Pengerang Integrated Petroleum Complex
Presentation by Johor Petroleum Development Corporation (JPDC)
Johor Petroleum Development Corporation Berhad | 20161
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Introduction
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Oil & Gas is one of the 12 National Key Economic Areas (NKEAs) in Malaysia’s Economic Transformation Programme (ETP)
3
Comms,Content &
Infra
Wholesale& Retail
Oil, Gas & Energy
Palm Oil
HealthServices
FinancialServ &
Capital Mkt
Greater KL
Agriculture
TourismEducation
Electrical& Electronics
Biz Services GROW
DIVERSIFY
SUSTAIN
Build alternative energy capabilities
Grow in downstream
Continue domestic Oil & Gas production
12 NKEAs
Oil, Gas & Energy contributes ~17% of Malaysia’s GDP
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Downstream Oil & Gas development in Johor is part of EPP4 and EPP13 under ETP Oil, Gas and Energy (OGE) NKEA
GROWDIVERSIFY
SUSTAIN
1. Enhanced oil recovery2. Develop small fields3. Increase exploration activities Make Malaysia #1 Asian hub for oil field
services
9. Reduce energy bill through energy efficiency
10. Build up solar power capacity11. Ensure best practice nuclear
deployment12. Drive industrial growth in
Sarawak with big hydro
Build alternative energy capabilities
4. Create a regional oil storage and trading hub
5. Unlock latent gas demand through LNG import
Grow in downstreamContinue domestic Oil & Gas production
6. Increase presence of major international oilfield services players
7. Create regional fabrication champions8. Encourage JV with world-class
companies13. Increasing petrochemical output
EPPs
BO
1. Increased oil & gas production abroad
2. Increase volumes in primary logistics3. Increase marketing of petroleum
products
4. Growth driven power demand5. Growth driven transmission and
distribution capacity6. Improve structure of Malaysia
energy supply industry
4
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Tanjung Bin• Oil storage• Developer :
Seaport Worldwide
• Current storage capacity : 1.15 mil cbm
Tanjung Langsat• Oil storage, marine
services, steel, Oilfield Services and Equipment, chemical
• Developer : Johor Corporation
• Current storage capacity : 820,000 cbm
Pengerang• Oil storage• Developer :
Dialog-Vopak-SSI• Current storage
capacity : 1.3 mil cbm
Singapore
Senai Airport
Target Storage Capacity
3mil cbm
Target Storage Capacity
2mil cbm
Target Storage Capacity
5mil cbm
2020 GNI impact:
USD0.5 Billion
2020 total new jobs:
800
▪ Demand to build storage capacity for the region▪ Complementing Singapore, the only major independent terminal and storage
facility in South East Asia▪ Potential for oil trading business, development of downstream industry (e.g.:
refinery, oil based petrochemical complex, LNG regasification terminal)
Southern Johor Planned Storage Capacity
10mil cbm
Source : OGE NKEA Lab
EPP4: Malaysia can become a regional oil storage hub with proximity to Singapore, deep water and land availability
5
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
20,000 acres (~80 km2) PETRONAS Pengerang Integrated Complex (PIC) DIALOG-Vopak Deepwater Petroleum Terminal Refineries Petrochemical Plants
2020 GNIRM18.3
Billion
New Jobs8,600
Private Investment
RM89 Billion
Public Investment
RM1.7 Billion
Pengerang, South East of Johor▪ Pengerang Integrated Petroleum
Complex (PIPC)
EPP13 in Johor: Petrochemical Complex will be built in Pengerang
EPP13: Increase in Petrochemical Output
▪ Increase volume of Malaysia’s petrochemical output
▪ Cater to Asia-Pacific region’s demand for premium specialty chemicals
6
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Overview of Johor Petroleum Development Corporation (JPDC)
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
JPDC is a federal Government agency entrusted to plan, coordinate, and promote the development of downstream O&G in Johor
2Singapore
2
31
Johor Bahru
Tanjung Langsat
Pengerang
TanjungBin
MANDATES
To promote and market Johor’ downstream oil & gas industry to potential investors
To coordinate and drive the execution of development projects in Johor
Coordination
Promotion & Marketing
To identify and manage funds required for financing the downstream oil and gas development in Johor
