75 8,522.80 29,887.55
### 6,802.23 8,522.80 15,325.03
### 19,544.43 7,896.12 27,440.55
### 17,919.95 6,635.20 24,555.15
6.00 ### 42,729.49 ### 82,540.69
### 22,706.03 7,896.12 30,602.15
### 18,494.78 7,918.77 26,413.55
### 24,526.35 8,522.80 33,049.15
### 20,315.09 7,896.12 28,211.21
### 22,706.03 8,522.80 31,228.83
### 18,786.41 6,635.20 25,421.61
### 18,786.41 6,635.20 25,421.61
Total Indirect Cost
Cablema
n
### 18,786.41 6,635.20 25,421.61
### 20,406.69 ### 31,643.06
### 25,867.63 8,522.80 34,390.43
### 28,166.98 ### 43,324.98
### 28,454.40 6,635.20 35,089.60
### 25,867.63 8,522.80 34,390.43
### 25,867.63 8,522.80 34,390.43
7,748.00 18,672.60 4,261.40 22,934.00
### 6,802.23 8,522.80 15,325.03
### 6,802.23 8,522.80 15,325.03
### 21,364.75 8,522.80 29,887.55
23 24 25 26 27 28
72,089.48 865,073.74 720.89
128,873.94 1,546,487.30 702.95
76,118.54 913,422.47 761.19
42,780.30 513,363.59 256.68
72,089.48 865,073.74 432.54
39,323.82 471,885.79 235.94
66,227.66 794,731.96 397.37
59,019.08 708,229.02 354.11
208,336.56 2,500,038.68 1,250.02
73,341.26 880,095.16 440.05
63,929.78 767,157.40 383.58
79,203.08 950,436.94 475.22
67,961.66 815,539.87 407.77
75,107.37 901,288.45 450.64
60,968.63 731,623.59 365.81
60,968.63 731,623.59 365.81
Labour Cost per month
Labour charges per year
Labour Cost per hour
60,968.63 731,623.59 365.81
77,581.18 930,974.10 465.49
82,220.97 986,651.65 493.33
106,093.69 1,273,124.33 636.56
82,721.60 992,659.20 496.33
82,220.97 986,651.65 493.33
82,220.97 986,651.65 493.33
54,022.74 648,272.91 324.14
39,323.82 471,885.79 235.94
39,323.82 471,885.79 235.94
72,089.48 865,073.74 432.54
29 30 31
For diesel Powered equipment
FHP of equipment C1 C2
46.41
90 0.57 1 46.41 654.71
46.41 -
147.40 0.8 1 46.41 1,203.96
643.43 1 1 46.41 6,569.42
135.00 0.5 1.2 46.41 827.01
200.00 0.3 1.4 46.41 857.64
223.00 0.58 1.3 46.41 1,716.73
46.41 -
46.41 -
76 0.58 1.3 46.41 585.07
70 1 1 46.41 714.70
61.66 0.3 1.4 46.41 264.41
46.41 -
46.41 -
46.41 -
46.41 -
Rate of Diesel
Cost of Diesel
46.41 -
46.41 -
60 1 1 46.41 612.60
49 0.8 1 46.41 400.23
180 0.3 1.4 46.41 771.87
50 1 1 46.41 510.50
60 1 1 46.41 612.60
46.41 -
180.00 0.3 1.4 46.41 771.87
180.00 0.3 1.4 46.41 771.87
78.00 0.3 1.4 46.41 334.48
32 33 34 35 36
46.41 -
For diesel Powered equipment
10%
30.00% 196.41 181.33 1,032.46
25.00% - - -
27.50% 331.09 224.00 1,759.05
27.50% 1,806.59 12.36 8,388.37
30.00% 248.10 46.13 1,121.24
30.00% 257.29 23.41 1,138.34
30.00% 515.02 104.58 2,336.32
25.00% - - -
25.00% - - -
30.00% 175.52 23.27 783.86
27.50% 196.54 22.95 934.19
30.00% 79.32 11.27 355.00
25.00% - - -
25.00% - - -
25.00% - - -
25.00% - - -
%age of lubricant consumption
Cost of oil lubricants
Cost of sundries
Total POL Cost
25.00% - - -
25.00% - - -
27.50% 168.46 8.07 789.14
27.50% 110.06 10.79 521.09
30.00% 231.56 4.13 1,007.56
27.50% 140.39 6.33 657.21
27.50% 168.46 8.07 789.14
25.00% - - -
30.00% 231.56 23.69 1,027.13
30.00% 231.56 23.69 1,027.13
30.00% 100.34 127.50 562.32
37 38 39 40
25.00% - - -
For Electrical Dirven Equipment
Engine Capacity in kw C1
38.46 0.00
38.46 0.00
135 0.8 1 38.46 3,115.30
0 0 0 38.46
38.46 0.00
38.46 0.00
38.46 0.00
12 1 1 38.46 461.53
46 1 1 38.46 1,769.18
38.46 0.00
38.46 0.00
38.46 0.00
44 1 1 38.46 1,692.26
135 0.8 1 38.46 4,153.73
7.46 1 1 38.46 286.91
14.92 1 1 38.46 573.83
C2
Rate of electricity
Cost of Electricity
26.11 1 1 38.46 1,004.20
75 1 1 38.46 2,884.53
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
38.46 0.00
41 42 43 44 45
For Electrical Dirven Equipment
0.10
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
27.50% 856.71 224.00 4,196.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
27.50% 126.92 0.13 588.58
27.50% 486.52 8.16 2,263.86
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
27.50% 465.37 29.20 2,186.83
27.50% 1142.28 193.69 5,489.70
27.50% 78.90 0.30 366.11
27.50% 157.80 0.77 732.41
%age of lubricant consumption
Cost of lubricants
Cost of sundries
Total POL Cost
27.50% 276.16 0.82 1,281.18
27.50% 793.25 3.08 3,680.86
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
25.00% 0.00 0.00 0.00
46 47 48 49
For Pneumatic Dirven Equipment
Engine Capacity in kw C1 Air Charges
38.46
38.46 163.51
135 0.8 1 38.46
0 0 0 38.46
38.46
38.46
38.46
12 1 1 38.46
46 1 1 38.46
38.46
38.46
38.46
44 1 1 38.46
135 0.8 1 38.46
7.46 1 1 38.46
14.92 1 1 38.46
C2
Rate of electricity
26.11 1 1 38.46
75 1 1 38.46
38.46
38.46
38.46
38.46
38.46
38.46 163.51
38.46
38.46
38.46
50 51 52 53 54
For Pneumatic Dirven Equipment
0.10
0.00 25.00% 0.00 0.00
654.05 25.00% 163.51 0.20
3,115.30 27.50% 856.71 0.40
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
461.53 27.50% 126.92 0.10
1,769.18 27.50% 486.52 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
1,692.26 27.50% 465.37 0.10
4,153.73 27.50% 1142.28 0.10
286.91 27.50% 78.90 0.10
573.83 27.50% 157.80 0.10
Cost of Electricity
%age of lubricant consumption
Cost of lubricants
Cost of sundries
1,004.20 27.50% 276.16 0.10
2,884.53 27.50% 793.25 0.15
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
654.05 25.00% 163.51 0.05
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
0.00 25.00% 0.00 0.00
55 56 57 58
For Pneumatic Dirven Equipment
0.00 1,032.46 4,357 5,446
817.76 817.76 4,982 6,228
3,972.40 9,927.46 14,819 18,523
8,388.37 8,861 11,077 38.46
0.00 1,121.24 2,240 2,800
0.00 1,138.34 1,705 2,131
0.00 2,336.32 4,191 5,239
588.54 1,177.12 1,534 1,917
2,255.71 4,519.57 5,941 7,426
0.00 783.86 1,548 1,935
0.00 934.19 1,733 2,166
0.00 355.00 1,006 1,258
2,157.73 4,344.56 5,241 6,552
5,296.10 10,785.80 14,699 18,373
365.92 732.03 1,104 1,380
731.73 1,464.14 1,847 2,308
Total POL Cost
Hourly use rate
Rate of Deliverables
(if any)Total POL Cost
1,280.46 2,561.64 2,945 3,682
3,677.93 7,358.79 7,890 9,862
0.00 789.14 1,421 1,777
0.00 521.09 1,317 1,647
0.00 1,007.56 1,573 1,966
0.00 657.21 1,259 1,574
0.00 789.14 1,421 1,777
817.61 817.61 1,153 1,441
0.00 1,027.13 1,597 1,997
0.00 1,027.13 1,597 1,997
0.00 562.32 3,188 3,985
59 60 61
Rate of Electricity
Rate analysis of Dozer
Cost of Equipment (Rs.) 8160000Scheduled Life in years 8Scheduled Life in hours 9000Life time repair provision (% of Cost of Equipment) 200Estimated annual operational hours = 1200
A Ownership costYearly dereciation wrt life in years 918000.00Yearly dereciation wrt life in hours 979200.00Average hourly dereciation (Rs.) 948600.00 790.50
B Hourly Repair ChargesAverage over lifetime (Rs.) 1813.33
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0.00
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 1 15808.00 15808.00
Sub Total 24310.79
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
27971.43Total Crew Charges/month 67778.22
Total Crew Charges/year 813338.59Hourly Crew Charges 677.78
