PROJECT SITE PLANDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS
ENTRANCE #1
ENTRANCE #2
ENTRANCE #3
ENTRANCE #4
ENTRANCE #5
ENTRANCE #6
PLAZA LANDSCAPE PLANDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS
CONCRETE PAVERSWITH EXPOSED GRANITE AGGREGATEOF DIFFERENT TEXTURES AND COLORS
BIORETENTION AREAS
ARMSTRONG MAPLES
LONDON PINES
CATENARY LIGHTSABOVE PLAZA
SEATING CUBEWITH LIGHT
PLAZA SITE PLANWAYFINDING, UTILITY STUBOUTSAND FUTURE ART ELEMENTS
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS
INTERCHANGEABLE METAL PANELSFOR FUTURE ART INSTALLATION
OVERHEADSTATION ID SIGN
SANITARY SEWER LATERAL &CLEANOUT FOR FUTURE CONNECTION
WATER HOSE BIBSIN LOCK BOXES
OVERHEADSTATION ID SIGN
DIRECTIONAL WAYFINDING, TRANSIT INFODESTINATION MAP & REAL-TIME DISPLAY
TRANSIT INFO KIOSK
REMOVE EXISTINGPLANTER, INSTALLNEW BIKE RACKS
REMOVE EXISTINGPLANTER, INSTALLNEW BIKE RACKS
REMOVE EXISTING PLANTER, INSTALL
REMOVE EXISTING PLANTER, INSTALL
REMOVE EXISTINGGUARDRAILS
REMOVE PORTIONS OFINTERIOR BRICK FACADE
REMOVE EXISTING STRUCTURE
EXISTING ESCALATORSTO REMAIN
SECTIONPLAN
EXISTING ENTRANCE 3 DEMOLITION PLAN AND SECTION
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
NEW GLASS TREADSTAIRS
NEW GLASS ANDSTEEL SIDE WALLS
NEW GLASS FLOORING
ENTRANCE 3 HEADHOUSEFLOOR PLAN
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
GLASS OVERHANG
SOUTH ELEVATION WEST ELEVATION
EAST ELEVATIONNORTH ELEVATION
NEW GLASS ANDSTEEL SIDE WALLS
NEW GLASS ANDSTEEL SIDE WALLS
NEW ROLLUP GATE
NEW ROLLUP GATE
NEW ROLLUP GATE
NEW GLASS ROOF
NEW GLASS ROOFNEW GLASS ROOF
NEW GLASS ROOF
NEW LED DISPLAYSCREENS
ENTRANCE 3 HEADHOUSEELEVATIONS
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
ENTRANCE 3 HEADHOUSELONGITUDINAL SECTION
NEW GLASS ANDSTEEL SIDE WALLS
NEW GLASS ROOF
NEW ROLL UP DOOR
NEW STAIRS
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
NEW GLASS ANDSTEEL SIDEWALLSNEW
ROLL UPGATE
NEWROLL UPGATE
NEW METALPANEL SYSTEM
NEW CEMENTICIOUSCOATING OVER BRICK
NEW METAL PANELSYSTEM -INTERCHANGABLEFOR FUTURE ARTINSTALLATION
UTILTIYPANELS ACCESS
NEW ENTRY STAIRS ATENTRANCE 3 HEADHOUSE
DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
ELECTRICAL &COMMUNICATIONS OUTLETS IN BASEFOR FUTURE ART, SOUND & LIGHTING INSTALLATIONS
SITE FURNISHINGSDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS
BIORETENTION AREA TO CAPTURE AND TREAT STORMWATER RUN OFF