PERFORMA-BPRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
PACKAGE SUMMERYPackage Number:- HP-11-10 District:- Solan State:- Himachal Pradesh
Sr.
No
Name of
Block
Name of Road Type of
Proposal
Proposed
Length
Cost of
Pavment
No. of
CD
works
Cost of
CD
works
Total Estimated Cost Average cost per Km
Cons.
Cost
Maintenance
cost
Cons.
Cost
Maintenanc
cost
From To N/U In Km Rs: In lac Nos. Rs: in
Lac
Rs: in
Lac
Rs: in Lac Rs: in
Lac
Rs: in Lac
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Nalagarh From
Baddi
Sai road
at km
18/500
Sai N 2.25 35.36 Nil Nil 35.36 0.74 16.03 0.33
N NEW CONNECTIVITY U UPGRADATION
Cost Rs. 36.10 Lac only
* Prepared by Signature Technical Scrutiny : Signature
Name (Er. R. C. Bassi) Done By : Name
Designation
* Checked by Signature Coordinator : Signature
Name (Er. A.K. Gupta) STA : Name
Designation
* Scrutinized by Signature
Name (Er. D. K. Nayyar)
Designation
8/3/2019 Performa Dpr Temp
2/16
PERFORMA CPRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
Check list for P.I.U. and S.T.A
(For Individual Road Work)
To be filled by PIU.1. Location:- State : Himachal Pradesh Distt. Solan Block:- Nalagarh
2. Package :- HP-11-10
3. Name of Road:- M/T of Link road to village Sauri km 0/0 to 2/250
4. Lingth (km) Total =2.250 In builtup area= nil In open area = 2.250
5. Estimated Cost Rs. 37.90 lakhs Average cost per km Rs. 16.85
6.Type of Proposal:- New Connectivity
If the proposed road is new connectivity- Is the road a part of core network
Yes
- Name of the unconnected habitations to be cross checked
with CN-6
Sauri
- Does the proposed road lead up to habitationsfor which it is supposed to provide connectivity(in other words are you sure that the road is notMade partially)
Yes
- Does the proposed road connect the un-connectedhabitations
a) Another habitations having all weather road - Nob) Directly to an all weather road - No
If (b) indicate the nature of road which
the proposed road leads
(a) (b)
RR MDR
SH NH
If the proposal for up gradation No- Is road a part of the core net work Yes- Is it associated through route or not No- PCI has been done No- Age of the road given Yes
- Is it certified that there are no other unconnectedNoeligible habitations in the District
- Population sub served by the proposed road
7. a) Whether the proposed road has the desired carriageway width, roadway
width and road land width (RLW)b) Indicate the actual widths of the following for the
proposed road(a) Carriageway
yesIn builtuparea (m)
In open area(m)
-- 3.05 mtr
-- 5/7 mtr
8/3/2019 Performa Dpr Temp
3/16
(b) Roadway
( c) Road land width
-- 5/7 mtr
INDEX MAP (Not to scale)
Baddi Sai
Ramshehar road
LAt KM 18/500
0/0 1/00 2/00 2/250
8. Base Year traffic Volume:- As the road is existing, hence Traffic census has been conducted for this road.
TotalBus/Truck LCV
/MiniBus
Car/Vans/Jeeps
Threewheellers
TwoWheelers
CycleRickshaw
Cycles
Bullockcart
Motorized
Non-Motorized
203 494 243 - 236 - - - 1176
9. Growth rate adopted (%) = 6 % Projected traffic:CVPD
10. Sub grade CBR for different sections
Chainage 0/520 1/490 2/160
Design CBR 6.8% 5.7% 5.4%
11. Cost DeatilA. Clearing and grubbing Cost inRs. NilB. Pavement Components
For Black Top For Unsealed
Item Thickness
Cost(Rs.) Item Thickness
Cost(Rs.)