D POL and Energy ChargesF.H.P. of Engine 90Hourly fuel consumption (in litres) C1 0.57 14.11Effective fuel consumption per hour C2 1.25 14.11Rate of Diesel 46.41Cost of Diesel 654.73Cost of oil and lubricant @ 30% 196.42Sundries and Misc. supplied @ 10 % of (B) above 181.33Hourly POL cost (Diesel) 1032.48
Energy Charges for drilling C1 0 0.00Rate of Electricity (Rs./KWH) C2 0 0.00Cost of Electricity (Rs.) 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 1032.48
Hourly Use Rate of the Equipment 4314.10 [(a) + (b)+ (c) + (d) ] say, 4314
Hence hourly use rate 5393
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of ROC
Cost of Equipment (Rs.) ###Scheduled Life in years 8Scheduled Life in hours 8000Life time repair provision (% of Cost of Equipment) 80Estimated annual operational hours = 2200
A Ownership costYearly dereciation wrt life in years 2141808.75Yearly dereciation wrt life in hours 4711979.25Average hourly dereciation (Rs.) 3426894.00 1557.68
B Hourly Repair ChargesAverage over lifetime (Rs.) 1903.83
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.125 15808.00 1976.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 22454.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
26486.43Total Crew Charges/month 64436.97
Total Crew Charges/year 773243.65Hourly Crew Charges 351.47
D POL and Energy ChargesF.H.P. of Engine 145Hourly fuel consumption (in litres) C1 0.5 12.76Effective fuel consumption per hour C2 0.8 12.76Rate of Diesel 46.41Cost of Diesel 592.19Cost of oil and lubricant @ 30% 177.66Sundries and Misc. supplied @ 10 % of (B) above 190.38Hourly POL cost (Diesel) 960.23
Energy Charges for drilling C1 0.00Rate of Electricity (Rs./KWH) C2 0.00Cost of Electricity (Rs.) 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Cost of air for 100 cfm 217.25Cost of air for 201 cfm 436.67Lubricants- 27.5% of cost of air 120.08Sundries and Misc. supplied @ 10 % above 190.38Hourly POL cost (Pneumatic) 747.13
Hourly POL and Energy Charges (Rs.) 1707.37
Hourly Use Rate of the Equipment 5520.35 [(a) + (b)+ (c) + (d) ] say, 5520
Hence hourly use rate 6900
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of 2 Boom Drill Jumbo
Cost of Equipment (Rs.) 28000000Scheduled Life in years 10Scheduled Life in hours 15000Life time repair provision (% of Cost of Equipment) 120Estimated annual operational hours = 1200
A Ownership costYearly dereciation wrt life in years 2520000.00Yearly dereciation wrt life in hours 2016000.00Average hourly dereciation (Rs.) 2268000.00 1890.00
B Hourly Repair ChargesAverage over lifetime (Rs.) 2240.00
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 2 18203.15 36406.29
Foreman 0.125 18203.15 2275.39
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 42633.69
Casual
Helper 4 12064.00 48256.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 51688.00
62535.35Total Crew Charges/month 156857.03
Total Crew Charges/year 1882284.40Hourly Crew Charges 1568.57
D POL and Energy ChargesF.H.P. of Engine 147.4Hourly fuel consumption (in litres) C1 0.8 25.94
Effective fuel consumption per hour C2 1 25.94Rate of Diesel 46.41Cost of Diesel 1203.99Cost of oil and lubricant @ 25% 301.00Sundries and Misc. supplied @ 10 % of (B) above 224.00Hourly POL cost (Diesel) 1728.98
Engine capacity in kw 270Electric Energy completion per hour C1 0.8 216.00
C2 1 216.00Rate of Electricity 38.46Cost of Electricity 8307.36Cost of oil and lubricant @ 25% 2076.84Sundries and Misc. supplied @ 10 % of (B) above 224.00Hourly POL cost (Electricity) 10608.20
Hourly POL and Energy Charges (Rs.) 12337.18
Hourly Use Rate of the Equipment 18035.75 [(a) + (b)+ (c) + (d) ]
Hence hourly use rate 22545
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of 600 KVA Diesel Generator
Cost of Equipment (Rs.) 3,089,050 Scheduled Life in years 15Scheduled Life in hours 30000Life time repair provision (% of Cost of Equipment) 120Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 185342.98Yearly dereciation wrt life in hours 185342.98Average hourly dereciation (Rs.) 185342.98 92.67
B Hourly Repair ChargesAverage over lifetime (Rs.) 123.56
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.5 15808.00 7904.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 28382.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.17 13728.00 2333.76
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14397.76
30624.80Total Crew Charges/month 73405.10
Total Crew Charges/year 880861.18Hourly Crew Charges 440.43
D POL and Energy ChargesF.H.P. of Engine 643.43Hourly fuel consumption (in litres) C1 1 141.55Effective fuel consumption per hour C2 1 141.55Rate of Diesel 46.41Cost of Diesel 6569.55Cost of oil and lubricant @ 25% 1642.39Sundries and Misc. supplied @ 10 % of (B) above 12.36Hourly POL cost (Diesel) 8224.29
Engine capacity in kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electri ity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 8224.29
Hourly Use Rate of the Equipment 8880.96 [(a) + (b)+ (c) + (d) ]
Hence hourly use rate 11101
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of 320 KVA Diesel Generator
Cost of Equipment (Rs.) 1,350,000 Scheduled Life in years 15Scheduled Life in hours 30000Life time repair provision (% of Cost of Equipment) 120Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 81000.00Yearly dereciation wrt life in hours 81000.00Average hourly dereciation (Rs.) 81000.00 40.50
B Hourly Repair ChargesAverage over lifetime (Rs.) 54.00
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.5 15808.00 7904.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 28382.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.17 13728.00 2333.76
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14397.76
30624.80Total Crew Charges/month 73405.10
Total Crew Charges/year 880861.18Hourly Crew Charges 440.43
D POL and Energy ChargesF.H.P. of Engine 343.16Hourly fuel consumption (in litres) C1 1 75.50Effective fuel consumption per hour C2 1 75.50Rate of Diesel 46.41Cost of Diesel 3503.73Cost of oil and lubricant @ 25% 875.93Sundries and Misc. supplied @ 10 % of (B) above 5.40Hourly POL cost (Diesel) 4385.07
Engine capacity in kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electri ity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 4385.07
Hourly Use Rate of the Equipment 4920.00 [(a) + (b)+ (c) + (d) ] say, 4920
Hence hourly use rate 6150.0
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Excavator
Cost of Equipment (Rs.) 4,612,746 Scheduled Life in years 12Scheduled Life in hours 15000Life time repair provision (% of Cost of Equipment) 150Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 345955.95Yearly dereciation wrt life in hours 553529.52Average hourly dereciation (Rs.) 449742.74 224.87