Sufficient Fund
To plan and develop strategies for the downstream oil and gas development in Johor
Integrated Planning
To ensure the availability of industry ready workforce to drive and sustain PIPC’s development growth
Industry Ready
Workforce
To enhance inclusiveness towards an equitable society with more access to economic opportunities in PIPC
Local Participation
1
2
4
3
5
6
South China Sea
2
JPDC’s Board of DirectorsCo-Chairman
Johor Chief MinisterY.A.B Dato’ Mohamed
Khaled Nordin
Co-ChairmanCEO of PEMANDUYBhg Dato’ Sri Idris
Jala
FEDERAL
Secretary General of Treasury, Ministry of
FinanceY.Bhg. Tan Sri Dr
Mohd Irwan SerigarAbdullah
Deputy General (Sectoral),
Economic Planning Unit
Y.Bhg. Datuk Allauddin bin Hj. Anuar
President / CEO, MPRC
Y.Bhg. Datuk Shahrol Azral Ibrahim Halmi
STATE
Johor State EXCO Member
Y.B. Datuk Ir. Haji Hasni Haji
Mohammad
Johor State Secretary
Y.B. Dato’ Haji Ismail bin Karim
Director, UPEN Johor
Tuan Haji Salehuddin bin Haji Hassan
INDUSTRY
Petrochemicals Advisor
En. Md Arif Mahmood
Oil Storage & Trading AdvisorY.Bhg. Tan Sri Dr. Ngau Boon Keat
SPECIALISED BODY
Chief Executive, JPDC
En. Mohd Yazid Ja’afar
9•To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 8
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Overview of Pengerang Integrated Petroleum Complex (PIPC)
Pengerang is chosen as the location to build a world class petrochemical hub due to strategic reasons
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Access to existing major international shipping lanes
• Middle East – Singapore – China
Safe and sheltered harbour• No breakwater required with
sufficient seagoing passage for VLCCs and ULCCs
Environmentally friendly• Very few Environmentally
Sensitive Areas (ESAs) which are easily preserved
Leveraging low transportation costs• Water depth of 24m enables Very
Large Crude Carriers (VLCCs) and Ultra Large Crude Carriers (ULCCs)
Proximity to an existing major trading hub
• Adjacent to Singapore
Availability of sufficient development land
• A single candidate plot in excess of 20,000 acres
10
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
PIPC in numbers
1 million bbl/day Refining Capacity
3.5 MTARGT Capacity
11.8 MTAPetrochemical Production
5 million m3
Oil Storage Capacity
1,220 MWCo-generation Plant
520 MLDRaw water supply
6
Pengerang Integrated Petroleum Complex (PIPC)
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 5
Refineries and Naphtha CrackersDedicated Jetties
Medium & Light Industries
An Integrated Petroleum Complex that will house StorageFacilities, Oil Refineries, Petrochemical Plants, LNGRegasification Facility and Other Supporting Facilities
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Future Development : High Speed Rail (Singapore-Johor-Kuala Lumpur) & Rapid Transit System (Singapore-JB)
… and also well connected with existing logistics infrastructure
Jurong Island
Senai Desaru Expressway
SINGAPORE
MALAYSIA
PIPC
To Senai Airport 100 km
To Johor Port 72 km
To Tg Langsat Port 70 km
To Tg Pelepas Port 132 km To Changi Airport 26 km
Johor Bahru
14
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 8
A comprehensive PIPC Masterplan to ensure development success
Pengerang Integrated Complex (PIC)
Plastics & Fine Chemicals Park
Downstream finished product zone
Medium & Light Industries Hub
CommercialServices Hub
SolidLogistics Hub
Future integrated investor 3
Future integrated investor 2
Future integrated investor 1
Pengerang Deepwater Terminal (PDT)
CUF WMC
ERC
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
In tandem with the commitment from investors, the Government is heavily investing in infrastructure & public amenities for PIPC
Drainage R2a (1.5 km)Stage: TenderingCommencement: April 2016Completion: April 2019
Main Drainage in PIPC
Drainage R3 (4.9 km)Stage: TenderingCommencement: April 2016Completion: April 2019
Drainage R1 (7.3 km)Stage: DesignCommencement: April 2017Completion: April 2019
Drainage R2 (6.4 km)Stage: TenderingCommencement: April 2016Completion: April 2019
New Ring Road (15.0 km)Stage: ConstructionCommencement: 18 Mac 2015Completion: January 2017
Upgrading of FT92 road (27.0 km)