Earth work 150 52291.00 Earth work
Sub Grade Preparation(GSB)
----- ------- Sub GradePreparation
WBM-1 ------ ------ Wearing surface
LinkroadtovillageSauri
8/3/2019 Performa Dpr Temp
4/16
WBM-2 75 630288.00
WBM-3 75 634975.00
C. Bituminious Layers
Prime coat 263915.00
BM/BBM ----Tack Coat 89564.00
MSS ----
PMC with seal coat 1296887.00
D. CD WorksNo. of Existing CD works 10Do they require any improvement? No
If yes, cost of Improvement NilNo. of proposed CDNil
Cost of proposed CD workNilE. Protection works Length: NilCost: Nil
F. Side Drains ( If Provided) Length: 2.217Cost:
G. Road logo, other road furniture Cost:
H. Five year routine maintenance:
Year Cost in Lac % cost
1st Year 35.36 0.357
2nd Year 35.36 0.386
3rd Year 35.36 0.417
4th Year 35.36 0.450
5th Year 35.36 0.486
12. Wheather the road has geometerics as per Rural RoadManual (RRM)
yes
13. Whether C.D work / Protection Work are provided
as per Rural Road Manual (RRM)
yes
14. Cost estimates are as per Standard Data Analysis and SSR yes
Certified that that information provided is true
Prepared by:
(Er. R. C. Bassi)
Assitant EngineerBaddi, Sub-DivisionHP PWD. Baddi
Checked by:
(Er. A.K. Gupta)
Executive EngineerNalagarh, DivisionHP PWD. Nalagarh
Scrutinized by:
(Er. D. K. Nayyar)
Superintending Engineer,
3rd circle HP PWD Solan
8/3/2019 Performa Dpr Temp
5/16
To be filled by S.T.A
Name of the S.T.A. NIT Hamirpur.
20. Specified remarks, if any by STA YES/NO
15. If the proposal is for new connectivity
- Have you satisfied your self that the proposed road is apart of the core network
- Is the unconnected habitations(s) part of list of un-connected habitation as perCN-6
- Does the proposal ensure full connectivity
YES/NO
YES/NO
YES/NO
16. Are you satisfied with the following
- Engineering surveys- Soil/ Material investigation- Traffic surveys / estimation- Hydraulic studies
YES/NO
YES/NO
YES/NO
YES/NO
17. Is the design of the following elements as per rural roads manual?
Alignment and geometric YES/NO
Pavement Design YES/NOCD work and protection measures YES/NO
Side drains YES/NO
Drainage layer YES/NO
18. Does the Estimation Conform to Standard Rate Analysis and SSR YES/NO
19. Does the proposal have provision for?
PMGSY Logo, Sign Board YES/NO
KM/HM Stone YES/NO
Guard Stones (where necessary) YES/NO
Traffic sign board (as necessary) YES/NO
5 year routine maintenance, estimated on lump-sum basis YES/NO
Does the proposal ensure full connectivity to target habitation
a) If no, the name of the unconnected habitation up to which it is connected
b) if such unconnected habitation eligible under PMGSY.
8/3/2019 Performa Dpr Temp
6/16
Certified that the Design and estimation for the proposed road work are based on the data and SSR Provided
by PIU Engineers. The proposal may be cleared.
Technical Scrutiny Coordinator
Done by S.T.A
Signature Signature.
Name Name
8/3/2019 Performa Dpr Temp
7/16
8/3/2019 Performa Dpr Temp
8/16
ANNEXURE-7
FORMAT F(See Para 7
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)SUMMARY SHEET.
Name of Block Code Total No. of
Habitaion
Un connected Habitations
>1000 500-999 250-499
8/3/2019 Performa Dpr Temp
9/16
FORMAT : F -2A
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVTY (PAVEMANT LAYERS)
District : Solan Block: Nalagarh
FORMAT : F -2B
Sr.No.