B Hourly Repair ChargesAverage over lifetime (Rs.) 461.27
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 26705.93
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
29887.55Total Crew Charges/month 72089.48
Total Crew Charges/year 865073.74Hourly Crew Charges 432.54
D POL and Energy ChargesF.H.P. of Engine 135Hourly fuel consumption (in litres) C1 0.5 17.82Effective fuel consumption per hour C2 1.2 17.82Rate of Diesel 46.41Cost of Diesel 827.03Cost of oil and lubricant @ 30% 248.11Sundries and Misc. supplied @ 10 % of (B) above 46.13Hourly POL cost (Diesel) 1121.26
Engine capacity in kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electri ity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 1121.26
Hourly Use Rate of the Equipment 2239.94 [(a) + (b)+ (c) + (d) ] say, 2240
Hence hourly use rate 2800
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Hyva
Cost of Equipment (Rs.) 1,605,117 Scheduled Life in years 12Scheduled Life in hours 15000Life time repair provision (% of Cost of Equipment) 175Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 120383.74Yearly dereciation wrt life in hours 192613.99Average hourly dereciation (Rs.) 156498.87 78.25
B Hourly Repair ChargesAverage over lifetime (Rs.) 187.26
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0.00
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 1 15808.00 15808.00
Sub Total 24310.79
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
27971.43Total Crew Charges/month 67778.22
Total Crew Charges/year 813338.59Hourly Crew Charges 406.67
D POL and Energy ChargesF.H.P. of Engine 200Hourly fuel consumption (in litres) C1 0.3 18.48Effective fuel consumption per hour C2 1.4 18.48Rate of Diesel 46.41Cost of Diesel 857.66Cost of oil and lubricant @ 25% 214.41Sundries and Misc. supplied @ 10 % of (B) above 18.73Hourly POL cost (Diesel) 1090.80
Engine capacity in kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electri ity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 1090.80
Hourly Use Rate of the Equipment 1762.98 [(a) + (b)+ (c) + (d) ] say, 1763
Hence hourly use rate 2204
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Loader
Cost of Equipment (Rs.) 7,843,137 Scheduled Life in years 10Scheduled Life in hours 15000Life time repair provision (% of Cost of Equipment) 200Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 705882.33Yearly dereciation wrt life in hours 941176.44Average hourly dereciation (Rs.) 823529.39 411.76
B Hourly Repair ChargesAverage over lifetime (Rs.) 1045.75
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24430.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.167 13728.00 2288.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14352.00
27438.03Total Crew Charges/month 66220.57
Total Crew Charges/year 794646.85Hourly Crew Charges 397.32
D POL and Energy ChargesF.H.P. of Engine 223Hourly fuel consumption (in litres) C1 0.58 36.99Effective fuel consumption per hour C2 1.3 36.99Rate of Diesel 46.41Cost of Diesel 1716.76Cost of oil and lubricant @ 30% 515.03Sundries and Misc. supplied @ 10 % of (B) above 104.58Hourly POL cost (Diesel) 2336.37
Engine capacity in kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electri ity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Hourly POL and Energy Charges (Rs.) 2336.37
Hourly Use Rate of the Equipment 4191.21 [(a) + (b)+ (c) + (d) ] say, 4191
Hence hourly use rate 5239
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Welding Machine
Cost of Equipment (Rs.) 19,588 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 80Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 1762.96Yearly dereciation wrt life in hours 2938.26Average hourly dereciation (Rs.) 2350.61 1.18
B Hourly Repair ChargesAverage over lifetime (Rs.) 1.31
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0.00
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Welder 1 15808.00 15808.00
Electrician 0.167 15808.00 2639.94
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 22399.94
Casual
Helper 1 12064.00 12064.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 12064.00
24555.15Total Crew Charges/month 59019.08
Total Crew Charges/year 708229.02Hourly Crew Charges 354.11
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 46.41Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine capacity in kw 12Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electri ity 461.52Cost of oil and lubricant @ 30% 138.46Sundries and Misc. supplied @ 10 % of (B) above 0.13Hourly POL cost (Electricity) 600.11
Hourly POL and Energy Charges (Rs.) 600.11
Hourly Use Rate of the Equipment 956.70 [(a) + (b)+ (c) + (d) ] say, 957
Hence hourly use rate 1196
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of batching plant
Cost of Equipment (Rs.) 3,262,674 Scheduled Life in years 18Scheduled Life in hours 30000Life time repair provision (% of Cost of Equipment) 75Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 163133.70Yearly dereciation wrt life in hours 195760.44Average hourly dereciation (Rs.) 179447.07 89.72
B Hourly Repair ChargesAverage over lifetime (Rs.) 81.57
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 6 18203.15 109218.88
Foreman 1.5 18203.15 27304.72
Mechanic 1.5 15808.00 23712.00
Electrician 1.5 15808.00 23712.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 183947.60
Casual
Helper 4 12064.00 48256.00
Watchman 3 13728.00 41184.00
Cable Man 0 13728.00 0.00
Beldar 18 12064.00 217152.00
Sub Total 306592.00
315783.68Total Crew Charges/month 806323.27
Total Crew Charges/year 9675879.25Hourly Crew Charges 4837.94
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 46.41Cost of Diesel 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 46Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 1769.16Cost of oil and lubricant @ 25% 442.29Sundries and Misc. supplied @ 10 % of (B) above 8.16Hourly POL cost (Electricity) 2219.61
Total POL cost 2219.61
Hourly Use Rate of the Equipment 7228.84 [(a) + (b)+ (c) + (d) ] say, 7229
Hence hourly use rate 9036
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of JCB 3DX
Cost of Equipment (Rs.) 1,745,001 Scheduled Life in years 10Scheduled Life in hours 15000Life time repair provision (% of Cost of Equipment) 200Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 157050.06Yearly dereciation wrt life in hours 209400.08Average hourly dereciation (Rs.) 183225.07 91.61
B Hourly Repair ChargesAverage over lifetime (Rs.) 232.67
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.5 15808.00 7904.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 28382.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.167 13728.00 2292.58
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14356.58