Stage: ConstructionCommencement: 3 August 2015Completion: 30 July 2017
New P1 Road (7.0 km)Stage: TenderingCommencement: May 2016Completion: May 2019
New P4 Road (7.0 km)Stage: DesignCommencement: December 2016Completion: December 2018
New P3 Road (4.2 km)Stage: DesignCommencement: December 2016Completion: December 2018
New P2 Road (5.6 km)Stage: TenderingCommencement: May 2016Completion: May 2019
NRR
FT92
P1
P2
P3
P4
R1
R3R2a
R2
New Sg. Rengit Fire Station
New Punggai Fire Station
Upgrading of Medical Clinic
New Police Station
New Schools
New Sebana Fire Station
• Overall Development Progress as at 29th
August 2016 : 17.81% (vs plan 18.87%) with a total of 25 packages • Completed: 7 packages• Construction: 13 packages• Planning Stage, Design & Procurement: 5
packages
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Overview of DIALOG Pengerang Deepwater Terminal (PDT)
DIALOG Pengerang Deepwater Terminal completed its first phase development in December 2014 and the second phase is currently progressing positively
500 acres reclaimed land Deepwater (24 meters) jetty facilities
capable of handling VLCCs and ULCCs
Sheltered harbour
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Petroleum TerminalTarget Storage Capacity
5mil cbm
Phase 2 : 157 acres + Capacity of 2.1 mil cbm+ 12 berths = RM6.3 billion
o Independent for storage, blending and distribution of crude oil and petroleum products
o Started operation April 2014o Completed December 2014
o Dedicated to PETRONAS RAPID for petroleum and petrochemical storage
o Target commissioning Q1 2019
LNG Terminalo LNG regasification facilities; a regasification
terminal (RGT-2) unit and two units (2 x 200,000 cbm) of LNG storage tanks
o The RGT-2 will have a capacity of 3.5 mtpa and will provide primary gas supply to the RAPID, Pengerang Cogeneration Plant (PCP) and the Peninsular Gas Utilization (PGU)
o Target commissioning Q4 2017
Phase 1 : 150 acres + Capacity of 1.3 mil cbm+ 6 berths = RM2 billion
DIALOG Pengerang Deepwater Terminal in illustration and progress in pictures
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Source: DIALOG
LNG
DIALOG Pengerang Deepwater Terminal in illustration and progress in pictures
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Source: DIALOG
SPV 1 (Completed December 2014)
DIALOG Pengerang Deepwater Terminal in illustration and progress in pictures
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Source: DIALOG
PDT Phase 2 (Construction in progress)
DIALOG Pengerang Deepwater Terminal in illustration and progress in pictures
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Source: DIALOG
PDT Phase 2 (Construction in progress)
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Overview of PETRONAS PengerangIntegrated Complex (PIC)
Final Investment Decision (FID) for the development of Pengerang Integrated Complex (PIC) was approved on 3 April 2014
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Refinery and Petrochemical Integrated Development (RAPID)
• Refinery (300k bbl/d refining capacity)• Naphtha cracker• Petrochemical plants
LNG regasification plant (RGT2)
Power generation plant(PCP)
Air separation unit(ASU)
Dedicated storage terminal(SPV2)
Raw water supply project(PAMER)
Supported by associated facilities
Utilities and facilities(UF)
PIC
PETRONAS Refinery and Petrochemical Integrated Development (RAPID) Configuration
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Construction of Refineries
PETRONAS Pengerang Integrated Complex (PIC) Project Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Construction of Steam Cracker Complex
PETRONAS Pengerang Integrated Complex (PIC) Project Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Construction of Regasification Terminal 2 (RGT-2)
PETRONAS Pengerang Integrated Complex (PIC) Project Progress
Source: PETRONAS
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Construction of Pengerang Co-generation Plant (PCP)
PETRONAS Pengerang Integrated Complex (PIC) Project Progress
Source: PETRONAS
Investment Opportunities by PETRONAS Chemicals Group
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
.. and with other milestones achieved according to plan, the dream will soon become a reality..