1
Block
NameofHabitationconnected
Benifited
Newconstruction/u
pgradation
(N)/Assosiatedthroughroute
(A)/Upgradation(U)
FacilitiesaccessedusedA/B/C/D
RoadlengthinKm
Existingsurfacetype
Roadfurniture
Detail
ClearingGrubbing
EarthWork
SubgradepreparationGSB
-1
SubbaseGSBG
-I
WBMG-II
WBMG-III
BOEEdging
KC.Drain/CutstonePCCdra
in
Primer/Tackco
at Surface dressing
OGPC
Sealcoat
From
To N A U
1 2 3 4 5 5A 5B 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1
Nalagarh
BaddiSairoada
tkm1
8/500
Sauri
N
- - -
2.2
5
Thicknessinmm -- 150
mm
75
mm
75
mm
- 20
mm
CostRsinlac
-- 0.52 -- 6.30 6.35 3.53
8/3/2019 Performa Dpr Temp
10/16
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVTY (PAVEMANT LAYERS)
District : Solan Package No.
Sr.No.
NameofBlock
CodeofBlock
Nameofroad
Habitation
connected/benefited
Population
Roadlengthinkm Existing C.D. Structure by type
of
Details of proposed C.D.
Structure by type.
TotalcostofpavementfromForma
F-
5
HumePipe
Culvert. B
ox/Arch/RC
Culverts M
inorBridge
HumepipeCulverts
Box/Arch/RC
Culverts M
inorBridge
TotalcostofproposedC.D.
strct.
No. Dia No. Length No. Dia No. Dia. No. Length No length
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2
1
NALAGARH
LinkroadtovillageSauri
1No
236souls
2.250km 8 900
mm
1 4.00Cost Rs.
2 1 3.00Cost Rs.
3Cost Rs.
4Cost Rs.
5Cost Rs.
6Cost Rs.
7Cost Rs.
8Cost Rs.
9Cost Rs.
10Cost Rs.
TotalCost Rs.
8/3/2019 Performa Dpr Temp
11/16
Addl. Assistant Engineer Assistant Engineer Executive Engineer
FORMAT : F -
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)Detail Of Existing Roads (For Upgradation)
District : Solan Package No. HP-11-10
Block: Nalagarh Length = 2.25 km
Sr.
No.
Name of
Road
Road
Length
Road
connecting to
Facilities
accessed
A/B/C/D
Traffic per day Existing road details
Trucks /
Buses
Tractors Land
width
(mt)
Road
width
(mt)
Embankment WBM Layer Bitumen layer
Ht Width Width Thickness Type Width Thickness
(mm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Link
road to
village
Sauri
2.25 km BSR road
MDR
29 Nos 34 Nos 5/7 mt 5/7 mt Nil Nil 3.05 300 PC 3.05 20 mm
*Road connecting to NH/SH/MDR/ODR/VR** Use A= market, B= Education Facilities, C = Health Centres, D = Combination of previous
*** Where actual figure is not available, Estimated figure may be included**** Type BM/MMS/DMC
8/3/2019 Performa Dpr Temp
12/16
FORMAT : F -4A
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)Association of routes
District : Solan Package No. HP-11-10
Package No Primary Network AssociatedThrough
route(ATR)
PCI Age Whether proposed for
Upgradation(U) or Renewal
(R)
Otherconformance
subsidiary tothe ATR
Whetherincludes in
package Y/N
Habitationserved wit
population
No. Habitation
Served (withpopulation)
HP-11-10 1 236
8/3/2019 Performa Dpr Temp
13/16
FORMAT : F -
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)COST ESTIMATE FOR ROAD CONSTRUCTION
Package No. HP-11-10
District : SolanRoad from.
Block: Nalagarh Length = 2.25 km
Sl.No.
Description of Items No. L(m)
B(m)
D/H(m)
Quantity Unit Rate Amoun(Rs.)
8/3/2019 Performa Dpr Temp
14/16
FORMAT : F -
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY) COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
Package No. HP-11-10
District : SolanRoad from.
Block: Nalagarh Length = 2.25 km
Sl.No.
Description of Items No. L(m)
B(m)
D/H(m)
Quantity Unit Rate Amoun(Rs.)
8/3/2019 Performa Dpr Temp
15/16
FORMAT : F -
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY) RATE ANALYSIS
State: H.P. District: Solan Package No. HP-11-10
8/3/2019 Performa Dpr Temp
16/16