30602.15Total Crew Charges/month 73341.26
Total Crew Charges/year 880095.16Hourly Crew Charges 440.05
D POL and Energy ChargesF.H.P. of Engine 76Hourly fuel consumption (in litres) C1 0.58 12.61Effective fuel consumption per hour C2 1.3 12.61Rate of Diesel 46.41Cost of Diesel 585.09Cost of oil and lubricant @ 30% 175.53Sundries and Misc. supplied @ 10 % of (B) above 23.27Hourly POL cost (Diesel) 783.88
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 1 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 783.88
Hourly Use Rate of the Equipment 1548.20 [(a) + (b)+ (c) + (d) ] say, 1548
Hence hourly use rate 1935
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Concrete Pump
Cost of Equipment (Rs.) 1,836,000 Scheduled Life in years 5Scheduled Life in hours 8000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 330480.00Yearly dereciation wrt life in hours 413100.00Average hourly dereciation (Rs.) 371790.00 185.90
B Hourly Repair ChargesAverage over lifetime (Rs.) 229.50
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.167 15808.00 2639.94
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 23118.48
Casual
Helper 1 12064.00 12064.00
Watchman 0.167 13728.00 2292.58
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14356.58
26390.90Total Crew Charges/month 63865.95
Total Crew Charges/year 766391.38Hourly Crew Charges 383.20
D POL and Energy ChargesF.H.P. of Engine 70Hourly fuel consumption (in litres) C1 1 15.40Effective fuel consumption per hour C2 1 15.40Rate of Diesel 46.41Cost of Diesel 714.71Cost of oil and lubricant @ 27.50% 196.55Sundries and Misc. supplied @ 10 % of (B) above 22.95Hourly POL cost (Diesel) 934.21
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 1 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 934.21
Hourly Use Rate of the Equipment 1732.80 [(a) + (b)+ (c) + (d) ] say, 1733
Hence hourly use rate 2166
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of transit mixer
Cost of Equipment (Rs.) 938,829 Scheduled Life in years 10Scheduled Life in hours 10000Life time repair provision (% of Cost of Equipment) 120Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 84494.61Yearly dereciation wrt life in hours 168989.22Average hourly dereciation (Rs.) 126741.92 63.37
B Hourly Repair ChargesAverage over lifetime (Rs.) 112.66
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0.5 18203.15 9101.57
Foreman 0.125 18203.15 2275.39
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 15328.97
Casual
Helper 0.5 12064.00 6032.00
Watchman 0.1667 13728.00 2288.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 8320.00
16839.17Total Crew Charges/month 40488.14
Total Crew Charges/year 485857.67Hourly Crew Charges 242.93
D POL and Energy ChargesF.H.P. of Engine 61.66Hourly fuel consumption (in litres) C1 0.3 5.70Effective fuel consumption per hour C2 1.4 5.70Rate of Diesel 46.41Cost of Diesel 264.42Cost of oil and lubricant @ 30% 79.32Sundries and Misc. supplied @ 10 % of (B) above 11.27Hourly POL cost (Diesel) 355.01
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 1 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 355.01
Hourly Use Rate of the Equipment 773.97 [(a) + (b)+ (c) + (d) ] say, 774
Hence hourly use rate 968
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Grout Pump
Cost of Equipment (Rs.) 2,920,244 Scheduled Life in years 10Scheduled Life in hours 10000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 262821.92Yearly dereciation wrt life in hours 525643.84Average hourly dereciation (Rs.) 394232.88 197.12
B Hourly Repair ChargesAverage over lifetime (Rs.) 292.02
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.167 15808.00 2634.67
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 23113.21
Casual
Helper 1 12064.00 12064.00
Watchman 0.167 13728.00 2292.58
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14356.58
26386.68Total Crew Charges/month 63856.46
Total Crew Charges/year 766277.56Hourly Crew Charges 383.14
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 44Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 1692.24Cost of oil and lubricant @ 30% 507.67Sundries and Misc. supplied @ 10 % of (B) above 29.20Hourly POL cost (Electricity) 2229.11
Total POL cost 2229.11
Hourly Use Rate of the Equipment 3101.39 [(a) + (b)+ (c) + (d) ] say, 3101
Hence hourly use rate 3877
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Wet Shotcrete machine
Cost of Equipment (Rs.) ###Scheduled Life in years 5Scheduled Life in hours 6000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 5229750.87Yearly dereciation wrt life in hours 8716251.44Average hourly dereciation (Rs.) 6973001.15 3486.50
B Hourly Repair ChargesAverage over lifetime (Rs.) 4842.36
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.5 15808.00 7904.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 28382.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
31228.83Total Crew Charges/month 75107.37
Total Crew Charges/year 901288.45Hourly Crew Charges 450.64
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 135Hourly fuel consumption (in litres) C1 0.4Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 2076.84Cost of oil and lubricant @ 25% 519.21Sundries and Misc. supplied 484.24Hourly POL cost (Electricity) 3080.29
Cost of air for 100 cfm 217.25Cost of air for 1150 cfm 2498.35Lubricants- 25% of cost of air 624.59Sundries and Misc. supplied @ 10 % (B) above 484.24Hourly POL cost (Pneumatic) 3607.17
Total POL cost 6687.46
Hourly Use Rate of the Equipment 15466.96 [(a) + (b)+ (c) + (d) ] say, 15467
Hence hourly use rate 19334
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Ventilation Fan
Cost of Equipment (Rs.) 922,549 Scheduled Life in years 12Scheduled Life in hours 10000Life time repair provision (% of Cost of Equipment) 80Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 69191.18Yearly dereciation wrt life in hours 166058.82Average hourly dereciation (Rs.) 117625.00 58.81
B Hourly Repair ChargesAverage over lifetime (Rs.) 73.80
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0.25 18203.15 4550.79
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 8502.79
Casual
Helper 0.5 12064.00 6032.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 6032.00
10119.83Total Crew Charges/month 24654.62
Total Crew Charges/year 295855.39Hourly Crew Charges 147.93
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Rated HP 75Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 2884.50Cost of oil and lubricant @ 30% 865.35Sundries and Misc. supplied 3.08Hourly POL cost (Electricity) 3752.93
Total POL cost 3752.93
Hourly Use Rate of the Equipment 4033.47 [(a) + (b)+ (c) + (d) ] say, 4033
Hence hourly use rate 5042