13
DIALOGPhase 2 & RGT2
construction commenced
Q1 2015
DIALOGPhase 1 operation
commenced12 April 2014
PETRONAS GAS
RGT2 operation commences
Q4 2017
PETRONASRefinery Ready
For Start-UpQ1 2019
DIALOGPhase 2 operation
commencesQ1 2019
TODAY
2014 2015 2017 2018 2019
PETRONASFID – 3 April
2016
PETRONAS Cogen Plant 1st
Commercial OperationJune 2017
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Industrial Park Development in PIPC
PIPC Industrial Park Development by :
i. Pengerang Industrial Park (PIP) by JCorp
Johor Petroleum Development Corporation Berhad | 2016
Pengerang Industrial Park (PIP) by JCorp
The Overview
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
• The only large scale industrial park in
Pengerang for SME’s.
• Accessibility to RAPID, Highways,
Roads and Haulage Road.
• PIP is within PIPC project area and the
project consist of :
o 1,231 acres of SME’s Industrial
Park (phase1 : 786 acres ; phase 2
: 445 acres).
o 243 acres of Commercial &
Residential development.
Pengerang Industrial Park (PIP) by JCorp
Proposed Project Timeline
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
PIPC Industrial Park Development by :
ii. Sg. Rengit Industrial Estate by DIALOG
Johor Petroleum Development Corporation Berhad | 2016
Sg. Rengit Industrial Estate is within PIPC
project area. The industrial park consist of :
• 333 acres of potential industries that can be
accommodated into the industrial park
• Type of potential industries are :
• petroleum & chemical storage facilities
& warehouses
• petrochemical manufacturing
industries
• bottling plants and drumming plants
• open yard storages
• other oil & gas related manufacturing
industries/activities.
Sg. Rengit Industrial Estate by DIALOG
The Overview
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
Development Component
Unit / Plot Size(Acre)
Commercial Zone
1 1.12
DetachedIndustry
67 194.06
Twin Industry(929 m2)
62 35.19
Cluster Industry(2090 m2)
36 8.80
TerraceIndustry(279 m2)
95 6.75
Future Development
N/A 14.87
Sg. Rengit Industrial Estate by DIALOG
The Development Component
Sg. Rengit Industrial Estate by DIALOG
Proposed Project Timeline
"To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub“ - JPDC
EIAApproved
Development Order
Submitted to Local Authority
May2016
July2016
June2016
Development Order Expected
To Be Approved
Environmental Impact Assessment (EIA)
Submitted to Department of
Environment (DOE)
Oct2016
Oct2019
Ready Built Factory For
Lease
Land clearance and site preparation (1 ½ year)
Vacant Possession
April2018
Copyright © Johor Petroleum Development Corporation Berhad | 2016
Conclusion
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Bringing huge benefits to the country and ample opportunities for businesses..
7
Helping transform Malaysia into a
high income nation
Diversifying the country’s economy
Increasing Malaysia’s export capacity
Opening up of Oil & Gas tradingopportunities
Providing the nation’s growing energy needs
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 14
PIPC has secured commitment from private investors and strong support from the Government of Malaysia..
National Project of strategic importance
PIPC is already operating! Independent storage started April 2014
PIC project is progressing at 39% and is on track to achieve PIC start-up Q1 2019
Public and private players are committed to realise the dream of an oil and gas hub in Pengerang
Thank you
Johor Petroleum Development Corporation Berhad | 2016
Main OfficeSuite 17.03A, Level 17,Menara MSC Cyberport,No. 5, Jalan Bukit Meldrum,80300 Johor Bahru,Johor, Malaysia.Tel : +607 – 267 2900Fax : +607 – 267 2999
facebook.com/johorpetroleumdevelopmentcorporationberhad
www.jpdc.gov.my
43