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
#N/A
Rate analysis of Compressor XA 280
Cost of Equipment (Rs.) 893,937 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 80454.33Yearly dereciation wrt life in hours 134090.55Average hourly dereciation (Rs.) 107272.44 53.64
B Hourly Repair ChargesAverage over lifetime (Rs.) 74.49
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.146
Foreman 0.125 18203.15 2275.39325
Mechanic 0.25 15808.00 3952
Electrician 0 15808.00 0
Supervisor 0 15808.00 0
Driver 0 15808.00 0
Sub Total 24430.5393
Casual
Helper 1 12064.00 12064
Watchman 0.25 13728.00 3432
Cable Man 0 13728.00 0
Beldar 0 12064.00 0
Sub Total 15496
28067.2314Total Crew Charges/month 67993.77065
Total Crew Charges/year 815925.2478Hourly Crew Charges 407.962624
D POL and Energy ChargesF.H.P. of Engine 60Hourly fuel consumption (in litres) C1 1 13.20Effective fuel consumption per hour C2 1 13.20Rate of Diesel 46.41Cost of Diesel 612.61Cost of oil and lubricant @ 27.5% 168.47Sundries and Misc. supplied @ 10 % of (B) above 7.45Hourly POL cost (Diesel) 788.53
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Diesel) 0.00
Total POL cost 788.53
Hourly Use Rate of the Equipment 1324.62 [(a) + (b)+ (c) + (d) ] say, 1325
Hence hourly use rate 1656
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of XAH 210
Cost of Equipment (Rs.) 968,828 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 87194.49Yearly dereciation wrt life in hours 145324.15Average hourly dereciation (Rs.) 116259.32 58.13
B Hourly Repair ChargesAverage over lifetime (Rs.) 80.74
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24430.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
28067.23Total Crew Charges/month 67993.77
Total Crew Charges/year 815925.25Hourly Crew Charges 407.96
D POL and Energy ChargesF.H.P. of Engine 60Hourly fuel consumption (in litres) C1 1 13.20Effective fuel consumption per hour C2 1 13.20Rate of Diesel 46.41Cost of Diesel 612.61Cost of oil and lubricant @ 30% 183.78Sundries and Misc. supplied @ 10 % of (B) above 8.07Hourly POL cost (Diesel) 804.47
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 804.47
Hourly Use Rate of the Equipment 1351.30 [(a) + (b)+ (c) + (d) ] say, 1351
Hence hourly use rate 1689
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Hydra
Cost of Equipment (Rs.) 863,516 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 150Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 77716.44Yearly dereciation wrt life in hours 129527.40Average hourly dereciation (Rs.) 103621.92 51.81
B Hourly Repair ChargesAverage over lifetime (Rs.) 107.94
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0.25 15808.00 3952.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 30657.93
Casual
Helper 2 12064.00 24128.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 27560.00
39684.35Total Crew Charges/month 97902.28
Total Crew Charges/year 1174827.34Hourly Crew Charges 587.41
D POL and Energy ChargesF.H.P. of Engine 49Hourly fuel consumption (in litres) C1 0.8 8.62Effective fuel consumption per hour C2 1 8.62Rate of Diesel 46.41Cost of Diesel 400.24Cost of oil and lubricant @ 30% 120.07Sundries and Misc. supplied @ 10 % of (B) above 10.79Hourly POL cost (Diesel) 531.11
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 531.11
Hourly Use Rate of the Equipment 1278.27 [(a) + (b)+ (c) + (d) ] say, 1278
Hence hourly use rate 1598
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Water Tanker
Cost of Equipment (Rs.) 550,000 Scheduled Life in years 10Scheduled Life in hours 16000Life time repair provision (% of Cost of Equipment) 120Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 49500.00Yearly dereciation wrt life in hours 61875.00Average hourly dereciation (Rs.) 55687.50 27.84
B Hourly Repair ChargesAverage over lifetime (Rs.) 41.25
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0
Foreman 0 18203.15 0
Mechanic 0.25 15808.00 3952
Electrician 0 15808.00 0
Supervisor 0 15808.00 0
Driver 2 15808.00 31616
Sub Total 35568
Casual
Helper 1 12064.00 12064
Watchman 0 13728.00 0
Cable Man 0 13728.00 0
Beldar 0 12064.00 0
Sub Total 12064
35089.6Total Crew Charges/month 82721.6
Total Crew Charges/year 992659.2Hourly Crew Charges 496.3296
D POL and Energy ChargesF.H.P. of Engine 180Hourly fuel consumption (in litres) C1 0.3 16.63Effective fuel consumption per hour C2 1.4 16.63Rate of Diesel 46.41Cost of Diesel 771.89Cost of oil and lubricant @ 30% 231.57Sundries and Misc. supplied @ 10 % of (B) above 4.13Hourly POL cost (Diesel) 1007.58
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 1007.58
Hourly Use Rate of the Equipment 1573.01 [(a) + (b)+ (c) + (d) ] say, 1573
Hence hourly use rate 1966
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Compressor XA175
Cost of Equipment (Rs.) 759,321 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 68338.89Yearly dereciation wrt life in hours 113898.15Average hourly dereciation (Rs.) 91118.52 45.56
B Hourly Repair ChargesAverage over lifetime (Rs.) 63.28
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24430.54
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
28067.23Total Crew Charges/month 67993.77
Total Crew Charges/year 815925.25Hourly Crew Charges 407.96
D POL and Energy ChargesF.H.P. of Engine 50Hourly fuel consumption (in litres) C1 1 11.00Effective fuel consumption per hour C2 1 11.00Rate of Diesel 46.41Cost of Diesel 510.51Cost of oil and lubricant @ 30% 153.15Sundries and Misc. supplied @ 10 % of (B) above 6.33Hourly POL cost (Diesel) 669.99
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 669.99
Hourly Use Rate of the Equipment 1186.79 [(a) + (b)+ (c) + (d) ] say, 1187
Hence hourly use rate 1484
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Compressor XAH210
Cost of Equipment (Rs.) 968,828 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 87194.49Yearly dereciation wrt life in hours 145324.15Average hourly dereciation (Rs.) 116259.32 58.13
B Hourly Repair ChargesAverage over lifetime (Rs.) 80.74
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.146
Foreman 0.125 18203.15 2275.39325
Mechanic 0.25 15808.00 3952
Electrician 0 15808.00 0
Supervisor 0 15808.00 0
Driver 0 15808.00 0
Sub Total 24430.5393
Casual
Helper 1 12064.00 12064
Watchman 0.25 13728.00 3432
Cable Man 0 13728.00 0
Beldar 0 12064.00 0
Sub Total 15496
28067.2314Total Crew Charges/month 67993.77065
Total Crew Charges/year 815925.2478Hourly Crew Charges 407.962624
D POL and Energy ChargesF.H.P. of Engine 60Hourly fuel consumption (in litres) C1 1 13.20Effective fuel consumption per hour C2 1 13.20Rate of Diesel 46.41Cost of Diesel 612.61Cost of oil and lubricant @ 30% 183.78Sundries and Misc. supplied @ 10 % of (B) above 8.07Hourly POL cost (Diesel) 804.47
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 804.47
Hourly Use Rate of the Equipment 1351.30 [(a) + (b)+ (c) + (d) ] say, 1351
Hence hourly use rate 1689
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Jack Hammer
Cost of Equipment (Rs.) 60,500 Scheduled Life in years 10Scheduled Life in hours 8000Life time repair provision (% of Cost of Equipment) 80Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 5445.00Yearly dereciation wrt life in hours 13612.50Average hourly dereciation (Rs.) 9528.75 4.76
B Hourly Repair ChargesAverage over lifetime (Rs.) 6.05
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.125 15808.00 1976.00
Electrician 0 15808.00 0.00
Supervisor 0.33 15808.00 5269.33
Driver 0 15808.00 0.00
Sub Total 25448.48
Casual
Helper 0.5 12064.00 6032.00
Watchman 0.125 13728.00 1716.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 7748.00
24620.18Total Crew Charges/month 57816.66
Total Crew Charges/year 693799.95Hourly Crew Charges 346.90
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 27.5% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Cost of air for 100 cfm 217.25Cost of air for 160 cfm 347.60Lubricants- 30% of cost of air 104.28Sundries and Misc. supplied @ 10 % (B) above 0.61Hourly POL cost (Pneumatic) 452.48
Total POL cost 452.48
Hourly Use Rate of the Equipment 810.19 [(a) + (b)+ (c) + (d) ] say, 810
Hence hourly use rate 1013
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Tata 909
Cost of Equipment (Rs.) 1,624,487 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 175Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 146203.80Yearly dereciation wrt life in hours 243673.00Average hourly dereciation (Rs.) 194938.40 97.47
B Hourly Repair ChargesAverage over lifetime (Rs.) 236.90
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.1667 15808.00 2634.67
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 23113.21
Casual
Helper 1 12064.00 12064.00
Watchman 0.1667 13728.00 2288.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14352.00
26384.16Total Crew Charges/month 63849.37
Total Crew Charges/year 766192.45Hourly Crew Charges 383.10
D POL and Energy ChargesF.H.P. of Engine 180Hourly fuel consumption (in litres) C1 0.3 16.63Effective fuel consumption per hour C2 1.4 16.63Rate of Diesel 46.41Cost of Diesel 771.89Cost of oil and lubricant @ 25% 192.97Sundries and Misc. supplied @ 10 % of (B) above 23.69Hourly POL cost (Diesel) 988.55
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 988.55
Hourly Use Rate of the Equipment 1706.02 [(a) + (b)+ (c) + (d) ] say, 1706
Hence hourly use rate 2133
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Tipper
Cost of Equipment (Rs.) 1,624,487 Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 175Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 146203.80Yearly dereciation wrt life in hours 243673.00Average hourly dereciation (Rs.) 194938.40 97.47
B Hourly Repair ChargesAverage over lifetime (Rs.) 236.90
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.125 18203.15 2275.39
Mechanic 0.1667 15808.00 2634.67
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 23113.21
Casual
Helper 1 12064.00 12064.00
Watchman 0.1667 13728.00 2288.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 14352.00
26384.16Total Crew Charges/month 63849.37
Total Crew Charges/year 766192.45Hourly Crew Charges 383.10
D POL and Energy ChargesF.H.P. of Engine 180Hourly fuel consumption (in litres) C1 0.3 16.63Effective fuel consumption per hour C2 1.4 16.63Rate of Diesel 46.41Cost of Diesel 771.89Cost of oil and lubricant @ 25% 192.97Sundries and Misc. supplied @ 10 % of (B) above 23.69Hourly POL cost (Diesel) 988.55
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 988.55
Hourly Use Rate of the Equipment 1706.02 [(a) + (b)+ (c) + (d) ] say, 1706
Hence hourly use rate 2133
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Spider Excavator
Cost of Equipment (Rs.) ###Scheduled Life in years 10Scheduled Life in hours 12000Life time repair provision (% of Cost of Equipment) 100Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 1377000.00Yearly dereciation wrt life in hours 2295000.00Average hourly dereciation (Rs.) 1836000.00 918.00
B Hourly Repair ChargesAverage over lifetime (Rs.) 1275.00
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 26705.93
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
29887.55Total Crew Charges/month 72089.48
Total Crew Charges/year 865073.74Hourly Crew Charges 432.54
D POL and Energy ChargesF.H.P. of Engine 78Hourly fuel consumption (in litres) C1 0.5 8.58Effective fuel consumption per hour C2 1 8.58Rate of Diesel 46.41Cost of Diesel 398.20Cost of oil and lubricant @ 25% 99.55Sundries and Misc. supplied @ 10 % of (B) above 127.50Hourly POL cost (Diesel) 625.25
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 625.25
Hourly Use Rate of the Equipment 3250.78 [(a) + (b)+ (c) + (d) ] say, 3251
Hence hourly use rate 4064
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Explosive Van
Cost of Equipment (Rs.) 481,781 Scheduled Life in years 15Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 28906.86Yearly dereciation wrt life in hours 43360.29Average hourly dereciation (Rs.) 36133.58 18.07
B Hourly Repair ChargesAverage over lifetime (Rs.) 16.86
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0
Foreman 0 18203.15 0
Mechanic 0.125 15808.00 1976
Electrician 0 15808.00 0
Supervisor 0 15808.00 0
Driver 1 15808.00 15808
Sub Total 17784
Casual
Helper 1 12064.00 12064
Watchman 0.167 13728.00 2288
Cable Man 0 13728.00 0
Beldar 0 12064.00 0
Sub Total 14352
22120.8Total Crew Charges/month 54256.8
Total Crew Charges/year 651081.6Hourly Crew Charges 325.5408
D POL and Energy ChargesF.H.P. of Engine 63Hourly fuel consumption (in litres) C1 0.3 5.82Effective fuel consumption per hour C2 1.4 5.82Rate of Diesel 46.41Cost of Diesel 270.16Cost of oil and lubricant @ 25% 67.54Sundries and Misc. supplied @ 10 % of (B) above 1.69Hourly POL cost (Diesel) 339.39
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 339.39
Hourly Use Rate of the Equipment 699.86 [(a) + (b)+ (c) + (d) ] say, 700
Hence hourly use rate 875
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Trailer
Cost of Equipment (Rs.) 1,307,856 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 175Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 98089.20Yearly dereciation wrt life in hours 117707.04Average hourly dereciation (Rs.) 107898.12 53.95
B Hourly Repair ChargesAverage over lifetime (Rs.) 114.44
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 0 18203.15 0.00
Foreman 0.25 18203.15 4550.79
Mechanic 0.25 15808.00 3952.00
Electrician 0 15808.00 0.00
Supervisor 0 15808.00 0.00
Driver 1 15808.00 15808.00
Sub Total 24310.79
Casual
Helper 1 12064.00 12064.00
Watchman 0.25 13728.00 3432.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 15496.00
27971.43Total Crew Charges/month 67778.22
Total Crew Charges/year 813338.59Hourly Crew Charges 406.67
D POL and Energy ChargesF.H.P. of Engine 160Hourly fuel consumption (in litres) C1 0.3 14.78Effective fuel consumption per hour C2 1.4 14.78Rate of Diesel 46.41Cost of Diesel 686.13Cost of oil and lubricant @ 30% 205.84Sundries and Misc. supplied @ 10 % of (B) above 11.44Hourly POL cost (Diesel) 903.41
Engine Capacity in Kw 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Electricity 0.00Cost of Electricity 0.00Cost of oil and lubricant @ 27.50% 0.00Sundries and Misc. supplied 0.00Hourly POL cost (Electricity) 0.00
Total POL cost 903.41
Hourly Use Rate of the Equipment 1478.46 [(a) + (b)+ (c) + (d) ] say, 1478
Hence hourly use rate 1848
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 3 HP
Cost of Equipment (Rs.) 16,569 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 1242.67Yearly dereciation wrt life in hours 1491.20Average hourly dereciation (Rs.) 1366.93 0.68
B Hourly Repair ChargesAverage over lifetime (Rs.) 0.58
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 0 12064.00 0.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 0.00
19304.92Total Crew Charges/month 43436.06
Total Crew Charges/year 521232.75Hourly Crew Charges 260.62
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 2.238Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 86.07Cost of oil and lubricant @ 25% 21.52Sundries and Misc. supplied @ 10% 0.06Hourly POL cost (Electricity) 107.65
Total POL cost 107.65
Hourly Use Rate of the Equipment 369.53 [(a) + (b)+ (c) + (d) ] say, 370
Hence hourly use rate 462
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 5 HP
Cost of Equipment (Rs.) 77,704 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 5827.77Yearly dereciation wrt life in hours 6993.32Average hourly dereciation (Rs.) 6410.55 3.21
B Hourly Repair ChargesAverage over lifetime (Rs.) 2.72
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 0 12064.00 0.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 0.00
19304.92Total Crew Charges/month 43436.06
Total Crew Charges/year 521232.75Hourly Crew Charges 260.62
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 3.73Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 143.46Cost of oil and lubricant @ 25% 35.86Sundries and Misc. supplied @ 10% 0.27Hourly POL cost (Electricity) 179.59
Total POL cost 179.59
Hourly Use Rate of the Equipment 446.13 [(a) + (b)+ (c) + (d) ] say, 446
Hence hourly use rate 558
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 10 HP
Cost of Equipment (Rs.) 84,637 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 6347.78Yearly dereciation wrt life in hours 7617.33Average hourly dereciation (Rs.) 6982.55 3.49
B Hourly Repair ChargesAverage over lifetime (Rs.) 2.96
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 0 12064.00 0.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 0.00
19304.92Total Crew Charges/month 43436.06
Total Crew Charges/year 521232.75Hourly Crew Charges 260.62
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 7.46Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 286.91Cost of oil and lubricant @ 27.50% 86.07Sundries and Misc. supplied 0.30Hourly POL cost (Electricity) 373.29
Total POL cost 373.29
Hourly Use Rate of the Equipment 640.36 [(a) + (b)+ (c) + (d) ] say, 640
Hence hourly use rate 800
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 16 HP
Cost of Equipment (Rs.) 165,173 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 12387.95Yearly dereciation wrt life in hours 14865.54Average hourly dereciation (Rs.) 13626.75 6.81
B Hourly Repair ChargesAverage over lifetime (Rs.) 5.78
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 0 12064.00 0.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 0.00
19304.92Total Crew Charges/month 43436.06
Total Crew Charges/year 521232.75Hourly Crew Charges 260.62
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 11.936Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 459.06Cost of oil and lubricant @ 25% 114.76Sundries and Misc. supplied 0.58Hourly POL cost (Electricity) 574.40
Total POL cost 574.40
Hourly Use Rate of the Equipment 847.61 [(a) + (b)+ (c) + (d) ] say, 848
Hence hourly use rate 1060
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 20 HP
Cost of Equipment (Rs.) 220,850 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 16563.75Yearly dereciation wrt life in hours 19876.50Average hourly dereciation (Rs.) 18220.13 9.11
B Hourly Repair ChargesAverage over lifetime (Rs.) 7.73
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 1 12064.00 12064.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 12064.00
25940.12Total Crew Charges/month 62135.26
Total Crew Charges/year 745623.15Hourly Crew Charges 372.81
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 14.92Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 573.82Cost of oil and lubricant @ 25% 143.46Sundries and Misc. supplied 0.77Hourly POL cost (Electricity) 718.05
Total POL cost 718.05
Hourly Use Rate of the Equipment 1107.70 [(a) + (b)+ (c) + (d) ] say, 1108
Hence hourly use rate 1385
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 25 HP
Cost of Equipment (Rs.) 108,227 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 8117.03Yearly dereciation wrt life in hours 9740.44Average hourly dereciation (Rs.) 8928.74 4.46
B Hourly Repair ChargesAverage over lifetime (Rs.) 3.79
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 1 12064.00 12064.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 12064.00
25940.12Total Crew Charges/month 62135.26
Total Crew Charges/year 745623.15Hourly Crew Charges 373
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 18.65Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 717.28Cost of oil and lubricant @ 25% 179.32Sundries and Misc. supplied 0.38Hourly POL cost (Electricity) 896.98
Total POL cost 896.98
Hourly Use Rate of the Equipment 1278.23 [(a) + (b)+ (c) + (d) ] say, 1278
Hence hourly use rate 1598
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
Rate analysis of Dewatering 35 HP
Cost of Equipment (Rs.) 234,375 Scheduled Life in years 12Scheduled Life in hours 20000Life time repair provision (% of Cost of Equipment) 70Estimated annual operational hours = 2000
A Ownership costYearly dereciation wrt life in years 17578.13Yearly dereciation wrt life in hours 21093.75Average hourly dereciation (Rs.) 19335.94 9.67
B Hourly Repair ChargesAverage over lifetime (Rs.) 8.20
C Labour Charges
Regular Nos. Amount (Rs.)
Operator 1 18203.15 18203.15
Foreman 0 18203.15 0.00
Mechanic 0.25 15808.00 3952.00
Electrician 0.125 15808.00 1976.00
Supervisor 0 15808.00 0.00
Driver 0 15808.00 0.00
Sub Total 24131.15
Casual
Helper 1 12064.00 12064.00
Watchman 0 13728.00 0.00
Cable Man 0 13728.00 0.00
Beldar 0 12064.00 0.00
Sub Total 12064.00
25940.12Total Crew Charges/month 62135.26
Total Crew Charges/year 745623.15Hourly Crew Charges 372.81
D POL and Energy ChargesF.H.P. of Engine 0Hourly fuel consumption (in litres) C1 0 0.00Effective fuel consumption per hour C2 0 0.00Rate of Diesel 0.00Cost of Diesel 0.00Cost of oil and lubricant @ 30% 0.00Sundries and Misc. supplied @ 10 % of (B) above 0.00Hourly POL cost (Diesel) 0.00
Engine Capacity in Kw 26.11Hourly fuel consumption (in litres) C1 1Effective fuel consumption per hour C2 1 0.00Rate of Electricity 38.46Cost of Electricity 1004.19Cost of oil and lubricant @ 25% 251.05Sundries and Misc. supplied 0.82Hourly POL cost (Electricity) 1256.06
Total POL cost 1256.06
Hourly Use Rate of the Equipment 1646.74 [(a) + (b)+ (c) + (d) ] say, 1647
Hence hourly use rate 2058
Wages(Rs.)/month
Add for hidden cost 80 % on Skilled Labour & 55 % on semi skilled/unskilled Labour
S.No Invoice Rate
1 2.00 3.00
0.02
1 Dozer 8,000,000.00 ###
2 ROC 18,665,000.00 ###
3 2 Boom Drill Jumbo 28,000,000.00 ###
4 600 KVA Diesel Generato 3,089,049.60 ###
5 Excavator 4,612,746.00 ###
6 Hyva 1,605,116.58 ###
7 Loader 7,843,137.00 ###
8 Welding Machine 19,588.40 19,588.40
9 Batching Plant 3,262,674.00 ###
10 JCB 3DX 1,745,000.69 ###
11 Concrete Pump 1,836,000.00 ###
12 Transit Mixer 938,829.00 938,829.00
13 Grout Pump 2,920,243.53 ###
14 Wet Shotcrete Machine 29,054,171.48 ###
15 Dewatering 10 HP 84,637.00 84,637.00
16 Dewatering 20 HP 220,850.00 220,850.00
17 Dewatering 35 HP 234,375.00 234,375.00
Equipment Description
Landed cost
18 Ventilation Fan 922,549.00 ###
19 Atlas Copco XAH 210 968,827.68 968,827.68
20 Hydra 863,516.00 863,516.00
21 Water Tanker 550,000.00 550,000.00
22 Compressor XA175 759,321.00 759,321.00
23 Compressor XAH210 968,827.68 968,827.68
24 Jack Hammer 60,500.00 60,500.00
25 Tata 909 1,592,634.00 ###
26 Tipper 1,592,634.00 ###
27 Spider Excavator 15,000,000.00 ###
28 320KVA Diesel Generato 1,350,000.00 ###
29 Dewatering 3 HP 16,244.00 16,568.88
30 Dewatering 5 HP 76,180.00 77,703.60
31 Dewatering 16 HP 161,934.00 165,172.68
32 Dewatering 25 HP 106,105.00 108,227.10
33 Explosive Van 481,781.00
34 Trailer ###
35 Rate of Diesel 46.41 36 Air Charges/100 cfm 217.25 37 XA 280 8,93,937.0038
Explosive 52.94 ED 13.51 NED 74.02 Rockbolt 143.01 Cement 345.00 Sand 1,129.00 Aggregate 2,470.00 Accelerator 34.98 Micro Silica 26.15 AEA 30.50 WRA 30.50 Superplasticizer 30.50 Reinforcement 35,350.00 Structural Steel 45,105.00 Polyfibre 261.98 Diesel 42.19 Boulder
cfm of XAH 210 450
cfm of XAH 175 360
Air Charges Calculation - XAH 210
Hourly use rate of 450 cfm diesel air compressor1777
Rate for 100 cfm including losses 434
Considering 50 % usage 217.247567
Air Charges 217.2475674
Air Charges Calculation - XA 280
Hourly use rate of approx. 500 cfm diesel air compressor 1656
Rate for 100 cfm including losses 364
Considering 50 % usage 182.135713
Air Charges 182.1357132
S.No
1 Dozer 5,393
2 ROC 6,900 6228
3 2 Boom Drill Jumbo 22,545
4 600 KVA Diesel Generato 11,101
5 320 KVA Diesel Generat 6,150
6 Excavator 2,800
7 Hyva 2,204
8 Loader 5,239
9 Welding Machine 1,196
10 Batching Plant 9,036
11 JCB 3DX 1,935
12 Concrete Pump 2,166
13 Transit Mixer 968
14 Grout Pump 3,877
15 Wet Shotcrete Machine 19,334
16 Dewatering 3 HP 439
17 Dewatering 5 HP 520
18 Dewatering 10 HP 839 839
19 Dewatering 16 HP 940
20 Dewatering 20 HP 1,226 1226
21 Dewatering 25 HP 1,402 1402
Equipment Description
Hourly use rate
work order rate
22 Dewatering 35 HP 1,788 1788
23 Ventilation Fan 5,042
24 Atlas Copco XAH 210 1,777
25 Hydra 1,647
26 Water Tanker 1,966
27 Compressor XA175 1,574
28 Compressor XAH210 1,777
29 Jack Hammer 1,441 1441
30 Tata 909 1,997
31 Tipper 1,997
32 Spider Excavator 3,985
33 Explosive Van 806 806
34 Trailer 2,197 2197
Cadre Rate Cadre
145 508.20 12,064
165 578.30 13,728
Skilled 190
665.92 15,808
219 766.82 18,203 Supervisor
### 2,139 48,750 ### 6,025 ###### 8,324 ###
Unit rate paid
Monthly rate
Unskilled Helper, Semi
SkilledWatchman, Cable Man
Driver,Mechanic,
Electrician, SupervisorHighly
SkilledOperator , Foreman,
Sr. manager
Cadre Rate/manday
Unskilled worker 508.20
Helper 508.20
Beldar 508.20
Watchman
578.30
Cableman 578.30
Driver 665.92 Mechanic 665.92
Electrician 665.92
Supervisor 766.82 Driller 766.82 Operator 766.82 Foreman 766.82 Engineer 2,138.80 Manager 6,024.92 Sr. Manager 8,324.44 Semi Skilled 578.30 Skilled 665.92 Highly Skilled 766.82 Blaster 766.82
Teesta Urja Limited Teesta Stage-III HE Project
Detailed Project Report 6 :28 Revised Cost Estimate
HOURLY USE RATE CALCULATIONS
3.NAME OF EQUIPMENT Compressed Air (100% Diesel)
At each work site of the project where the requirement is concentrated, electric air comprssor will be used like in HRT, PH etc. However, standby diesel ir compressors areto be provided at these locations. Further, at the locations where the drilling is spread over like indam excavation, quarry site etc only diesel comprssor will be provided for flexibilty and redundancy. For calculating air charges, a compsite rate for 100 cfm air from electric and diesel equally has been worked out.
Hourly use rate of 500 cfm diesel air compressor ###Rate for 100 cfm including losses 262.27
Considering 50 % usage 131.13
Teesta Urja Limited Teesta Stage-III HE Project
Detailed Project Report 6 :29 Revised Cost Estimate
HOURLY USE RATE CALCULATIONS
air comprssor will be used like in HRT, PH etc. However, standby diesel ir compressors areto be provided at these locations. Further, at the locations where the drilling is spread over like indam excavation, quarry site etc only diesel comprssor will be provided for flexibilty and redundancy. For calculating air charges, a compsite rate for 100 cfm air from electric and diesel equally has been